MY150281A - System and method for monitoring and controlling production from wells - Google Patents
System and method for monitoring and controlling production from wellsInfo
- Publication number
- MY150281A MY150281A MYPI20094363A MYPI20094363A MY150281A MY 150281 A MY150281 A MY 150281A MY PI20094363 A MYPI20094363 A MY PI20094363A MY PI20094363 A MYPI20094363 A MY PI20094363A MY 150281 A MY150281 A MY 150281A
- Authority
- MY
- Malaysia
- Prior art keywords
- well
- wells
- monitoring
- sensor measurements
- production
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000012544 monitoring process Methods 0.000 title 1
- 238000005259 measurement Methods 0.000 abstract 2
- 238000004590 computer program Methods 0.000 abstract 1
- 239000012530 fluid Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/737,402 US20080262737A1 (en) | 2007-04-19 | 2007-04-19 | System and Method for Monitoring and Controlling Production from Wells |
US11/738,327 US20080257544A1 (en) | 2007-04-19 | 2007-04-20 | System and Method for Crossflow Detection and Intervention in Production Wellbores |
Publications (1)
Publication Number | Publication Date |
---|---|
MY150281A true MY150281A (en) | 2013-12-31 |
Family
ID=39876171
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MYPI20094363A MY150281A (en) | 2007-04-19 | 2008-04-18 | System and method for monitoring and controlling production from wells |
Country Status (10)
Country | Link |
---|---|
US (1) | US20080257544A1 (ru) |
AU (2) | AU2008242758A1 (ru) |
BR (2) | BRPI0810415A2 (ru) |
CA (2) | CA2684281A1 (ru) |
GB (2) | GB2461210B (ru) |
MX (1) | MX2009011200A (ru) |
MY (1) | MY150281A (ru) |
NO (2) | NO20093167L (ru) |
RU (1) | RU2484242C2 (ru) |
WO (1) | WO2008131218A2 (ru) |
Families Citing this family (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7926593B2 (en) | 2004-11-23 | 2011-04-19 | Weatherford/Lamb, Inc. | Rotating control device docking station |
US7711486B2 (en) * | 2007-04-19 | 2010-05-04 | Baker Hughes Incorporated | System and method for monitoring physical condition of production well equipment and controlling well production |
US8251140B2 (en) * | 2009-09-15 | 2012-08-28 | Schlumberger Technology Corporation | Fluid monitoring and flow characterization |
US20110139446A1 (en) * | 2009-12-15 | 2011-06-16 | Baker Hughes Incorporated | Method of Determining Queried Fluid Cuts Along a Tubular |
CA2705680C (en) | 2010-05-27 | 2012-11-27 | Imperial Oil Resources Limited | Creation of hydrate barrier during in situ hydrocarbon recovery |
US9324049B2 (en) | 2010-12-30 | 2016-04-26 | Schlumberger Technology Corporation | System and method for tracking wellsite equipment maintenance data |
US9175539B2 (en) | 2012-05-21 | 2015-11-03 | Bp Corporation North America Inc. | Methods and systems for pressure testing components of a hydrocarbon well system |
CA2874977C (en) * | 2012-06-15 | 2018-05-29 | Landmark Graphics Corporation | Systems and methods for optimizing facility limited production and injection in an integrated reservoir and gathering network |
CN103541699B (zh) * | 2012-07-12 | 2015-12-02 | 中国石油化工股份有限公司 | 防反窜分层流量控制采油管柱 |
US8857518B1 (en) | 2012-09-26 | 2014-10-14 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
WO2014051568A1 (en) | 2012-09-26 | 2014-04-03 | Halliburton Energy Services, Inc. | In-line sand screen gauge carrier |
US8893783B2 (en) | 2012-09-26 | 2014-11-25 | Halliburton Energy Services, Inc. | Tubing conveyed multiple zone integrated intelligent well completion |
US9598952B2 (en) | 2012-09-26 | 2017-03-21 | Halliburton Energy Services, Inc. | Snorkel tube with debris barrier for electronic gauges placed on sand screens |
SG11201502036PA (en) | 2012-09-26 | 2015-04-29 | Halliburton Energy Services Inc | Single trip multi-zone completion systems and methods |
US9163488B2 (en) | 2012-09-26 | 2015-10-20 | Halliburton Energy Services, Inc. | Multiple zone integrated intelligent well completion |
AU2012391060B2 (en) | 2012-09-26 | 2017-02-02 | Halliburton Energy Services, Inc. | Method of placing distributed pressure gauges across screens |
AU2012391059B2 (en) | 2012-09-26 | 2017-02-02 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
EP2885494B1 (en) | 2012-09-26 | 2019-10-02 | Halliburton Energy Services, Inc. | Snorkel tube with debris barrier for electronic gauges placed on sand screens |
US20140126325A1 (en) * | 2012-11-02 | 2014-05-08 | Silixa Ltd. | Enhanced seismic surveying |
WO2015040042A1 (en) * | 2013-09-17 | 2015-03-26 | Mærsk Olie Og Gas A/S | Detection of a watered out zone in a segmented completion |
US9611731B2 (en) * | 2013-10-04 | 2017-04-04 | Halliburton Energy Services, Inc. | Determination of formation dip/azimuth with multicomponent induction data |
US20150114631A1 (en) * | 2013-10-24 | 2015-04-30 | Baker Hughes Incorporated | Monitoring Acid Stimulation Using High Resolution Distributed Temperature Sensing |
GB2538371B (en) * | 2013-11-13 | 2020-07-01 | Sensia Netherlands B V | Well testing and monitoring |
US20150134258A1 (en) * | 2013-11-13 | 2015-05-14 | Schlumberger Technology Corporation | Well Pressure Control Event Detection and Prediction Method |
WO2016067222A1 (en) * | 2014-10-28 | 2016-05-06 | Onesubsea Ip Uk Limited | Additive management system |
US10280740B2 (en) * | 2014-12-03 | 2019-05-07 | Baker Hughes, A Ge Company, Llc | Sandface liner with power, control and communication link via a tie back string |
CN106150445B (zh) * | 2015-04-14 | 2018-09-21 | 大庆丹枫石油技术开发有限公司 | 一趟管柱两层分层射孔-分层测试联作管柱及其操作方法 |
CN106150446B (zh) * | 2015-04-14 | 2018-12-21 | 华通科创(唐山)石油工程技术服务有限公司 | 一种可先测下层的跨隔射孔-测试联作管柱及其操作方法 |
CN106285548B (zh) * | 2015-05-12 | 2018-09-21 | 江苏省金峰石油机械制造有限公司 | 封隔器-可开关筛管组合装置 |
CN106285559B (zh) * | 2015-05-29 | 2018-09-07 | 良工阀门集团有限公司 | 压控式常开阀与压控式常闭阀组合装置及其操作方法 |
WO2017023318A1 (en) | 2015-08-05 | 2017-02-09 | Halliburton Energy Services Inc. | Quantification of crossflow effects on fluid distribution during matrix injection treatments |
RU2604103C1 (ru) * | 2015-08-31 | 2016-12-10 | Общество с ограниченной ответственностью "Газпром добыча Кузнецк" | Способ автоматического управления метаноугольной скважиной |
CN105134140A (zh) * | 2015-09-17 | 2015-12-09 | 东营嘉岩石油工艺研究院 | 固定链条式长冲程抽油机 |
GB2544799A (en) * | 2015-11-27 | 2017-05-31 | Swellfix Uk Ltd | Autonomous control valve for well pressure control |
US10215002B2 (en) | 2016-05-05 | 2019-02-26 | Saudi Arabian Oil Company | Determining wellbore leak crossflow rate between formations in an injection well |
RU2634754C1 (ru) * | 2016-08-16 | 2017-11-07 | Публичное акционерное общество "Акционерная нефтяная Компания "Башнефть" | Способ автоматического распределения суммарного потока газа по нагнетательным скважинам при водогазовом методе воздействия на пласт |
US10401207B2 (en) * | 2016-09-14 | 2019-09-03 | GE Oil & Gas UK, Ltd. | Method for assessing and managing sensor uncertainties in a virtual flow meter |
US20180187533A1 (en) * | 2017-01-05 | 2018-07-05 | Saudi Arabian Oil Company | Hydrocarbon production by fluidically isolating vertical regions of formations |
RU2652220C1 (ru) * | 2017-06-27 | 2018-04-25 | Акционерное общество "Новомет-Пермь" | Способ определения дебита скважин, оборудованных насосными установками |
RU2652219C1 (ru) * | 2017-06-27 | 2018-04-25 | Акционерное общество "Новомет-Пермь" | Способ определения дебита скважин, оборудованных насосными установками |
RU2653210C2 (ru) * | 2017-08-15 | 2018-05-07 | Олег Сергеевич Николаев | Способ поинтервальной добычи нефти из многопластовой скважины и беспакерная насосная установка для его осуществления |
US10900344B2 (en) | 2017-11-07 | 2021-01-26 | Saudi Arabian Oil Company | Determining wellbore leak crossflow rate between formations in an injection well |
CN109944581B (zh) * | 2017-12-19 | 2022-03-29 | 中国石油天然气股份有限公司 | 油井套损的获取方法及装置 |
RU2679773C1 (ru) * | 2018-01-10 | 2019-02-12 | Общество с ограниченной ответственностью "Газпром проектирование" | Способ учета перетоков газа по техногенным флюидопроводящим каналам между двумя газоконденсатными пластами |
US10625669B2 (en) * | 2018-02-21 | 2020-04-21 | Ford Global Technologies, Llc | Vehicle sensor operation |
RU2704068C1 (ru) * | 2018-11-13 | 2019-10-23 | Общество с ограниченной ответственностью "Газпромнефть Научно-Технический Центр" (ООО "Газпромнефть НТЦ") | Способ оценки межпластовых внутриколонных перетоков в скважине |
CN109138982B (zh) * | 2018-11-16 | 2023-09-26 | 美钻深海能源科技研发(上海)有限公司 | 水下装备生物腐蚀自动安全关井系统 |
WO2021080622A1 (en) * | 2019-10-25 | 2021-04-29 | Halliburton Energy Services, Inc. | Wax removal in a production line |
RU2759143C1 (ru) * | 2020-11-27 | 2021-11-09 | Общество с ограниченной ответственностью «Тюменский институт нефти и газа» | Способ повышения эффективности гидродинамических методов увеличения нефтеотдачи пласта |
RU2758326C1 (ru) * | 2021-04-12 | 2021-10-28 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Способ регулирования режима работы скважины, оборудованной установкой электроцентробежного насоса, в системе межскважинной перекачки |
CN115492558B (zh) * | 2022-09-14 | 2023-04-14 | 中国石油大学(华东) | 一种海域天然气水合物降压开采井筒中水合物二次生成防治装置及防治方法 |
Family Cites Families (55)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3211225A (en) * | 1963-05-28 | 1965-10-12 | Signal Oil & Gas Co | Well treating apparatus |
US3710867A (en) * | 1971-01-05 | 1973-01-16 | Petrolite Corp | Apparatus and process for adding chemicals |
US3954006A (en) * | 1975-01-31 | 1976-05-04 | Schlumberger Technology Corporation | Methods for determining velocities and flow rates of fluids flowing in well bore |
US4064936A (en) * | 1976-07-09 | 1977-12-27 | Mcclure L C | Chemical treating system for oil wells |
FR2421272A1 (fr) * | 1978-03-28 | 1979-10-26 | Europ Propulsion | Systeme pour la telecommande et l'entretien d'une tete de puits immergee |
US4354553A (en) * | 1980-10-14 | 1982-10-19 | Hensley Clifford J | Corrosion control downhole in a borehole |
US4436148A (en) * | 1981-04-27 | 1984-03-13 | Richard Maxwell | Chemical treatment for oil wells |
US4375833A (en) * | 1981-09-04 | 1983-03-08 | Meadows Floyd G | Automatic well treatment system |
US4635723A (en) * | 1983-07-07 | 1987-01-13 | Spivey Melvin F | Continuous injection of corrosion-inhibiting liquids |
US4582131A (en) * | 1984-09-26 | 1986-04-15 | Hughes Tool Company | Submersible chemical injection pump |
US4665981A (en) * | 1985-03-05 | 1987-05-19 | Asadollah Hayatdavoudi | Method and apparatus for inhibiting corrosion of well tubing |
US4589434A (en) * | 1985-06-10 | 1986-05-20 | Exxon Production Research Co. | Method and apparatus to prevent hydrate formation in full wellstream pipelines |
JPS62110135A (ja) * | 1985-11-08 | 1987-05-21 | Cosmo Co Ltd | アスフアルテン濃度定量方法および装置 |
US4721158A (en) * | 1986-08-15 | 1988-01-26 | Amoco Corporation | Fluid injection control system |
US4830112A (en) * | 1987-12-14 | 1989-05-16 | Erickson Don J | Method and apparatus for treating wellbores |
US4901563A (en) * | 1988-09-13 | 1990-02-20 | Atlantic Richfield Company | System for monitoring fluids during well stimulation processes |
US4926942A (en) * | 1989-02-22 | 1990-05-22 | Profrock Jr William P | Method for reducing sand production in submersible-pump wells |
US5006845A (en) * | 1989-06-13 | 1991-04-09 | Honeywell Inc. | Gas kick detector |
US5172717A (en) * | 1989-12-27 | 1992-12-22 | Otis Engineering Corporation | Well control system |
US5517593A (en) * | 1990-10-01 | 1996-05-14 | John Nenniger | Control system for well stimulation apparatus with response time temperature rise used in determining heater control temperature setpoint |
US5305209A (en) * | 1991-01-31 | 1994-04-19 | Amoco Corporation | Method for characterizing subterranean reservoirs |
US5209301A (en) * | 1992-02-04 | 1993-05-11 | Ayres Robert N | Multiple phase chemical injection system |
US5353237A (en) * | 1992-06-25 | 1994-10-04 | Oryx Energy Company | System for increasing efficiency of chemical treatment |
US6006832A (en) * | 1995-02-09 | 1999-12-28 | Baker Hughes Incorporated | Method and system for monitoring and controlling production and injection wells having permanent downhole formation evaluation sensors |
US5706896A (en) * | 1995-02-09 | 1998-01-13 | Baker Hughes Incorporated | Method and apparatus for the remote control and monitoring of production wells |
US5829520A (en) * | 1995-02-14 | 1998-11-03 | Baker Hughes Incorporated | Method and apparatus for testing, completion and/or maintaining wellbores using a sensor device |
US5647435A (en) * | 1995-09-25 | 1997-07-15 | Pes, Inc. | Containment of downhole electronic systems |
US5767680A (en) * | 1996-06-11 | 1998-06-16 | Schlumberger Technology Corporation | Method for sensing and estimating the shape and location of oil-water interfaces in a well |
US6446014B1 (en) * | 1997-02-25 | 2002-09-03 | Cham Ocondi | Method and apparatus for measuring and controlling the flow of fluids from coal seam gas wells |
US6061634A (en) * | 1997-04-14 | 2000-05-09 | Schlumberger Technology Corporation | Method and apparatus for characterizing earth formation properties through joint pressure-resistivity inversion |
US6281489B1 (en) * | 1997-05-02 | 2001-08-28 | Baker Hughes Incorporated | Monitoring of downhole parameters and tools utilizing fiber optics |
US5937946A (en) * | 1998-04-08 | 1999-08-17 | Streetman; Foy | Apparatus and method for enhancing fluid and gas flow in a well |
MXPA01006122A (es) * | 1998-12-21 | 2002-03-27 | Baker Hughes Inc | Inyeccion de quimicos en circuito cerrado y sistema de verificacion para operaciones petroliferas. |
US6196314B1 (en) * | 1999-02-15 | 2001-03-06 | Baker Hughes Incorporated | Insoluble salt control system and method |
US6467340B1 (en) * | 1999-10-21 | 2002-10-22 | Baker Hughes Incorporated | Asphaltenes monitoring and control system |
US6543540B2 (en) * | 2000-01-06 | 2003-04-08 | Baker Hughes Incorporated | Method and apparatus for downhole production zone |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
NO309884B1 (no) * | 2000-04-26 | 2001-04-09 | Sinvent As | ReservoarovervÕkning ved bruk av kjemisk intelligent frigjøring av tracere |
RU15117U1 (ru) * | 2000-05-26 | 2000-09-20 | Общество с ограниченной ответственностью "Пульс" | Система управления процессом интенсификации добычи жидкости из буровых скважин и устройство для интенсификации добычи |
US6408943B1 (en) * | 2000-07-17 | 2002-06-25 | Halliburton Energy Services, Inc. | Method and apparatus for placing and interrogating downhole sensors |
US7089167B2 (en) * | 2000-09-12 | 2006-08-08 | Schlumberger Technology Corp. | Evaluation of reservoir and hydraulic fracture properties in multilayer commingled reservoirs using commingled reservoir production data and production logging information |
US20020112888A1 (en) * | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
CA2437335C (en) * | 2001-02-05 | 2008-01-08 | Schlumberger Canada Limited | Optimization of reservoir, well and surface network systems |
US6795773B2 (en) * | 2001-09-07 | 2004-09-21 | Halliburton Energy Services, Inc. | Well completion method, including integrated approach for fracture optimization |
US7178591B2 (en) * | 2004-08-31 | 2007-02-20 | Schlumberger Technology Corporation | Apparatus and method for formation evaluation |
RU2240422C2 (ru) * | 2002-08-20 | 2004-11-20 | Общество с ограниченной ответственностью "Дарси Ойл Инжиниринг" | Способ оптимизации процесса извлечения нефти из пласта |
US7725301B2 (en) * | 2002-11-04 | 2010-05-25 | Welldynamics, B.V. | System and method for estimating multi-phase fluid rates in a subterranean well |
BRPI0408502A (pt) * | 2003-03-17 | 2006-03-07 | Joule Microsystems Canada Inc | sistema que permite a análise remota de fluidos |
US7261162B2 (en) * | 2003-06-25 | 2007-08-28 | Schlumberger Technology Corporation | Subsea communications system |
US20050149264A1 (en) * | 2003-12-30 | 2005-07-07 | Schlumberger Technology Corporation | System and Method to Interpret Distributed Temperature Sensor Data and to Determine a Flow Rate in a Well |
US6874361B1 (en) * | 2004-01-08 | 2005-04-05 | Halliburton Energy Services, Inc. | Distributed flow properties wellbore measurement system |
US7114557B2 (en) * | 2004-02-03 | 2006-10-03 | Schlumberger Technology Corporation | System and method for optimizing production in an artificially lifted well |
GB2416871A (en) * | 2004-07-29 | 2006-02-08 | Schlumberger Holdings | Well characterisation using distributed temperature sensor data |
US7654318B2 (en) * | 2006-06-19 | 2010-02-02 | Schlumberger Technology Corporation | Fluid diversion measurement methods and systems |
US7890273B2 (en) * | 2007-02-20 | 2011-02-15 | Schlumberger Technology Corporation | Determining fluid and/or reservoir information using an instrumented completion |
-
2007
- 2007-04-20 US US11/738,327 patent/US20080257544A1/en not_active Abandoned
-
2008
- 2008-04-18 AU AU2008242758A patent/AU2008242758A1/en not_active Abandoned
- 2008-04-18 MX MX2009011200A patent/MX2009011200A/es active IP Right Grant
- 2008-04-18 WO PCT/US2008/060817 patent/WO2008131218A2/en active Application Filing
- 2008-04-18 RU RU2009142437/03A patent/RU2484242C2/ru not_active IP Right Cessation
- 2008-04-18 AU AU2008270950A patent/AU2008270950B2/en active Active
- 2008-04-18 GB GB0918123A patent/GB2461210B/en not_active Expired - Fee Related
- 2008-04-18 BR BRPI0810415-8A2A patent/BRPI0810415A2/pt not_active IP Right Cessation
- 2008-04-18 MY MYPI20094363A patent/MY150281A/en unknown
- 2008-04-18 CA CA002684281A patent/CA2684281A1/en not_active Abandoned
- 2008-04-18 CA CA2684291A patent/CA2684291C/en active Active
- 2008-04-18 BR BRPI0810434-4A2A patent/BRPI0810434A2/pt not_active IP Right Cessation
- 2008-04-18 GB GB0918121.5A patent/GB2462949B/en active Active
-
2009
- 2009-10-19 NO NO20093167A patent/NO20093167L/no not_active Application Discontinuation
- 2009-10-19 NO NO20093161A patent/NO20093161L/no not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
BRPI0810434A2 (pt) | 2014-10-14 |
NO20093167L (no) | 2010-01-18 |
RU2484242C2 (ru) | 2013-06-10 |
WO2008131218A3 (en) | 2009-01-15 |
AU2008242758A1 (en) | 2008-10-30 |
RU2009142437A (ru) | 2011-05-27 |
CA2684291A1 (en) | 2009-01-08 |
GB2461210A (en) | 2009-12-30 |
WO2008131218A2 (en) | 2008-10-30 |
BRPI0810415A2 (pt) | 2014-10-14 |
GB0918121D0 (en) | 2009-12-02 |
US20080257544A1 (en) | 2008-10-23 |
GB2461210B (en) | 2010-12-01 |
GB0918123D0 (en) | 2009-12-02 |
MX2009011200A (es) | 2009-12-09 |
CA2684281A1 (en) | 2008-10-30 |
AU2008270950B2 (en) | 2014-06-05 |
NO20093161L (no) | 2009-11-18 |
CA2684291C (en) | 2014-07-29 |
GB2462949A (en) | 2010-03-03 |
AU2008270950A1 (en) | 2009-01-08 |
GB2462949B (en) | 2012-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MY150281A (en) | System and method for monitoring and controlling production from wells | |
WO2009005876A3 (en) | System and method for monitoring and controlling production from wells | |
GB2461445A (en) | System and method for monitoring physical condition of production well equipment and controlling well production | |
GB2488724A (en) | Wireline-adjustable downhole flow control devices and methods for using same | |
WO2014055598A3 (en) | Apparatus, system, and method for controlling the flow of drilling fluid in a wellbore | |
GB2447820A (en) | Well control systems and associated methods | |
MY154395A (en) | System and method for water breakthrough detection intervention in a production well | |
MX2012012066A (es) | Control de retroalimentacion en sistemas microfluidicos. | |
SG135168A1 (en) | System and method for monitoring drilling process parameters and controlling drilling operation | |
SA516380639B1 (ar) | طريقة لتحويل النفايات الى وحل والتخلص منها عن طريق ضخها تحت ضغط داخل تكوينات جوفية تحت الأرض | |
GB2472919B (en) | Adjustment of mud circulation when evaluating a formation | |
NO20171711A1 (en) | Condition Based Maintenance Program Based on Life-Stress Acceleration Model and Time-Varying Stress Model | |
GB2482839A (en) | Well monitoring | |
ATE520063T1 (de) | Verbesserungen in bezug auf bohrvorrichtungen und verfahren | |
WO2008041067A3 (en) | Method for controlling a process using measurement predictions | |
WO2015002904A3 (en) | System and console for monitoring and managing well site operations | |
GB2545860A (en) | Real-time control of drilling fluid properties using predictive models | |
EA201070005A1 (ru) | Системы и способы обработки подземного пласта с интерпретацией данных замкнутого цикла в режиме реального времени | |
SA119410067B1 (ar) | التنبؤ بتوزيع مادة في مرحلة معالجة بالتصديع الهيدروليكي | |
MY180660A (en) | Real time downhole sensor data for controlling surface stimulation equipment | |
MX342054B (es) | Sistema de produccion para extraer hidrocarburos de un pozo. | |
GB2506779A (en) | Active equivalent circulating density control with real-time data connection | |
MY176955A (en) | Expanded mud pulse telemetry | |
MY185413A (en) | Elastic pipe control and compensation with managed pressure drilling | |
EA201290587A1 (ru) | Дистанционное управление бурением и заканчиванием скважин |