NL1020123C1 - Lost edge shuttering, comprises single piece profile for contact with liquid concrete and anchor devices securable to inside of profile via temporary fasteners - Google Patents

Lost edge shuttering, comprises single piece profile for contact with liquid concrete and anchor devices securable to inside of profile via temporary fasteners Download PDF

Info

Publication number
NL1020123C1
NL1020123C1 NL1020123A NL1020123A NL1020123C1 NL 1020123 C1 NL1020123 C1 NL 1020123C1 NL 1020123 A NL1020123 A NL 1020123A NL 1020123 A NL1020123 A NL 1020123A NL 1020123 C1 NL1020123 C1 NL 1020123C1
Authority
NL
Netherlands
Prior art keywords
concrete
profile
edge
fasteners
profile element
Prior art date
Application number
NL1020123A
Other languages
Dutch (nl)
Inventor
Franciscus Petrus Matheus Loon
Original Assignee
Bat Continental B V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bat Continental B V filed Critical Bat Continental B V
Priority to NL1020123A priority Critical patent/NL1020123C1/en
Application granted granted Critical
Publication of NL1020123C1 publication Critical patent/NL1020123C1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B2005/322Floor structures wholly cast in situ with or without form units or reinforcements with permanent forms for the floor edges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B2005/324Floor structures wholly cast in situ with or without form units or reinforcements with peripheral anchors or supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The shuttering comprises a single-piece profile (11), preferably made from steel, plastic and/or aluminium, the inside of the profile being designed to come into contact with the liquid concrete (10) so that the lateral and bottom sides (14) of the free end (15) of the concrete floor (10) or ceiling being formed combine with the profile to form an integral structure once the concrete has set. The vertical side wall contains openings (19) such as a hole or slot for fastener devices to be passed through. The shuttering further comprises anchor devices such as an anchor rail (5) with a U or C-shaped cross-section and optionally provided with anchors (6) for mounting fastener devices. The anchor devices can be releasably clamped to the inside of the profile using temporary fasteners (16-18) during concrete casting. The temporary fasteners are completely removed following concrete casting so that permanent fasteners for mounting support devices can be fitted in the anchor devices. An INDEPENDENTR CLAIM is also included for a method for forming and protecting the free ends of a concrete floor or ceiling using the lost shuttering.

Description

Verloren randbekistingselementen en werkwijze voor het installeren van verankeringsorganen 5 De uitvinding heeft betrekking op een verloren randbekistingselement ten gebruike bij vervaardiging en tevens bescherming van de vrije uiteinden van betonvloer- of plafondelementen alsmede voor het installeren van verankeringsorganen zoals bijv. ankerrails, bij montage van bijv. randbeveiliging, maar ook bijv. voor een stelbaar mëtselwerk-ondersteuningelement, gordijngevel-drager, of andere soortgelijke 10 bouwconstructie. De uitvinding heeft tevens betrekking op een werkwijze voor het toepassen van het randbekistingselement.The invention relates to a lost edge formwork element for use in the manufacture and also protection of the free ends of concrete floor or ceiling elements, as well as for installing anchoring elements such as, for example, anchor rails, when mounting e.g. edge protection, but also for instance for an adjustable brickwork support element, curtain wall support, or other similar building construction. The invention also relates to a method for applying the edge formwork element.

De vervaardiging van betonnen vloer- of plafondelementen in moderne bouw geschiedt d.m.v. het storten van het vloeibare beton in een daarvoor geschikte 15 bekisting die enerzijds bestaat uit tijdelijk geïnstalleerde bekistingdelen. Deze bekistingdelen zullen na verharding van het gestorte beton losgemaakt resp. verwijderd (en eventueel hergebruikt) worden, terwijl anderzijds niet verwijderbare zgn. verloren bekistingselementen in de betonconstructie geïntegreerd worden. De randbekisting die dient ter vervaardiging en bescherming van de vrije uiteinden van 20 de betonvloer- of plafondelementen kan als verloren bekisting uitgevoerd worden.The manufacture of concrete floor or ceiling elements in modern construction takes place by means of. pouring the liquid concrete into a suitable formwork which on the one hand consists of temporarily installed formwork parts. These formwork parts will be released or cured after hardening of the poured concrete. removed (and possibly reused), while on the other hand non-removable so-called formwork elements are integrated into the concrete structure. The edge formwork that serves to manufacture and protect the free ends of the concrete floor or ceiling elements can be designed as lost formwork.

Aan de zijrand resp. bovenrand van het vrije buitenuiteinde van de langszijde (of kopzijde) van de genoemde betonvloeren wordt een draag- of ondersteuningsorgaan, zoals bijv. metselwerkondersteuning-orgaan gemonteerd 25 nadat het betonverhardingsproces voltooid is. Om dit ondersteuningsorgaan te kunnen monteren moeten eerst een aantal moeizame en tijdrovende voorbereidende werkzaamheden verricht worden, zoals bijv. hakken, boren en afvlakken van de bovenrand en zijrand van de langszijde (of kopzijde) van de betonvloeren. Vervolgens moeten de holtes en nieuw ontstane eventuele 30 oneffenheden in de betonvloeren- of plafondelementen ter plaatse van de gemonteerde ondersteuningsorganen worden afgewerkt d.m.v. het uitvullen met 1020123 2 bijv. krimpvrije -mortel of vulplaten. Vervolgens kunnen eerst de binnenwanden opgetrokken worden, resp. isolatie geplaatst worden waarna het geheel, of secties van de buitenwanden die nu op de ondersteunende organen (die gemonteerd zijn op betonvloeren) rusten, afgewerkt kunnen worden.At the side edge resp. A top or bottom edge of the free outer end of the longitudinal side (or end face) of said concrete floors is a support or support member, such as for example masonry support member, mounted after the concrete hardening process is completed. In order to be able to mount this support member, a number of difficult and time-consuming preparatory work must first be carried out, such as, for example, chopping, drilling and flattening the top edge and side edge of the longitudinal (or end) side of the concrete floors. Subsequently, the cavities and any new unevennesses in the concrete floor or ceiling elements must be finished at the location of the mounted support members by means of. filling with 1020123 2, eg shrink-free mortar or shims. The inner walls can then first be raised or raised. insulation can be installed after which the whole, or sections of the outer walls that now rest on the supporting members (that are mounted on concrete floors), can be finished.

55

Ingeval de verloren randbekisting vervaardigd is uit staalplaatmateriaa! wordt er aan de bovengenoemde werkzaamheden vóór het monteren van een draag- of ondersteuningsorgaan ook het boren van staalplaatmateriaal toegevoegd waardoor > weer meer tijd nodig is. Ter vereenvoudiging van deze operaties zijn bepaalde 10 randbekistingssystemen voorzien van een aan de binnenzijde van een randbekistingselement gelast verankeringsorgaan, zoals bijv. een stalen C-profiel of U-profiel, waardoor het nu mogelijk wordt om hiermede d.m.v. bevestigingsmiddelen zoals bijv. hamerkopbouten, de draag- of ondersteuningsorgaan, zoals bijv. een metselwerkondersteuning-orgaan in een latere bouwfase te monteren. De nadelen 15 van deze opstelling zijn enerzijds de inflexibiliteit, d.w.z. de te installeren verloren randbekisting moet in een vroeg stadium volledig berekend en nauwkeurig dimensionaal bepaald zijn, waarbij eventuele aanpassingen in een latere bouwfase nauwelijks of niet meer mogelijk zijn, en anderzijds de hoge prijs omdat dan het systeem in principe alleen uit RVS vervaardigd kan worden. Deze eis ontstaat mede 20 door het feit dat indien het verankeringsorgaan uit een gebruikelijk (goedkoper) verzinkte staalmateriaal vervaardigd is dat d.m.v. lassen op de randbekisting aangebracht wordt, dat dan de anticorrosieve zinklaag daarvan onherstelbaar beschadigd wordt, waardoor het gehele bekistingsysteem afgekeurd zou moeten worden.In case the lost edge formwork is made from steel sheet material! The drilling of steel sheet material is also added to the aforementioned work prior to mounting a supporting or supporting member, so that more time is again required. To simplify these operations, certain edge formwork systems are provided with an anchoring member welded to the inside of an edge formwork element, such as, for example, a steel C-profile or U-profile, as a result of which it is now possible to do this by means of e.g. mounting means such as, for example, hammer head bolts, the support or support member, such as, for example, a masonry support member in a later stage of construction. The disadvantages of this arrangement are, on the one hand, the inflexibility, ie the lost edge formwork to be installed must be fully calculated and accurately dimensioned at an early stage, whereby any adjustments in a later construction phase are hardly or no longer possible, and on the other hand the high price because then the system can in principle only be manufactured from stainless steel. This requirement is partly due to the fact that if the anchoring member is made from a customary (cheaper) galvanized steel material that is d.m.v. When welding is applied to the edge formwork, the anticorrosive zinc layer thereof is irreparably damaged, as a result of which the entire formwork system should be rejected.

2525

Door de toepassing van het nieuwe verloren bekistingselement voor het installeren van verankeringorganen volgens de uitvinding worden bovengenoemde problemen geëlimineerd.The use of the new lost formwork element for installing anchoring means according to the invention eliminates the above-mentioned problems.

30 De essentie van de uitvinding ligt in de gebruikmaking van een randbekistingselement hetwelke een profielelement uit een stuk omvat, bij voorkeur •-0201 23 3 uit staal, kunststof, aluminium of een combinatie ervan, waarbij aan de binnenzijde van het profielelement het vloeibaar betonmateriaal zodanig gestort wordt, dat tenminste zij- en onderrand van het vrije uiteinde van de te vervaardigen betonvloer of het plafondelement door het randbekistingsprofielelement omvat wordt en dat na 5 verharding van het beton tezamen met het profielelement een geheel vormt; een en ander zodanig, dat de opstaande zijwand voorzien is van openingen zoals een gat of sleuf, voor doorvoer van bevestigingsmiddelen, alsmede omvattend verankeringsorganen zoals een ankerrail met een U- of C-profiel al dan niet voorzien van ankers, geschikt voor het monteren van bevestigingsmiddelen, welke 10 voor het storten van het beton losneembaar tegen de binnenzijde van het profielelement worden geklemd m.b.v. tijdelijke bevestigingsmiddelen, en voorts tijdelijke bevestigingsmiddelen welke na het storten van het beton geheel worden verwijderd en vervangen door definitieve bevestigingsmiddelen aan te brengen in de verankeringsorganen voor montage van draag- of ondersteuningselementen 15The essence of the invention lies in the use of an edge formwork element which comprises a one-piece profile element, preferably of steel, plastic, aluminum or a combination thereof, wherein on the inside of the profile element the liquid concrete material is such it is poured that at least the side and bottom edges of the free end of the concrete floor or ceiling element to be manufactured are covered by the edge formwork profile element and that after hardening of the concrete together with the profile element form a whole; all such that the upright side wall is provided with openings such as a hole or slot, for passage of fastening means, as well as comprising anchoring members such as an anchor rail with a U or C profile, whether or not provided with anchors, suitable for mounting fastening means which are releasably clamped against the inside of the profile element for pouring the concrete by means of temporary fasteners, and furthermore temporary fasteners which after the pouring of the concrete are completely removed and replaced by arranging definitive fasteners in the anchoring members for mounting of supporting or supporting elements

Bovendien is dit gat of de sleuf afdichtbaar ingeval er géén verankeringsorganen voor het fixeren van de genoemde draag- of ondersteuningsorganen gemonteerd dienen te worden.Moreover, this hole or slot is sealable in case no anchoring members have to be mounted for fixing the said supporting or supporting members.

20 Bevestiging van verankeringsorganen (zoals bijv. U-, C- of andere geschikte profielen) op de randbekisting vóór het storten van vloeibaar beton geschiedt d.m.v. tijdelijke bevestigingsmiddelen. Verschillende bevestigingsmiddelen kunnen hierbij gebruikt worden, zoals bijv. hamerkopbouten met hamerkoppen of hamerkopmoeren die geplaatst zijn aan de binnenzijde van het profiel van het 25 verankeringsorgaan alsmede volgplaten geplaatst aan de buitenzijde van het verloren randbekistingselement.Attachment of anchoring members (such as e.g. U, C or other suitable profiles) to the edge formwork prior to pouring of liquid concrete takes place by means of temporary fasteners. Different fastening means can be used here, such as for example hammerhead bolts with hammerheads or hammerhead nuts that are placed on the inside of the profile of the anchoring member as well as follower plates placed on the outside of the lost edge formwork element.

De uitvinding voorziet voorts in een werkwijze onder toepassing van een randbekistingselement volgens de uitvinding en omvat de volgende maatregelen: 1020123 4 a. Bevestiging, vóór het storten van het vloeibare beton, van de verankeringsorganen aan de binnenzijde van het profielelement met behulp van tijdelijke bevestigingsmiddelen; b. na storten en uitharden van het beton, het demonteren van de tijdelijke S bevestigingsmiddelen waarna plaatsing van de definitieve bevestigingsmiddelen in de verankeringsorganen plaats vindt voor montage van draag- of ondersteuningselementenThe invention further provides a method using an edge formwork element according to the invention and comprises the following measures: a. Fixing, before pouring the liquid concrete, of the anchoring members on the inside of the profile element with the aid of temporary fastening means; b. after pouring and hardening of the concrete, the dismantling of the temporary S fasteners after which placement of the final fasteners in the anchoring members takes place for mounting of supporting or supporting elements

Door het toepassen van de werkwijze is het mogelijk om nu op voordelige wijze 10 gedemonteerd tijdelijk bevestigingsmateriaal b.v. op de bouwplaats te gaan hergebruiken door er opnieuw verankeringsorganen mee te bevestigen op profielelementen, zodat daardoor een vermindering van het verbruik van tijdelijk bevestigingsmateriaal mogelijk wordt en daarmee een kostenbesparing kan worden gerealiseerd.By applying the method, it is now possible to advantageously dismantle temporarily fastening material, e.g. to re-use it on the construction site by re-attaching anchoring members to profile elements, so that a reduction in the consumption of temporary fastening material is possible and thus a cost saving can be realized.

1515

De uitvinding zal hierna beschreven worden aan de hand van een uitvoeringsvoorbeeld met behulp van de tekening.The invention will be described below with reference to an exemplary embodiment with the aid of the drawing.

Fig. 1 toont een perspectivisch aanzicht van een bestaand verloren randbekistingssysteem; 20 Fig. 2 toont een perspectivisch aanzicht van een ander bestaand verloren randbekistingssysteem;FIG. 1 shows a perspective view of an existing lost edge formwork system; FIG. 2 shows a perspective view of another existing lost edge formwork system;

Fig. 3 toont een perspectivisch aanzicht een uitvoeringsvorm van het nieuwe verloren randbekistingselement;FIG. 3 shows a perspective view of an embodiment of the new lost edge formwork element;

Fig. 4 toont in een dwarsdoorsnede een uitvoeringsvorm getoond in Fig. 3 van het 25 verloren randbekistingselement;FIG. 4 shows in cross-section an embodiment shown in FIG. 3 of the lost edge formwork element;

Fig.5 toont een perspectivisch aanzicht van een andere uitvoeringsvorm van het nieuw verloren randbekistingselement;Fig. 5 shows a perspective view of another embodiment of the newly lost edge formwork element;

Fig.6 toont in een dwarsdoorsnede een uitvoeringsvorm getoond in Fig. 5 van het nieuwe verloren randbekistingselement; 30 Fig.7 toont in een dwarsdoorsnede weer een andere uitvoeringsvorm van het nieuwe verloren randbekistingselement.Fig. 6 shows in cross-section an embodiment shown in Figs. 5 of the new lost edge formwork element; Fig. 7 shows in cross-section yet another embodiment of the new lost edge formwork element.

1020123 51020123 5

In Fig.l is het conventionele belastingsysteem weergegeven. Dit bekistingssysteem omvat enerzijds een basisbekistingselement dat bestaat uit breedplaatvloer 1 voorzien van betonwapening 2 en anderzijds uit een randbekistingselement 3 5 omvattend in hoofdzaak een bekistingsplaat 4 vervaardigd uit hout- of houthoudend materiaal. Aan de binnenzijde van bekistingsplaat 4 is een ankerrail 5 ter verankering van bijv. draag- of ondersteuningsorganen (niet getoond) bevestigd d.m.v. houtschroeven (of -nagels) 7. De ankerrail 5 is voorzien van ankers 6 ter verankering in het betonmateriaal (niet getoond). Draag- of ondersteuningsorganen 10 zullen aan de buitenzijde van de betonvloer (niet getoond) in een latere bouwfase gemonteerd worden. De buitenzijde van bekistingplaat 4 is verstevigd door regel 8.The conventional load system is shown in Fig. 1. This formwork system comprises on the one hand a basic formwork element consisting of wide slab floor 1 provided with concrete reinforcement 2 and on the other hand of an edge formwork element 3 comprising substantially a formwork plate 4 made of wood or wood-containing material. An anchor rail 5 for anchoring, for example, support or support members (not shown) is attached to the inside of shuttering plate 4 by means of wood screws (or nails) 7. The anchor rail 5 is provided with anchors 6 for anchoring in the concrete material (not shown). Supporting or supporting members 10 will be mounted on the outside of the concrete floor (not shown) in a later construction phase. The outside of formwork plate 4 is reinforced by line 8.

Fig. 2 toont een conventionele verloren randbekistingssysteem dat bestaat uit geprofileerde staalplaat Θ en breedplaatvloer 1. De geprofileerde staalplaat 9 wordt 15 bevestigd op de breedplaatvloer 1 waarna het vloeibaar beton gestort wordt. Na verharding van beton 10’ ontstaat er een compacte betonvloer 10 met een d.m.v. geprofileerde staalplaat 9 beschermde boven-, zij- en onderrand aan het vrije uiteinde ervan.FIG. 2 shows a conventional lost edge formwork system consisting of profiled steel plate Θ and wide plate floor 1. The profiled steel plate 9 is fixed on the wide plate floor 1 after which the liquid concrete is poured. After hardening of concrete 10 ’, a compact concrete floor 10 with a d.m.v. profiled steel sheet 9 protected top, side and bottom edge at its free end.

20 In Fig.3 is een stalen profielelement 11 getoond, waarbij aan de binnenzijde van dit profielelement 11 alsmede op de breedplaatvloer 1 vloeibaar beton 10’ gestort is. Na verharding van beton 10’ wordt een compacte betonvloer 10 verkregen. Zijrand 12 en bovenrand 13 van gestort beton 10’ alsmede onderrand 14 van het vrije uiteinde 15 van breedplaatvloer 1 zijn door het profielelement 11 overkraagd. 25 Ankerrail 5 voorzien van ankers 6 is met behulp van tijdelijke bevestigingsmiddelen zoals b.v. een meervoud van volgplaten 16, hamerkopschroeven 17 en moeren 18 door de daarvoor geschikte gaten of gleuven 19 tijdelijk bevestigd op stalen profielelement 11. Na verharding van beton 10’ worden de tijdelijke bevestigingmiddelen (volgplaten 16, hamerkopschroeven 17 en moeren 18) 30 verwijderd of gedemonteerd voor hergebruik en vervolgens worden dan de definitieve bevestigingsmiddelen voor bijv. randbeveiliging, maar ook bijv. een 1020123 6 stelbaar metselwerk-ondersteuningelement, gordijngevel-drager, of andere soortgelijke bouwconstructie, gemonteerd. De gedemonteerde tijdelijke bevestigingsmiddelen kunnen op voordelige wijze worden hergebruikt bij het -samenstellen b.v. op de bouwplaats van nieuwe randbekistingselementen door er 5 opnieuw verankeringsorganen mee te bevestigen aan profielelementen.Fig. 3 shows a steel profile element 11, wherein liquid concrete 10 'has been poured on the inside of this profile element 11 and on the wide slab floor 1. A compact concrete floor 10 is obtained after hardening of concrete 10 ". Side edge 12 and top edge 13 of poured concrete 10 "as well as bottom edge 14 of the free end 15 of wide slab floor 1 are overhanged by the profile element 11. Anchor rail 5 provided with anchors 6 is secured by means of temporary fastening means such as e.g. a plurality of follower plates 16, hammer head screws 17 and nuts 18 temporarily fixed on steel profile element 11 by suitable holes or slots 19. After hardening of concrete 10 ', the temporary fastening means (follow plates 16, hammer head screws 17 and nuts 18) 30 are removed or dismantled for reuse and then the definitive fastening means for, for example, edge protection, but also, for example, an adjustable brickwork support element, curtain wall support, or other similar building construction, are then mounted. The dismantled temporary fasteners can advantageously be reused in the assembly, e.g. at the construction site of new edge formwork elements by attaching 5 anchoring members to profile elements again.

Fig.4 geeft de onderlinge dimensionale verhoudingen weer tussen het profielelement 11, breedplaatvloer 1, gestort betonmateriaal 10’, complete betonvloer 10 en ankerrail 5 voorzien van ankers 6 die tijdelijk bevestigd is d.m.v. 10 volgplaat 16, hamerkopschroef 17 en moer 18 op het profielelement.11. U-vormig profielelement 11 heeft een breed basislijf 20 en twee korte parallelle- of haaks omgezette benen 21 en 22. In deze uitvoeringsvorm is het bovenuiteinde 21 korter dan het onderuiteinde 22.Fig. 4 shows the mutual dimensional relationships between the profile element 11, wide slab floor 1, poured concrete material 10 ', complete concrete floor 10 and anchor rail 5 provided with anchors 6 which are temporarily attached by means of. 10 follower plate 16, hammer head screw 17 and nut 18 on the profile element.11. U-shaped profile element 11 has a wide base body 20 and two short legs 21 and 22 flanged in parallel or at right angles. In this embodiment, the upper end 21 is shorter than the lower end 22.

15 Het in Fig.5 getoonde stalen profielelement 23 is L-vormig met een breed opstaand basislijf 20’ en een haaks gevormd been 22’ aan het onderuiteinde ervan. Zijrand 12’ van het gestorte beton 10’ en onderrand 14' van het vrije uiteinde van breedplaatvloer 1 van betonvloer 10 zijn door het profielelement 23 omhuld. Ankerrail 5, voorzien van ankers 6, is met behulp van tijdelijke bevestigingsmiddelen 20 zoals b.v. een aantal volgplaten 16, hamerkopschroeven 17 en moeren 18 door de daarvoor geschikte gaten of gleuven 19 tijdelijk bevestigd op het stalen profielelement 23. Na verharding van beton 10’ kunnen de tijdelijke bevestigingmiddelen (volgplaten 16, hamerkopschroeven 17 en moeren 18) verwijderd of gedemonteerd worden en vervolgens kunnen dan definitieve 25 bevestigingsmiddelen voor een (of meer) draag- of ondersteuningsorgaan (niet getoond), zoals bijv. een metselwerkondersteuning-orgaan gemonteerd worden.The steel profile element 23 shown in Fig. 5 is L-shaped with a wide upright base body 20 "and a square-shaped leg 22" at its lower end. Side edge 12 'of the poured concrete 10' and bottom edge 14 'of the free end of wide slab floor 1 of concrete floor 10 are enveloped by the profile element 23. Anchor rail 5, provided with anchors 6, is secured with the aid of temporary fasteners 20 such as e.g. a number of follower plates 16, hammer head screws 17 and nuts 18 temporarily fixed to the steel profile element 23 by the appropriate holes or slots 19. After hardening of concrete 10 ', the temporary fastening means (follow plates 16, hammer head screws 17 and nuts 18) can be removed or dismantled and then definitive mounting means for one (or more) support or support member (not shown), such as e.g. a masonry support member, can then be mounted.

In Fig.6 zijn de onderlinge dimensionale verhoudingen zichtbaar tussen het profielelement 23 en de ankerrail 5, voorzien van ankers 6, tijdelijk bevestigd d.m.v. 30 volgplaten 16, hamerkopschroeven 17 en moeren 18 volgens de uitvoeringsvorm getoond in Fig.5.In Fig. 6, the mutual dimensional relationships are visible between the profile element 23 and the anchor rail 5, provided with anchors 6, temporarily attached by means of 30 follower plates 16, hammer head screws 17 and nuts 18 according to the embodiment shown in Fig. 5.

1020123 71020123 7

Volgens Fig.7 is het profielelement 24 voorzien van ankerrail 5 met bijhorende anker(s) 6 waarbij het lange liggende been 26 aan de onderzijde van het profielelement 24 voorzien is van bevestigingsmiddelen 25 voor montage op de 5 breedplaatvloer 1. Het lange liggende been 26 is bovendien ook voorzien van een naar boven omgezet uiteinde 27 waardoor het profielelement 24 in het gestorte beton 10’ geïntegreerd (verankerd) wordt. D.mv. deze constructieoplossing wordt de gewenste rechthoekige uitsparing 28 met afmetingen van bijv. b x h = 100 mm x 50 mm in de betonvloer 10 verkregen.According to Fig. 7, the profile element 24 is provided with anchor rail 5 with associated anchor (s) 6, wherein the long lying leg 26 on the underside of the profile element 24 is provided with fixing means 25 for mounting on the wide slab floor 1. The long lying leg 26 is furthermore also provided with an end 27 which is turned upwards, as a result of which the profile element 24 is integrated into the poured concrete 10 '(anchored). D.mv. With this construction solution the desired rectangular recess 28 with dimensions of, for example, b x h = 100 mm x 50 mm is obtained in the concrete floor 10.

1010

De gleuven/gaten 19 getoond ίή de figuren 3-7 kunnen rond, langwerpig of vierkant zijn maar ook in een andere vorm uitgevoerd worden. Zij kunnen verticaal of horizontaal, naast elkaar of onder elkaar, of in een combinatie ervan geplaatst worden, afhankelijk van de gewenste (toekomstige) positie van de te monteren 15 draag- of ondersteuningsorganen, zoals bijv. metselwerkondersteuning-organen.The slots / holes 19 shown in Figures 3-7 can be round, elongated or square, but can also be made in a different shape. They can be placed vertically or horizontally, next to each other or below each other, or in a combination thereof, depending on the desired (future) position of the support or support members to be mounted, such as, for example, brickwork support members.

Verankeringsorganen uitgevoerd als ankerrails 5, voorzien van ankers 6, getoond in figuren 3-7, kunnen behalve uit het getoonde stalen C-profiel ook uit andere profielen of materialen zoals bijv. U-profiel, etc. vervaardigd worden. Tijdelijke 20 bevestigingmiddelen als volgplaten 16, hamerkopschroeven 17 en moeren 18 kunnen naar keuze ook andere geschikte uitvoeringsvormen hebben.Anchoring members designed as anchor rails 5, provided with anchors 6, shown in figures 3-7, can be manufactured from other profiles or materials such as, for example, U-profile, etc., in addition to the steel C-profile shown. Temporary fasteners such as follower plates 16, hammer head screws 17 and nuts 18 may optionally also have other suitable embodiments.

25 1020123 3025 1020123 30

Claims (4)

1. Randbekistingselement ten gebruike bij vervaardiging en bescherming van de vrije uiteinden van een betonvloer (10) of -plafondelement alsmede voor het installeren van verankeringsorganen (5) bij montage van draag- of ondersteuningsorganen zoals bijv. een stelbaar metselwerkondersteuningselement, een randbeveiligingselement, een 10 gordijngeveldrager of een andere soortgelijke bouwconstructie, omvattend: a. een profielelement uit één stuk (11, 23, 24), bij voorkeur uit staal, kunststof, aluminium of een combinatie ervan, waarbij aan de binnenzijde van het profielelement (11, 23, 24) het vloeibaar betonmateriaal gestort wordt, zodanig dat tenminste zij- en onderrand van het vrije uiteinde van de te 15 vervaardigen betonvloer of het plafondelement door het randbekistingsprofielelement omvat wordt en dat na verharding van het beton tezamen met het profielelement een geheel vormt; een en ander zodanig, dat de opstaande zijwand voorzien is van openingen zoals een gat of sleuf, voor doorvoer van bevestigingsmiddelen; 20 b. verankeringsorganen (5) zoals een ankerrail met een U- of C-profiel al dan niet voorzien van ankers (6), geschikt voor het monteren van bevestigingsmiddelen, welke voor het storten van het beton losneembaar tegen de binnenzijde van het profielelement worden geklemd m.b.v. tijdelijke bevestigingsmiddelen (16,17,18); 25 c. tijdelijke bevestigingsmiddelen (16, 17, 18) welke na het storten van het beton geheel worden verwijderd zodat de definitieve bevestigingsmiddelen kunnen worden aangebracht in de verankeringsorganen voor montage van draag- of ondersteuningselementen. 10201231. Edge form element for use in the manufacture and protection of the free ends of a concrete floor (10) or ceiling element and for the installation of anchoring elements (5) when mounting support or support elements such as, for example, an adjustable masonry support element, an edge protection element, a 10 curtain wall support or other similar building construction, comprising: a. a one-piece profile element (11, 23, 24), preferably made of steel, plastic, aluminum or a combination thereof, wherein on the inside of the profile element (11, 23, 24 the liquid concrete material is poured in such a way that at least the side and bottom edge of the free end of the concrete floor or ceiling element to be manufactured is covered by the edge formwork profile element and that after hardening of the concrete together with the profile element forms a whole; all this such that the upright side wall is provided with openings such as a hole or slot for passage of fastening means; B. anchoring members (5) such as an anchor rail with a U or C profile, whether or not provided with anchors (6), suitable for mounting fasteners, which are releasably clamped against the inside of the profile element for pouring the concrete by means of e.g. temporary fasteners (16, 17, 18); C. temporary fasteners (16, 17, 18) which are completely removed after pouring the concrete so that the definitive fasteners can be arranged in the anchoring members for mounting supporting or supporting elements. 1020123 2. Randbekistingselement volgens conclusie 1, met het kenmerk, dat de tijdelijke bevestigingselementen omvatten: a. een uit de ankerrail verwijderbaar schroefelement, waarvan de kop is 5 aangebracht in het verankeringsorgaan of de ankerrail en waarbij zijn uiteinde door een opening in het profielelement is gevoerd; b. volgplaat, welke op het schroefelement is aangebracht aan de buitenzijde van het profielelement; c. moer welke op het schroefelement is aangebracht en aanligt tegen de 10 volgplaat.2. Edge form element as claimed in claim 1, characterized in that the temporary fastening elements comprise: a. A screw element removable from the anchor rail, the head of which is arranged in the anchoring member or anchor rail and wherein its end is led through an opening in the profile element ; b. follower plate, which is arranged on the outside of the profile element on the screw element; c. nut which is mounted on the screw element and abuts against the follower plate. 3. Randbekistingselement volgens conclusie 2, met het kenmerk, dat het verwijderbare schroefelement een hamerkopbout is.3. Edge form element according to claim 2, characterized in that the removable screw element is a hammer head bolt. 4. Werkwijze ter vervaardiging en bescherming van de vrije uiteinden van een betonvloer of plafondelement onder toepassing van een randbekistingselement volgens een der voorgaande conclusies 1-3 omvattende de volgende maatregelen: a. bevestiging, vóór het storten van het vloeibare beton, van de 20 verankeringsorganen (5) aan de binnenzijde van het profielelement (11, 23, 24. met behulp van tijdelijke bevestigingsmiddelen(16,17,18); b. na storten en uitharden van het beton, het demonteren van de tijdelijke bevestigingsmiddelen waarna plaatsing van de definitieve bevestigingsmiddelen in de verankeringsorganen (5) plaatsvindt voor 25 montage van draag- of ondersteuningselementen. - 0 201 234. Method for manufacturing and protecting the free ends of a concrete floor or ceiling element using an edge formwork element according to any one of the preceding claims 1-3, comprising the following measures: a. Fixing, prior to pouring of the liquid concrete, of the anchoring members (5) on the inside of the profile element (11, 23, 24. using temporary fastening means (16, 17, 18), b) after pouring and hardening the concrete, dismantling the temporary fastening means after which placement of the definitive fastening means takes place in the anchoring members (5) for mounting supporting or supporting elements
NL1020123A 2002-03-07 2002-03-07 Lost edge shuttering, comprises single piece profile for contact with liquid concrete and anchor devices securable to inside of profile via temporary fasteners NL1020123C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
NL1020123A NL1020123C1 (en) 2002-03-07 2002-03-07 Lost edge shuttering, comprises single piece profile for contact with liquid concrete and anchor devices securable to inside of profile via temporary fasteners

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1020123A NL1020123C1 (en) 2002-03-07 2002-03-07 Lost edge shuttering, comprises single piece profile for contact with liquid concrete and anchor devices securable to inside of profile via temporary fasteners
NL1020123 2002-03-07

Publications (1)

Publication Number Publication Date
NL1020123C1 true NL1020123C1 (en) 2003-09-12

Family

ID=29244923

Family Applications (1)

Application Number Title Priority Date Filing Date
NL1020123A NL1020123C1 (en) 2002-03-07 2002-03-07 Lost edge shuttering, comprises single piece profile for contact with liquid concrete and anchor devices securable to inside of profile via temporary fasteners

Country Status (1)

Country Link
NL (1) NL1020123C1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1860251A1 (en) * 2006-05-24 2007-11-28 Arcelor Construction France Concrete floor of the type with with collaborative form-slabs having an opening and building kit for realizing said opening
GB2485792A (en) * 2010-11-24 2012-05-30 Wincro Metal Ind Ltd Structural fixing element for embedding into concrete
NL2006645C2 (en) * 2011-04-20 2012-10-23 Dycore B V FLOOR ELEMENT WITH SHARED RANDBOX.
GB2592951A (en) * 2020-03-11 2021-09-15 Balanced Earth Homes Ltd Improvements relating to insulated raft foundations

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1860251A1 (en) * 2006-05-24 2007-11-28 Arcelor Construction France Concrete floor of the type with with collaborative form-slabs having an opening and building kit for realizing said opening
GB2485792A (en) * 2010-11-24 2012-05-30 Wincro Metal Ind Ltd Structural fixing element for embedding into concrete
NL2006645C2 (en) * 2011-04-20 2012-10-23 Dycore B V FLOOR ELEMENT WITH SHARED RANDBOX.
GB2592951A (en) * 2020-03-11 2021-09-15 Balanced Earth Homes Ltd Improvements relating to insulated raft foundations

Similar Documents

Publication Publication Date Title
US8844224B2 (en) Utility dowel bracket
US20100005736A1 (en) Method of concrete building construction and adjustable brace system therefor
KR101018411B1 (en) Beam side form for deep deck and joint structure and construction method of reinforce concrete beam and slab for deep deck floor system thereof
AU2013206540B1 (en) An edge-formwork element with integrated channel
WO2016068692A1 (en) A formwork arrangement
NL1020123C1 (en) Lost edge shuttering, comprises single piece profile for contact with liquid concrete and anchor devices securable to inside of profile via temporary fasteners
US10829945B2 (en) Construction assembly
WO2016203483A1 (en) Composite framing and wall
US20110000150A1 (en) Construction insert
US5843323A (en) Adjustable window pour mold mounting system
KR100614959B1 (en) A combined structure including a curtain box
KR100946192B1 (en) Apparatus for removing and coupling forms
EP3828364A1 (en) Assembly kit and method for assembling a safety railing, as well as such a safety railing
KR101966138B1 (en) The supporter for concrete forms of slab
JP2000234410A (en) Driven form and slab construction method making use thereof
RU122678U1 (en) FORMING SHIELD
US10577794B2 (en) Wall construction
KR100677873B1 (en) Concrete Crack Prevention Device
JP2001173240A (en) Reinforced outer wall and method of reinforcing outer wall
KR20190000607U (en) Safety railing for Form Meong-yeoi
AU2014203324A1 (en) A combination edge-formwork, post-tension and facade fixing assembly
EP4321712A1 (en) Block for supporting a hoarding system
KR102606899B1 (en) Wall structure using combined precast foundation reinforcement network and precast wall using and its construction method
EP3249146A1 (en) A fastening device and method and an installation comprising such a fastening device
KR200402508Y1 (en) Concrete Crack Prevention Device

Legal Events

Date Code Title Description
PD1B A search report has been drawn up
VD2 Lapsed due to expiration of the term of protection

Effective date: 20080307