Method and device of moving scaffold for bridge construction Download PDFInfo
- Publication number
- KR970011231A KR970011231A KR1019950026110A KR19950026110A KR970011231A KR 970011231 A KR970011231 A KR 970011231A KR 1019950026110 A KR1019950026110 A KR 1019950026110A KR 19950026110 A KR19950026110 A KR 19950026110A KR 970011231 A KR970011231 A KR 970011231A
- Authority
- KR
- South Korea
- Prior art keywords
- scaffold
- moving
- longitudinal
- bridge
- mobile
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
- E01D21/065—Incremental launching
Abstract
본 발명은 거푸집이 부착된 이동식비계를 해체없이 경간이동시키며서 교량의 상부구조를 한 경간씩 시공해 나가는 이동식비계공법에 적용되는 이동식비계 이동방법과 이동장치에 관한 것이다. 종래의 이동시비계의 구성은 비계보의 종,횡방향 이동방식이 각각 비계보를 슬라이딩부재형의 받침장치에 받쳐 슬라이딩방식으로 이동시키는 구성이었는 바, 비계보를 종,횡방향으로 이동시키는 슬라이딩부재들의 구성이 복잡하고 가공이 어려우며, 자체 중량이 무겁고 제작단가가 많이 소요되면서 특히 종방향이동은 별도로 구비되는 로프 견인장비에 의하여 수행하므로서 종방향이동속도가 불규칙하고 불안정하며, 전후방 비계보들의 동시이동 연동제어가 매우 까다로우며, 전체적으로 이동수행시간이 느리고 작업공수가 많아지는 폐딘이 있었던 것이다.The present invention relates to a mobile scaffold moving method and a moving device applied to the mobile scaffolding method for constructing the upper structure of the bridge by a span while moving the scaffold with a formwork without disassembly. Conventional mobile scaffolding has a structure in which the longitudinal and lateral movement of the scaffold is configured to move the scaffold in a sliding manner by supporting the supporting device of the sliding member type, and the sliding member for moving the scaffold in the longitudinal and transverse directions. Their configuration is difficult and difficult to process, and their own weight is heavy and manufacturing cost is high. In particular, longitudinal movement is carried out by a separate rope traction device, so the longitudinal movement speed is irregular and unstable, and simultaneous movement of front and rear scaffolds The interlocking control is very difficult, and the overall movement time is slow and the workmanship is increased.
본 발명은 이동식비계의 이동방법에 있어서, 각각의 교각브라켓위에 설치된 비계보 받침장치의 구성을 비계보의 하단을 구름접동상태로 받치는 받침수단과, 상기 받침수단중 일부를 회전구동시킬 수 있는 회전구동수단을 일체로 구비하는 종행이동장치 및 상기 종행이동장치를 수용하는 구름방식의 횡행이동장치로 구성된 이동대차에 의하여, 교각브라켓에서의 비계보 횡방향이동시에는 비계보를 상기 종행이동장치의 받침수단으로 받쳐지지한 상태에서 횡행이동장치에 의하여 구름방식으로 횡행이동시키고, 경간이동을 위한 비계보의 종방향이동은 상기 종행이동장치에 구비된 회전구동수단을 직접적으로 회전구동시켜 비계보를 구름방식(rail&wheel system)으로 종방향이동시킴을 특징으로 하는 교량공사용 이동식비계를 이동방법과 이동장치를 제공함에 특징이 있는 것이다.The present invention provides a method for moving a mobile scaffold, comprising: a supporting means configured to support a lower portion of the scaffold in a rolling contact state, and a rotation capable of rotating a portion of the supporting means in a scaffold support device installed on each pier bracket. The scaffolding is carried out in the horizontal direction of the scaffold on the pier bracket by a moving cart comprising a longitudinal moving device having a driving means integrally and a rolling horizontal moving device for accommodating the longitudinal moving device. In the state supported by the supporting means, the transverse movement in the rolling method by the transverse movement device, and the longitudinal movement of the scaffold for the span movement is by rotating the rotary drive means provided in the longitudinal movement device directly to the scaffold The method of moving and moving the device for moving bridge scaffolds, which is characterized by the longitudinal movement of the rail and wheel system. It is characterized by the gongham.
Description
본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음As this is a public information case, the full text was not included.
제1도는 본 발명이 적용되는 일예의 이동식비계의 개요도 및 경간이동 상태도로서,1 is a schematic diagram and a span movement state diagram of an example of a mobile scaffold to which the present invention is applied,
(가)도는 일 경간에서의 교량상판 콘크리트 타설시의 전체구성 정면도,(A) The overall configuration front view at the time of bridge deck concrete pouring in one span,
(나)도는 일 경간에서 다음 경간으로의 이동식비계 종방향이동 상태도.(B) is the longitudinal movement state of the mobile scaffold from one span to the next.
(다)도는 다음 경간으로 이동완료된 상태의 이동식비계 설치상태도.(C) is a diagram showing the installation of mobile scaffolding with movement completed to the next span.
제2도는 제1도의 구성중 일 경간부분의 이동식비계 설치상태확대고,2 is to enlarge the installation state of the mobile scaffolding of one span portion of the configuration of FIG.
제3도는 제2도의 평면으로 본 이동식비계의 요부구성평면도,3 is a plan view of main components of a mobile scaffold viewed in the plane of FIG.
제4도는 일예의 이동식비계에서의 본 발명의 이동장치를 설치한 상태의 일측면도,4 is a side view of a state in which the mobile device of the present invention is installed in an example of a mobile scaffold;
제5도는 본 발명에 의한 일실시예의 이동장치 사시도,5 is a perspective view of a moving device according to an embodiment of the present invention;
제6도는 제5도 실시예의 이동장치를 사용한 일예의 이동식비계 요부 측면구성도 및 경간이동 위치로의 횡방향이동 완료상태의 측면도,6 is a side view of a mobile scaffold main portion of an example using the moving device of the embodiment of FIG. 5 and a side view of a transverse completion state to a span moving position;
제7도는 제5도 실시예의 이동장치 측면구성도,7 is a side view of the mobile device of the fifth embodiment;
제8도는 제7도중 A-A선상으로 본 일실시예 이동장치의 일측 종단면도,FIG. 8 is a longitudinal cross-sectional view of one side of an exemplary embodiment of the mobile device viewed along line A-A in FIG.
제9도는 본 발명에 의한 본 일실시예 이동장치의 설치상태 평면도,9 is a plan view of the installation state of the present embodiment mobile device according to the present invention,
제10도는 본 발명의 일실시예 이동장치의 초기설치상태 및 비계보 초기횡행이동도.10 is an initial installation state of the mobile device and the non-lineage initial transverse mobility of one embodiment of the present invention.
Claims (13)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019950026110A KR0173518B1 (en) | 1995-08-23 | 1995-08-23 | Moving method and apparatus of launchable scaffold for bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019950026110A KR0173518B1 (en) | 1995-08-23 | 1995-08-23 | Moving method and apparatus of launchable scaffold for bridge construction |
Publications (2)
Publication Number | Publication Date |
---|---|
KR970011231A true KR970011231A (en) | 1997-03-27 |
KR0173518B1 KR0173518B1 (en) | 1999-02-18 |
Family
ID=19424203
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019950026110A KR0173518B1 (en) | 1995-08-23 | 1995-08-23 | Moving method and apparatus of launchable scaffold for bridge construction |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR0173518B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100904031B1 (en) * | 2007-07-30 | 2009-06-22 | 가와다 고교 가부시키가이샤 | Bridge construction method |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100706052B1 (en) * | 1999-08-28 | 2007-04-13 | 삼성중공업 주식회사 | A erection method of bridge |
KR20030093680A (en) * | 2002-06-05 | 2003-12-11 | 브이에스엘코리아 주식회사 | The construction method of double-t girder bridge by underslung movable scaffolding system |
KR100632202B1 (en) * | 2004-04-13 | 2006-10-16 | (주)씨씨엘 코리아 | Self-moving movable scafolding system |
KR101360946B1 (en) * | 2012-03-16 | 2014-02-13 | 김묘남 | Apparatus For Moving Weight And Method For Moving The Weight Using The Apparatus |
CN113047152B (en) * | 2021-05-18 | 2022-10-11 | 中铁四局集团有限公司 | Descending type double-span movable formwork and construction method |
-
1995
- 1995-08-23 KR KR1019950026110A patent/KR0173518B1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100904031B1 (en) * | 2007-07-30 | 2009-06-22 | 가와다 고교 가부시키가이샤 | Bridge construction method |
Also Published As
Publication number | Publication date |
---|---|
KR0173518B1 (en) | 1999-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4754935B2 (en) | Mobile suspension scaffold device and mobile suspension scaffold construction method | |
CN109183618B (en) | Bridge girder erection machine for rapid construction of prefabricated bridge | |
CN103147407B (en) | Propellent trolley capable of enabling main beam of movable die carrier to rotate in horizontal plane | |
KR970011231A (en) | Method and device of moving scaffold for bridge construction | |
KR200391266Y1 (en) | Railless truck for constructing bridge | |
JP2808179B2 (en) | Mobile bogie device such as arched mobile form device | |
KR200274862Y1 (en) | traveling apparatus for movable inspection of pier arround | |
JP2008013998A (en) | Movable suspended scaffolding device | |
JPH09256323A (en) | Bridge girder installing apparatus | |
CN208665180U (en) | Railcar and rail car system | |
KR100367028B1 (en) | A self propelled working platform for construction and maintenance of bridge | |
JP2001064915A (en) | Transferring truck for constructing bridge | |
JPH049903B2 (en) | ||
JP2000230206A (en) | Elevated track construction method and device | |
CN215633018U (en) | Shield tunnel side wall pouring trolley | |
JPH049901B2 (en) | ||
JPS6220366Y2 (en) | ||
JPH049902B2 (en) | ||
JPH049904B2 (en) | ||
CN113550766A (en) | Shield tunnel side wall pouring trolley | |
JPH0426377B2 (en) | ||
JP2000345517A (en) | Connecting type movable form device | |
JP2002105912A (en) | Temporary support device for bridge on road | |
JPH0226009B2 (en) | ||
CN103382701A (en) | Transport system for corbel mechanism of under-deck non-self-propelled movable mould frame and mounting method of transport system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20021031 Year of fee payment: 5 |
|
LAPS | Lapse due to unpaid annual fee |