CN215633018U - Shield tunnel side wall pouring trolley - Google Patents

Shield tunnel side wall pouring trolley Download PDF

Info

Publication number
CN215633018U
CN215633018U CN202122037858.3U CN202122037858U CN215633018U CN 215633018 U CN215633018 U CN 215633018U CN 202122037858 U CN202122037858 U CN 202122037858U CN 215633018 U CN215633018 U CN 215633018U
Authority
CN
China
Prior art keywords
frame
formwork
side wall
shield tunnel
trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122037858.3U
Other languages
Chinese (zh)
Inventor
徐树军
周昆
刘继刚
陆野
徐兆凯
耿方升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Shield Engineering Co Ltd
Original Assignee
China Railway 14th Bureau Group Shield Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Shield Engineering Co Ltd filed Critical China Railway 14th Bureau Group Shield Engineering Co Ltd
Priority to CN202122037858.3U priority Critical patent/CN215633018U/en
Application granted granted Critical
Publication of CN215633018U publication Critical patent/CN215633018U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型要解决的技术问题是提供一种盾构隧道侧墙浇筑台车,能够与盾构施工同步作业,缩短工期,模板组件稳定牢固,实现安全快速施工,其包括有台车架、行走机构、模板组件。模板组件包括左侧模板和右侧模板,所述左侧模板和右侧模板通过横向撑杆对应连接在所述台车架的左右两侧。

Figure 202122037858

The technical problem to be solved by the utility model is to provide a shield tunnel side wall pouring trolley, which can operate synchronously with the shield construction, shorten the construction period, the formwork assembly is stable and firm, and realizes safe and rapid construction. Institutions, template components. The formwork assembly includes a left formwork and a right formwork, and the left formwork and the right formwork are correspondingly connected to the left and right sides of the trolley frame through transverse struts.

Figure 202122037858

Description

Shield tunnel side wall pouring trolley
Technical Field
The utility model relates to the field of large-diameter shield tunnel side wall pouring construction, in particular to a shield tunnel side wall pouring trolley.
Background
In recent years, a great deal of river-crossing shield tunnels in China are constructed, and in the construction process of internal structures of large shield tunnels, the side wall pouring construction mode mainly adopts a traditional wood formwork or a triangular trolley, however, the two modes mainly have the following problems:
(1) the erection and dismantling period is long in the construction process of the wood template, and the occupied space of the material is large;
(2) slurry pipelines, water-gas pipelines and other tunneling supporting facilities are arranged on two sides of the slurry shield tunnel, and side wall construction needs to be carried out after the tunnel is communicated, so that the whole construction period is limited;
(3) in the construction process of the triangular trolley, the template is difficult to reinforce and easy to run, so that the structural size does not meet the design requirement;
the existence of above-mentioned technical problem leads to the difficult cycle length of construction in the shield tunnel, consequently urgently needs a equipment that is fit for shield tunnel side wall and pours.
SUMMERY OF THE UTILITY MODEL
The technical problem to be solved by the utility model is to provide the shield tunnel side wall pouring trolley which can synchronously operate with shield construction, shortens the construction period, ensures that the template assembly is stable and firm, and realizes safe and quick construction.
The utility model is realized by the following technical scheme:
a trolley for casting a side wall of a shield tunnel comprises a trolley frame, wherein the trolley frame comprises a door-shaped frame, bottom longitudinal beams are respectively arranged on the left side and the right side of the bottom of the door-shaped frame, a plurality of telescopic ground foot supports are arranged at the bottom of each bottom longitudinal beam, and a driving wheel and a driven wheel are correspondingly arranged at the front end and the rear end of the bottom of each bottom longitudinal beam; the walking mechanism comprises a track assembly, and the track assembly is used for bearing all ground foot supports and is matched with the driving wheel and the driven wheel to walk; the template assembly comprises a left template and a right template, and the left template and the right template are correspondingly connected to the left side and the right side of the trolley frame through transverse support rods; and the operating platform is arranged at the top of the trolley frame and used for concrete pouring construction.
Furthermore, the door-shaped frame is composed of a plurality of frame units, the frame units are longitudinally distributed on the bottom longitudinal beam from front to back, and adjacent frame units are fixedly connected by a strut diagonal brace;
each frame unit comprises a cross beam and two stand columns, and the cross beam is fixedly connected with the two stand columns in a door shape.
Furthermore, in each frame unit, the bottoms of the left and right ends of the cross beam are fixedly connected with transverse hanging rails through longitudinal hanging rails, and each transverse hanging rail is provided with a chain block in a matching manner;
the left side template and the right side template are correspondingly connected to the upright columns on the left side and the right side in the trolley frame through the transverse support rods.
Furthermore, guide wheels are arranged at the left end and the right end of the cross beam, each transverse supporting rod consists of a left section rod, a middle rod and a right section rod, and opposite screws are arranged at the left end and the right end of the middle rod respectively and are in threaded connection with the left section rod and the right section rod.
Further, the driving wheel and the driven wheel respectively comprise a roller wheel support, two roller wheels are rotatably connected in the roller wheel support along the front-back direction, a speed reduction motor is arranged at the top of the outer wall of the roller wheel support of the driving wheel, and an output shaft of the speed reduction motor is in transmission connection with the roller wheels through a chain.
Furthermore, a guardrail is arranged at the top of the operating platform.
Compared with the prior art, the utility model has the following beneficial effects:
(1) the template assembly comprises a left template and a right template, and the left template and the right template are correspondingly connected to the left side and the right side of the trolley frame through transverse support rods; the side walls on the two sides of the tunnel can be synchronously poured, and the construction progress is accelerated;
the trolley frame can move in the front-back direction in cooperation with the travelling mechanism, synchronous operation with shield construction can be realized under the condition that shield construction requirements are considered, and the construction period is greatly shortened;
the utility model can synchronously operate with shield construction, shortens construction period, ensures that the template assembly is stable and firm, and realizes safe and quick construction;
(2) the portal frame is composed of a plurality of frame units, the frame units are longitudinally distributed on the bottom longitudinal beam in the front-back direction, and the adjacent frame units are fixedly connected by the inclined struts of the supporting columns, so that the portal frame is stable in structure, an operation platform is conveniently arranged at the top, and construction by multiple persons is realized under the condition of ensuring safety;
(3) the utility model has compact structure, firmness and stability, can integrally move and is convenient to use in the shield tunnel.
Drawings
FIG. 1 is a schematic diagram of a construction state of a shield tunnel side wall pouring trolley according to the utility model;
FIG. 2 is a side view of a trolley frame of the shield tunnel side wall pouring trolley of the utility model;
FIG. 3 is a schematic view of the connection of the stud to the form assembly of the present invention;
FIG. 4 is a schematic view of the transverse hanger rail of the present invention;
in the figure: 1. the device comprises upright columns, 2, cross beams, 3, bottom longitudinal beams, 4, ground foot supports, 5, transverse hanging rails, 6, chain blocks, 7, a track assembly, 8, a driving wheel, 9, a driven wheel, 10, a guide wheel, 11, a left side template, 12, a right side template, 13, transverse support rods, 14 and an operation platform.
Detailed Description
The technical solutions in the embodiments of the present application will be described clearly and completely with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments of the present application without making any creative effort, shall fall within the protection scope of the present application.
In the description of the present invention, it is to be understood that the terms "left", "right", "front", "back", "upper", "lower", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
As shown in fig. 1 to 4, the present embodiment discloses a shield tunnel sidewall casting trolley, which mainly includes a trolley frame, a traveling mechanism, a formwork assembly, and an operation platform 14. The whole portal structure that is of bogie frame, its length along the tunnel direction of advance is 10.5 meters, and whole width is 11.75 meters, and the design span is 6.25m, and interior height is 4.5 m.
The bogie frame consists of a door-shaped frame and two bottom longitudinal beams 3, the door-shaped frame comprises 6 frame units serving as main stress components of the bogie, and the frame units consist of upright posts 1, cross beams 2 and strut diagonal braces. Wherein, stand 1 is 400mm 300 mm's H shaped steel, and every frame cell has 2 stands, is left and right distribution, and the platform truck is total 12 stands in this embodiment. The crossbeam 2 is wholly 350mm 350mmH shaped steel and constitutes, and there is 1 crossbeam in every frame element, and the platform truck is total 6 crossbeams in this embodiment. The supporting oblique beams are 14# channel steel, each frame unit is provided with 4 supporting oblique beams, and the trolley in the embodiment has 24 supporting oblique beams. The frame unit is in a door-shaped structure through the cross beam 2, the upright post 1 and the supporting oblique beam, and the structure is stable.
Each bottom longitudinal beam 3 is a double-web H-shaped steel with the height of 500mm x 400mm, and stiffening ribs are arranged at intervals of 0.5 meter along the longitudinal direction to ensure rigidity. 1 bottom of stand of every frame cell passes through bolt fixed connection on end longeron 3, in order to guarantee structural stability, welds as an organic wholely through the pillar bracing between the adjacent frame cell in front and back, and in this embodiment, the pillar bracing also adopts 14# channel-section steel equally. Six ground foot supports 4 are installed along the fore-and-aft direction to 3 bottoms of every end longeron, and every ground foot supports 4 and all is the bracing piece of diameter 30mm, is provided with the screw thread on the bracing piece, through rotatory bracing piece, can realize the flexible of ground foot support 4.
In each frame unit, longitudinal hanging rails are arranged at the bottoms of the left end and the right end of the cross beam 2, the longitudinal hanging rails are mainly composed of 20# B I-steel, transverse hanging rails 5 are arranged at the bottoms of the longitudinal hanging rails in a welding mode, the length of each transverse hanging rail 5 is 1.175 m, and each transverse hanging rail is composed of 16# I-steel. And a chain block 6 is arranged on the transverse hanging rail 5 in a matching way, and the chain block 6 is mainly used for hoisting the side wall template.
The running mechanism mainly comprises a track assembly 7, wherein the track assembly 7 is composed of two running tracks, and each running track adopts a P43 heavy track. The two walking rails are respectively and correspondingly positioned under the two bottom longitudinal beams 3 and used for bearing all the foundation supports 4. The front end and the rear end of the bottom of each bottom longitudinal beam 3 are correspondingly provided with a driving wheel 8 and a driven wheel 9, all the driving wheels 8 and the driven wheels 9 comprise roller wheel supports, two roller wheels are rotatably connected in the roller wheel supports along the front-rear direction, the tops of the outer walls of the roller wheel supports corresponding to the driving wheels 8 are provided with speed reducing motors, and output shafts of the speed reducing motors are in transmission connection with the roller wheels through chains. Through chain transmission, the driving wheel 8 drives the whole machine to travel along the traveling track, and the driven wheel 9 follows up. In order to ensure the stability of the trolley during walking, guide wheels 10 are arranged at the left end and the right end of the cross beam 2 in each frame unit, and the guide wheels 10 are tightly attached to the inner wall of a segment of the shield tunnel to ensure that the trolley can stably walk.
The template component comprises a left template 11 and a right template 12, wherein the panels of the left template 11 and the right template 12 are made of 6+2 stainless steel composite plates, longitudinal ribs of the panels are made of 12# channel steel, the distance between the longitudinal ribs is 350mm, and back ribs are made of double-spliced 14# channel steel, so that the rigidity of the increased template is improved. The left side template 11 and the right side template 12 are correspondingly connected to the upright posts 1 on the left side and the right side of each frame unit in the trolley frame through the transverse support rods 13, 12 upright posts 1 are arranged in the whole trolley, and in order to ensure stability, two transverse support rods 13 which are distributed up and down are arranged on each upright post 1 in a matched mode, so that 24 transverse support rods 13 exist in the whole trolley. Every horizontal vaulting pole 13 comprises left side section pole, intermediate lever and right side section pole, and both ends are equipped with opposite screw and threaded connection left side section pole and right side section pole respectively about the intermediate lever, so design, through rotatory intermediate lever, can shorten or extend the interval of left side section pole and right side section pole to realize horizontal vaulting pole 13's flexible regulation. The one end of horizontal vaulting pole 13 is passed through the bolt fastening on the face of template subassembly, and the other end rotates through the round pin axle and connects on stand 1, and so design through the length of adjusting horizontal vaulting pole 13, can change the inclination and the distribution distance of template subassembly on the horizontal plane, satisfies the demand of different constructions guaranteeing that the template passes power under the stable prerequisite in the work progress.
Operation platform 14 sets up and is used for concrete placement construction at platform truck frame top, and operation platform adopts the checkered plate welding of 0.5 centimeters thick to form, is equipped with the guardrail at operation platform's top, installs the cat ladder at the platform truck front end for operation platform usefulness about.
When the side wall pouring trolley for the shield tunnel is used for side wall pouring construction of the shield tunnel, the side walls on two sides of the tunnel are synchronously poured, the construction progress is accelerated, concrete loads are transmitted to 6 frame units through the template assembly and are transmitted to the ground downwards, guide wheels at the left end and the right end of a cross beam are supported on the inner wall of a duct piece of the shield tunnel, and therefore the stability of the trolley is guaranteed against deviation;
the utility model can realize synchronous operation with shield construction, thereby greatly shortening the construction period; when needs platform truck gos forward one section distance, support rotatory upwards shrink with the lower margin to make action wheel and follow driving wheel can normal operating on the walking track, after one section distance of platform truck walking, support rotatory extension with the lower margin again and support on the walking track.

Claims (6)

1.一种盾构隧道侧墙浇筑台车,其特征在于,包括有,1. a shield tunnel side wall pouring trolley, is characterized in that, comprises, 台车架,其包括门型框架,所述门型框架的底部左右两侧分别设有底纵梁,所述底纵梁的底部设有多个可伸缩的地脚支撑,所述底纵梁的底部前后端对应设有主动轮和从动轮;A trolley frame includes a portal frame, bottom longitudinal beams are respectively provided on the left and right sides of the bottom of the portal frame, and a plurality of retractable foot supports are provided at the bottom of the bottom longitudinal beam, and the bottom longitudinal beam The front and rear ends of the bottom are correspondingly provided with driving wheels and driven wheels; 行走机构,其包括轨道组件,所述轨道组件用于承载所有的地脚支撑以及配合主动轮、从动轮行走;A traveling mechanism, which includes a track assembly, the track assembly is used to carry all the foot supports and cooperate with the driving wheel and the driven wheel to travel; 模板组件,其包括左侧模板和右侧模板,所述左侧模板和右侧模板通过横向撑杆对应连接在所述台车架的左右两侧;a formwork assembly, comprising a left formwork and a right formwork, the left formwork and the right formwork are correspondingly connected to the left and right sides of the trolley frame through transverse struts; 操作平台,其设置在所述台车架顶部用于混凝土浇筑施工。An operating platform is arranged on the top of the trolley frame for concrete pouring construction. 2.根据权利要求1所述的盾构隧道侧墙浇筑台车,其特征在于,所述门型框架由多个框架单元构成,所述框架单元前后纵向分布在所述底纵梁上,相邻框架单元由支柱斜撑固定连接;2 . The shield tunnel side wall casting trolley according to claim 1 , wherein the portal frame is composed of a plurality of frame units, and the frame units are longitudinally distributed on the bottom longitudinal beam in the front and rear. The adjacent frame units are fixedly connected by the diagonal braces of the pillars; 每个框架单元包括横梁和两个立柱,所述横梁与两个立柱呈门形状固定连接。Each frame unit includes a beam and two uprights, and the beams and the two uprights are fixedly connected in the shape of a door. 3.根据权利要求2所述的盾构隧道侧墙浇筑台车,其特征在于,在每个框架单元中,所述横梁的左右两端底部均通过纵向吊轨固定连接有横向吊轨,每个横向吊轨上配合安装有手拉葫芦;3. The shield tunnel side wall casting trolley according to claim 2 is characterized in that, in each frame unit, the bottoms of the left and right ends of the beam are fixedly connected with transverse suspension rails through longitudinal suspension rails, and each A chain hoist is installed on each of the horizontal hanging rails; 所述左侧模板和右侧模板通过横向撑杆对应连接在台车架内左右两侧的立柱上。The left formwork and the right formwork are correspondingly connected to the uprights on the left and right sides of the trolley frame through transverse struts. 4.根据权利要求3所述的盾构隧道侧墙浇筑台车,其特征在于,所述横梁左右两端均设有导轮,每根横向撑杆由左段杆、中间杆和右段杆组成,所述中间杆的左右两端分别设有相反的螺丝并螺纹连接所述左段杆和右段杆。4. The shield tunnel side wall casting trolley according to claim 3, wherein the left and right ends of the beam are provided with guide wheels, and each transverse strut consists of a left section rod, a middle rod and a right section rod The left and right ends of the intermediate rod are respectively provided with opposite screws and are threadedly connected to the left section rod and the right section rod. 5.根据权利要求1所述的盾构隧道侧墙浇筑台车,其特征在于,所述主动轮、从动轮均包括滚轮支架,所述滚轮支架内沿着前后方向转动连接有两个滚轮,所述主动轮的滚轮支架外壁顶部设置有减速电机,所述减速电机的输出轴通过链条与所述滚轮传动连接。5. The shield tunnel side wall casting trolley according to claim 1, wherein the driving wheel and the driven wheel both comprise a roller bracket, and two rollers are connected in the roller bracket along the front-rear direction. A deceleration motor is arranged on the top of the outer wall of the roller bracket of the driving wheel, and the output shaft of the deceleration motor is connected with the roller through a chain. 6.根据权利要求1-5任一项所述的盾构隧道侧墙浇筑台车,其特征在于,所述操作平台的顶部设有护栏。6 . The shield tunnel side wall casting trolley according to claim 1 , wherein a guardrail is provided on the top of the operating platform. 7 .
CN202122037858.3U 2021-08-27 2021-08-27 Shield tunnel side wall pouring trolley Active CN215633018U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122037858.3U CN215633018U (en) 2021-08-27 2021-08-27 Shield tunnel side wall pouring trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122037858.3U CN215633018U (en) 2021-08-27 2021-08-27 Shield tunnel side wall pouring trolley

Publications (1)

Publication Number Publication Date
CN215633018U true CN215633018U (en) 2022-01-25

Family

ID=79902993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122037858.3U Active CN215633018U (en) 2021-08-27 2021-08-27 Shield tunnel side wall pouring trolley

Country Status (1)

Country Link
CN (1) CN215633018U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550766A (en) * 2021-08-27 2021-10-26 中铁十四局集团大盾构工程有限公司 A shield tunnel side wall pouring trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550766A (en) * 2021-08-27 2021-10-26 中铁十四局集团大盾构工程有限公司 A shield tunnel side wall pouring trolley

Similar Documents

Publication Publication Date Title
CN102296971B (en) A lining method for a tunnel emergency avoidance zone and a tunnel lining trolley
CN105952482B (en) Self-propelled tunnel inverted arch lining trolley
CN105756687B (en) Traveling type large cross-section tunnel tunneling lining trolley and tunnel excavation lining construction method
CN102337905B (en) Open type TBM (Tunnel Boring Machine) fullface synchronous lining trolley for hydraulictunnel
CN211397597U (en) Template trolley and tunnel construction vehicle set
CN108868829A (en) Movable Portal Combined Formwork for Secondary Lining of Variable Cross-section Tunnel
CN202544854U (en) Lining trolley for subway station
CN114808686A (en) Bridge half-width large-section bridge floor beam joint construction and inspection equipment
CN102268858A (en) Cradle for suspension pouring of arch-type bridge
CN210317334U (en) A template platform truck for tunnel thin wall mid-board concrete placement
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN113550766A (en) A shield tunnel side wall pouring trolley
CN115613477A (en) Main beam cantilever trackless triangular hanging basket and construction method
CN213510651U (en) Integrated two-liner trolley for tunnel construction
CN220955643U (en) Multifunctional comprehensive operation trolley for arch-collecting installation
CN219387925U (en) Hydraulic reinforcement binding trolley for lining of large open cut tunnel
CN118933885A (en) A single-track railway tunnel secondary lining construction trolley and construction method thereof
CN108130864B (en) Integral prefabricated bridge whole span beam transportation and erection equipment
CN215145934U (en) Work platform can be dismantled to circle section from walking in tunnel
CN218621893U (en) Trackless triangular hanging basket
CN214219733U (en) A light-duty mobile trolley system with arched support under the condition of restricted working space
CN202300422U (en) Open type tunnel boring machine (TBM) full cross section synchronous lining building trolley for hydraulic tunnel
CN215715521U (en) Trolley middle plate assembling mechanism capable of spanning steel supports to assemble subway station
CN223594186U (en) Auxiliary supporting structure for tunnel maintenance
CN212202075U (en) Trackless self-propelled tunnel secondary lining trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: ZHENGZHOU NEW DAFANG HEAVY INDUSTRIES & TECHNOLOGY Co.,Ltd.

Assignor: CHINA RAILWAY 14TH BUREAU GROUP SHIELD ENGINEERING Co.,Ltd.

Contract record no.: X2025980040961

Denomination of utility model: A shield tunnel side wall pouring trolley

Granted publication date: 20220125

License type: Common License

Record date: 20251203