NO20061871L - Karakterisering av konnektivitet i reservoarmodeller ved hjelp av baner med minst motstand - Google Patents
Karakterisering av konnektivitet i reservoarmodeller ved hjelp av baner med minst motstandInfo
- Publication number
- NO20061871L NO20061871L NO20061871A NO20061871A NO20061871L NO 20061871 L NO20061871 L NO 20061871L NO 20061871 A NO20061871 A NO 20061871A NO 20061871 A NO20061871 A NO 20061871A NO 20061871 L NO20061871 L NO 20061871L
- Authority
- NO
- Norway
- Prior art keywords
- connectivity
- characterization
- paths
- resistance
- reservoir models
- Prior art date
Links
- 238000012512 characterization method Methods 0.000 title 1
- 239000004215 Carbon black (E152) Substances 0.000 abstract 1
- 238000005094 computer simulation Methods 0.000 abstract 1
- 239000012530 fluid Substances 0.000 abstract 1
- 229930195733 hydrocarbon Natural products 0.000 abstract 1
- 150000002430 hydrocarbons Chemical class 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 238000004088 simulation Methods 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/66—Subsurface modeling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/66—Subsurface modeling
- G01V2210/663—Modeling production-induced effects
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Geophysics And Detection Of Objects (AREA)
- Analysing Materials By The Use Of Radiation (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Foreliggende oppfinnelse gjelder numerisk simulering av geologiske undergrunnsreservoarer. Nærmere bestemt er utførelser av oppfinnelsen relatert til datamaskinmodellering av overføring av egenskaper, for eksempel strømmen av fluid (feks. naturlige hydrokarbonressurser og vann), innenfor geologiske undergrunnsreservoarer. En utførelse av oppfinnelsen inkluderer en fremgangsmåte for evaluering av overføringen av en egenskap innen et geologisk undergrunnsreservoar ved hjelp av en grafteori enkeltkilde korteste banealgoritme.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US50733203P | 2003-09-30 | 2003-09-30 | |
PCT/US2004/032942 WO2005033739A2 (en) | 2003-09-30 | 2004-09-29 | Characterizing connectivity in reservoir models using paths of least resistance |
Publications (1)
Publication Number | Publication Date |
---|---|
NO20061871L true NO20061871L (no) | 2006-04-27 |
Family
ID=34421609
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20061871A NO20061871L (no) | 2003-09-30 | 2006-04-27 | Karakterisering av konnektivitet i reservoarmodeller ved hjelp av baner med minst motstand |
Country Status (6)
Country | Link |
---|---|
US (1) | US7584086B2 (no) |
EP (1) | EP1668561A2 (no) |
CN (1) | CN100590637C (no) |
CA (1) | CA2538577C (no) |
NO (1) | NO20061871L (no) |
WO (1) | WO2005033739A2 (no) |
Families Citing this family (78)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2569102A1 (en) * | 2004-06-07 | 2005-12-22 | Exxonmobil Upstream Research Company | Method for solving implicit reservoir simulation matrix equation |
US8139507B2 (en) * | 2004-09-15 | 2012-03-20 | Hewlett-Packard Development Company, L.P. | Network graph for alternate routes |
FR2886742B1 (fr) * | 2005-06-02 | 2007-07-27 | Inst Francais Du Petrole | Methode de changement d'echelle des permeabilites absolues pour construire un modele de simulation d'ecoulement |
US20070016389A1 (en) * | 2005-06-24 | 2007-01-18 | Cetin Ozgen | Method and system for accelerating and improving the history matching of a reservoir simulation model |
BRPI0708449B1 (pt) * | 2006-03-02 | 2019-01-22 | Exxonmobil Upstream Res Co | métodos para produção de hidrocarbonetos |
US7660711B2 (en) * | 2006-04-28 | 2010-02-09 | Saudi Arabian Oil Company | Automated event monitoring system for online reservoir simulation |
US20080040086A1 (en) * | 2006-08-09 | 2008-02-14 | Schlumberger Technology Corporation | Facilitating oilfield development with downhole fluid analysis |
FR2918179B1 (fr) * | 2007-06-29 | 2009-10-09 | Inst Francais Du Petrole | Methode pour estimer la permeabilite d'un reseau de fractures a partir d'une analyse de connectivite |
EP2247820A4 (en) * | 2007-12-13 | 2016-02-24 | Exxonmobil Upstream Res Co | PARALLEL ADAPTIVE DATA DISTRIBUTION IN A STORAGE SIMULATION USING AN UN-STRUCTURED GRID |
WO2009076728A1 (en) * | 2007-12-17 | 2009-06-25 | Leximancer Pty Ltd | Methods for determining a path through concept nodes |
EP2235500B1 (en) * | 2007-12-18 | 2018-10-31 | Exxonmobil Upstream Research Company | Determining connectivity architecture in 2-d and 3-d heterogeneous data |
AU2008340399B2 (en) * | 2007-12-21 | 2013-09-26 | Exxonmobil Upstream Research Company | Method and apparatus for analyzing three-dimensional data |
BRPI0820732A2 (pt) * | 2007-12-21 | 2015-06-16 | Exxonmobil Upstream Res Co | Método para modelar uma região física, produto de programa de computador, e, método para modelar uma bacia geológica subsuperficial em um computador |
US20140313195A1 (en) * | 2008-02-29 | 2014-10-23 | Cherif Atia Algreatly | 3D Model Mapping |
EP2098887A1 (en) | 2008-03-03 | 2009-09-09 | Exxonmobil Upstream Research Company | Determining connectivity architecture in 2-D and 3-D heterogeneous data |
EP2252903A4 (en) * | 2008-03-10 | 2018-01-03 | Exxonmobil Upstream Research Company | Method for determing distinct alternative paths between two object sets in 2-d and 3-d heterogeneous data |
WO2009137176A2 (en) * | 2008-05-05 | 2009-11-12 | Exxonmobile Upstream Research Company | Systems and methods for connectivity analysis using functional obejects |
US8095349B2 (en) * | 2008-05-30 | 2012-01-10 | Kelkar And Associates, Inc. | Dynamic updating of simulation models |
US8355898B2 (en) * | 2008-06-17 | 2013-01-15 | Chevron U.S.A. Inc. | System and method for modeling flow events responsible for the formation of a geological reservoir |
US8560969B2 (en) * | 2008-06-26 | 2013-10-15 | Landmark Graphics Corporation | Systems and methods for imaging operations data in a three-dimensional image |
WO2010033710A2 (en) * | 2008-09-19 | 2010-03-25 | Chevron U.S.A. Inc. | Computer-implemented systems and methods for use in modeling a geomechanical reservoir system |
CN102165413A (zh) * | 2008-09-30 | 2011-08-24 | 埃克森美孚上游研究公司 | 自适应迭代求解器 |
US8311339B2 (en) * | 2008-11-05 | 2012-11-13 | Palo Alto Research Center Incorporated | Method to robustly match images with similar body and head pose from image sequence |
EP2356611B1 (en) * | 2008-11-06 | 2018-08-29 | Exxonmobil Upstream Research Company | System and method for planning a drilling operation |
US8301426B2 (en) * | 2008-11-17 | 2012-10-30 | Landmark Graphics Corporation | Systems and methods for dynamically developing wellbore plans with a reservoir simulator |
US8339396B2 (en) * | 2009-03-05 | 2012-12-25 | Schlumberger Technology Corporation | Coarsening and splitting techniques |
US8350851B2 (en) * | 2009-03-05 | 2013-01-08 | Schlumberger Technology Corporation | Right sizing reservoir models |
RU2549147C2 (ru) * | 2009-05-07 | 2015-04-20 | Сауди Арабиан Ойл Компани | Системы, компьютерно-реализуемые способы и компьютерно-считываемые программные продукты для расчета приближенного давления дренирования скважины для имитатора коллектора |
BR112012011970A2 (pt) * | 2009-11-23 | 2016-05-10 | Exxonmobil Upstream Res Co | método e sistema para modelagem de propriedades geológicas utilizando elementos finitos mistos e homogeneizados |
FR2953039B1 (fr) * | 2009-11-26 | 2012-01-13 | Inst Francais Du Petrole | Methode d'exploitation d'un gisement petrolier par reconstruction de modele de reservoir |
US8931580B2 (en) | 2010-02-03 | 2015-01-13 | Exxonmobil Upstream Research Company | Method for using dynamic target region for well path/drill center optimization |
BR112012017278A2 (pt) * | 2010-02-12 | 2016-04-26 | Exxonmobil Upstream Res Co | método e sistema para criar modelos de simulação de ajuste de histórico |
US9594186B2 (en) | 2010-02-12 | 2017-03-14 | Exxonmobil Upstream Research Company | Method and system for partitioning parallel simulation models |
US8731873B2 (en) | 2010-04-26 | 2014-05-20 | Exxonmobil Upstream Research Company | System and method for providing data corresponding to physical objects |
US8532968B2 (en) * | 2010-06-16 | 2013-09-10 | Foroil | Method of improving the production of a mature gas or oil field |
US20110310101A1 (en) * | 2010-06-22 | 2011-12-22 | Schlumberger Technology Corporation | Pillar grid conversion |
US8725478B2 (en) | 2010-08-09 | 2014-05-13 | Conocophillips Company | Reservoir upscaling method with preserved transmissibility |
US9229129B2 (en) * | 2010-12-10 | 2016-01-05 | Conocophillips Company | Reservoir geobody calculation |
EP2678802A4 (en) * | 2011-02-21 | 2017-12-13 | Exxonmobil Upstream Research Company | Reservoir connectivity analysis in a 3d earth model |
AU2011365481B2 (en) * | 2011-04-12 | 2015-08-06 | Landmark Graphics Corporation | Variable fidelity simulation of flow in porous media |
US20140236558A1 (en) * | 2011-05-17 | 2014-08-21 | Serguei Maliassov | Method For Partitioning Parallel Reservoir Simulations In the Presence of Wells |
AU2011377643B2 (en) * | 2011-09-20 | 2015-10-29 | Landmark Graphics Corporation | System and method for coarsening in reservoir simulation system |
US9316761B2 (en) * | 2012-01-25 | 2016-04-19 | Baker Hughes Incorporated | Determining reservoir connectivity using fluid contact gravity measurements |
US9535978B2 (en) | 2012-03-29 | 2017-01-03 | International Business Machines Corporation | Semantic mapping of topic map meta-models identifying assets and events to include weights |
US9158871B2 (en) | 2012-04-06 | 2015-10-13 | Ut-Battelle, Llc | Graph modeling systems and methods |
WO2013169429A1 (en) | 2012-05-08 | 2013-11-14 | Exxonmobile Upstream Research Company | Canvas control for 3d data volume processing |
EP2923225A4 (en) * | 2012-11-20 | 2016-10-12 | Stochastic Simulation Ltd | METHOD AND SYSTEM FOR CHARACTERIZING SUBSURFACE TANKS |
US10429545B2 (en) | 2012-12-13 | 2019-10-01 | Landmark Graphics Corporation | System, method and computer program product for evaluating and ranking geobodies using a euler characteristic |
US10481297B2 (en) | 2013-01-28 | 2019-11-19 | Westerngeco L.L.C. | Fluid migration pathway determination |
WO2014117114A1 (en) | 2013-01-28 | 2014-07-31 | Westerngeco Seismic Holdings Limited | Fluid migration pathway determination |
US9715762B2 (en) | 2013-07-02 | 2017-07-25 | Landmark Graphics Corporation | 3D stadia algorithm for discrete network meshing |
BR112015030321A2 (pt) * | 2013-07-02 | 2017-07-25 | Landmark Graphics Corp | algoritmo lofting para malha de rede discreta |
WO2015035105A1 (en) * | 2013-09-05 | 2015-03-12 | Schlumberger Canada Limited | Integrated oilfield asset modeling using multiple resolutions of reservoir detail |
US10346745B2 (en) * | 2013-09-05 | 2019-07-09 | International Business Machines Corporation | Method of using graphical index maps to provide automated relationship discovery and impact analyses |
US9790770B2 (en) | 2013-10-30 | 2017-10-17 | The Texas A&M University System | Determining performance data for hydrocarbon reservoirs using diffusive time of flight as the spatial coordinate |
CN106170823A (zh) | 2014-03-10 | 2016-11-30 | 兰德马克绘图国际公司 | 使用来自地层层序中的邻近表面的单侧非节点约束而对地质表面建模 |
JP6502133B2 (ja) * | 2014-03-28 | 2019-04-17 | 日本碍子株式会社 | 多孔質体、ハニカムフィルタ、多孔質体の製造方法、及びハニカムフィルタの製造方法 |
US10443358B2 (en) * | 2014-08-22 | 2019-10-15 | Schlumberger Technology Corporation | Oilfield-wide production optimization |
AU2015384833A1 (en) * | 2015-03-04 | 2017-08-10 | Landmark Graphics Corporation | Path optimization in production network systems |
US10042915B2 (en) | 2015-09-28 | 2018-08-07 | International Business Machines Corporation | Semantic mapping of topic map meta-models identifying assets and events to include directionality |
US10387476B2 (en) | 2015-11-24 | 2019-08-20 | International Business Machines Corporation | Semantic mapping of topic map meta-models identifying assets and events to include modeled reactive actions |
JP6605951B2 (ja) * | 2015-12-25 | 2019-11-13 | 株式会社東芝 | シミュレーション装置及びシミュレーション方法 |
US10274331B2 (en) * | 2016-09-16 | 2019-04-30 | Polaris Industries Inc. | Device and method for improving route planning computing devices |
WO2018160279A1 (en) * | 2017-02-28 | 2018-09-07 | National Technology & Engineering Solutions Of Sandia, Llc (Ntess) | Methods for preventing computationally explosive calculations for model parameters distributed on a hierarchy of geometric simplices |
WO2018183992A1 (en) | 2017-03-31 | 2018-10-04 | Schlumberger Technology Corporation | Smooth surface wrapping of features in an imaged volume |
WO2019118656A1 (en) | 2017-12-14 | 2019-06-20 | Schlumberger Technology Corporation | System and method for simulating reservoir models |
CN109339772B (zh) * | 2018-09-10 | 2022-01-04 | 中国石油天然气股份有限公司 | 井区气藏连通关系判定方法及装置 |
EP4018075A1 (en) * | 2019-08-23 | 2022-06-29 | Total Se | Method for determining locations of wells in a field |
CN110796383A (zh) * | 2019-11-01 | 2020-02-14 | 长沙理工大学 | 一种考虑生态基流的水系连通性评价指标体系 |
CN110837608B (zh) * | 2019-11-07 | 2024-04-12 | 中科天玑数据科技股份有限公司 | 一种基于多源数据的舆情话题传播路径分析系统和方法 |
CN111983678B (zh) * | 2020-07-22 | 2024-02-23 | 中海石油(中国)有限公司深圳分公司 | 一种快速评价深水砂体发育潜力的方法 |
WO2022103801A1 (en) | 2020-11-13 | 2022-05-19 | Chevron U.S.A. Inc. | Well correlation through intermediary well |
US20230366309A1 (en) * | 2020-11-13 | 2023-11-16 | Chevron U.S.A. Inc. | Visualization of directional influence of wells on correlation |
US20240061146A1 (en) | 2020-11-13 | 2024-02-22 | Chevron U.S.A. Inc. | Subsurface characterization based on multiple correlation scenarios |
CN113034686B (zh) * | 2021-03-29 | 2023-10-13 | 中国科学院新疆生态与地理研究所 | 一种基于拓扑排序的地层顺序获取方法 |
US20230119861A1 (en) * | 2021-10-20 | 2023-04-20 | Chevron U.S.A. Inc. | Acceleration of subsurface simulation using filtered grid connectivity graph |
CN113960288B (zh) * | 2021-10-28 | 2023-09-19 | 中国石油大学(华东) | 一种源-汇系统定量评价方法 |
US20230376354A1 (en) * | 2022-05-19 | 2023-11-23 | The Boeing Company | Hybrid-Computing Resource Optimization |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5501273A (en) * | 1994-10-04 | 1996-03-26 | Amoco Corporation | Method for determining the reservoir properties of a solid carbonaceous subterranean formation |
US5732192A (en) | 1994-11-30 | 1998-03-24 | The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration | Global qualitative flow-path modeling for local state determination in simulation and analysis |
US5757663A (en) | 1995-09-26 | 1998-05-26 | Atlantic Richfield Company | Hydrocarbon reservoir connectivity tool using cells and pay indicators |
US6106561A (en) * | 1997-06-23 | 2000-08-22 | Schlumberger Technology Corporation | Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator |
US6662146B1 (en) | 1998-11-25 | 2003-12-09 | Landmark Graphics Corporation | Methods for performing reservoir simulation |
WO2000058910A1 (en) | 1999-03-31 | 2000-10-05 | Exxonmobil Upstream Research Company | Method for simulating a characteristic of a physical system |
US6477515B1 (en) | 1999-08-11 | 2002-11-05 | The United States Of America As Represented By The Secretary Of The Navy | Efficient computation of least cost paths with hard constraints |
US6549879B1 (en) * | 1999-09-21 | 2003-04-15 | Mobil Oil Corporation | Determining optimal well locations from a 3D reservoir model |
EP1247238A1 (en) | 1999-10-13 | 2002-10-09 | The Trustees Of Columbia University In The City Of New York | Petroleum reservoir simulation and characterization system and method |
US6928399B1 (en) | 1999-12-03 | 2005-08-09 | Exxonmobil Upstream Research Company | Method and program for simulating a physical system using object-oriented programming |
AU2001271633A1 (en) | 2000-06-29 | 2002-01-14 | Object Reservoir, Inc. | System and method for defining and displaying a reservoir model |
US7277836B2 (en) | 2000-12-29 | 2007-10-02 | Exxonmobil Upstream Research Company | Computer system and method having a facility network architecture |
US20020177986A1 (en) | 2001-01-17 | 2002-11-28 | Moeckel George P. | Simulation method and system using component-phase transformations |
FR2823877B1 (fr) | 2001-04-19 | 2004-12-24 | Inst Francais Du Petrole | Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol |
US7062719B2 (en) | 2001-08-15 | 2006-06-13 | National Instruments Corporation | Graphically defining a route through one or more switch devices |
US6862531B2 (en) | 2002-01-15 | 2005-03-01 | Westerngeco, L.L.C. | Layer stripping converted reflected waveforms for dipping fractures |
-
2004
- 2004-09-29 US US10/568,940 patent/US7584086B2/en not_active Expired - Fee Related
- 2004-09-29 CN CN200480028500A patent/CN100590637C/zh not_active Expired - Fee Related
- 2004-09-29 CA CA2538577A patent/CA2538577C/en not_active Expired - Fee Related
- 2004-09-29 WO PCT/US2004/032942 patent/WO2005033739A2/en active Application Filing
- 2004-09-29 EP EP04789530A patent/EP1668561A2/en not_active Withdrawn
-
2006
- 2006-04-27 NO NO20061871A patent/NO20061871L/no not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
US20070027666A1 (en) | 2007-02-01 |
US7584086B2 (en) | 2009-09-01 |
CA2538577A1 (en) | 2005-04-14 |
WO2005033739A3 (en) | 2006-04-06 |
CN100590637C (zh) | 2010-02-17 |
CN1860489A (zh) | 2006-11-08 |
WO2005033739A2 (en) | 2005-04-14 |
EP1668561A2 (en) | 2006-06-14 |
CA2538577C (en) | 2010-08-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20061871L (no) | Karakterisering av konnektivitet i reservoarmodeller ved hjelp av baner med minst motstand | |
Sun et al. | Numerical simulation of CO2 huff-n-puff in complex fracture networks of unconventional liquid reservoirs | |
NO20051563L (no) | Fremgangsmate for konstruksjo av en geomekanisk modell av en undergrunnssone som er tiltenkt koblet med en reservoarmodell | |
Wang et al. | Discrete fracture modeling using Centroidal Voronoi grid for simulation of shale gas plays with coupled nonlinear physics | |
GB2455237A (en) | System and method for performing oilfield simulation operations | |
US20120150519A1 (en) | Enhanced oil recovery screening model | |
GB2463146A (en) | Modeling the transient behavior or BHA/drill string while drilling | |
EA200970017A1 (ru) | Способ и система для проектирования и оптимизации операций бурения и заканчивания в углеводородных пластах - коллекторах | |
AU2011383286B2 (en) | System and method for simulation of gas desorption in a reservoir using a multi-porosity approach | |
CA2665122A1 (en) | System and method for performing oilfield simulation operations | |
EA201070207A1 (ru) | Способ управления добычей из нефтегазоносного коллектора в режиме реального времени | |
NO20100029L (no) | Fremgangsmate, program og datasystem for a harmonisere modelldata for hydrokarbonreservoarer | |
NO20054001L (no) | Fremgangsmate for a bestemme flerfasestromningsparametere til et porost medium som tar hensyn til den lokale heterogenitet. | |
Le et al. | A new multiscale model for flow and transport in unconventional shale oil reservoirs | |
Sun et al. | Simulation-based enhanced oil recovery predictions from wettability alteration in the Middle Bakken tight reservoir with hydraulic fractures | |
Hernandez et al. | Update on the modeling of the Rotokawa geothermal system: 2010–2014 | |
Zhang et al. | Non-Darcy displacement in linear composite and radial aquifer during CO2 sequestration | |
Wang et al. | Benchmark test and sensitivity analysis for Geothermal Applications in the Netherlands | |
Kazmouz et al. | Numerical simulation of shale gas flow in three-dimensional fractured porous media | |
Zhang | Well Interference Analysis of Shale Gas Wells Based on Embedded Discrete Fracture Model | |
Tueros et al. | Refined ensemble-based waterflooding optimization subject to field-wide constraints | |
Goumiri et al. | The effect of capillary pressure on the saturation equation of two‐phase flow in porous media | |
Mata et al. | Modeling the Influence of Pressure Depletion in Fracture Propagation and Quantifying the Impact of Asymmetric Fracture Wings in Ultimate Recovery | |
Alarouj et al. | Numerical modelling of self-potential in subsurface reservoirs | |
Xia et al. | Characterization of multi-scale discrete-fracture/matrix interactions in naturally fractured reservoirs using mud loss data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FC2A | Withdrawal, rejection or dismissal of laid open patent application |