KR970006715A - Construction method of prefabricated guard room for apartment - Google Patents

Construction method of prefabricated guard room for apartment Download PDF

Info

Publication number
KR970006715A
KR970006715A KR1019950023431A KR19950023431A KR970006715A KR 970006715 A KR970006715 A KR 970006715A KR 1019950023431 A KR1019950023431 A KR 1019950023431A KR 19950023431 A KR19950023431 A KR 19950023431A KR 970006715 A KR970006715 A KR 970006715A
Authority
KR
South Korea
Prior art keywords
apartment
prefabricated
walls
iron plate
guard room
Prior art date
Application number
KR1019950023431A
Other languages
Korean (ko)
Other versions
KR0151541B1 (en
Inventor
권혁우
노희철
Original Assignee
최훈
삼성건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최훈, 삼성건설 주식회사 filed Critical 최훈
Priority to KR1019950023431A priority Critical patent/KR0151541B1/en
Publication of KR970006715A publication Critical patent/KR970006715A/en
Application granted granted Critical
Publication of KR0151541B1 publication Critical patent/KR0151541B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

본 발명은 아파트용 조립식 경비실의 시공방법에 관한 것으로, 기초공사를 겸한 바닥의 시공을 현장타설 철근 콘크리트또는 조립식 기초판부재 설치로 시공한 후 그 위에 사방 벽체를 돌출 철근을 이용해 몰타르로 각각 연결하도록 하고, 상기 벽체는 각각의 공간부를 통하여 돌출된 철근등을 철판으로 상호 연결한 후 너트를 조여 연결하여 내외측의 틈새에는실리콘으로 코킹하여 메우고, 상기의 사방 벽체와 지붕은 매입된 철판의 노출부위에 현장에서 철판을 덧대어 상호 용접하여 연결하므로서 현장에서 별도의 어려운 공정을 거치지 않아도 되므로 비숙련공에 의해서도 안정되고 빠른 시공이 가능하도록 한 것이다.The present invention relates to a method of constructing a prefabricated guard room for an apartment, and to construct the floor construction combined with the foundation work by installing the site-reinforced reinforced concrete or prefabricated base plate member, and then connect the four-sided wall to the mortar by using the reinforcing bars on it. The wall is connected to each other by reinforcing steel bars, etc. protruding through each space portion, and then tighten the nuts to connect the inside and outside gaps by caulking with silicon, and the four walls and the roof are exposed portions of the embedded steel plate. By attaching the iron plate at the site and connecting it to each other, it is possible to perform stable and fast construction even by unskilled workers because it does not have to go through a difficult process in the field.

Description

아파트용 조립식 경비실의 시공방법Construction method of prefabricated guard room for apartment

본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음Since this is an open matter, no full text was included.

제1도는 본 발명의 시공상태를 나타낸 분리사시도, 제2도는 본 발명의 벽체를 상호 연결하는 상태를 나타낸 일부단면도, 제3도는 본 발명의 벽체와 지붕을 연결하는 상태를 나타낸 개략도.1 is an exploded perspective view showing a construction state of the present invention, Figure 2 is a partial cross-sectional view showing a state of interconnecting the walls of the present invention, Figure 3 is a schematic diagram showing a state of connecting the wall and the roof of the present invention.

Claims (3)

바닥부재(3)와 계단부재(4)가 현장 타설 콘크리트 또는 조립식 기초부재로 시공되는 기초판(1)을 형성하는단계와, 상기 기초판(1)의 벽체 접속부위(5)에 다수의 구멍(6)을 형성하여 철근(7a)~(10a)들이 하향돌출된 벽체(7)~(10)들을 시멘트 몰타르로 접합연결하는 단계와, 상기의 벽체(7)~(10)들을 철판(17)으로 연결하는 단계와, 상기의 벽체(7)~(10)에서 상면에 노출시킨 철판(12)과 지붕(11)에서 노출시킨 철판(13)에 현장에서 철판(14)을 덧대어 용접으로 접합하는 단계들에 의해 시공됨을 특징으로 하는 아파트용 조립식 경비실의 시공방법.Forming a base plate (1) in which the bottom member (3) and the staircase member (4) are constructed of site-cast concrete or prefabricated base member, and a plurality of holes in the wall connection portion (5) of the base plate (1). (6) forming a step of joining and connecting the walls (7) to (10) from which the reinforcing bars (7a) to (10a) protrude downward with cement mortar, and the walls (7) to (10) of the steel plate (17). Step) and by welding the iron plate 14 in the field on the iron plate 12 exposed on the upper surface in the wall (7) ~ (10) and the iron plate 13 exposed from the roof (11) Construction method of the prefabricated security room for the apartment, characterized in that the construction by the step of bonding. 제1항에 있어서, 상기의 벽체(7)~(10) 및 지붕(11)은 각각 PC공법에 의해 제작된 단위 부재를 사용하도록한 아파트용 조립식 경비실의 시공방법.The method for constructing a prefabricated guard room for an apartment according to claim 1, wherein the walls (7) to (10) and the roof (11) are each made of a unit member manufactured by a PC method. 제1항에 있어서, 벽체(7)~(10)들은 공간부(15)(15')로 나사부가 일체인 철근(16)(16')이 돌출되도록 하고,구멍(17')(17")이 형성된 철판(17)을 상기의 공간부(15)(15')에 끼워 맞춘 다음, 너트(18)(18')로 체결하여 고정하고 미장으로 마감한 후, 내외측 틈새(19)(19')를 코킹층(20)(20')으로 형성하여 시공하는 아파트용 조립식 경비실의 시공방법.The walls (7) to (10) are provided with spaces (15) and (15 ') so that the reinforcing bars (16) and (16') having integral threaded portions protrude, and the holes (17 ') and (17 "). ), The iron plate (17) formed is fitted to the space (15) (15 '), and then fastened by fastening with nuts (18) (18') and finished with plastering, then the inner and outer gaps 19 ( 19 ') a method of constructing a prefabricated guard room for the apartment to be formed by forming the caulking layer (20, 20'). ※ 참고사항 : 최초출원 내용에 의하여 공개하는 것임.※ Note: The disclosure is based on the initial application.
KR1019950023431A 1995-07-31 1995-07-31 Process for constructing prefabricated guard house KR0151541B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019950023431A KR0151541B1 (en) 1995-07-31 1995-07-31 Process for constructing prefabricated guard house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019950023431A KR0151541B1 (en) 1995-07-31 1995-07-31 Process for constructing prefabricated guard house

Publications (2)

Publication Number Publication Date
KR970006715A true KR970006715A (en) 1997-02-21
KR0151541B1 KR0151541B1 (en) 1998-10-15

Family

ID=19422404

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019950023431A KR0151541B1 (en) 1995-07-31 1995-07-31 Process for constructing prefabricated guard house

Country Status (1)

Country Link
KR (1) KR0151541B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100440394B1 (en) * 2002-08-30 2004-07-14 최영호 prefabricated tea house
KR100539010B1 (en) * 2005-06-15 2005-12-26 오종택 The booth for simultaneous interpretation
WO2015137577A1 (en) * 2014-03-12 2015-09-17 박준신 Construction method for stacking unit body structure of concrete house

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2513901C1 (en) * 2012-10-01 2014-04-20 Сергей Юрьевич Моссаковский Observation tower
KR102424407B1 (en) * 2020-11-24 2022-07-22 (주)싱스웰 Smart Shelter Based on Artificial Intelligence

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100440394B1 (en) * 2002-08-30 2004-07-14 최영호 prefabricated tea house
KR100539010B1 (en) * 2005-06-15 2005-12-26 오종택 The booth for simultaneous interpretation
WO2015137577A1 (en) * 2014-03-12 2015-09-17 박준신 Construction method for stacking unit body structure of concrete house

Also Published As

Publication number Publication date
KR0151541B1 (en) 1998-10-15

Similar Documents

Publication Publication Date Title
KR970006715A (en) Construction method of prefabricated guard room for apartment
US20030056460A1 (en) Engineered wall system
GB1563266A (en) Framed building structure
JP2004352457A (en) Junction structure for shaft unit in elevator shaft
KR100567270B1 (en) Connecting Method and Structure of Precast Concrete Panel
KR100829954B1 (en) Utility system in modular housing
JPS6137693Y2 (en)
JP4312623B2 (en) Method for constructing concrete floor with steps, structure thereof, and concrete plate with steps used in the construction method
JP2781641B2 (en) Construction method of concrete basement
JP3140397B2 (en) Steel basement
JP2000120196A (en) Method for constructing parapet
KR950009611B1 (en) Assembling high apartments joining structure
KR200147067Y1 (en) Inside and outside wall setting-up device
JP2506484B2 (en) Concrete assembled basement
KR200326554Y1 (en) a support of panel
JPH0115764Y2 (en)
JP2781640B2 (en) Construction method of concrete basement
JPH0427077A (en) House with concrete built-up type basement
JPH0696916B2 (en) Construction method of partition wall wall panel for extension
JPH10238010A (en) Half precast floor board and floor structure using it
JP2960479B2 (en) Building block for concrete underground unit
JPH0418100B2 (en)
RU93006192A (en) TEAM MONOLITHIC BUILDING
JPH10227036A (en) Building foundation reinforcing method and structure thereof
JPH11350643A (en) Masonry lock panel

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20090605

Year of fee payment: 12

LAPS Lapse due to unpaid annual fee