MY171194A - A construction method of a large-scale raft foundation in a high-temperature environment - Google Patents

A construction method of a large-scale raft foundation in a high-temperature environment

Info

Publication number
MY171194A
MY171194A MYPI2014702646A MYPI2014702646A MY171194A MY 171194 A MY171194 A MY 171194A MY PI2014702646 A MYPI2014702646 A MY PI2014702646A MY PI2014702646 A MYPI2014702646 A MY PI2014702646A MY 171194 A MY171194 A MY 171194A
Authority
MY
Malaysia
Prior art keywords
raft foundation
construction
concrete
pouring
construction joint
Prior art date
Application number
MYPI2014702646A
Inventor
Mingbao Chen
Zuguo Liu
Original Assignee
China Mcc17 Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mcc17 Group Ltd filed Critical China Mcc17 Group Ltd
Publication of MY171194A publication Critical patent/MY171194A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Foundations (AREA)

Abstract

A construction method of a large-scale raft foundation in a high-temperature environment is executed by dividing a raft foundation into small parts for forming a "division of cabins", adopting a recessed construction joint at a middle portion of a thickness of a raft foundation construction joint, laying a layer of geotextile 3 on a non-reinforced concrete cushion 2, laying a layer of PVC waterproof rolling material 4 on the geotextile 3, plastering a mortar leveling layer 5 on the PVC waterproof rolling material 4, disposing a rubber water stop 10 on the construction joint, setting a level grouting pipe 8 and a longitudinal grouting pipe 9 on the rubber water stop 10, pouring small concrete after a complete construction of a recess of the construction joint and the waterproof design, maintaining the concrete for seven days, and subjecting one side or all sides of the poured raft foundation divided into in small parts in the "division of cabins" to an overall push construction method. The subject invention not only assures of not generating crakes but also overcomes a waterproof construction in contradiction to a pouring of raft foundation concrete derived from an" interval pouring" method by pouring one concrete part and preserving another concrete part, thereby increasing a use efficiency of mechanism and shortening the term of works.
MYPI2014702646A 2013-03-15 2013-07-08 A construction method of a large-scale raft foundation in a high-temperature environment MY171194A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310083221.5A CN103205979B (en) 2013-03-15 2013-03-15 Method for constructing large raft foundation under high temperature

Publications (1)

Publication Number Publication Date
MY171194A true MY171194A (en) 2019-10-01

Family

ID=48753371

Family Applications (1)

Application Number Title Priority Date Filing Date
MYPI2014702646A MY171194A (en) 2013-03-15 2013-07-08 A construction method of a large-scale raft foundation in a high-temperature environment

Country Status (3)

Country Link
CN (1) CN103205979B (en)
MY (1) MY171194A (en)
WO (1) WO2014139252A1 (en)

Families Citing this family (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264676A (en) * 2014-09-25 2015-01-07 沈建东 Construction method of mass concrete of high-rise building foundations
CN104499498B (en) * 2014-12-24 2016-11-23 河北省电力勘测设计研究院 A kind of construction method of mass concrete building
CN104746526B (en) * 2015-04-10 2016-06-15 天津市赛英工程技术咨询有限公司 A kind of raft foundation with fluid pipeline path
CN106120873B (en) * 2016-07-06 2019-07-26 江苏江中集团有限公司 A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN106320274A (en) * 2016-10-27 2017-01-11 中国葛洲坝集团第工程有限公司 Horizontal construction joint of rockfill dam face and construction method of horizontal construction joint
CN108547337B (en) * 2016-11-22 2020-02-28 叶香菲 Foundation construction technology for building foundation
CN109024700A (en) * 2017-02-27 2018-12-18 中冶建工集团有限公司 A kind of water-proof concrete configuration device and its building basement external wall waterproof construction method
CN106869188A (en) * 2017-04-07 2017-06-20 黄以恒 The constructing structure and its construction method of a kind of sole plate post-poured strip anti-seep water
WO2018214144A1 (en) * 2017-05-26 2018-11-29 南通八建集团有限公司 Construction control method for 3.3 m thick raft foundation for super high-rise housing project
CN109308362B (en) * 2017-07-28 2022-12-13 广联达科技股份有限公司 Method and system for constructing raft plate post-cast strip and computer device
CN108240038B (en) * 2018-03-15 2023-09-08 北京城建集团有限责任公司 Ultra-large plane concrete structure based on multistage grid type post-cast strip and construction method
CN108867822A (en) * 2018-08-10 2018-11-23 中建八局第二建设有限公司 A kind of constructing device and its construction method of anti-water Double-layer floor drain
CN109208907A (en) * 2018-10-19 2019-01-15 中国十七冶集团有限公司 High temperature and the temperature difference it is big under conditions of overlength reinforced concrete wall panel compartment construction method
CN109778917B (en) * 2019-02-22 2024-02-09 中铁第六勘察设计院集团有限公司 Cold joint waterproof structure for underground engineering construction and construction method
CN110067311B (en) * 2019-05-14 2024-04-12 长江勘测规划设计研究有限责任公司 Connection structure and method for joint of new and old concrete members
CN110295630B (en) * 2019-07-26 2024-05-31 深圳市建工集团股份有限公司 Multilayer constraint anti-leakage post-pouring belt structure
CN111335364B (en) * 2020-03-06 2022-07-26 河北建设集团股份有限公司 Construction method for steel bar structure at concrete outer wall column when steel plate waterstop meets concrete
CN111441393B (en) * 2020-05-12 2024-09-24 中铁建工集团有限公司 Waterproof closing-in technology for foundation of high-low topography building
CN112081146A (en) * 2020-09-03 2020-12-15 江苏凯伦建材股份有限公司 Construction method of polymer self-adhesive film waterproof coiled material capable of being constructed in rainy season
CN112177001B (en) * 2020-09-18 2022-11-04 中国三峡建设管理有限公司 Method for improving construction efficiency of large-volume concrete pouring by dragging or overturning mold
CN112681324A (en) * 2020-12-16 2021-04-20 中建科技集团有限公司 Construction method of underground ultra-long thin-wall concrete structure and concrete
CN112779931B (en) * 2021-01-26 2024-07-02 中国五冶集团有限公司 Basement construction joint waterproof device, waterproof structure and waterproof method
CN113323010A (en) * 2021-05-17 2021-08-31 宇旺建工集团有限公司 Construction method of embedded tower crane foundation
CN113529774B (en) * 2021-07-19 2023-02-28 中国十九冶集团有限公司 Construction method for mounting large foundation steel bars
CN113818468B (en) * 2021-08-11 2022-11-04 广州地铁设计研究院股份有限公司 First-stage construction method for flexibly reserving metro vehicle section structure of floor type high-rise building
CN113756371A (en) * 2021-09-15 2021-12-07 中国二十二冶集团有限公司 Concrete density construction method at horizontal seam of waterproof concrete
CN114059654A (en) * 2021-12-03 2022-02-18 河南沃克曼建设工程有限公司 Rapid construction method for improved AAO biological pond chamber jumping method of sewage treatment station
CN114059505B (en) * 2021-12-16 2023-08-25 中国电建集团贵阳勘测设计研究院有限公司 Hydropower station water inrush position grouting construction method and grouting equipment
CN114525800A (en) * 2022-02-28 2022-05-24 苏州佳固士新材料科技有限公司 Leakage treatment method for basement raft plate
CN115341575A (en) * 2022-09-03 2022-11-15 锦汇建设集团有限公司 Basement anti-cracking raft and construction method thereof
CN115897589A (en) * 2022-10-31 2023-04-04 中铁一局集团市政环保工程有限公司 Waterproof concrete interval pouring construction method for buried sewage treatment plant
CN116163331B (en) * 2023-03-23 2024-05-14 中国建筑第二工程局有限公司 Construction process of large-thickness variable-section raft foundation
CN116815837B (en) * 2023-08-29 2023-11-17 上海建工一建集团有限公司 Pre-lifting construction method for soft soil geological super-high-rise piled raft foundation
CN117822592B (en) * 2024-03-05 2024-05-28 山东金城建设有限公司 Construction method of post-pouring belt concrete blocking structure and post-pouring belt concrete blocking structure

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000212971A (en) * 1999-01-25 2000-08-02 Hitoshi Mori Pc foundation slab and pc foundation beam member for mat foundation, and work method for mat foundation using them
KR100412980B1 (en) * 2001-08-07 2003-12-31 주식회사유신코퍼레이션 Method for reducing heat of hydration generated from mass concrete
JP2007039948A (en) * 2005-08-02 2007-02-15 Canadian Home Kk Foundation construction method and foundation
JP2008285808A (en) * 2007-05-15 2008-11-27 Ksk:Kk Composition for leveling material, and its use method
CN101962997A (en) * 2010-09-30 2011-02-02 天津二十冶建设有限公司 Mass concrete construction method of super-thick foundation
CN102041809A (en) * 2010-11-17 2011-05-04 中国核工业华兴建设有限公司 Construction method for nuclear island raft foundation of nuclear power station
CN102433930A (en) * 2011-08-26 2012-05-02 中国建筑东北设计研究院有限公司 Overground-underground bidirectional ultra-long concrete seamless design method
CN102425307B (en) * 2011-10-19 2012-09-05 江苏瑞峰建设集团有限公司 Casting method for avoiding formation of mass concrete cracks
CN102363960A (en) * 2011-11-23 2012-02-29 国核工程有限公司 Large-volume concrete pouring method for nuclear island raft foundation
CN102653946A (en) * 2012-05-21 2012-09-05 中国十七冶集团有限公司 Waterproof construction method for setting rubber waterstop at bottom of reinforced concrete raft foundation

Also Published As

Publication number Publication date
CN103205979B (en) 2015-04-08
WO2014139252A1 (en) 2014-09-18
CN103205979A (en) 2013-07-17

Similar Documents

Publication Publication Date Title
MY171194A (en) A construction method of a large-scale raft foundation in a high-temperature environment
WO2012177143A3 (en) A method for constructing a tunnel course, and structural element for use by the method
GB2557702A (en) Tunnel
NZ721038A (en) Ground improvement method
CA2927895C (en) Concrete element comprising a sound-absorber
EA201490827A1 (en) METHOD OF EXTRACTING WITH A CIRCLE WITH CONTINUOUS CONCRETE LINES
PH12017501962A1 (en) Scour protection for an underwater bottom alongside a quay wall, and method for providing the same
AR088174A1 (en) PROCEDURE TO PRODUCE A CONSTRUCTION MATERIAL
CN103882836B (en) A kind of method and filling device controlling Sluice Pier crack
CN203022112U (en) Prefabricated concrete open trench
CN204435431U (en) Basement bottom board waterproof construction
AR083440A1 (en) METHOD AND DEVICE FOR THE DRAINAGE OF INFILTRATED WATER IN HYDRAULIC STRUCTURES
CN204435434U (en) Basement side wall ater-casting water proof structure
CN204435432U (en) Basement side wall waterproof construction
CN204626473U (en) Basement roof waterproof construction
CN203144968U (en) Concrete slab expansion joint
CN207672608U (en) The underground pipe gallery of 3D printing
NZ628259A (en) Concrete shuttering
CN203065977U (en) Open ditch under ramp
CN203412212U (en) Roof waterproofing structure for crane plant
CN205382573U (en) Waterproof structure of basement concrete wall external corner that has brick protection wall
MX2017002173A (en) Prefabricated concrete surface foundation system for photovoltaic and thermosolar plants and method for the implementation thereof.
UA83660U (en) Method for rebuilding houses and facilities
GB2583665A9 (en) Composite construction
Qin et al. Prevention measures for diffraction flows around H-type steel joint of diaphragm wall