CN203065977U - Open ditch under ramp - Google Patents

Open ditch under ramp Download PDF

Info

Publication number
CN203065977U
CN203065977U CN 201320042953 CN201320042953U CN203065977U CN 203065977 U CN203065977 U CN 203065977U CN 201320042953 CN201320042953 CN 201320042953 CN 201320042953 U CN201320042953 U CN 201320042953U CN 203065977 U CN203065977 U CN 203065977U
Authority
CN
China
Prior art keywords
pea gravel
gravel concreten
concrete cover
thickness
brickwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320042953
Other languages
Chinese (zh)
Inventor
郑新海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320042953 priority Critical patent/CN203065977U/en
Application granted granted Critical
Publication of CN203065977U publication Critical patent/CN203065977U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an open ditch under a ramp, which is characterized by comprising a fine stone concrete cushion layer, bricks, water-proof mortar and a concrete cover plate, wherein the fine stone concrete cushion layer is arranged on plain soil; the thickness of the fine stone concrete cushion layer is 60 mm; two bricks are built on the fine stone concrete cushion layer; the thickness of each brick is 80 mm; a brickwork forms a drain ditch with the width of 200 mm; the surface of the brickwork is painted with the water-proof mortar; the concrete cover plate is arranged at the top of the drain ditch; and the thickness of the concrete cover plate is 120 mm.

Description

Open drain under the ramp
Technical field
The utility model relates to open drain under a kind of ramp, is applicable to construction field.
Background technology
Outdoor open drain structure refers at the outdoor raceway groove that arranges to get rid of the water discharge technology measure of outdoor ponding.How effectively draining guarantee simultaneously outdoor open drain non-leakage be the problem that runs in the engineering practice.
The utility model content
The technical problem that the utility model solves provides open drain under a kind of ramp, solves existing technical deficiency.
The utility model comprises pea gravel concreten bed course, brick, waterproofing mortar, concrete cover, above the plain soil pea gravel concreten bed course is set, the pea gravel concreten cushion thickness is 60mm, build two skin bricks above the pea gravel concreten bed course by laying bricks or stones, every skin brick height is 80mm, and it is the gutter of 200mm that brickwork forms width, brickwork external coating waterproofing mortar, the top, gutter arranges concrete cover, and concrete cover thickness is 120mm.
The utility model is simple and practical.
Description of drawings
Open drain schematic diagram under Fig. 1 ramp.
Accompanying drawing sign: 1, pea gravel concreten bed course, 2, brick, 3, waterproofing mortar, 4, concrete cover.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Fig. 1 is open drain schematic diagram under the ramp.The utility model comprises pea gravel concreten bed course 1, brick 2, waterproofing mortar 3, concrete cover 4, above the plain soil pea gravel concreten bed course 1 is set, pea gravel concreten bed course 1 thickness is 60mm, build two skin bricks 2 above the pea gravel concreten bed course 1 by laying bricks or stones, every skin brick 2 highly is 80mm, and it is the gutter of 200mm that brickwork forms width, brickwork external coating waterproofing mortar, the top, gutter arranges concrete cover 4, and concrete cover 4 thickness are 120mm.

Claims (1)

1. open drain under the ramp, it is characterized in that comprising pea gravel concreten bed course, brick, waterproofing mortar, concrete cover, above the plain soil pea gravel concreten bed course is set, the pea gravel concreten cushion thickness is 60mm, builds two skin bricks above the pea gravel concreten bed course by laying bricks or stones, and every skin brick height is 80mm, it is the gutter of 200mm that brickwork forms width, brickwork external coating waterproofing mortar, the top, gutter arranges concrete cover, and concrete cover thickness is 120mm.
CN 201320042953 2013-01-10 2013-01-10 Open ditch under ramp Expired - Fee Related CN203065977U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320042953 CN203065977U (en) 2013-01-10 2013-01-10 Open ditch under ramp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320042953 CN203065977U (en) 2013-01-10 2013-01-10 Open ditch under ramp

Publications (1)

Publication Number Publication Date
CN203065977U true CN203065977U (en) 2013-07-17

Family

ID=48764788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320042953 Expired - Fee Related CN203065977U (en) 2013-01-10 2013-01-10 Open ditch under ramp

Country Status (1)

Country Link
CN (1) CN203065977U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111412013A (en) * 2020-03-26 2020-07-14 中电建十一局工程有限公司 Construction method of weak surrounding rock tunnel in water-rich area

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111412013A (en) * 2020-03-26 2020-07-14 中电建十一局工程有限公司 Construction method of weak surrounding rock tunnel in water-rich area

Similar Documents

Publication Publication Date Title
CN202099816U (en) Prefabricated waterproof and soil-blocking plate for later poured band of outer wall of basement
CN202450559U (en) Waterproof structure of basement
CN202466648U (en) Waterproof structure of basement
CN203065977U (en) Open ditch under ramp
CN203022112U (en) Prefabricated concrete open trench
CN203200795U (en) Waterproof structure for post-cast strip
CN204780507U (en) Drainage garden way
CN204626473U (en) Basement roof waterproof construction
CN203821190U (en) Ecological water storing brick
CN204435431U (en) Basement bottom board waterproof construction
CN203160086U (en) Waterless pavement device
CN204435432U (en) Basement side wall waterproof construction
CN203412212U (en) Roof waterproofing structure for crane plant
CN103437408B (en) Built-in impermeable floor drain
CN203007769U (en) Automobile ramp
CN203096772U (en) Basement concrete slab waterproof structure
CN202492916U (en) Concrete drainage ditch
CN204001327U (en) A kind of settling tank washroom backfill earth construction
CN203145173U (en) Embedding structure of prefabricated open trench
CN203022113U (en) Prefabricated open trench burying structure
CN203008107U (en) Apron slope with concrete open trench
CN202500209U (en) Brick drainage ditch
CN203201034U (en) Planted roof
CN203200892U (en) Road surface water-collecting well
CN203066107U (en) Indoor open trench of basement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130717

Termination date: 20140110