MX2024001387A - Plant and process for multi-mode manufacturing of metal strips and plates. - Google Patents
Plant and process for multi-mode manufacturing of metal strips and plates.Info
- Publication number
- MX2024001387A MX2024001387A MX2024001387A MX2024001387A MX2024001387A MX 2024001387 A MX2024001387 A MX 2024001387A MX 2024001387 A MX2024001387 A MX 2024001387A MX 2024001387 A MX2024001387 A MX 2024001387A MX 2024001387 A MX2024001387 A MX 2024001387A
- Authority
- MX
- Mexico
- Prior art keywords
- plates
- shear
- plant
- reduction
- metal strips
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title 1
- 239000002184 metal Substances 0.000 title 1
- 238000000034 method Methods 0.000 title 1
- 238000005096 rolling process Methods 0.000 abstract 3
- 229910000831 Steel Inorganic materials 0.000 abstract 1
- 238000010923 batch production Methods 0.000 abstract 1
- 238000001816 cooling Methods 0.000 abstract 1
- 230000006698 induction Effects 0.000 abstract 1
- 239000007788 liquid Substances 0.000 abstract 1
- 239000010959 steel Substances 0.000 abstract 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/463—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B13/00—Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories
- B21B13/22—Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories for rolling metal immediately subsequent to continuous casting, i.e. in-line rolling of steel
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B45/00—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B45/02—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
- B21B45/0203—Cooling
- B21B45/0209—Cooling devices, e.g. using gaseous coolants
- B21B45/0215—Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
- B21B45/0218—Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes for strips, sheets, or plates
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2265/00—Forming parameters
- B21B2265/14—Reduction rate
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B45/00—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B45/02—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
- B21B45/0203—Cooling
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Rolling (AREA)
- Continuous Casting (AREA)
Abstract
A plant for the endless or batch production of strips and plates of hot-rolled steel, with thickness from 0,6 mm to 50 mm, comprises a continuous caster (1) of thin slabs with liquid core reduction, followed by an induction heater (2), with a first shear (3) therebetween, and then a rolling mill (4) followed by a second shear (5) and a run out table with a cooling device (6) and a pusher/piler (7) for plates and then a third shear (8) and a plurality of coilers (9), and it further includes a minimum-reduction rolling stand (10) arranged between the continuous caster (1) and the first shear (3), said minimum- reduction rolling stand (10) being designed to perform a slab thickness reduction of only about 10% and in any case not more than 20%.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT102017000039423A IT201700039423A1 (en) | 2017-04-10 | 2017-04-10 | PLANT AND PROCEDURE FOR MANUFACTURING IN MULTIPLE STEEL RIBBONS AND SHEET METHODS |
Publications (1)
Publication Number | Publication Date |
---|---|
MX2024001387A true MX2024001387A (en) | 2024-02-27 |
Family
ID=59521593
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2019012216A MX2019012216A (en) | 2017-04-10 | 2018-04-09 | Plant and process for multi-mode manufacturing of metal strips and plates. |
MX2024001387A MX2024001387A (en) | 2017-04-10 | 2019-10-10 | Plant and process for multi-mode manufacturing of metal strips and plates. |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2019012216A MX2019012216A (en) | 2017-04-10 | 2018-04-09 | Plant and process for multi-mode manufacturing of metal strips and plates. |
Country Status (11)
Country | Link |
---|---|
EP (2) | EP3632582B1 (en) |
JP (2) | JP7095071B2 (en) |
KR (1) | KR102435246B1 (en) |
CN (1) | CN110573269B (en) |
ES (2) | ES2887184T3 (en) |
IT (1) | IT201700039423A1 (en) |
MA (1) | MA47042B1 (en) |
MX (2) | MX2019012216A (en) |
PH (1) | PH12019502312A1 (en) |
RU (1) | RU2752592C2 (en) |
WO (1) | WO2018189652A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114746196B (en) * | 2020-05-22 | 2024-09-06 | 株式会社Tmeic | Cutting position control device |
IT202000016120A1 (en) * | 2020-07-03 | 2022-01-03 | Arvedi Steel Eng S P A | PLANT AND PROCEDURE FOR THE CONTINUOUS PRODUCTION OF HOT ROLLED ULTRA-THIN STEEL STRIPS |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5276952A (en) * | 1992-05-12 | 1994-01-11 | Tippins Incorporated | Method and apparatus for intermediate thickness slab caster and inline hot strip and plate line |
CA2202616C (en) * | 1994-10-20 | 2001-01-23 | Fritz-Peter Pleschiutschnigg | Process and device for producing a steel strip with the properties of a cold-rolled product |
US6309482B1 (en) * | 1996-01-31 | 2001-10-30 | Jonathan Dorricott | Steckel mill/on-line controlled cooling combination |
NL1007739C2 (en) | 1997-12-08 | 1999-06-09 | Hoogovens Staal Bv | Method and device for manufacturing a high strength steel strip. |
KR100353570B1 (en) | 1996-12-19 | 2002-09-19 | 코루스 스타알 베.뷔. | Process and device for producing a steel strip or sheet |
DE19713604A1 (en) * | 1997-04-02 | 1998-10-08 | Schloemann Siemag Ag | A position-controlled compression frame arranged upstream of a finishing train for continuously cast strip material |
KR100863557B1 (en) * | 2002-07-31 | 2008-10-15 | 주식회사 포스코 | prevention apparatus for distortion of slab in roughing mill |
ITMI20021996A1 (en) | 2002-09-19 | 2004-03-20 | Giovanni Arvedi | PROCESS AND PRODUCTION LINE FOR THE MANUFACTURE OF ULTRA-THIN HOT TAPE BASED ON THE TECHNOLOGY OF THE THIN SHEET |
CN1972764B (en) * | 2005-04-07 | 2011-12-07 | 乔瓦尼·阿尔韦迪 | Process and system for manufacturing metal strips and sheets without solution of continuity between continuous casting and rolling |
ITRM20050523A1 (en) * | 2005-10-21 | 2007-04-22 | Danieli Off Mecc | PROCESS AND PLANT FOR THE PRODUCTION OF METAL TAPES. |
DE102008020412A1 (en) * | 2007-08-24 | 2009-02-26 | Sms Demag Ag | Method and device for producing a metal strip by casting rolls |
DE102008003222A1 (en) * | 2007-09-13 | 2009-03-19 | Sms Demag Ag | Compact flexible CSP system for continuous, semi-continuous and batch operation |
IT1400002B1 (en) | 2010-05-10 | 2013-05-09 | Danieli Off Mecc | PROCEDURE AND PLANT FOR THE PRODUCTION OF FLAT LAMINATED PRODUCTS |
DE102011004245A1 (en) * | 2010-10-07 | 2012-04-12 | Sms Siemag Ag | Method and device for producing a metal strip by casting rolls |
DE102013019698A1 (en) | 2013-05-03 | 2014-11-06 | Sms Siemag Ag | Method for producing a metallic strip |
CN106244916B (en) * | 2016-09-18 | 2018-05-08 | 武汉钢铁有限公司 | High-quality Thin Specs hot rolled alloy tool steel and its CSP production technologies |
-
2017
- 2017-04-10 IT IT102017000039423A patent/IT201700039423A1/en unknown
-
2018
- 2018-04-09 CN CN201880024408.9A patent/CN110573269B/en active Active
- 2018-04-09 MA MA47042A patent/MA47042B1/en unknown
- 2018-04-09 EP EP19208335.0A patent/EP3632582B1/en active Active
- 2018-04-09 ES ES19208335T patent/ES2887184T3/en active Active
- 2018-04-09 MX MX2019012216A patent/MX2019012216A/en unknown
- 2018-04-09 JP JP2020504467A patent/JP7095071B2/en active Active
- 2018-04-09 RU RU2019135817A patent/RU2752592C2/en active
- 2018-04-09 KR KR1020197033306A patent/KR102435246B1/en active IP Right Grant
- 2018-04-09 WO PCT/IB2018/052459 patent/WO2018189652A1/en active Application Filing
- 2018-04-09 ES ES18718524T patent/ES2866154T3/en active Active
- 2018-04-09 EP EP18718524.4A patent/EP3606681B1/en active Active
-
2019
- 2019-10-09 PH PH12019502312A patent/PH12019502312A1/en unknown
- 2019-10-10 MX MX2024001387A patent/MX2024001387A/en unknown
-
2022
- 2022-05-20 JP JP2022082806A patent/JP2022107666A/en active Pending
Also Published As
Publication number | Publication date |
---|---|
RU2752592C2 (en) | 2021-07-29 |
JP2022107666A (en) | 2022-07-22 |
EP3632582B1 (en) | 2021-06-09 |
MA47042B1 (en) | 2022-01-31 |
KR102435246B1 (en) | 2022-08-22 |
PH12019502312A1 (en) | 2020-10-12 |
RU2019135817A3 (en) | 2021-06-04 |
EP3632582A1 (en) | 2020-04-08 |
JP7095071B2 (en) | 2022-07-04 |
ES2866154T3 (en) | 2021-10-19 |
WO2018189652A1 (en) | 2018-10-18 |
ES2887184T3 (en) | 2021-12-22 |
MA47042A1 (en) | 2020-12-31 |
CN110573269A (en) | 2019-12-13 |
KR20190134776A (en) | 2019-12-04 |
MX2019012216A (en) | 2019-11-21 |
IT201700039423A1 (en) | 2018-10-10 |
EP3606681A1 (en) | 2020-02-12 |
CN110573269B (en) | 2022-01-04 |
JP2020516466A (en) | 2020-06-11 |
EP3606681B1 (en) | 2021-01-27 |
RU2019135817A (en) | 2021-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE602006005834D1 (en) | METHOD AND APPARATUS FOR PRODUCING METAL STRIPS | |
DE602005027500D1 (en) | METHOD AND APPROPRIATE APPARATUS FOR PRODUCING STEEL BANDS WITH CONTINUITY LOSS | |
WO2011158091A3 (en) | Rolling method for flat products and relative rolling line | |
MX2024001387A (en) | Plant and process for multi-mode manufacturing of metal strips and plates. | |
CN103436780A (en) | Production method of steel for LED bracket | |
MX2015011735A (en) | Method for producing a metal strip by casting and rolling. | |
RU2014104074A (en) | METHOD FOR PRODUCING FLAT ELECTRICAL STEEL ROLL WITH ORIENTED GRAIN STRUCTURE FOR APPLICATION IN THE ELECTRICAL INDUSTRY | |
RU2013132544A (en) | Rolling Mill for the Production of Pipe Steel and Thin Strip | |
CN105327937A (en) | Magnesium alloy plate and strip rolling production line and rolling molding production method thereof | |
RU2013120545A (en) | METHOD AND DEVICE FOR MANUFACTURE OF A METAL STRIP UNLIMITED ROLLING | |
UA106325C2 (en) | Rolling method for strip and corresponding rolling line | |
CA2586719A1 (en) | Apparatus for manufacturing metal material by rolling | |
ATE336309T1 (en) | METHOD FOR ROLLING THIN AND/OR THICK SLABES OF STEEL MATERIALS INTO HOT STRIP | |
RU2013138635A (en) | METAL ROLLING METHOD AND APPROPRIATE ROLLING MACHINE | |
MX2021008043A (en) | Hot-rolled steel sheet and production method therefor. | |
FI20195052A1 (en) | Method for manufacturing of stainless steel strips | |
MX2023003891A (en) | Method of making thin floor plate. | |
CN205183324U (en) | Magnesium alloy sheet takes rolling production line | |
CN103752609A (en) | Method for rolling current-conducting copper bar or plate by using hot rolling machine | |
RU2012124897A (en) | COMMISSIONING A CLEAN GROUP OF CROSSES OF A ROLLING MILL IN A COMBINED CASTING AND ROLLING PLANT | |
CN204503752U (en) | Torrid zone continuous casting and rolling Heat treating machine set | |
RU2465078C1 (en) | Method of reducing continuously cast slabs | |
RU2014100500A (en) | METHOD FOR PRODUCING ROLLED ROLLING ON CONTINUOUS WIDESBAND | |
CN102962251A (en) | Process for preventing defect of sharp angle on edge parts of intermediate billet of low-carbon low-silicon non-oriented electrical steel | |
UA92950C2 (en) | METHOD for HEATING AND PREPARATION of the blankS BEFORE rolling in the hot rolling mills |