MX2017014416A - Galeria prefabricada de tubos de material compuesto de bambu. - Google Patents

Galeria prefabricada de tubos de material compuesto de bambu.

Info

Publication number
MX2017014416A
MX2017014416A MX2017014416A MX2017014416A MX2017014416A MX 2017014416 A MX2017014416 A MX 2017014416A MX 2017014416 A MX2017014416 A MX 2017014416A MX 2017014416 A MX2017014416 A MX 2017014416A MX 2017014416 A MX2017014416 A MX 2017014416A
Authority
MX
Mexico
Prior art keywords
bamboo
prefabricated
flame
pipe
pipe gallery
Prior art date
Application number
MX2017014416A
Other languages
English (en)
Inventor
Ye Ling
Zhu Xin
Niu Lin
Original Assignee
Zhejiang Xinzhou Bamboo Based Composites Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xinzhou Bamboo Based Composites Tech Co Ltd filed Critical Zhejiang Xinzhou Bamboo Based Composites Tech Co Ltd
Publication of MX2017014416A publication Critical patent/MX2017014416A/es

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/11Lining shafts; Linings therefor with combinations of different materials, e.g. wood, metal, concrete
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L57/00Protection of pipes or objects of similar shape against external or internal damage or wear
    • F16L57/04Protection of pipes or objects of similar shape against external or internal damage or wear against fire or other external sources of extreme heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/16Rigid pipes wound from sheets or strips, with or without reinforcement
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0071Wood
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0075Textiles

Abstract

Se proporciona una galería prefabricada de tubos de material compuesto de bambú que tiene una sección transversal circular y se forma a partir de una pluralidad de segmentos de tubería prefabricados conectados, en donde los segmentos de tubería comprenden un cuerpo de tubería (1) y un componente que soporta la fuerza (2), el cuerpo de tubería (1) comprende, sucesivamente desde el interior hacia el exterior, una capa de revestimiento (11), una capa estructural (12) y una capa protectora exterior (13), la capa de revestimiento (11) comprende una resina ignífuga y una tela ignífuga, la capa estructural (12) comprende al menos una pluralidad de capas de tiras de bambú formadas por tiras de bambú enrolladas, sobre las cuales se adhiere una resina soluble en agua, la capa protectora exterior (13) comprende al menos una resina ignífuga, y el componente que soporta la fuerza (2) se fija a la superficie interior del cuerpo de la tubería. La galería de tubos prefabricados producidos de bambú tiene una buena resistencia, masa ligera, bajo costo, buena impermeabilidad, gran resistencia al choque y una construcción conveniente.
MX2017014416A 2015-09-08 2016-07-20 Galeria prefabricada de tubos de material compuesto de bambu. MX2017014416A (es)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201520689829.7U CN205136858U (zh) 2015-09-08 2015-09-08 一种预制竹复合管廊
PCT/CN2016/090573 WO2017041583A1 (zh) 2015-09-08 2016-07-20 一种预制竹复合管廊

Publications (1)

Publication Number Publication Date
MX2017014416A true MX2017014416A (es) 2018-03-02

Family

ID=55622652

Family Applications (1)

Application Number Title Priority Date Filing Date
MX2017014416A MX2017014416A (es) 2015-09-08 2016-07-20 Galeria prefabricada de tubos de material compuesto de bambu.

Country Status (11)

Country Link
US (1) US10184223B2 (es)
EP (1) EP3296605B1 (es)
JP (1) JP6535102B2 (es)
CN (1) CN205136858U (es)
BR (1) BR112017024303A2 (es)
CA (1) CA2987834C (es)
ES (1) ES2723699T3 (es)
MX (1) MX2017014416A (es)
MY (1) MY190914A (es)
RU (1) RU2686966C1 (es)
WO (1) WO2017041583A1 (es)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105042213A (zh) * 2015-09-08 2015-11-11 浙江鑫宙竹基复合材料科技有限公司 一种预制竹复合管廊及其制作方法
CN205136858U (zh) * 2015-09-08 2016-04-06 浙江鑫宙竹基复合材料科技有限公司 一种预制竹复合管廊
CN105546230B (zh) * 2016-02-02 2018-05-15 浙江鑫宙竹基复合材料科技有限公司 一种秸秆竹缠绕复合管及其制备方法
CN108017890B (zh) * 2016-10-28 2020-11-06 浙江鑫宙竹基复合材料科技有限公司 一种阻燃竹缠绕复合制品及其制备方法
CN108018871B (zh) * 2016-10-31 2020-08-04 浙江鑫宙竹基复合材料科技有限公司 用直线联接将管段连接件嵌合安装在两管廊管段间的结构
CN108018873B (zh) * 2016-10-31 2020-08-04 浙江鑫宙竹基复合材料科技有限公司 用转角联接将转角束节嵌合安装在两个管廊管段间的结构
CN108018875B (zh) * 2016-10-31 2020-09-22 浙江鑫宙竹基复合材料科技有限公司 一种管廊用内嵌式支撑构件和管廊装配的结构
CN108018874A (zh) * 2016-10-31 2018-05-11 浙江鑫宙竹基复合材料科技有限公司 用于竹复合综合管廊的可拼接管件及包括该管件的管廊
CN109024677A (zh) * 2018-08-10 2018-12-18 上海公路桥梁(集团)有限公司 拼装方法
CN109441490B (zh) * 2019-01-02 2024-02-09 中铁第六勘察设计院集团有限公司 一种可快速安装及拆卸的叠落盾构模块化钢支撑加固结构
CN113774961B (zh) * 2021-06-01 2022-09-16 中国二十冶集团有限公司 地下廊式结构顶进中继间防水方法

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3350165B2 (ja) * 1993-08-27 2002-11-25 清水建設株式会社 トンネルの補強構造体、及びトンネルの補強方法
JPH0775242A (ja) * 1993-08-31 1995-03-17 Eiichi Tashiro 地下共同管路
US7156582B2 (en) * 2002-01-16 2007-01-02 Angel Garcia Ballesteros Inspectable tunnel for underground pipes and cables
CN2607503Y (zh) * 2003-04-04 2004-03-24 吴懋川 一种复合管道
CN201434160Y (zh) * 2009-06-04 2010-03-31 芜湖圣弗兰玻璃钢有限公司 竹纤维缠绕复合管
CN201651576U (zh) * 2010-02-09 2010-11-24 芜湖圣弗兰玻璃钢有限公司 直竹条增强竹复管
CN202327397U (zh) * 2011-11-17 2012-07-11 新疆广水管道有限公司 竹复合压力管
RU2529687C2 (ru) * 2012-04-24 2014-09-27 Александр Витольдович Малицкий Композитный слоистый материал (варианты)
CN203604828U (zh) * 2013-11-07 2014-05-21 浙江鑫宙竹基复合材料科技有限公司 热固型竹砂复合压力管
CN203798263U (zh) * 2014-04-28 2014-08-27 中铁一局集团有限公司 爆破防护用竹排加筋挡石装置
CN104089105B (zh) * 2014-07-07 2016-02-10 浙江鑫宙竹基复合材料科技有限公司 竹砂缠绕复合管的制备方法
CN204083574U (zh) * 2014-08-06 2015-01-07 浙江鑫宙竹基复合材料科技有限公司 一种用于连接竹复合管的管束节
CN205136858U (zh) * 2015-09-08 2016-04-06 浙江鑫宙竹基复合材料科技有限公司 一种预制竹复合管廊
CN105042213A (zh) * 2015-09-08 2015-11-11 浙江鑫宙竹基复合材料科技有限公司 一种预制竹复合管廊及其制作方法
CN105526430B (zh) * 2016-02-02 2018-12-18 浙江鑫宙竹基复合材料科技有限公司 一种秸秆缠绕复合管及其制备方法
CN206545227U (zh) * 2016-10-31 2017-10-10 浙江鑫宙竹基复合材料科技有限公司 一种竹复合综合管廊
CN206545226U (zh) * 2016-10-31 2017-10-10 浙江鑫宙竹基复合材料科技有限公司 用于竹复合综合管廊的可拼接管件及包括该管件的管廊

Also Published As

Publication number Publication date
JP2018516321A (ja) 2018-06-21
CN205136858U (zh) 2016-04-06
WO2017041583A1 (zh) 2017-03-16
EP3296605B1 (en) 2019-03-06
US10184223B2 (en) 2019-01-22
MY190914A (en) 2022-05-19
CA2987834C (en) 2019-02-19
EP3296605A4 (en) 2018-05-16
CA2987834A1 (en) 2017-03-16
ES2723699T3 (es) 2019-08-30
EP3296605A1 (en) 2018-03-21
BR112017024303A2 (pt) 2018-07-24
JP6535102B2 (ja) 2019-06-26
RU2686966C1 (ru) 2019-05-06
US20180051437A1 (en) 2018-02-22

Similar Documents

Publication Publication Date Title
MX2017014416A (es) Galeria prefabricada de tubos de material compuesto de bambu.
EA033215B1 (ru) Многослойная труба и способ ее производства
WO2013155514A3 (en) Pipe section having bonded composite barrier layer
WO2015130379A3 (en) Fiber winding system for composite projectile barrel structure
WO2013188467A3 (en) Enhanced recoil attenuating safety helmet
WO2012007116A3 (en) Fuel tank of plastic and method for the production thereof
MX358681B (es) Forro para reforzar una tuberia y metodo para hacerlo.
FI3111130T3 (fi) Paineastia
MX2017005565A (es) Revestimiento automotriz fibroso.
EP4013909A4 (en) COMPOSITE YARNS
CL2012000901A1 (es) Uso de un tubo de acero recubierto de una capa extruida hecha de una composición moldeada de poliamida el cual sirve para la construcción de una estructura de cimientos para una estructura offshore fija; estructura.
NZ736047A (en) Composite hose assembly
WO2014130433A3 (en) Thermoplastic composite pipe with longitudinal reinforcement
EP4036287A4 (en) POLYCARBONATE FIBERS, FIBER STRUCTURE AND RESIN COMPOSITES
MX2017007807A (es) Tubo de proteccion y contencion de multiples capas para conductos, cables y similares.
MX2016011138A (es) Hilo compuesto con nucleo de vidrio.
PH12016000216A1 (en) Underwater pipe and connector assembly and method of assembling an underwater pipe and connector
BR112016025505A2 (pt) tubo de refugo de compósito de multicamadas
GB2571435B (en) Integrated composite hybrid shock tower
CN203857143U (zh) 一种玻璃钢夹砂管
US20160114558A1 (en) CFKC Multiple Protection Composite
GB2609480B (en) Composite pipe end-fitting
GB2609478B (en) Composite pipe end-fitting
GB2609479B (en) Composite pipe end-fitting
EP4006216A4 (en) POLYAMIDE-BASED COMPOSITE FIBER AND FINISHED YARN