US7177764B2
(en)
*
|
2000-07-14 |
2007-02-13 |
Schlumberger Technology Corp. |
Simulation method and apparatus for determining subsidence in a reservoir
|
US20050114831A1
(en)
*
|
2001-04-18 |
2005-05-26 |
Andres Callegari |
Volume body renderer
|
DK1381998T3
(da)
*
|
2001-04-18 |
2012-02-06 |
Landmark Graphics Corp |
Volumenlegeme-renderer
|
US6823297B2
(en)
*
|
2003-03-06 |
2004-11-23 |
Chevron U.S.A. Inc. |
Multi-scale finite-volume method for use in subsurface flow simulation
|
US7496488B2
(en)
|
2003-03-06 |
2009-02-24 |
Schlumberger Technology Company |
Multi-scale finite-volume method for use in subsurface flow simulation
|
FR2869116B1
(fr)
*
|
2004-04-14 |
2006-06-09 |
Inst Francais Du Petrole |
Methode pour construire un modele geomecanique d'une zone souterraine destine a etre couple a un modele de reservoir
|
WO2006016942A1
(en)
*
|
2004-07-07 |
2006-02-16 |
Exxonmobil Upstream Research Company |
Predicting sand-grain composition and sand texture
|
BRPI0513047A
(pt)
*
|
2004-07-07 |
2008-04-22 |
Exxonmobil Upstream Res Co |
aplicações de rede bayesiana à geologia e à geografia
|
US7707018B2
(en)
*
|
2004-12-14 |
2010-04-27 |
Schlumberger Technology Corporation |
Finite volume method system and program storage device for linear elasticity involving coupled stress and flow in a reservoir simulator
|
US20060153005A1
(en)
*
|
2005-01-07 |
2006-07-13 |
Herwanger Jorg V |
Determination of anisotropic physical characteristics in and around reservoirs
|
FR2886742B1
(fr)
*
|
2005-06-02 |
2007-07-27 |
Inst Francais Du Petrole |
Methode de changement d'echelle des permeabilites absolues pour construire un modele de simulation d'ecoulement
|
MX2007016586A
(es)
*
|
2005-07-27 |
2008-03-04 |
Exxonmobil Upstream Res Co |
Modelaje de pozo asociado con extraccion de hidrocarburos a partir de yacimientos subterraneos.
|
CA2616835C
(en)
|
2005-07-27 |
2015-09-29 |
Exxonmobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
US8249844B2
(en)
|
2005-07-27 |
2012-08-21 |
Exxonmobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
US8355873B2
(en)
*
|
2005-11-29 |
2013-01-15 |
Halliburton Energy Services, Inc. |
Method of reservoir characterization and delineation based on observations of displacements at the earth's surface
|
US8504341B2
(en)
*
|
2006-01-31 |
2013-08-06 |
Landmark Graphics Corporation |
Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators
|
WO2007149766A2
(en)
*
|
2006-06-18 |
2007-12-27 |
Chevron U.S.A. Inc. |
Reservoir simulation using a multi-scale finite volume including black oil modeling
|
WO2008046833A1
(en)
*
|
2006-10-16 |
2008-04-24 |
Shell Internationale Research Maatschappij B.V. |
Method of detecting a lateral boundary of a reservoir
|
US7565278B2
(en)
*
|
2006-12-04 |
2009-07-21 |
Chevron U.S.A. Inc. |
Method, system and apparatus for simulating fluid flow in a fractured reservoir utilizing a combination of discrete fracture networks and homogenization of small fractures
|
CA2674820C
(en)
*
|
2007-01-05 |
2020-01-21 |
Landmark Graphics Corporation, A Halliburton Company |
Systems and methods for selectively imaging objects in a display of multiple three-dimensional data-objects
|
US8265915B2
(en)
*
|
2007-08-24 |
2012-09-11 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
CA2690991C
(en)
*
|
2007-08-24 |
2013-12-24 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
US8548782B2
(en)
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
GB0723224D0
(en)
*
|
2007-11-27 |
2008-01-09 |
Fujitsu Ltd |
A multi-level gris embedding process with uniform and non-uniform grid refinement for multigurid-fdtd electromagnetic solver
|
GB0723222D0
(en)
*
|
2007-11-27 |
2008-01-09 |
Fujitsu Ltd |
A very stable multigrid fdtd solver
|
CA2702965C
(en)
|
2007-12-13 |
2014-04-01 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
US7830745B2
(en)
*
|
2007-12-27 |
2010-11-09 |
Schlumberger Technology Corporation |
Identifying the Q-factor using microseismic event generated S-coda waves
|
WO2009085395A1
(en)
*
|
2007-12-31 |
2009-07-09 |
Exxonmobil Upstream Research Company |
Methods and systems for determining near-wellbore characteristics and reservoir properties
|
US8190414B2
(en)
*
|
2008-03-26 |
2012-05-29 |
Exxonmobil Upstream Research Company |
Modeling of hydrocarbon reservoirs containing subsurface features
|
AU2009229194B2
(en)
*
|
2008-03-28 |
2014-10-02 |
Exxonmobil Upstream Research Company |
Computing a consistent velocity vector field from a set of fluxes
|
US8204726B2
(en)
*
|
2008-05-16 |
2012-06-19 |
Chevron U.S.A. Inc. |
Multi-scale method for multi-phase flow in porous media
|
CA2723381C
(en)
*
|
2008-06-06 |
2017-02-07 |
Landmark Graphics Corporation, A Halliburton Company |
Systems and methods for imaging a three-dimensional volume of geometrically irregular grid data representing a grid volume
|
EP2310972A2
(en)
|
2008-07-03 |
2011-04-20 |
Chevron U.S.A. Inc. |
Multi-scale finite volume method for reservoir simulation
|
US8280709B2
(en)
*
|
2008-10-03 |
2012-10-02 |
Schlumberger Technology Corporation |
Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
|
AU2009302317A1
(en)
*
|
2008-10-09 |
2010-04-15 |
Chevron U.S.A. Inc. |
Iterative multi-scale method for flow in porous media
|
WO2010062710A1
(en)
*
|
2008-11-03 |
2010-06-03 |
Saudi Arabian Oil Company |
Three dimensional well block radius determiner machine and related computer implemented methods and program products
|
US8374836B2
(en)
*
|
2008-11-12 |
2013-02-12 |
Geoscape Analytics, Inc. |
Methods and systems for constructing and using a subterranean geomechanics model spanning local to zonal scale in complex geological environments
|
CN102282562B
(zh)
|
2009-01-13 |
2015-09-23 |
埃克森美孚上游研究公司 |
优化井作业计划
|
US8275589B2
(en)
*
|
2009-02-25 |
2012-09-25 |
Schlumberger Technology Corporation |
Modeling a reservoir using a compartment model and a geomechanical model
|
US8359163B2
(en)
*
|
2009-06-01 |
2013-01-22 |
Schlumberger Technology Corporation |
Estimating fluid flow in a reservoir
|
US20110224835A1
(en)
*
|
2009-06-03 |
2011-09-15 |
Schlumberger Technology Corporation |
Integrated flow assurance system
|
WO2011043862A1
(en)
|
2009-10-07 |
2011-04-14 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
CN102648425B
(zh)
|
2009-10-28 |
2014-12-10 |
雪佛龙美国公司 |
用于储集层仿真的多尺度有限体积方法
|
CN102640163B
(zh)
|
2009-11-30 |
2016-01-20 |
埃克森美孚上游研究公司 |
用于储层模拟的适应性牛顿法
|
US9134454B2
(en)
|
2010-04-30 |
2015-09-15 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
US20130151160A1
(en)
*
|
2010-06-08 |
2013-06-13 |
Schlumberger Technology Corporation |
Method for determining the stress-strain state of a stratified medium
|
WO2012003007A1
(en)
|
2010-06-29 |
2012-01-05 |
Exxonmobil Upstream Research Company |
Method and system for parallel simulation models
|
CA2803066A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
US20130096899A1
(en)
*
|
2010-07-29 |
2013-04-18 |
Exxonmobile Upstream Research Company |
Methods And Systems For Machine - Learning Based Simulation of Flow
|
CA2805446C
(en)
|
2010-07-29 |
2016-08-16 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
US9058445B2
(en)
|
2010-07-29 |
2015-06-16 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
US9436658B2
(en)
|
2010-08-09 |
2016-09-06 |
Landmark Graphics Corporation |
Systems and methods for creating a surface in a faulted space
|
US8433551B2
(en)
*
|
2010-11-29 |
2013-04-30 |
Saudi Arabian Oil Company |
Machine, computer program product and method to carry out parallel reservoir simulation
|
WO2012039811A1
(en)
|
2010-09-20 |
2012-03-29 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
CA2814669A1
(en)
|
2010-11-23 |
2012-05-31 |
Exxonmobil Upstream Research Company |
Variable discretization method for flow simulation on complex geological models
|
AU2010365379B2
(en)
|
2010-12-16 |
2015-07-23 |
Landmark Graphics Corporation |
Method and system of plotting correlated data
|
US9747393B2
(en)
|
2011-02-09 |
2017-08-29 |
Exxonmobil Upstream Research Company |
Methods and systems for upscaling mechanical properties of geomaterials
|
US8762118B2
(en)
*
|
2011-03-07 |
2014-06-24 |
Schlumberger Technology Corporation |
Modeling hydraulic fractures
|
US20130231901A1
(en)
*
|
2011-09-15 |
2013-09-05 |
Zhengang Lu |
Well pad placement
|
CA2843929C
(en)
|
2011-09-15 |
2018-03-27 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
|
WO2013148021A1
(en)
|
2012-03-28 |
2013-10-03 |
Exxonmobil Upstream Research Company |
Method for mutiphase flow upscaling
|
NO339744B1
(no)
*
|
2012-08-10 |
2017-01-30 |
Schlumberger Technology Bv |
Hybrid, lokal ikke-avstemmende metode for flerfasestrømningssimuleringer i heterogent sprukne medier
|
US10036829B2
(en)
|
2012-09-28 |
2018-07-31 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
SG11201606940SA
(en)
*
|
2012-11-20 |
2016-10-28 |
Stochastic Simulation Ltd |
Method and system for characterising subsurface reservoirs
|
US10012055B2
(en)
*
|
2013-01-24 |
2018-07-03 |
Schlumberger Technology Corporation |
Analysis of surface networks for fluids
|
CN103968883B
(zh)
*
|
2013-01-24 |
2016-08-24 |
上海朝辉压力仪器有限公司 |
淤泥探测方法及淤泥探测仪
|
US20150160371A1
(en)
*
|
2013-12-06 |
2015-06-11 |
Schlumberger Technology Corporation |
Gpu accelerated deflation in geomechanics simulator
|
WO2016018723A1
(en)
|
2014-07-30 |
2016-02-04 |
Exxonmobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
AU2015339883B2
(en)
|
2014-10-31 |
2018-03-29 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
CA2963416A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
US10082601B2
(en)
*
|
2014-12-04 |
2018-09-25 |
Chevron U.S.A. Inc. |
System and method for geomechanical and rock physics elastostatic modeling
|
US10280722B2
(en)
|
2015-06-02 |
2019-05-07 |
Baker Hughes, A Ge Company, Llc |
System and method for real-time monitoring and estimation of intelligent well system production performance
|
CN105136621A
(zh)
*
|
2015-08-18 |
2015-12-09 |
昆明理工大学 |
一种用液固两相介质模拟库底淤沙的分析方法
|
CN105467466B
(zh)
*
|
2015-12-07 |
2018-01-09 |
中国石油大学(华东) |
一种基于多尺度信息的致密储层成岩相预测方法
|
CN105738952B
(zh)
*
|
2016-02-02 |
2017-11-07 |
中国石油大学(北京) |
一种水平井区储层岩石相建模方法
|
CN106354918B
(zh)
*
|
2016-08-26 |
2019-07-12 |
中国科学院力学研究所 |
一种水力压裂中流固耦合问题数值模拟的构建方法
|
CN106547034B
(zh)
*
|
2016-11-09 |
2018-11-02 |
西南石油大学 |
一种确定致密储层岩石脆性指数的方法
|
US10839114B2
(en)
|
2016-12-23 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
US11041976B2
(en)
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
CN107622165B
(zh)
*
|
2017-09-25 |
2018-06-05 |
西南石油大学 |
一种页岩气水平井重复压裂产能计算方法
|
CN108442911A
(zh)
*
|
2018-02-28 |
2018-08-24 |
西南石油大学 |
一种页岩气水平井重复压裂水力裂缝参数优化设计方法
|
CN109752773B
(zh)
*
|
2018-11-30 |
2020-11-13 |
中国石油大学(华东) |
用于深部岩体古应力场模拟的非均质力学参数场确定方法
|
US20210096276A1
(en)
*
|
2019-10-01 |
2021-04-01 |
Exxonmobil Upstream Research Company |
Model for Coupled Porous Flow and Geomechanics for Subsurface Simulation
|
CN117213442A
(zh)
*
|
2023-11-07 |
2023-12-12 |
中交天津港湾工程研究院有限公司 |
一种穿河顶管施工时河床沉降的监测装置及监测方法
|