NO20080923L - Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner - Google Patents
Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjonerInfo
- Publication number
- NO20080923L NO20080923L NO20080923A NO20080923A NO20080923L NO 20080923 L NO20080923 L NO 20080923L NO 20080923 A NO20080923 A NO 20080923A NO 20080923 A NO20080923 A NO 20080923A NO 20080923 L NO20080923 L NO 20080923L
- Authority
- NO
- Norway
- Prior art keywords
- principles
- hydrocarbons
- extraction
- subsurface formations
- well
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
Abstract
En fremgangsmåte og apparatur knyttet til forskjellige faser av en brønnkomplettering. I en utførelsesform er en fremgangsmåte beskrevet, som inkluderer identifikasjon av første prinsippers fysikalske lover som styrer ytelse av en brønnkomplettering og parametre knyttet til de første prinsippers fysikalske lover eller brønnen. En koplet fysikksimulator velges, basert på de første prinsippers fysikalske lovene. Deretter genereres en koplet fysikk begrensning, basert på den koplete fysikksimulatoren som innlemmer de første prinsippers fysikalske lovene og parametrene.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US70281205P | 2005-07-27 | 2005-07-27 | |
PCT/US2006/026395 WO2007018862A2 (en) | 2005-07-27 | 2006-07-06 | Well modeling associated with extraction of hydrocarbons from subsurface formations |
Publications (1)
Publication Number | Publication Date |
---|---|
NO20080923L true NO20080923L (no) | 2008-04-24 |
Family
ID=35478263
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20080923A NO20080923L (no) | 2005-07-27 | 2008-02-22 | Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner |
Country Status (8)
Country | Link |
---|---|
US (1) | US20090216508A1 (no) |
EP (1) | EP1922669A2 (no) |
CN (1) | CN101233527B (no) |
CA (1) | CA2616816A1 (no) |
EA (1) | EA015435B1 (no) |
MX (1) | MX2007016586A (no) |
NO (1) | NO20080923L (no) |
WO (1) | WO2007018862A2 (no) |
Families Citing this family (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101238465B (zh) * | 2005-07-27 | 2010-10-27 | 埃克森美孚上游研究公司 | 与从地下岩层抽取碳氢化合物相关的井建模 |
EP1917619B1 (en) | 2005-07-27 | 2016-08-17 | Exxonmobil Upstream Research Company | Well modeling associated with extraction of hydrocarbons from subsurface formations |
US8352227B2 (en) * | 2006-10-30 | 2013-01-08 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
US8775141B2 (en) * | 2007-07-02 | 2014-07-08 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
AU2008290585B2 (en) * | 2007-08-17 | 2011-10-06 | Shell Internationale Research Maatschappij B.V. | Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches |
CA2690991C (en) * | 2007-08-24 | 2013-12-24 | Exxonmobil Upstream Research Company | Method for multi-scale geomechanical model analysis by computer simulation |
DK200701385A (da) * | 2007-09-26 | 2009-03-27 | Maersk Olie & Gas | Fremgangsmåde til stimulelring af en brönd |
US8260595B2 (en) * | 2008-09-02 | 2012-09-04 | Schlumberger Technology Corporation | Intelligent completion design for a reservoir |
US8280709B2 (en) * | 2008-10-03 | 2012-10-02 | Schlumberger Technology Corporation | Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations |
US9228415B2 (en) | 2008-10-06 | 2016-01-05 | Schlumberger Technology Corporation | Multidimensional data repository for modeling oilfield operations |
US8301426B2 (en) * | 2008-11-17 | 2012-10-30 | Landmark Graphics Corporation | Systems and methods for dynamically developing wellbore plans with a reservoir simulator |
CN102282562B (zh) | 2009-01-13 | 2015-09-23 | 埃克森美孚上游研究公司 | 优化井作业计划 |
US9043189B2 (en) | 2009-07-29 | 2015-05-26 | ExxonMobil Upstream Research—Law Department | Space-time surrogate models of subterranean regions |
EP2646944A4 (en) * | 2010-12-01 | 2017-02-22 | Exxonmobil Upstream Research Company | Simultaneous source inversion for marine streamer data with cross-correlation objective function |
US8862443B2 (en) * | 2011-02-22 | 2014-10-14 | Landmark Graphics Corporation | Generating data for geomechanical modeling |
US10077639B2 (en) | 2012-06-15 | 2018-09-18 | Landmark Graphics Corporation | Methods and systems for non-physical attribute management in reservoir simulation |
US20140180658A1 (en) * | 2012-09-04 | 2014-06-26 | Schlumberger Technology Corporation | Model-driven surveillance and diagnostics |
RU2493362C1 (ru) * | 2012-09-19 | 2013-09-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ разработки нефтяной залежи |
US10140393B2 (en) * | 2012-11-01 | 2018-11-27 | Exxonmobil Upstream Research Company | Systems and methods for modeling subterranean formations that include gaseous hydrocarbons and adsorbed hydrocarbons |
US9810045B2 (en) * | 2013-08-27 | 2017-11-07 | Halliburton Energy Services, Inc. | Connection conditions for modeling fluid transport in a well system environment |
US9611731B2 (en) * | 2013-10-04 | 2017-04-04 | Halliburton Energy Services, Inc. | Determination of formation dip/azimuth with multicomponent induction data |
US10685086B2 (en) | 2015-09-15 | 2020-06-16 | Conocophillips Company | Avoiding water breakthrough in unconsolidated sands |
US10394974B2 (en) * | 2015-10-01 | 2019-08-27 | Arizona Board Of Regents On Behalf Of Arizona State University | Geometry based method for simulating fluid flow through heterogeneous porous media |
US10891407B2 (en) | 2017-03-28 | 2021-01-12 | Saudi Arabian Oil Company | System and method for automated-inflow control device design |
US11041976B2 (en) | 2017-05-30 | 2021-06-22 | Exxonmobil Upstream Research Company | Method and system for creating and using a subsurface model in hydrocarbon operations |
RU2658422C1 (ru) * | 2017-06-06 | 2018-06-21 | Общество с ограниченной ответственностью "Конкорд" | Способ назначения нагнетательных и добывающих скважин и изменения их интервалов перфораций |
US20200182038A1 (en) * | 2018-12-10 | 2020-06-11 | National Oilwell Varco, L.P. | High-speed analytics and virtualization engine |
GB201820356D0 (en) * | 2018-12-13 | 2019-01-30 | Expro North Sea Ltd | Methodology for analysis of valve dynamic closure performance |
RU2720859C1 (ru) * | 2019-05-29 | 2020-05-13 | Общество с ограниченной ответственностью "Газпром добыча Кузнецк" | Способ выбора конструкции горизонтальной метаноугольной скважины |
US11927080B2 (en) * | 2021-10-25 | 2024-03-12 | Baker Hughes Oilfield Operations Llc | Sand screen selection |
Family Cites Families (64)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5058012A (en) * | 1989-02-07 | 1991-10-15 | Marathon Oil Company | Method of extrapolating reservoir performance |
US5416697A (en) * | 1992-07-31 | 1995-05-16 | Chevron Research And Technology Company | Method for determining rock mechanical properties using electrical log data |
US6109368A (en) * | 1996-03-25 | 2000-08-29 | Dresser Industries, Inc. | Method and system for predicting performance of a drilling system for a given formation |
GB2352036B (en) * | 1998-05-04 | 2002-11-27 | Schlumberger Evaluation & Prod | Near wellbore modelling method and apparatus |
US6088656A (en) * | 1998-11-10 | 2000-07-11 | Schlumberger Technology Corporation | Method for interpreting carbonate reservoirs |
JP2000173897A (ja) * | 1998-12-08 | 2000-06-23 | Mitsubishi Electric Corp | 露光精度制御方法、装置および記録媒体 |
US6460006B1 (en) * | 1998-12-23 | 2002-10-01 | Caterpillar Inc | System for predicting compaction performance |
US6182756B1 (en) * | 1999-02-10 | 2001-02-06 | Intevep, S.A. | Method and apparatus for optimizing production from a gas lift well |
WO2000048022A1 (en) * | 1999-02-12 | 2000-08-17 | Schlumberger Limited | Uncertainty constrained subsurface modeling |
US6810370B1 (en) * | 1999-03-31 | 2004-10-26 | Exxonmobil Upstream Research Company | Method for simulation characteristic of a physical system |
US6230101B1 (en) * | 1999-06-03 | 2001-05-08 | Schlumberger Technology Corporation | Simulation method and apparatus |
US6196318B1 (en) * | 1999-06-07 | 2001-03-06 | Mobil Oil Corporation | Method for optimizing acid injection rate in carbonate acidizing process |
GB2351350B (en) * | 1999-06-23 | 2001-09-12 | Sofitech Nv | Cavity stability prediction method for wellbores |
US6266619B1 (en) * | 1999-07-20 | 2001-07-24 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US6549879B1 (en) * | 1999-09-21 | 2003-04-15 | Mobil Oil Corporation | Determining optimal well locations from a 3D reservoir model |
NO310797B1 (no) * | 1999-12-13 | 2001-08-27 | Univ California | Fremgangsmåte for å overvåkning av havbunnens innsynkning og gravitasjonsendring |
US6826486B1 (en) * | 2000-02-11 | 2004-11-30 | Schlumberger Technology Corporation | Methods and apparatus for predicting pore and fracture pressures of a subsurface formation |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US6840317B2 (en) * | 2000-03-02 | 2005-01-11 | Shell Oil Company | Wireless downwhole measurement and control for optimizing gas lift well and field performance |
US20050273304A1 (en) * | 2000-03-13 | 2005-12-08 | Smith International, Inc. | Methods for evaluating and improving drilling operations |
US7020597B2 (en) * | 2000-10-11 | 2006-03-28 | Smith International, Inc. | Methods for evaluating and improving drilling operations |
US6785641B1 (en) * | 2000-10-11 | 2004-08-31 | Smith International, Inc. | Simulating the dynamic response of a drilling tool assembly and its application to drilling tool assembly design optimization and drilling performance optimization |
US7464013B2 (en) * | 2000-03-13 | 2008-12-09 | Smith International, Inc. | Dynamically balanced cutting tool system |
US20020013687A1 (en) * | 2000-03-27 | 2002-01-31 | Ortoleva Peter J. | Methods and systems for simulation-enhanced fracture detections in sedimentary basins |
US7188058B2 (en) * | 2000-04-04 | 2007-03-06 | Conocophillips Company | Method of load and failure prediction of downhole liners and wellbores |
US6745159B1 (en) * | 2000-04-28 | 2004-06-01 | Halliburton Energy Services, Inc. | Process of designing screenless completions for oil or gas wells |
US20020055868A1 (en) * | 2000-05-24 | 2002-05-09 | Dusevic Angela G. | System and method for providing a task-centric online environment |
US7177764B2 (en) * | 2000-07-14 | 2007-02-13 | Schlumberger Technology Corp. | Simulation method and apparatus for determining subsidence in a reservoir |
GB0017227D0 (en) * | 2000-07-14 | 2000-08-30 | Schlumberger Ind Ltd | Fully coupled geomechanics in a commerical reservoir simulator |
US7089167B2 (en) * | 2000-09-12 | 2006-08-08 | Schlumberger Technology Corp. | Evaluation of reservoir and hydraulic fracture properties in multilayer commingled reservoirs using commingled reservoir production data and production logging information |
US20020049575A1 (en) * | 2000-09-28 | 2002-04-25 | Younes Jalali | Well planning and design |
WO2002029195A2 (en) * | 2000-10-04 | 2002-04-11 | Sofitech N.V. | Production optimization for multilayer commingled reservoirs |
US6634426B2 (en) * | 2000-10-31 | 2003-10-21 | James N. McCoy | Determination of plunger location and well performance parameters in a borehole plunger lift system |
AU2002239619A1 (en) * | 2000-12-08 | 2002-06-18 | Peter J. Ortoleva | Methods for modeling multi-dimensional domains using information theory to resolve gaps in data and in theories |
US6836731B1 (en) * | 2001-02-05 | 2004-12-28 | Schlumberger Technology Corporation | Method and system of determining well performance |
US6668922B2 (en) * | 2001-02-16 | 2003-12-30 | Schlumberger Technology Corporation | Method of optimizing the design, stimulation and evaluation of matrix treatment in a reservoir |
US7200539B2 (en) * | 2001-02-21 | 2007-04-03 | Baker Hughes Incorporated | Method of predicting the on-set of formation solid production in high-rate perforated and open hole gas wells |
GB2372567B (en) * | 2001-02-22 | 2003-04-09 | Schlumberger Holdings | Estimating subsurface subsidence and compaction |
US6901391B2 (en) * | 2001-03-21 | 2005-05-31 | Halliburton Energy Services, Inc. | Field/reservoir optimization utilizing neural networks |
US6904366B2 (en) * | 2001-04-03 | 2005-06-07 | The Regents Of The University Of California | Waterflood control system for maximizing total oil recovery |
US6980929B2 (en) * | 2001-04-18 | 2005-12-27 | Baker Hughes Incorporated | Well data collection system and method |
FR2824652B1 (fr) * | 2001-05-09 | 2003-10-31 | Inst Francais Du Petrole | Methode pour determiner par simulation numerique les conditions de restauration par les fluides d'un gisement, d'un puits complexe endommage par les operations de forage |
US20040205576A1 (en) * | 2002-02-25 | 2004-10-14 | Chikirivao Bill S. | System and method for managing Knowledge information |
FR2837947B1 (fr) * | 2002-04-02 | 2004-05-28 | Inst Francais Du Petrole | Methode pour quantifier les incertitudes liees a des parametres continus et discrets descriptifs d'un milieu par construction de plans d'experiences et analyse statistique |
US6892812B2 (en) * | 2002-05-21 | 2005-05-17 | Noble Drilling Services Inc. | Automated method and system for determining the state of well operations and performing process evaluation |
US7657415B2 (en) * | 2002-05-31 | 2010-02-02 | Schlumberger Technology Corporation | Subterranean formation treatment methods using a darcy scale and pore scale model |
AU2003234669A1 (en) * | 2002-05-31 | 2003-12-19 | Schlumberger Technology Corporation | Method and apparatus for effective well and reservoir evaluation without the need for well pressure history |
WO2004046503A1 (en) * | 2002-11-15 | 2004-06-03 | Schlumberger Surenco Sa | Optimizing well system models |
US6654692B1 (en) * | 2002-11-21 | 2003-11-25 | Conocophillips Company | Method of predicting rock properties from seismic data |
US7181380B2 (en) * | 2002-12-20 | 2007-02-20 | Geomechanics International, Inc. | System and process for optimal selection of hydrocarbon well completion type and design |
US6810332B2 (en) * | 2003-01-31 | 2004-10-26 | Chevron U.S.A. Inc. | Method for computing complexity, confidence and technical maturity indices for reservoir evaluations |
US6823297B2 (en) * | 2003-03-06 | 2004-11-23 | Chevron U.S.A. Inc. | Multi-scale finite-volume method for use in subsurface flow simulation |
US6804609B1 (en) * | 2003-04-14 | 2004-10-12 | Conocophillips Company | Property prediction using residual stepwise regression |
FR2855631A1 (fr) * | 2003-06-02 | 2004-12-03 | Inst Francais Du Petrole | Methode pour optimiser la production d'un gisement petrolier en presence d'incertitudes |
US7343970B2 (en) * | 2003-12-04 | 2008-03-18 | Schlumberger Technology Corporation | Real time optimization of well production without creating undue risk of formation instability |
US7191062B2 (en) * | 2003-12-22 | 2007-03-13 | Caterpillar Inc | Method and system of forecasting compaction performance |
US20050199391A1 (en) * | 2004-02-03 | 2005-09-15 | Cudmore Julian R. | System and method for optimizing production in an artificially lifted well |
GB2413403B (en) * | 2004-04-19 | 2008-01-09 | Halliburton Energy Serv Inc | Field synthesis system and method for optimizing drilling operations |
US20060015310A1 (en) * | 2004-07-19 | 2006-01-19 | Schlumberger Technology Corporation | Method for simulation modeling of well fracturing |
FR2874706B1 (fr) * | 2004-08-30 | 2006-12-01 | Inst Francais Du Petrole | Methode de modelisation de la production d'un gisement petrolier |
US7809537B2 (en) * | 2004-10-15 | 2010-10-05 | Saudi Arabian Oil Company | Generalized well management in parallel reservoir simulation |
US7859943B2 (en) * | 2005-01-07 | 2010-12-28 | Westerngeco L.L.C. | Processing a seismic monitor survey |
US7561998B2 (en) * | 2005-02-07 | 2009-07-14 | Schlumberger Technology Corporation | Modeling, simulation and comparison of models for wormhole formation during matrix stimulation of carbonates |
EP1917619B1 (en) * | 2005-07-27 | 2016-08-17 | Exxonmobil Upstream Research Company | Well modeling associated with extraction of hydrocarbons from subsurface formations |
-
2006
- 2006-07-06 WO PCT/US2006/026395 patent/WO2007018862A2/en active Search and Examination
- 2006-07-06 US US11/922,531 patent/US20090216508A1/en not_active Abandoned
- 2006-07-06 CN CN2006800275489A patent/CN101233527B/zh not_active Expired - Fee Related
- 2006-07-06 EP EP06774546A patent/EP1922669A2/en not_active Withdrawn
- 2006-07-06 CA CA002616816A patent/CA2616816A1/en not_active Abandoned
- 2006-07-06 EA EA200800435A patent/EA015435B1/ru not_active IP Right Cessation
- 2006-07-06 MX MX2007016586A patent/MX2007016586A/es unknown
-
2008
- 2008-02-22 NO NO20080923A patent/NO20080923L/no not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
CA2616816A1 (en) | 2007-02-15 |
WO2007018862A3 (en) | 2007-07-12 |
EP1922669A2 (en) | 2008-05-21 |
CN101233527B (zh) | 2012-07-04 |
EA200800435A1 (ru) | 2008-10-30 |
WO2007018862A2 (en) | 2007-02-15 |
MX2007016586A (es) | 2008-03-04 |
EA015435B1 (ru) | 2011-08-30 |
US20090216508A1 (en) | 2009-08-27 |
CN101233527A (zh) | 2008-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20080923L (no) | Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner | |
NO20080922L (no) | Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner | |
EA200970017A1 (ru) | Способ и система для проектирования и оптимизации операций бурения и заканчивания в углеводородных пластах - коллекторах | |
WO2014193529A3 (en) | System and method for characterizing uncertainty in subterranean reservoir fracture networks | |
EA201070207A1 (ru) | Способ управления добычей из нефтегазоносного коллектора в режиме реального времени | |
WO2008055188A8 (en) | System and method for performing oilfield simulation operations | |
NO20091092L (no) | Fremgangsmate og system for planlegging hydrokarbonutvinning fra en hydrokarbonformasjon | |
MX2009001264A (es) | Emulador de campo petrolifero. | |
NO20080953L (no) | Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner | |
NO20093357L (no) | Neuralnett for bruk i boresimulering | |
EA200601673A1 (ru) | Способ и устройство для размещения отходов бурения с использованием вероятностного подхода | |
NO20100029L (no) | Fremgangsmate, program og datasystem for a harmonisere modelldata for hydrokarbonreservoarer | |
GB2463146A (en) | Modeling the transient behavior or BHA/drill string while drilling | |
NO20071670L (no) | Framgangsmate og anordning for a analysere ytelsen til et hydrokarbonreservoar. | |
GB2462227A (en) | System and method for performing a drilling operation in an oilfield | |
EA201170598A1 (ru) | Способы и системы для моделирования, проектирования и проведения буровых работ, которые учитывают вибрации | |
WO2006052665A3 (en) | System and method for generating grammatically correct text strings | |
NO20092491L (no) | Bayesisk produksjonsanalyseteknikk for oppsprukne bronner med flere trinn | |
WO2007035745A3 (en) | Well treatment device, method, and system | |
AR079145A1 (es) | Simulacion probabilistica de la propagacion de fracturas subterraneas | |
EA200700100A1 (ru) | Способ разработки глубоких геотермальных резервуаров и отбора из них | |
NO20076611L (no) | Fremgangsmater og anordninger for analysering og styring av forplantningen av bolger i et borehull, generert med vannhammer | |
DE602005008800D1 (de) | Verfahren, Apparat und Computerprogramm zur stochastischen Simulation von Paleokanälen oder geologischen Paleostrukturen | |
GB2464003B (en) | System and method for performing oilfield simulation operations | |
EP2080107A4 (en) | CHARACTER POSITION-BASED PASSWORD IDENTIFICATION |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FC2A | Withdrawal, rejection or dismissal of laid open patent application |