GB2462949A - System and method for monitoring and controlling production from wells - Google Patents
System and method for monitoring and controlling production from wells Download PDFInfo
- Publication number
- GB2462949A GB2462949A GB0918121A GB0918121A GB2462949A GB 2462949 A GB2462949 A GB 2462949A GB 0918121 A GB0918121 A GB 0918121A GB 0918121 A GB0918121 A GB 0918121A GB 2462949 A GB2462949 A GB 2462949A
- Authority
- GB
- United Kingdom
- Prior art keywords
- well
- wells
- monitoring
- sensor measurements
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000012544 monitoring process Methods 0.000 title 1
- 238000005259 measurement Methods 0.000 abstract 2
- 238000004590 computer program Methods 0.000 abstract 1
- 239000012530 fluid Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Flow Control (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Pipeline Systems (AREA)
Abstract
A system and method for obtaining enhanced production from a well is provided. The system includes a processor (150) that processes instructions contained in a computer program, which includes instructions to monitor actual flow rate of the fluid from each production zone (52a, 526) of a well over a time period corresponding to a first setting of the flow control devices and to employ a nodal analysis on a plurality of inputs from downhole sensor measurements, surface sensor measurements, one or more current positions of the devices to determine one or more new settings that will provide enhanced production from the well.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/737,402 US20080262737A1 (en) | 2007-04-19 | 2007-04-19 | System and Method for Monitoring and Controlling Production from Wells |
US11/738,327 US20080257544A1 (en) | 2007-04-19 | 2007-04-20 | System and Method for Crossflow Detection and Intervention in Production Wellbores |
PCT/US2008/060828 WO2009005876A2 (en) | 2007-04-19 | 2008-04-18 | System and method for monitoring and controlling production from wells |
Publications (3)
Publication Number | Publication Date |
---|---|
GB0918121D0 GB0918121D0 (en) | 2009-12-02 |
GB2462949A true GB2462949A (en) | 2010-03-03 |
GB2462949B GB2462949B (en) | 2012-10-24 |
Family
ID=39876171
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB0918123A Expired - Fee Related GB2461210B (en) | 2007-04-19 | 2008-04-18 | System and method for crossflow detection and intervention in production wellbores |
GB0918121.5A Active GB2462949B (en) | 2007-04-19 | 2008-04-18 | System and method for monitoring and controlling production from wells |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB0918123A Expired - Fee Related GB2461210B (en) | 2007-04-19 | 2008-04-18 | System and method for crossflow detection and intervention in production wellbores |
Country Status (10)
Country | Link |
---|---|
US (1) | US20080257544A1 (en) |
AU (2) | AU2008270950B2 (en) |
BR (2) | BRPI0810415A2 (en) |
CA (2) | CA2684291C (en) |
GB (2) | GB2461210B (en) |
MX (1) | MX2009011200A (en) |
MY (1) | MY150281A (en) |
NO (2) | NO20093167L (en) |
RU (1) | RU2484242C2 (en) |
WO (1) | WO2008131218A2 (en) |
Families Citing this family (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7926593B2 (en) | 2004-11-23 | 2011-04-19 | Weatherford/Lamb, Inc. | Rotating control device docking station |
US7711486B2 (en) * | 2007-04-19 | 2010-05-04 | Baker Hughes Incorporated | System and method for monitoring physical condition of production well equipment and controlling well production |
US8251140B2 (en) | 2009-09-15 | 2012-08-28 | Schlumberger Technology Corporation | Fluid monitoring and flow characterization |
US20110139446A1 (en) * | 2009-12-15 | 2011-06-16 | Baker Hughes Incorporated | Method of Determining Queried Fluid Cuts Along a Tubular |
CA2705680C (en) | 2010-05-27 | 2012-11-27 | Imperial Oil Resources Limited | Creation of hydrate barrier during in situ hydrocarbon recovery |
US9324049B2 (en) * | 2010-12-30 | 2016-04-26 | Schlumberger Technology Corporation | System and method for tracking wellsite equipment maintenance data |
BR112014028856A2 (en) | 2012-05-21 | 2018-04-24 | Bp Corp North America Inc | methods and systems for pressure testing of hydrocarbon well system components. |
AU2013274731B2 (en) * | 2012-06-15 | 2016-08-25 | Landmark Graphics Corporation | Systems and methods for optimizing facility limited production and injection in an integrated reservoir and gathering network |
CN103541699B (en) * | 2012-07-12 | 2015-12-02 | 中国石油化工股份有限公司 | Anti-anti-channeling zonal flow rate controls flow string |
US8857518B1 (en) | 2012-09-26 | 2014-10-14 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
WO2014051564A1 (en) | 2012-09-26 | 2014-04-03 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
US9598952B2 (en) | 2012-09-26 | 2017-03-21 | Halliburton Energy Services, Inc. | Snorkel tube with debris barrier for electronic gauges placed on sand screens |
US8893783B2 (en) * | 2012-09-26 | 2014-11-25 | Halliburton Energy Services, Inc. | Tubing conveyed multiple zone integrated intelligent well completion |
AU2012391057B2 (en) | 2012-09-26 | 2016-12-01 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
BR112015006496B1 (en) | 2012-09-26 | 2020-06-30 | Halliburton Energy Services, Inc | WASTE BARRIER FOR USE IN A WELL HOLE |
SG11201501839VA (en) | 2012-09-26 | 2015-04-29 | Halliburton Energy Services Inc | In-line sand screen gauge carrier |
MX359317B (en) | 2012-09-26 | 2018-09-25 | Halliburton Energy Services Inc | Method of placing distributed pressure gauges across screens. |
US9163488B2 (en) | 2012-09-26 | 2015-10-20 | Halliburton Energy Services, Inc. | Multiple zone integrated intelligent well completion |
US20140126325A1 (en) * | 2012-11-02 | 2014-05-08 | Silixa Ltd. | Enhanced seismic surveying |
WO2015040042A1 (en) * | 2013-09-17 | 2015-03-26 | Mærsk Olie Og Gas A/S | Detection of a watered out zone in a segmented completion |
US9611731B2 (en) * | 2013-10-04 | 2017-04-04 | Halliburton Energy Services, Inc. | Determination of formation dip/azimuth with multicomponent induction data |
US20150114631A1 (en) * | 2013-10-24 | 2015-04-30 | Baker Hughes Incorporated | Monitoring Acid Stimulation Using High Resolution Distributed Temperature Sensing |
US20150134258A1 (en) * | 2013-11-13 | 2015-05-14 | Schlumberger Technology Corporation | Well Pressure Control Event Detection and Prediction Method |
WO2015073626A1 (en) * | 2013-11-13 | 2015-05-21 | Schlumberger Canada Limited | Well testing and monitoring |
US20170247986A1 (en) | 2014-10-28 | 2017-08-31 | Bryan BUSSELL | Additive management system |
US10280740B2 (en) * | 2014-12-03 | 2019-05-07 | Baker Hughes, A Ge Company, Llc | Sandface liner with power, control and communication link via a tie back string |
CN106150445B (en) * | 2015-04-14 | 2018-09-21 | 大庆丹枫石油技术开发有限公司 | Two layers of layering perforation-zonal testing axle-linked cable-car of one-trip string and its operating method |
CN106150446B (en) * | 2015-04-14 | 2018-12-21 | 华通科创(唐山)石油工程技术服务有限公司 | It is a kind of can Xian Ce lower layer across every combined operation of perforation and testing tubing string and its operating method |
CN106285548B (en) * | 2015-05-12 | 2018-09-21 | 江苏省金峰石油机械制造有限公司 | The switchable screen casing combination unit of packer- |
CN106285559B (en) * | 2015-05-29 | 2018-09-07 | 良工阀门集团有限公司 | Pressure-controlled normally open valve is combined the unit with pressure-controlled normally close valve and its operating method |
WO2017023318A1 (en) | 2015-08-05 | 2017-02-09 | Halliburton Energy Services Inc. | Quantification of crossflow effects on fluid distribution during matrix injection treatments |
RU2604103C1 (en) * | 2015-08-31 | 2016-12-10 | Общество с ограниченной ответственностью "Газпром добыча Кузнецк" | Method of automatic control of coal-methanol well |
CN105134140A (en) * | 2015-09-17 | 2015-12-09 | 东营嘉岩石油工艺研究院 | Fixed chain type long-stroke pumping unit |
GB2544799A (en) * | 2015-11-27 | 2017-05-31 | Swellfix Uk Ltd | Autonomous control valve for well pressure control |
US10215002B2 (en) | 2016-05-05 | 2019-02-26 | Saudi Arabian Oil Company | Determining wellbore leak crossflow rate between formations in an injection well |
RU2634754C1 (en) * | 2016-08-16 | 2017-11-07 | Публичное акционерное общество "Акционерная нефтяная Компания "Башнефть" | Method of automatic distribution of total gas flow through pressure wells in water-gas method effect on formation |
US10401207B2 (en) * | 2016-09-14 | 2019-09-03 | GE Oil & Gas UK, Ltd. | Method for assessing and managing sensor uncertainties in a virtual flow meter |
US20180187533A1 (en) * | 2017-01-05 | 2018-07-05 | Saudi Arabian Oil Company | Hydrocarbon production by fluidically isolating vertical regions of formations |
RU2652219C1 (en) * | 2017-06-27 | 2018-04-25 | Акционерное общество "Новомет-Пермь" | Method of determining flow rate of wells equipped with pumping units |
RU2652220C1 (en) * | 2017-06-27 | 2018-04-25 | Акционерное общество "Новомет-Пермь" | Method of determining flow rate of wells equipped with pumping units |
RU2653210C2 (en) * | 2017-08-15 | 2018-05-07 | Олег Сергеевич Николаев | Method for interval oil production from a multiple zone well and a packerless pumping plant for implementation thereof |
US10900344B2 (en) | 2017-11-07 | 2021-01-26 | Saudi Arabian Oil Company | Determining wellbore leak crossflow rate between formations in an injection well |
CN109944581B (en) * | 2017-12-19 | 2022-03-29 | 中国石油天然气股份有限公司 | Method and device for acquiring casing damage of oil well |
RU2679773C1 (en) * | 2018-01-10 | 2019-02-12 | Общество с ограниченной ответственностью "Газпром проектирование" | Method of accounting of gas flows on man-made fluid-conducting channels between two gas-condensate formations |
US10625669B2 (en) * | 2018-02-21 | 2020-04-21 | Ford Global Technologies, Llc | Vehicle sensor operation |
RU2704068C1 (en) * | 2018-11-13 | 2019-10-23 | Общество с ограниченной ответственностью "Газпромнефть Научно-Технический Центр" (ООО "Газпромнефть НТЦ") | Method for assessment of inter-column inter-formation overflow in a well |
CN109138982B (en) * | 2018-11-16 | 2023-09-26 | 美钻深海能源科技研发(上海)有限公司 | Automatic safety well closing system for underwater equipment biological corrosion |
WO2021080622A1 (en) * | 2019-10-25 | 2021-04-29 | Halliburton Energy Services, Inc. | Wax removal in a production line |
RU2759143C1 (en) * | 2020-11-27 | 2021-11-09 | Общество с ограниченной ответственностью «Тюменский институт нефти и газа» | Method for increasing the efficiency of hydrodynamic methods for increasing the petroleum recovery of a reservoir |
RU2758326C1 (en) * | 2021-04-12 | 2021-10-28 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method for regulating the operating mode of a well equipped with an electric center pump installation in an inter-well pumping system |
CN115492558B (en) * | 2022-09-14 | 2023-04-14 | 中国石油大学(华东) | Device and method for preventing secondary generation of hydrate in pressure-reducing exploitation shaft of sea natural gas hydrate |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040084180A1 (en) * | 2002-11-04 | 2004-05-06 | Shah Piyush C. | System and method for estimating multi-phase fluid rates in a subterranean well |
GB2416871A (en) * | 2004-07-29 | 2006-02-08 | Schlumberger Holdings | Well characterisation using distributed temperature sensor data |
Family Cites Families (53)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3211225A (en) * | 1963-05-28 | 1965-10-12 | Signal Oil & Gas Co | Well treating apparatus |
US3710867A (en) * | 1971-01-05 | 1973-01-16 | Petrolite Corp | Apparatus and process for adding chemicals |
US3954006A (en) * | 1975-01-31 | 1976-05-04 | Schlumberger Technology Corporation | Methods for determining velocities and flow rates of fluids flowing in well bore |
US4064936A (en) * | 1976-07-09 | 1977-12-27 | Mcclure L C | Chemical treating system for oil wells |
FR2421272A1 (en) * | 1978-03-28 | 1979-10-26 | Europ Propulsion | SYSTEM FOR REMOTE CONTROL AND MAINTENANCE OF A SUBMERSIBLE WELL HEAD |
US4354553A (en) * | 1980-10-14 | 1982-10-19 | Hensley Clifford J | Corrosion control downhole in a borehole |
US4436148A (en) * | 1981-04-27 | 1984-03-13 | Richard Maxwell | Chemical treatment for oil wells |
US4375833A (en) * | 1981-09-04 | 1983-03-08 | Meadows Floyd G | Automatic well treatment system |
US4635723A (en) * | 1983-07-07 | 1987-01-13 | Spivey Melvin F | Continuous injection of corrosion-inhibiting liquids |
US4582131A (en) * | 1984-09-26 | 1986-04-15 | Hughes Tool Company | Submersible chemical injection pump |
US4665981A (en) * | 1985-03-05 | 1987-05-19 | Asadollah Hayatdavoudi | Method and apparatus for inhibiting corrosion of well tubing |
US4589434A (en) * | 1985-06-10 | 1986-05-20 | Exxon Production Research Co. | Method and apparatus to prevent hydrate formation in full wellstream pipelines |
JPS62110135A (en) * | 1985-11-08 | 1987-05-21 | Cosmo Co Ltd | Method and apparatus for quantifying concentration of asphaltene |
US4721158A (en) * | 1986-08-15 | 1988-01-26 | Amoco Corporation | Fluid injection control system |
US4830112A (en) * | 1987-12-14 | 1989-05-16 | Erickson Don J | Method and apparatus for treating wellbores |
US4901563A (en) * | 1988-09-13 | 1990-02-20 | Atlantic Richfield Company | System for monitoring fluids during well stimulation processes |
US4926942A (en) * | 1989-02-22 | 1990-05-22 | Profrock Jr William P | Method for reducing sand production in submersible-pump wells |
US5006845A (en) * | 1989-06-13 | 1991-04-09 | Honeywell Inc. | Gas kick detector |
US5172717A (en) * | 1989-12-27 | 1992-12-22 | Otis Engineering Corporation | Well control system |
US5517593A (en) * | 1990-10-01 | 1996-05-14 | John Nenniger | Control system for well stimulation apparatus with response time temperature rise used in determining heater control temperature setpoint |
US5305209A (en) * | 1991-01-31 | 1994-04-19 | Amoco Corporation | Method for characterizing subterranean reservoirs |
US5209301A (en) * | 1992-02-04 | 1993-05-11 | Ayres Robert N | Multiple phase chemical injection system |
US5353237A (en) * | 1992-06-25 | 1994-10-04 | Oryx Energy Company | System for increasing efficiency of chemical treatment |
US5706896A (en) * | 1995-02-09 | 1998-01-13 | Baker Hughes Incorporated | Method and apparatus for the remote control and monitoring of production wells |
US6006832A (en) * | 1995-02-09 | 1999-12-28 | Baker Hughes Incorporated | Method and system for monitoring and controlling production and injection wells having permanent downhole formation evaluation sensors |
US5829520A (en) * | 1995-02-14 | 1998-11-03 | Baker Hughes Incorporated | Method and apparatus for testing, completion and/or maintaining wellbores using a sensor device |
US5647435A (en) * | 1995-09-25 | 1997-07-15 | Pes, Inc. | Containment of downhole electronic systems |
US5767680A (en) * | 1996-06-11 | 1998-06-16 | Schlumberger Technology Corporation | Method for sensing and estimating the shape and location of oil-water interfaces in a well |
US6446014B1 (en) * | 1997-02-25 | 2002-09-03 | Cham Ocondi | Method and apparatus for measuring and controlling the flow of fluids from coal seam gas wells |
US6061634A (en) * | 1997-04-14 | 2000-05-09 | Schlumberger Technology Corporation | Method and apparatus for characterizing earth formation properties through joint pressure-resistivity inversion |
US6281489B1 (en) * | 1997-05-02 | 2001-08-28 | Baker Hughes Incorporated | Monitoring of downhole parameters and tools utilizing fiber optics |
US5937946A (en) * | 1998-04-08 | 1999-08-17 | Streetman; Foy | Apparatus and method for enhancing fluid and gas flow in a well |
WO2000037770A1 (en) * | 1998-12-21 | 2000-06-29 | Baker Hughes Incorporated | Closed loop chemical injection and monitoring system for oilfield operations |
US6196314B1 (en) * | 1999-02-15 | 2001-03-06 | Baker Hughes Incorporated | Insoluble salt control system and method |
US6467340B1 (en) * | 1999-10-21 | 2002-10-22 | Baker Hughes Incorporated | Asphaltenes monitoring and control system |
US6543540B2 (en) * | 2000-01-06 | 2003-04-08 | Baker Hughes Incorporated | Method and apparatus for downhole production zone |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
NO20002137A (en) * | 2000-04-26 | 2001-04-09 | Sinvent As | Reservoir monitoring using chemically intelligent tracer release |
RU15117U1 (en) * | 2000-05-26 | 2000-09-20 | Общество с ограниченной ответственностью "Пульс" | SYSTEM OF MANAGEMENT OF THE PROCESS OF INTENSIFICATION OF LIQUID PRODUCTION FROM DRILLING WELLS AND A DEVICE FOR INTENSIFICATION OF PRODUCTION |
US6408943B1 (en) * | 2000-07-17 | 2002-06-25 | Halliburton Energy Services, Inc. | Method and apparatus for placing and interrogating downhole sensors |
ATE377137T1 (en) * | 2000-09-12 | 2007-11-15 | Schlumberger Technology Bv | INVESTIGATION OF MULTI-LAYER DEPOSITS |
US20020112888A1 (en) * | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
EP1358394B1 (en) * | 2001-02-05 | 2007-01-24 | Schlumberger Holdings Limited | Optimization of reservoir, well and surface network systems |
US6795773B2 (en) * | 2001-09-07 | 2004-09-21 | Halliburton Energy Services, Inc. | Well completion method, including integrated approach for fracture optimization |
US7178591B2 (en) * | 2004-08-31 | 2007-02-20 | Schlumberger Technology Corporation | Apparatus and method for formation evaluation |
RU2240422C2 (en) * | 2002-08-20 | 2004-11-20 | Общество с ограниченной ответственностью "Дарси Ойл Инжиниринг" | Method for optimizing process of oil extraction from bed |
AU2004239363A1 (en) * | 2003-03-17 | 2004-11-25 | Joule Microsystems Canada Inc. | System enabling remote analysis of fluids |
US7261162B2 (en) * | 2003-06-25 | 2007-08-28 | Schlumberger Technology Corporation | Subsea communications system |
US20050149264A1 (en) * | 2003-12-30 | 2005-07-07 | Schlumberger Technology Corporation | System and Method to Interpret Distributed Temperature Sensor Data and to Determine a Flow Rate in a Well |
US6874361B1 (en) * | 2004-01-08 | 2005-04-05 | Halliburton Energy Services, Inc. | Distributed flow properties wellbore measurement system |
US7114557B2 (en) * | 2004-02-03 | 2006-10-03 | Schlumberger Technology Corporation | System and method for optimizing production in an artificially lifted well |
US7654318B2 (en) * | 2006-06-19 | 2010-02-02 | Schlumberger Technology Corporation | Fluid diversion measurement methods and systems |
US7890273B2 (en) * | 2007-02-20 | 2011-02-15 | Schlumberger Technology Corporation | Determining fluid and/or reservoir information using an instrumented completion |
-
2007
- 2007-04-20 US US11/738,327 patent/US20080257544A1/en not_active Abandoned
-
2008
- 2008-04-18 RU RU2009142437/03A patent/RU2484242C2/en not_active IP Right Cessation
- 2008-04-18 AU AU2008270950A patent/AU2008270950B2/en active Active
- 2008-04-18 CA CA2684291A patent/CA2684291C/en active Active
- 2008-04-18 MY MYPI20094363A patent/MY150281A/en unknown
- 2008-04-18 CA CA002684281A patent/CA2684281A1/en not_active Abandoned
- 2008-04-18 BR BRPI0810415-8A2A patent/BRPI0810415A2/en not_active IP Right Cessation
- 2008-04-18 AU AU2008242758A patent/AU2008242758A1/en not_active Abandoned
- 2008-04-18 BR BRPI0810434-4A2A patent/BRPI0810434A2/en not_active IP Right Cessation
- 2008-04-18 WO PCT/US2008/060817 patent/WO2008131218A2/en active Application Filing
- 2008-04-18 MX MX2009011200A patent/MX2009011200A/en active IP Right Grant
- 2008-04-18 GB GB0918123A patent/GB2461210B/en not_active Expired - Fee Related
- 2008-04-18 GB GB0918121.5A patent/GB2462949B/en active Active
-
2009
- 2009-10-19 NO NO20093167A patent/NO20093167L/en not_active Application Discontinuation
- 2009-10-19 NO NO20093161A patent/NO20093161L/en not_active Application Discontinuation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040084180A1 (en) * | 2002-11-04 | 2004-05-06 | Shah Piyush C. | System and method for estimating multi-phase fluid rates in a subterranean well |
GB2416871A (en) * | 2004-07-29 | 2006-02-08 | Schlumberger Holdings | Well characterisation using distributed temperature sensor data |
Also Published As
Publication number | Publication date |
---|---|
GB0918121D0 (en) | 2009-12-02 |
WO2008131218A3 (en) | 2009-01-15 |
GB2461210B (en) | 2010-12-01 |
MX2009011200A (en) | 2009-12-09 |
AU2008270950A1 (en) | 2009-01-08 |
AU2008270950B2 (en) | 2014-06-05 |
CA2684291C (en) | 2014-07-29 |
AU2008242758A1 (en) | 2008-10-30 |
RU2009142437A (en) | 2011-05-27 |
BRPI0810434A2 (en) | 2014-10-14 |
WO2008131218A2 (en) | 2008-10-30 |
GB2462949B (en) | 2012-10-24 |
RU2484242C2 (en) | 2013-06-10 |
NO20093167L (en) | 2010-01-18 |
US20080257544A1 (en) | 2008-10-23 |
GB0918123D0 (en) | 2009-12-02 |
MY150281A (en) | 2013-12-31 |
GB2461210A (en) | 2009-12-30 |
NO20093161L (en) | 2009-11-18 |
CA2684291A1 (en) | 2009-01-08 |
CA2684281A1 (en) | 2008-10-30 |
BRPI0810415A2 (en) | 2014-10-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2462949A (en) | System and method for monitoring and controlling production from wells | |
WO2009005876A3 (en) | System and method for monitoring and controlling production from wells | |
MY171268A (en) | Use of downhole pressure measurements while drilling to detect and mitigate influxes | |
GB2488724A (en) | Wireline-adjustable downhole flow control devices and methods for using same | |
WO2009009196A3 (en) | System and method for monitoring physical condition of production well equipment and controlling well production | |
GB2469776A (en) | A system and method for real-time quality control for downhole logging devices | |
GB2447820A (en) | Well control systems and associated methods | |
DE602005024044D1 (en) | METHOD, SYSTEM AND PROGRAM MEMORY DEVICE FOR OPTIMIZING VALVE SETTINGS IN INSTRUMENTED DRILLING TUBES USING ADJUSTED GRADIENT TECHNOLOGY AND RESERVOIR SIMULATION | |
NO20171711A1 (en) | Condition Based Maintenance Program Based on Life-Stress Acceleration Model and Time-Varying Stress Model | |
GB2472919B (en) | Adjustment of mud circulation when evaluating a formation | |
MY154395A (en) | System and method for water breakthrough detection intervention in a production well | |
SA521430925B1 (en) | Automated Drilling Advisory and Control System | |
BR0315021A (en) | Methods for controlling a well and performing an overflow test | |
MX2015008339A (en) | Method for wellbore stimulation optimization. | |
GB2454390A (en) | Method for controlling and/or optimizing production of oil and/or gas wells and facilities | |
EA200702563A1 (en) | METHOD FOR AUTOMATED INHOMOGENEOUS PROPPANT PLACEMENT IN THE UNDERGROUND PLANT | |
WO2010135636A3 (en) | Apparatus and method for modeling well designs and well performance | |
GB2545860A (en) | Real-time control of drilling fluid properties using predictive models | |
EA201070005A1 (en) | SYSTEMS AND METHODS OF TREATMENT OF THE UNDERGROUND PLATE WITH INTERPRETATION OF THE DATED CYCLE DURING THE REAL TIME MODE | |
MX2010005447A (en) | Retrievable downhole testing tool. | |
ATE509305T1 (en) | METHOD AND DEVICE FOR PROGRAMMING AND/OR CONFIGURING A SAFETY CONTROLLER | |
MX342054B (en) | Production system for producing hydrocarbons from a well. | |
GB2506779A (en) | Active equivalent circulating density control with real-time data connection | |
MY185413A (en) | Elastic pipe control and compensation with managed pressure drilling | |
MX2010000767A (en) | Methods and systems of planning a procedure for cleaning a wellbore. |