MX2018005677A - Sistema de seguimiento, gestion, planificacion y distribucion de proyectos de construccion in situ. - Google Patents

Sistema de seguimiento, gestion, planificacion y distribucion de proyectos de construccion in situ.

Info

Publication number
MX2018005677A
MX2018005677A MX2018005677A MX2018005677A MX2018005677A MX 2018005677 A MX2018005677 A MX 2018005677A MX 2018005677 A MX2018005677 A MX 2018005677A MX 2018005677 A MX2018005677 A MX 2018005677A MX 2018005677 A MX2018005677 A MX 2018005677A
Authority
MX
Mexico
Prior art keywords
components
identify
planning
managing
status
Prior art date
Application number
MX2018005677A
Other languages
English (en)
Inventor
Michael Schwartz Timothy
Original Assignee
Nucor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nucor Corp filed Critical Nucor Corp
Publication of MX2018005677A publication Critical patent/MX2018005677A/es

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0481Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance
    • G06F3/0482Interaction with lists of selectable items, e.g. menus
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0484Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
    • G06F3/04842Selection of displayed objects or displayed text elements
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K7/00Methods or arrangements for sensing record carriers, e.g. for reading patterns
    • G06K7/10Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation
    • G06K7/14Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation using light without selection of wavelength, e.g. sensing reflected white light
    • G06K7/1404Methods for optical code recognition
    • G06K7/1408Methods for optical code recognition the method being specifically adapted for the type of code
    • G06K7/14131D bar codes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/20Configuration CAD, e.g. designing by assembling or positioning modules selected from libraries of predesigned modules
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0481Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance
    • G06F3/04815Interaction with a metaphor-based environment or interaction object displayed as three-dimensional, e.g. changing the user viewpoint with respect to the environment or object
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2219/00Indexing scheme for manipulating 3D models or images for computer graphics
    • G06T2219/004Annotating, labelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Computer Hardware Design (AREA)
  • Geometry (AREA)
  • Economics (AREA)
  • Human Computer Interaction (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Computer Graphics (AREA)
  • Software Systems (AREA)
  • Structural Engineering (AREA)
  • Evolutionary Computation (AREA)
  • Architecture (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Civil Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Electromagnetism (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Un sistema de gestión de construcción permite a un usuario capturar un identificador de elemento a partir de un elemento (por ejemplo, envío, grupo de componentes y/o uno o más componentes) utilizando un dispositivo móvil. El identificador de elemento se puede usar para identificar un proyecto y acceder a un modelo para el producto, identificar un componente en un modelo y/o identificar los componentes en un envío para propósitos de distribución. Además, el sistema se puede usar para identificar un estado para uno o más componentes. El estado puede ser que uno o más componentes se envíen, reciban, distribuyan para ensamblaje, instalen o similares. El estado de uno o más componentes se puede actualizar automáticamente al capturar el identificador de elemento. Además, el usuario también puede seleccionar información de envío para envíos pasados, actuales y futuros con el fin de identificar uno o más componentes asociados con cada uno de los envíos.
MX2018005677A 2017-05-05 2018-05-04 Sistema de seguimiento, gestion, planificacion y distribucion de proyectos de construccion in situ. MX2018005677A (es)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201762502309P 2017-05-05 2017-05-05
US15/969,125 US11250176B2 (en) 2017-05-05 2018-05-02 System for on-site tracking, managing, planning and staging construction projects
US15/969,146 US11256833B2 (en) 2017-05-05 2018-05-02 System for on-site tracking, managing, planning and staging construction projects

Publications (1)

Publication Number Publication Date
MX2018005677A true MX2018005677A (es) 2018-11-09

Family

ID=64015347

Family Applications (1)

Application Number Title Priority Date Filing Date
MX2018005677A MX2018005677A (es) 2017-05-05 2018-05-04 Sistema de seguimiento, gestion, planificacion y distribucion de proyectos de construccion in situ.

Country Status (3)

Country Link
US (3) US11256833B2 (es)
CA (1) CA3003842A1 (es)
MX (1) MX2018005677A (es)

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11256833B2 (en) 2017-05-05 2022-02-22 Nucor Corporation System for on-site tracking, managing, planning and staging construction projects
US11836676B2 (en) * 2017-08-04 2023-12-05 Evolve Mep, Llc Determining vendor components, kits, and logistics based on construction drawings
US20220180015A9 (en) * 2018-11-09 2022-06-09 Anchor Ring Solutions, Llc Construction anchor apparatus and system and methodology of use
AU2019376170B2 (en) * 2018-11-09 2024-05-09 Anchor Ring Solutions, Llc Systems and methodology for construction management and equipment positioning via building information modeling
CN111523743A (zh) * 2019-03-22 2020-08-11 拉扎斯网络科技(上海)有限公司 订单分配方法、装置、服务器及非易失性存储介质
US11326423B2 (en) * 2019-05-16 2022-05-10 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings
US11499423B2 (en) 2019-05-16 2022-11-15 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration
USD960915S1 (en) * 2019-05-21 2022-08-16 Tata Consultancy Services Limited Display screen with graphical user interface for menu navigation
US11475176B2 (en) * 2019-05-31 2022-10-18 Anguleris Technologies, Llc Method and system for automatically ordering and fulfilling architecture, design and construction product sample requests
CN110378670B (zh) * 2019-07-17 2023-04-28 重庆大学 一种空间网络技术模型及其构建方法和应用
CN111209614A (zh) * 2019-10-21 2020-05-29 广州市第一市政工程有限公司 一种基于bim技术的高大梁板一键识别方法
US11821289B2 (en) 2019-11-18 2023-11-21 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis
CN110853487A (zh) * 2019-11-25 2020-02-28 西安工业大学 一种用于城市设计的数字化沙盘系统
CN111078750B (zh) * 2019-11-29 2023-03-10 深圳市华阳国际工程设计股份有限公司 项目模型的数据统计方法、装置及计算机存储介质
US11429760B2 (en) * 2020-04-07 2022-08-30 Todd Hesnor QR coded construction drawings
CN112199758A (zh) * 2020-10-30 2021-01-08 华中科技大学 基于bim技术的基坑工程设计与动态风险分析方法及系统
CN112536913A (zh) * 2020-12-04 2021-03-23 中铁十九局集团第一工程有限公司 基于bim加lot技术的钢筋数字化加工方法
CN112668084A (zh) * 2020-12-30 2021-04-16 晟通科技集团有限公司 模板编码方法、计算机装置及存储介质
CN113763207B (zh) * 2021-02-09 2023-11-24 北京中交京纬公路造价技术有限公司 一种基于互联网的移动数据采集系统
CN113112601A (zh) * 2021-04-06 2021-07-13 河南中安建设工程有限公司 一种基于bim技术的建筑施工预拼装方法
CN114021267B (zh) * 2021-08-16 2023-10-24 中建交通建设集团有限公司 Revit软件塔吊及塔吊基础深化设计方法及系统
CN113761724A (zh) * 2021-08-18 2021-12-07 淮阴工学院 基于bim技术的装配式建筑施工组织与进度管理方法
US11604905B1 (en) * 2021-12-08 2023-03-14 Tiver Built LLC Smart render design tool and method
CN114969935B (zh) * 2022-06-01 2023-03-31 北京梦诚科技有限公司 一种基建图形算量方法、系统、电子设备及存储介质
CN115470557B (zh) * 2022-09-16 2023-04-07 盐城工学院 一种基于bim的智能建筑设计方法及系统
CN116522565B (zh) * 2023-07-04 2024-01-12 深圳华建电力工程技术有限公司 一种基于bim的电力工程设计配电网规划方法及计算机设备

Family Cites Families (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7062532B1 (en) 1999-03-25 2006-06-13 Autodesk, Inc. Method and apparatus for drawing collaboration on a network
US8121874B1 (en) 1999-05-27 2012-02-21 Accenture Global Services Limited Phase delivery of components of a system required for implementation technology
US7283975B2 (en) * 2001-02-05 2007-10-16 Broughton W Curtis System and method for tracking and managing construction projects
US7720703B1 (en) 2001-02-05 2010-05-18 Trimble Navigation Limited System and method for tracking and managing construction projects
US8219466B2 (en) * 2002-08-05 2012-07-10 John Yupeng Gui System and method for providing asset management and tracking capabilities
US7917409B1 (en) * 2002-10-22 2011-03-29 PPI Technology Services, LP Method for monitoring and assembling equipment
US7277889B2 (en) * 2003-10-07 2007-10-02 Louis Salvatore Addonisio Asset management and status system
US20050131658A1 (en) * 2003-12-16 2005-06-16 Mei Hsaio L.S. Systems and methods for 3D assembly venue modeling
JP2006099308A (ja) * 2004-09-29 2006-04-13 Hitachi Ltd コンポーネントベース・アプリケーション構築方法
US7913190B2 (en) * 2005-07-18 2011-03-22 Dassault Systèmes Method, system and software for visualizing 3D models
US8830239B2 (en) * 2008-04-21 2014-09-09 Saleemz Holdings Pty Ltd Materials management system and method
US8514058B2 (en) 2008-08-18 2013-08-20 Trimble Navigation Limited Construction equipment component location tracking
JP2010108321A (ja) 2008-10-31 2010-05-13 Hitachi-Ge Nuclear Energy Ltd 建設状況可視化システム
US8732125B2 (en) 2010-03-09 2014-05-20 Autodesk, Inc. Systems and methods for construction field management and operations with building information modeling
US20110246155A1 (en) * 2010-03-30 2011-10-06 Aide Audra Fitch Computer-Readable Medium And Systems For Applying Multiple Impact Factors
US9064219B2 (en) * 2010-05-05 2015-06-23 J. E. Dunn Construction Group, Inc. System and method for managing facility content and equipment information
US20160335731A1 (en) * 2010-05-05 2016-11-17 Site 10.01, Inc. System and method for monitoring and managing information
US20110307281A1 (en) 2010-06-11 2011-12-15 Satterfield & Pontikes Construction, Inc. Model inventory manager
US9141928B2 (en) * 2010-08-02 2015-09-22 At&T Intellectual Property I, L.P. System and method for vendor and customer management in a supply chain
US9424371B2 (en) 2010-11-05 2016-08-23 Autodesk, Inc. Click to accept as built modeling
US8843350B2 (en) * 2011-06-03 2014-09-23 Walter P. Moore and Associates, Inc. Facilities management system
US20140006074A1 (en) * 2011-10-19 2014-01-02 Advanced Construction Techniques Ltd. System and method for gathering, analyzing, managing and sharing ground modification operation data
US9817839B2 (en) * 2011-11-29 2017-11-14 Trimble Inc. Managing information at a construction site
US9031585B2 (en) 2011-11-29 2015-05-12 Trimble Navigation Limited Integrating position information into a handheld tool
US20140365259A1 (en) * 2011-11-29 2014-12-11 Trimble Navigation Limited In-field installation record of a project
US8668136B2 (en) * 2012-03-01 2014-03-11 Trimble Navigation Limited Method and system for RFID-assisted imaging
US20130325410A1 (en) * 2012-03-06 2013-12-05 Kierantimberlake Associates, Llp Method for real time estimation of embodied environmental impact in a building design
US9400902B2 (en) 2012-05-22 2016-07-26 Trimble Navigation Limited Multi-modal entity tracking and display
US10296665B2 (en) * 2013-03-15 2019-05-21 On Center Software, Inc. Image management in construction project software programs
US10204388B2 (en) 2013-04-19 2019-02-12 Trimble Inc. Method, system, and medium of construction project management
US8887993B2 (en) 2013-04-23 2014-11-18 The Boeing Company Barcode access to electronic resources for complex system parts
US9098593B2 (en) 2013-04-23 2015-08-04 The Boeing Company Barcode access to electronic resources for lifecycle tracking of complex system parts
CN110111035B (zh) 2013-06-19 2023-08-18 美国邮政管理局 用于提供对流通网络中的物品的实时追踪的系统和方法
MX2016007771A (es) * 2013-12-16 2017-03-10 Latista Tech Inc Sistema de gestion de proyecto que proporciona una interaccion optimizada con modelos digitales.
US20160034730A1 (en) * 2014-07-31 2016-02-04 Trimble Navigation Limited Asset location on construction site
US20160071258A1 (en) * 2014-09-08 2016-03-10 Guy L. McClung, III Responsibility system, ID and Tracking of items and debris including retread tires
AU2015339254A1 (en) 2014-10-28 2017-05-18 Lghorizon, Llc Component-based building assessment
US9875458B2 (en) * 2014-12-27 2018-01-23 Trimble Inc. Tracking of built components by using ID tags
US20160225097A1 (en) * 2015-02-04 2016-08-04 Asurvest, Inc Method of Detecting Damage and Filing a Claim for an Electrical Appliance
CN113032863A (zh) 2015-03-24 2021-06-25 开利公司 建筑物系统的基于楼层平面图的规划
JP6662134B2 (ja) 2016-03-18 2020-03-11 日本電気株式会社 タグ管理装置、タグ管理方法、プログラム
US20180239313A1 (en) * 2017-02-22 2018-08-23 Stellar Vdc Residential, Llc Building model with virtual capture of as built features and objective performance tracking
US11256833B2 (en) 2017-05-05 2022-02-22 Nucor Corporation System for on-site tracking, managing, planning and staging construction projects
US11030709B2 (en) * 2018-10-29 2021-06-08 DIGIBILT, Inc. Method and system for automatically creating and assigning assembly labor activities (ALAs) to a bill of materials (BOM)

Also Published As

Publication number Publication date
US11250176B2 (en) 2022-02-15
US11256833B2 (en) 2022-02-22
US11900020B2 (en) 2024-02-13
US20180321799A1 (en) 2018-11-08
US20180322225A1 (en) 2018-11-08
US20220138367A1 (en) 2022-05-05
CA3003842A1 (en) 2018-11-05

Similar Documents

Publication Publication Date Title
MX2018005677A (es) Sistema de seguimiento, gestion, planificacion y distribucion de proyectos de construccion in situ.
WO2015038207A3 (en) Customer controlled management of shipments
GB2573426A (en) Systems and methods for monitoring item distribution
BR112018068092A2 (pt) monitoramento de segurança inteligente e sistema analítico para equipamento de proteção individual
MX2016011979A (es) Sistemas, aparatos y metodos para la creacion y distribucion de clips multimedia.
BR112016029787A8 (pt) faixas de valor para elementos de sintaxe em criptografia de vídeo
WO2015061787A3 (en) Method and apparatus for managing remote devices and accessing remote device information
WO2014210550A3 (en) Freight shipment booking system
MX2016009950A (es) Clasificacion de exceso de inventario en instalaciones de venta minorista.
IN2014CH01236A (es)
PL405872A1 (pl) Sposób, program i system konwersji modeli danych systemu zasilania
SG11201805866UA (en) Permission management and resource control method and apparatus
WO2014051826A3 (en) System and method for product vendor selection
GB2556749A (en) Apparatus and method for collecting customer inventory information
MX2016009949A (es) Gestion de exceso de inventario en instalaciones de venta minorista.
GB2544367A (en) Tool for planning crowd control measures
SG10201402869VA (en) Certified factory location
MX2022004518A (es) Sistemas y metodos para auditar activos.
PH12016501446B1 (en) Distribution container management system, distribution container management method, and distribution container management program
GB2550772A (en) System for automated oilfield supply demand balancing and forecasting
SG10201902931SA (en) Operation management
MX2019015181A (es) Metodos y sistemas para rastrear equipos de perforacion.
MX2016011916A (es) Sistemas y metodos para instalacion de una red de venta supervisada remotamente.
Annevelink et al. Logistical case study for the AragÓn region using the locagistics tool
Clovis TRTR Conference 2016 Planning Status Brief.