GB2461210A - System and method for crossflow detection and intervention in production wellbores - Google Patents
System and method for crossflow detection and intervention in production wellbores Download PDFInfo
- Publication number
- GB2461210A GB2461210A GB0918123A GB0918123A GB2461210A GB 2461210 A GB2461210 A GB 2461210A GB 0918123 A GB0918123 A GB 0918123A GB 0918123 A GB0918123 A GB 0918123A GB 2461210 A GB2461210 A GB 2461210A
- Authority
- GB
- United Kingdom
- Prior art keywords
- measurements
- crossflow
- intervention
- detection
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title abstract 2
- 238000001514 detection method Methods 0.000 title 1
- 238000005259 measurement Methods 0.000 abstract 4
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Flow Control (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Pipeline Systems (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
Abstract
A system and method for managing a production from a wellbore (50) that includes taking measurements relating to one or more selected parameters for each of the production zones (52a, 52b) over a time period and determining the occurrence of the cross flow in the wellbore using a trend of the one or more of the measurements. The system includes a processor (150) that receives information relating to the measurements made over time relating to the selected parameters, wherein the processor determines or predicts the occurrence of the cross flow from a trend of at least one of the measurements.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/737,402 US20080262737A1 (en) | 2007-04-19 | 2007-04-19 | System and Method for Monitoring and Controlling Production from Wells |
US11/738,327 US20080257544A1 (en) | 2007-04-19 | 2007-04-20 | System and Method for Crossflow Detection and Intervention in Production Wellbores |
PCT/US2008/060817 WO2008131218A2 (en) | 2007-04-19 | 2008-04-18 | System and method for crossflow detection and intervention in production wellbores |
Publications (3)
Publication Number | Publication Date |
---|---|
GB0918123D0 GB0918123D0 (en) | 2009-12-02 |
GB2461210A true GB2461210A (en) | 2009-12-30 |
GB2461210B GB2461210B (en) | 2010-12-01 |
Family
ID=39876171
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB0918123A Expired - Fee Related GB2461210B (en) | 2007-04-19 | 2008-04-18 | System and method for crossflow detection and intervention in production wellbores |
GB0918121.5A Active GB2462949B (en) | 2007-04-19 | 2008-04-18 | System and method for monitoring and controlling production from wells |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB0918121.5A Active GB2462949B (en) | 2007-04-19 | 2008-04-18 | System and method for monitoring and controlling production from wells |
Country Status (10)
Country | Link |
---|---|
US (1) | US20080257544A1 (en) |
AU (2) | AU2008242758A1 (en) |
BR (2) | BRPI0810415A2 (en) |
CA (2) | CA2684291C (en) |
GB (2) | GB2461210B (en) |
MX (1) | MX2009011200A (en) |
MY (1) | MY150281A (en) |
NO (2) | NO20093161L (en) |
RU (1) | RU2484242C2 (en) |
WO (1) | WO2008131218A2 (en) |
Families Citing this family (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7926593B2 (en) | 2004-11-23 | 2011-04-19 | Weatherford/Lamb, Inc. | Rotating control device docking station |
US7711486B2 (en) * | 2007-04-19 | 2010-05-04 | Baker Hughes Incorporated | System and method for monitoring physical condition of production well equipment and controlling well production |
US8251140B2 (en) * | 2009-09-15 | 2012-08-28 | Schlumberger Technology Corporation | Fluid monitoring and flow characterization |
US20110139446A1 (en) * | 2009-12-15 | 2011-06-16 | Baker Hughes Incorporated | Method of Determining Queried Fluid Cuts Along a Tubular |
CA2705680C (en) | 2010-05-27 | 2012-11-27 | Imperial Oil Resources Limited | Creation of hydrate barrier during in situ hydrocarbon recovery |
US9324049B2 (en) * | 2010-12-30 | 2016-04-26 | Schlumberger Technology Corporation | System and method for tracking wellsite equipment maintenance data |
WO2013176648A1 (en) * | 2012-05-21 | 2013-11-28 | Bp Corporation North America Inc. | Methods and systems for pressure testing components of a hydrocarbon well system |
RU2600254C2 (en) * | 2012-06-15 | 2016-10-20 | Лэндмарк Графикс Корпорейшн | System and methods for optimising extraction and pumping, limited by process complex, in integrated reservoir bed and collecting network |
CN103541699B (en) * | 2012-07-12 | 2015-12-02 | 中国石油化工股份有限公司 | Anti-anti-channeling zonal flow rate controls flow string |
EP4033069A1 (en) | 2012-09-26 | 2022-07-27 | Halliburton Energy Services, Inc. | Method of placing distributed pressure gauges across screens |
US8857518B1 (en) | 2012-09-26 | 2014-10-14 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
US9085962B2 (en) | 2012-09-26 | 2015-07-21 | Halliburton Energy Services, Inc. | Snorkel tube with debris barrier for electronic gauges placed on sand screens |
US9163488B2 (en) | 2012-09-26 | 2015-10-20 | Halliburton Energy Services, Inc. | Multiple zone integrated intelligent well completion |
US9598952B2 (en) | 2012-09-26 | 2017-03-21 | Halliburton Energy Services, Inc. | Snorkel tube with debris barrier for electronic gauges placed on sand screens |
EP2900908B1 (en) | 2012-09-26 | 2018-10-31 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
US8893783B2 (en) | 2012-09-26 | 2014-11-25 | Halliburton Energy Services, Inc. | Tubing conveyed multiple zone integrated intelligent well completion |
BR112015006647B1 (en) | 2012-09-26 | 2020-10-20 | Halliburton Energy Services, Inc | well sensor system and detection method in a well bore |
US8746337B2 (en) | 2012-09-26 | 2014-06-10 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
GB2546937B (en) * | 2012-11-02 | 2017-11-29 | Silixa Ltd | Combining seismic survey and DAS fluid flow data for improved results |
WO2015040042A1 (en) * | 2013-09-17 | 2015-03-26 | Mærsk Olie Og Gas A/S | Detection of a watered out zone in a segmented completion |
MX369499B (en) * | 2013-10-04 | 2019-11-11 | Halliburton Energy Services Inc | Determination of formation dip/azimuth with multicomponent induction data. |
US20150114631A1 (en) * | 2013-10-24 | 2015-04-30 | Baker Hughes Incorporated | Monitoring Acid Stimulation Using High Resolution Distributed Temperature Sensing |
US11408270B2 (en) * | 2013-11-13 | 2022-08-09 | Sensia Llc | Well testing and monitoring |
US20150134258A1 (en) * | 2013-11-13 | 2015-05-14 | Schlumberger Technology Corporation | Well Pressure Control Event Detection and Prediction Method |
EP4102027A1 (en) * | 2014-10-28 | 2022-12-14 | OneSubsea IP UK Limited | Additive management system |
US10280740B2 (en) * | 2014-12-03 | 2019-05-07 | Baker Hughes, A Ge Company, Llc | Sandface liner with power, control and communication link via a tie back string |
CN106150445B (en) * | 2015-04-14 | 2018-09-21 | 大庆丹枫石油技术开发有限公司 | Two layers of layering perforation-zonal testing axle-linked cable-car of one-trip string and its operating method |
CN106150446B (en) * | 2015-04-14 | 2018-12-21 | 华通科创(唐山)石油工程技术服务有限公司 | It is a kind of can Xian Ce lower layer across every combined operation of perforation and testing tubing string and its operating method |
CN106285548B (en) * | 2015-05-12 | 2018-09-21 | 江苏省金峰石油机械制造有限公司 | The switchable screen casing combination unit of packer- |
CN106285559B (en) * | 2015-05-29 | 2018-09-07 | 良工阀门集团有限公司 | Pressure-controlled normally open valve is combined the unit with pressure-controlled normally close valve and its operating method |
WO2017023318A1 (en) | 2015-08-05 | 2017-02-09 | Halliburton Energy Services Inc. | Quantification of crossflow effects on fluid distribution during matrix injection treatments |
RU2604103C1 (en) * | 2015-08-31 | 2016-12-10 | Общество с ограниченной ответственностью "Газпром добыча Кузнецк" | Method of automatic control of coal-methanol well |
CN105134140A (en) * | 2015-09-17 | 2015-12-09 | 东营嘉岩石油工艺研究院 | Fixed chain type long-stroke pumping unit |
GB2544799A (en) * | 2015-11-27 | 2017-05-31 | Swellfix Uk Ltd | Autonomous control valve for well pressure control |
US10215002B2 (en) | 2016-05-05 | 2019-02-26 | Saudi Arabian Oil Company | Determining wellbore leak crossflow rate between formations in an injection well |
RU2634754C1 (en) * | 2016-08-16 | 2017-11-07 | Публичное акционерное общество "Акционерная нефтяная Компания "Башнефть" | Method of automatic distribution of total gas flow through pressure wells in water-gas method effect on formation |
US10401207B2 (en) * | 2016-09-14 | 2019-09-03 | GE Oil & Gas UK, Ltd. | Method for assessing and managing sensor uncertainties in a virtual flow meter |
US20180187533A1 (en) * | 2017-01-05 | 2018-07-05 | Saudi Arabian Oil Company | Hydrocarbon production by fluidically isolating vertical regions of formations |
RU2652220C1 (en) * | 2017-06-27 | 2018-04-25 | Акционерное общество "Новомет-Пермь" | Method of determining flow rate of wells equipped with pumping units |
RU2652219C1 (en) * | 2017-06-27 | 2018-04-25 | Акционерное общество "Новомет-Пермь" | Method of determining flow rate of wells equipped with pumping units |
RU2653210C2 (en) * | 2017-08-15 | 2018-05-07 | Олег Сергеевич Николаев | Method for interval oil production from a multiple zone well and a packerless pumping plant for implementation thereof |
US10900344B2 (en) | 2017-11-07 | 2021-01-26 | Saudi Arabian Oil Company | Determining wellbore leak crossflow rate between formations in an injection well |
CN109944581B (en) * | 2017-12-19 | 2022-03-29 | 中国石油天然气股份有限公司 | Method and device for acquiring casing damage of oil well |
RU2679773C1 (en) * | 2018-01-10 | 2019-02-12 | Общество с ограниченной ответственностью "Газпром проектирование" | Method of accounting of gas flows on man-made fluid-conducting channels between two gas-condensate formations |
US10625669B2 (en) * | 2018-02-21 | 2020-04-21 | Ford Global Technologies, Llc | Vehicle sensor operation |
RU2704068C1 (en) * | 2018-11-13 | 2019-10-23 | Общество с ограниченной ответственностью "Газпромнефть Научно-Технический Центр" (ООО "Газпромнефть НТЦ") | Method for assessment of inter-column inter-formation overflow in a well |
CN109138982B (en) * | 2018-11-16 | 2023-09-26 | 美钻深海能源科技研发(上海)有限公司 | Automatic safety well closing system for underwater equipment biological corrosion |
WO2021080622A1 (en) * | 2019-10-25 | 2021-04-29 | Halliburton Energy Services, Inc. | Wax removal in a production line |
RU2759143C1 (en) * | 2020-11-27 | 2021-11-09 | Общество с ограниченной ответственностью «Тюменский институт нефти и газа» | Method for increasing the efficiency of hydrodynamic methods for increasing the petroleum recovery of a reservoir |
RU2758326C1 (en) * | 2021-04-12 | 2021-10-28 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method for regulating the operating mode of a well equipped with an electric center pump installation in an inter-well pumping system |
CN115492558B (en) * | 2022-09-14 | 2023-04-14 | 中国石油大学(华东) | Device and method for preventing secondary generation of hydrate in pressure-reducing exploitation shaft of sea natural gas hydrate |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3954006A (en) * | 1975-01-31 | 1976-05-04 | Schlumberger Technology Corporation | Methods for determining velocities and flow rates of fluids flowing in well bore |
US20020043370A1 (en) * | 2000-09-12 | 2002-04-18 | Bobby Poe | Evaluation of reservoir and hydraulic fracture properties in multilayer commingled reservoirs using commingled reservoir production data and production logging information |
US6874361B1 (en) * | 2004-01-08 | 2005-04-05 | Halliburton Energy Services, Inc. | Distributed flow properties wellbore measurement system |
Family Cites Families (52)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3211225A (en) * | 1963-05-28 | 1965-10-12 | Signal Oil & Gas Co | Well treating apparatus |
US3710867A (en) * | 1971-01-05 | 1973-01-16 | Petrolite Corp | Apparatus and process for adding chemicals |
US4064936A (en) * | 1976-07-09 | 1977-12-27 | Mcclure L C | Chemical treating system for oil wells |
FR2421272A1 (en) * | 1978-03-28 | 1979-10-26 | Europ Propulsion | SYSTEM FOR REMOTE CONTROL AND MAINTENANCE OF A SUBMERSIBLE WELL HEAD |
US4354553A (en) * | 1980-10-14 | 1982-10-19 | Hensley Clifford J | Corrosion control downhole in a borehole |
US4436148A (en) * | 1981-04-27 | 1984-03-13 | Richard Maxwell | Chemical treatment for oil wells |
US4375833A (en) * | 1981-09-04 | 1983-03-08 | Meadows Floyd G | Automatic well treatment system |
US4635723A (en) * | 1983-07-07 | 1987-01-13 | Spivey Melvin F | Continuous injection of corrosion-inhibiting liquids |
US4582131A (en) * | 1984-09-26 | 1986-04-15 | Hughes Tool Company | Submersible chemical injection pump |
US4665981A (en) * | 1985-03-05 | 1987-05-19 | Asadollah Hayatdavoudi | Method and apparatus for inhibiting corrosion of well tubing |
US4589434A (en) * | 1985-06-10 | 1986-05-20 | Exxon Production Research Co. | Method and apparatus to prevent hydrate formation in full wellstream pipelines |
JPS62110135A (en) * | 1985-11-08 | 1987-05-21 | Cosmo Co Ltd | Method and apparatus for quantifying concentration of asphaltene |
US4721158A (en) * | 1986-08-15 | 1988-01-26 | Amoco Corporation | Fluid injection control system |
US4830112A (en) * | 1987-12-14 | 1989-05-16 | Erickson Don J | Method and apparatus for treating wellbores |
US4901563A (en) * | 1988-09-13 | 1990-02-20 | Atlantic Richfield Company | System for monitoring fluids during well stimulation processes |
US4926942A (en) * | 1989-02-22 | 1990-05-22 | Profrock Jr William P | Method for reducing sand production in submersible-pump wells |
US5006845A (en) * | 1989-06-13 | 1991-04-09 | Honeywell Inc. | Gas kick detector |
US5172717A (en) * | 1989-12-27 | 1992-12-22 | Otis Engineering Corporation | Well control system |
US5517593A (en) * | 1990-10-01 | 1996-05-14 | John Nenniger | Control system for well stimulation apparatus with response time temperature rise used in determining heater control temperature setpoint |
US5305209A (en) * | 1991-01-31 | 1994-04-19 | Amoco Corporation | Method for characterizing subterranean reservoirs |
US5209301A (en) * | 1992-02-04 | 1993-05-11 | Ayres Robert N | Multiple phase chemical injection system |
US5353237A (en) * | 1992-06-25 | 1994-10-04 | Oryx Energy Company | System for increasing efficiency of chemical treatment |
US6006832A (en) * | 1995-02-09 | 1999-12-28 | Baker Hughes Incorporated | Method and system for monitoring and controlling production and injection wells having permanent downhole formation evaluation sensors |
US5706896A (en) * | 1995-02-09 | 1998-01-13 | Baker Hughes Incorporated | Method and apparatus for the remote control and monitoring of production wells |
US5829520A (en) * | 1995-02-14 | 1998-11-03 | Baker Hughes Incorporated | Method and apparatus for testing, completion and/or maintaining wellbores using a sensor device |
US5647435A (en) * | 1995-09-25 | 1997-07-15 | Pes, Inc. | Containment of downhole electronic systems |
US5767680A (en) * | 1996-06-11 | 1998-06-16 | Schlumberger Technology Corporation | Method for sensing and estimating the shape and location of oil-water interfaces in a well |
US6446014B1 (en) * | 1997-02-25 | 2002-09-03 | Cham Ocondi | Method and apparatus for measuring and controlling the flow of fluids from coal seam gas wells |
US6061634A (en) * | 1997-04-14 | 2000-05-09 | Schlumberger Technology Corporation | Method and apparatus for characterizing earth formation properties through joint pressure-resistivity inversion |
US6281489B1 (en) * | 1997-05-02 | 2001-08-28 | Baker Hughes Incorporated | Monitoring of downhole parameters and tools utilizing fiber optics |
US5937946A (en) * | 1998-04-08 | 1999-08-17 | Streetman; Foy | Apparatus and method for enhancing fluid and gas flow in a well |
GB2361730B (en) * | 1998-12-21 | 2003-05-07 | Baker Hughes Inc | Closed loop chemical injection and monitoring system for oilfield operations |
US6196314B1 (en) * | 1999-02-15 | 2001-03-06 | Baker Hughes Incorporated | Insoluble salt control system and method |
US6467340B1 (en) * | 1999-10-21 | 2002-10-22 | Baker Hughes Incorporated | Asphaltenes monitoring and control system |
US6543540B2 (en) * | 2000-01-06 | 2003-04-08 | Baker Hughes Incorporated | Method and apparatus for downhole production zone |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
NO20002137A (en) * | 2000-04-26 | 2001-04-09 | Sinvent As | Reservoir monitoring using chemically intelligent tracer release |
RU15117U1 (en) * | 2000-05-26 | 2000-09-20 | Общество с ограниченной ответственностью "Пульс" | SYSTEM OF MANAGEMENT OF THE PROCESS OF INTENSIFICATION OF LIQUID PRODUCTION FROM DRILLING WELLS AND A DEVICE FOR INTENSIFICATION OF PRODUCTION |
US6408943B1 (en) * | 2000-07-17 | 2002-06-25 | Halliburton Energy Services, Inc. | Method and apparatus for placing and interrogating downhole sensors |
US20020112888A1 (en) * | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
US7434619B2 (en) * | 2001-02-05 | 2008-10-14 | Schlumberger Technology Corporation | Optimization of reservoir, well and surface network systems |
US6795773B2 (en) * | 2001-09-07 | 2004-09-21 | Halliburton Energy Services, Inc. | Well completion method, including integrated approach for fracture optimization |
US7178591B2 (en) * | 2004-08-31 | 2007-02-20 | Schlumberger Technology Corporation | Apparatus and method for formation evaluation |
RU2240422C2 (en) * | 2002-08-20 | 2004-11-20 | Общество с ограниченной ответственностью "Дарси Ойл Инжиниринг" | Method for optimizing process of oil extraction from bed |
US7725301B2 (en) * | 2002-11-04 | 2010-05-25 | Welldynamics, B.V. | System and method for estimating multi-phase fluid rates in a subterranean well |
CN1777798A (en) * | 2003-03-17 | 2006-05-24 | 焦耳显微系统加拿大公司 | System enabling remote analysis of fluids. |
US7261162B2 (en) * | 2003-06-25 | 2007-08-28 | Schlumberger Technology Corporation | Subsea communications system |
US20050149264A1 (en) * | 2003-12-30 | 2005-07-07 | Schlumberger Technology Corporation | System and Method to Interpret Distributed Temperature Sensor Data and to Determine a Flow Rate in a Well |
US7114557B2 (en) * | 2004-02-03 | 2006-10-03 | Schlumberger Technology Corporation | System and method for optimizing production in an artificially lifted well |
GB2416871A (en) * | 2004-07-29 | 2006-02-08 | Schlumberger Holdings | Well characterisation using distributed temperature sensor data |
US7654318B2 (en) * | 2006-06-19 | 2010-02-02 | Schlumberger Technology Corporation | Fluid diversion measurement methods and systems |
US7890273B2 (en) * | 2007-02-20 | 2011-02-15 | Schlumberger Technology Corporation | Determining fluid and/or reservoir information using an instrumented completion |
-
2007
- 2007-04-20 US US11/738,327 patent/US20080257544A1/en not_active Abandoned
-
2008
- 2008-04-18 CA CA2684291A patent/CA2684291C/en active Active
- 2008-04-18 CA CA002684281A patent/CA2684281A1/en not_active Abandoned
- 2008-04-18 GB GB0918123A patent/GB2461210B/en not_active Expired - Fee Related
- 2008-04-18 RU RU2009142437/03A patent/RU2484242C2/en not_active IP Right Cessation
- 2008-04-18 GB GB0918121.5A patent/GB2462949B/en active Active
- 2008-04-18 AU AU2008242758A patent/AU2008242758A1/en not_active Abandoned
- 2008-04-18 BR BRPI0810415-8A2A patent/BRPI0810415A2/en not_active IP Right Cessation
- 2008-04-18 BR BRPI0810434-4A2A patent/BRPI0810434A2/en not_active IP Right Cessation
- 2008-04-18 AU AU2008270950A patent/AU2008270950B2/en active Active
- 2008-04-18 MX MX2009011200A patent/MX2009011200A/en active IP Right Grant
- 2008-04-18 MY MYPI20094363A patent/MY150281A/en unknown
- 2008-04-18 WO PCT/US2008/060817 patent/WO2008131218A2/en active Application Filing
-
2009
- 2009-10-19 NO NO20093161A patent/NO20093161L/en not_active Application Discontinuation
- 2009-10-19 NO NO20093167A patent/NO20093167L/en not_active Application Discontinuation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3954006A (en) * | 1975-01-31 | 1976-05-04 | Schlumberger Technology Corporation | Methods for determining velocities and flow rates of fluids flowing in well bore |
US20020043370A1 (en) * | 2000-09-12 | 2002-04-18 | Bobby Poe | Evaluation of reservoir and hydraulic fracture properties in multilayer commingled reservoirs using commingled reservoir production data and production logging information |
US6874361B1 (en) * | 2004-01-08 | 2005-04-05 | Halliburton Energy Services, Inc. | Distributed flow properties wellbore measurement system |
Also Published As
Publication number | Publication date |
---|---|
RU2009142437A (en) | 2011-05-27 |
GB2462949A (en) | 2010-03-03 |
WO2008131218A2 (en) | 2008-10-30 |
AU2008270950B2 (en) | 2014-06-05 |
NO20093167L (en) | 2010-01-18 |
WO2008131218A3 (en) | 2009-01-15 |
BRPI0810434A2 (en) | 2014-10-14 |
CA2684291A1 (en) | 2009-01-08 |
MX2009011200A (en) | 2009-12-09 |
GB0918123D0 (en) | 2009-12-02 |
NO20093161L (en) | 2009-11-18 |
CA2684281A1 (en) | 2008-10-30 |
AU2008270950A1 (en) | 2009-01-08 |
US20080257544A1 (en) | 2008-10-23 |
GB0918121D0 (en) | 2009-12-02 |
GB2461210B (en) | 2010-12-01 |
BRPI0810415A2 (en) | 2014-10-14 |
CA2684291C (en) | 2014-07-29 |
GB2462949B (en) | 2012-10-24 |
RU2484242C2 (en) | 2013-06-10 |
AU2008242758A1 (en) | 2008-10-30 |
MY150281A (en) | 2013-12-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2461210A (en) | System and method for crossflow detection and intervention in production wellbores | |
GB2463381A (en) | System and method for water breakthrough detection and intervention in a production well | |
WO2009075962A3 (en) | Methods and systems to estimate wellbore events | |
WO2007022364A3 (en) | Change audit method, apparatus and system | |
GB2435534B (en) | Method,system,and computer program product for performing prognosis and asset management services | |
WO2006019635A3 (en) | Method of operating a plumbing system | |
WO2007130495A3 (en) | Efficiently filtering using a web site | |
MY186645A (en) | Fluid inflow | |
ATE406502T1 (en) | METHOD FOR FACILITATING WELL OPERATION | |
WO2007118202A3 (en) | Learning-based recommendation system incorporating collaborative filtering and feedback | |
WO2009070676A3 (en) | Determining postural stability | |
TW200746983A (en) | Temperature control method of electronic component, and the system thereof component | |
ITVA20060060A1 (en) | METHOD AND RELATIVE DEVICE TO ESTIMATE THE GAUSSIAN WHITE NOISE LEVEL THAT CORROMPERS A DIGITAL IMAGE | |
WO2008060861A3 (en) | Method and system for analyzing schedule trends | |
WO2010129677A3 (en) | Apparatus and method for predicting properties of earth formations | |
FR2916380B1 (en) | METHOD AND DEVICE FOR OVERMOULTING A GLASS ELEMENT BY A SEAL PORTION COMPRISING AN INSERT, GLAZING AND INSERT IN PARTICULAR FOR THIS METHOD. | |
NO346368B1 (en) | A method for the concentration of alpha-mannosidase. | |
NO20023024L (en) | Improved method and apparatus for predicting fluid characteristics in a wellbore | |
FR2910496B1 (en) | METHOD OF ADJUSTING THE LOCAL CHARACTERISTICS OF A NON-WOVEN, AND PRODUCTION PLANT THEREFOR. | |
GB2486087A (en) | Systems and methods for monitoring corrosion in a well | |
FR2926149B1 (en) | DEVICE, SYSTEMS AND METHOD FOR SECURELY STARTING A COMPUTER INSTALLATION | |
WO2010075579A3 (en) | Methods of predicting medically refractive ulcerative colitis (mr-uc) requiring colectomy | |
GB201120804D0 (en) | Apparatus for monitoring the serviceability of a drain or sewer | |
FR2904177B1 (en) | DEVICE AND METHOD FOR PRODUCING AND CONTAINING PLASMA. | |
FR2899412B1 (en) | "METHOD AND SYSTEM FOR UPDATING TOPOLOGY CHANGES IN A COMPUTER NETWORK" |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PCNP | Patent ceased through non-payment of renewal fee |
Effective date: 20130418 |