KR960004915B1 - Overlay method for height adjustable manhole - Google Patents

Overlay method for height adjustable manhole Download PDF

Info

Publication number
KR960004915B1
KR960004915B1 KR1019920000756A KR920000756A KR960004915B1 KR 960004915 B1 KR960004915 B1 KR 960004915B1 KR 1019920000756 A KR1019920000756 A KR 1019920000756A KR 920000756 A KR920000756 A KR 920000756A KR 960004915 B1 KR960004915 B1 KR 960004915B1
Authority
KR
South Korea
Prior art keywords
manhole
overlay
manhole frame
layer
construction
Prior art date
Application number
KR1019920000756A
Other languages
Korean (ko)
Inventor
신이찌 쯔바끼모리
Original Assignee
신이찌 쯔바끼모리
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 신이찌 쯔바끼모리 filed Critical 신이찌 쯔바끼모리
Priority to KR1019920000756A priority Critical patent/KR960004915B1/en
Application granted granted Critical
Publication of KR960004915B1 publication Critical patent/KR960004915B1/en

Links

Abstract

내용 없음.No content.

Description

오버레이(overlay)공법Overlay method

제 1 도 내지 제 4 도는 본 발명에 의한 오버레이 공법의 공정을 나타낸 단면도로써,1 to 4 are cross-sectional views showing the process of the overlay method according to the present invention,

제 1 도는 오버레이 완료 상태.1 is the overlay completion state.

제 2 도는 맨홀 상부의 오버레이를 원형절단하고 절단 포장판 및 맨홀틀을 철거하는 상태.2 is a state in which the overlay of the upper part of the manhole is cut and the cutting pavement plate and the manhole frame are removed.

제 3 도는 맨홀틀을 설치한 후의 상태.3 is the state after installing the manhole frame.

제 4 도는 맨홀틀 주위에 포장재를 타설(打設)한 후의 상태를 각각 나타낸 것임.4 shows the state after pouring the packing material around the manhole frame, respectively.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1 : 맨홀틀 2 : 덮개1: manhole frame 2: cover

3 : 박리재 4 : 포장층3: release material 4: packing layer

5 : 오버레 6 : 맨홀 기초벽5: Oberrey 6: manhole foundation wall

7 : 절단포판 8 : 맨홀틀 박리기7: cutting fabric plate 8: manhole frame peeler

9 : 고정기초 10 : 포장재9: fixed foundation 10: packing material

20 : 개방부위 30 : 공간부20: open part 30: space part

본 발명은 오버레이 공법에 관한 것으로, 특히 맨홀틀을 포함하는 포장의 오버레이 공법에 관한 것이다.The present invention relates to an overlay process, and more particularly, to an overlay process for a pavement comprising a manhole frame.

일반적으로 시공구간에 맨홀이 있는 도로상을 포장하기 위해서는 다음과 같은 순서로 시공하고 있다.In general, in order to pave the road with a manhole in the construction section, construction is carried out in the following order.

1. 압축기 및 브레이커로 맨홀주위를 인력을 이용하여 파헤친다.1. Dig manhole around manhole with compressor and breaker.

2. 포장에 앞서 이미 설치된 맨홀의 높이를 조정하고 교통의 원활화를 위하여 맨홀과의 단차를 없애는 포장을 한다.2. Prior to paving, adjust the height of the already installed manhole and wrap it to eliminate the step with manhole for smooth transportation.

3. 오버레이 포장을 위하여 상기 단차포장 부위를 제거한다. 이 때에도 물론 압축기 및 브레이커를 주로 이용한다.3. Remove the stepped packing site for overlay packaging. At this time, of course, the compressor and the breaker are mainly used.

4. 덤프트럭, 아스팔트 피니셔, 로드롤러 및 타이어 롤러 등을 이용하여 포장 마무리 높이 및 맨홀의 높이에 맞추어 표층포장을 실시하여 시공을 완료한다.4. Use the dump truck, asphalt finisher, road roller, tire roller, etc. to complete the construction by surface layering according to the paving height and manhole height.

이와 같은 종래의 맨홀을 포함하는 도로포장에 있어서는, 포장면과 맨홀 뚜껑이 맞닿는 부분은 단차가 발생하기 쉽다. 이 단차는 도로포장의 질을 떨어 뜨린다. 또, 이 오차는 교통개시시에 충격음과 진동발생의 원인으로 된다.In the road pavement including such a conventional manhole, the step where the pavement surface and the manhole cover abut easily occurs. This step reduces the quality of the pavement. This error also causes shock sound and vibration to occur at the start of traffic.

그리고 이미 시공된 포장표면의 경우, 기일경과로 인하여 균열이나 파손이 많아지고 차량통행 때문에 포장두께가 불충분하게 되어 있는 경우 등에는 도로수선을 위해 포장표면에 필요로 하는 두께로 오버레이를 실시하게 된다.In the case of the pavement surface that has already been constructed, if the crack or damage is increased due to the passage of time and the pavement thickness is insufficient due to the passage of the vehicle, the pavement surface is overlaid with the thickness required for the pavement repair.

그러나 상기 종래 오버레이 공법은, 포장구간 내에 맨홀틀이 부설되어 있는 부분은 맨홀틀을 우회하면서 오버레이를 시공할 필요가 있기 때문에, 오버레이 작업성이 현저히 저하하는 등의 문제가 있었다.However, the conventional overlay method has a problem such that the workability of the overlay is remarkably deteriorated because the overlay where the manhole frame is placed in the paving section needs to be constructed while bypassing the manhole frame.

본 발명은 이와 같은 종래 기술의 문제점을 감안하여 이를 해소하기 위하여 발명된 것으로, 그 목적으로 하는 바는 맨홀틀을 포함하는 포장의 표면을 오버레이함에 있어서, 작업성이 매우 좋은 오버레이를 시공할 수 있는 오버레이 공법을 제공하고자 하는 것이다.The present invention has been invented to solve this problem in view of the prior art, and its object is to overlay the surface of the pavement including the manhole frame, the workability of the overlay can be constructed very good It is to provide an overlay method.

상기 목적을 달성하기 위한 본 발명의 오버레이 공법은, 맨홀틀의 개방부위를 통하여 공지의 맨홀틀 박리기가 통과해 절단포장판 및 맨홀틀이 철거되는 공정과, 상기 맨홀틀 주위의 포장이 상기 오버레이층 위에서부터 통형상으로 절단됨과 동시에 상기 오버레이층을 덮개 상부로부터 박리시키고 박리재 및 덮개를 철거하여 상기 맨홀틀을 개방하고, 이 맨홀틀 주위의 공간부에 포장재가 타설되는 공정을 포함하는 도로포장의 오버레이 공법에 있어서, 상기 맨홀틀 및 덮개의 표면에 박리재가 피복됨과 동시에 포장층 표면 및 상기 박리재 표면이 오버레이층으로 오버레이되는 공정과, 맨홀 기벽 위에 두께가 두꺼운 조(粗)조정재와, 비교적 미세조정이 가능한, 얇은 두께의 미(微)조정재와의 조합으로 구성되는 고정기초가 구축됨과 동시에 이 고정기초 위에 상기 맨홀틀이 설치되는 공정으로 이루어진다.In order to achieve the above object, the overlay method of the present invention includes a process of removing a cutting packaging plate and a manhole frame through a known manhole frame peeler through an open portion of the manhole frame, and the wrap around the manhole frame is the overlay layer. The pavement is cut into a tubular shape from above, and at the same time, the overlay layer is peeled off from the top of the cover, and the peeling material and the cover are removed to open the manhole frame, and the paving material is poured into the space around the manhole frame. In the overlay method, a step of covering the surface of the manhole frame and the cover with a release material and overlaying the surface of the packaging layer and the surface of the release material with the overlay layer, a coarse adjustment material having a thick thickness on the manhole base wall, and a relatively fine A fixed foundation consisting of a combination of thin adjustment microadjustable materials is constructed, and at the same time this fixed foundation The manhole frame is formed on the process.

상기 공정으로 구성되는 본 발명의 오버레이 공법은, 오버레이층을 선시공하고 맨홀틀 부위를 절단하여 맨홀틀 전체를 들어낸 후 고정기초를 시공하며 공간부에 포장재를 타설하는 것으로 되기 때문에, 시공하고자 하는 공사구간의 포장표면에 맨홀틀이 있더라도 이를 우회하여 시공하므로 작업성이 현저하게 향상된다.In the overlay method of the present invention composed of the above process, the construction of the overlay layer and cutting the manhole frame part to lift the entire manhole frame, and then the fixed foundation and to place the packaging material in the space, the construction to be constructed Even if there is a manhole frame on the pavement surface of the section, workability is remarkably improved since it is constructed by bypassing it.

이하, 첨부도면을 참조하여 본 발명의 오버레이 공법에 대하여 자세하게 설명한다.Hereinafter, the overlay method of the present invention will be described in detail with reference to the accompanying drawings.

제 1 도 내지 제 4 도는 본 발명에 의한 오버레이 공법의 공정을 나타낸 단면도이다.1 to 4 are cross-sectional views showing the process of the overlay method according to the present invention.

도면중 부호 1은 맨홀틀, 2는 이 맨홀틀(1)의 상부에 설치되는 덮개이다. 먼저, 제 1 도에 나타낸 바와 같이 상기 맨홀틀(1)의 덮개(2) 표면에는 원형의 노반지(路盤紙 ; underlay paper : 콘크리트 포장시공에 있어서 콘크리트의 몰탈분이 노반에 흡수되는 것을 방지하기 위하여 콘크리트가 경화한 다음의 노반 마찰응력을 감소시키기 위하여 노반위에 까는 종이이며, 일반적으로 크라프트지, 폴리에틸렌 필름, 타보링지 등이 사용된다)로 된 박리재(3)가 점착됨과 동시에, 포장층(4)의 표면에 상기 박리재(3) 표면도 포함하여 필요로 하는 두께의 오버레이층(5)이 맨홀틀(1)을 우회함이 없이 시공된다.In the figure, reference numeral 1 denotes a manhole frame, and 2 denotes a cover provided on an upper portion of the manhole frame 1. First, as shown in FIG. 1, on the surface of the cover 2 of the manhole frame 1, in order to prevent the mortar of concrete from being absorbed by the roadbed in a circular underlay paper (concrete paving). It is a paper covering the roadbed in order to reduce the roadbed frictional stress after hardening of concrete, and in general, a release layer 3 made of kraft paper, polyethylene film, taboring paper, and the like is adhered to the pavement layer ( The overlay layer 5 of the required thickness including the surface of the release material 3 on the surface of 4) is constructed without bypassing the manhole frame 1.

상기 박리재(3)는 후에 상기 맨홀틀(1) 덮개 표면으로부터 오버레이층(5)을 용이하게 박리하기 위하여 사용되며, 예컨대 상기 노반지 이외에 박리용 처리제 등의 각종 약제로 대체될 수도 있다.The release material 3 is later used to easily peel off the overlay layer 5 from the surface of the manhole frame 1, and may be replaced by various chemical agents such as a peeling treatment agent, for example, in addition to the old ring.

여기에서, 상기 시멘트 성분의 포장층(4)과 아스팔트 혼합층인 오버레이층(5)을 결합시키기 위하여 하층의 표면에 역청재료를 소량 산포(散布)하는 택코트(tack coat)를 끼워서 시공하는 것이 좋다.In this case, in order to bond the cement pavement layer 4 and the overlay layer 5, which is an asphalt mixture layer, it is preferable to apply a tack coat to the surface of the lower layer by spreading a small amount of bitumen material. .

이와 같은 선(先) 오버레이 공정은 종래의 후 오버레이 공정과는 완전히 다르다. 즉, 오버레이는 상기 맨홀틀(1)을 피하지 않고 덮개(2)를 포함하여 전체적으로 시공되는 것이다. 이것은 오버레이 시공의 단순화를 꾀하는 것이기 때문에 작업성이 좋게 된다.This pre-overlay process is completely different from the conventional post overlay process. In other words, the overlay is constructed entirely including the cover 2 without avoiding the manhole frame 1. This improves workability because it is intended to simplify overlay construction.

이어서, 제 2 도에 나타난 바와 같이, 상기 오버레이층(5) 위에서부터 맨홀틀(1) 주위의 포장층(4)이 공지의 도시하지 아니한 노면원형 절단기에 의해 원형상으로 맨홀 기초벽(6) 상면의 깊이까지 절단된다.Subsequently, as shown in FIG. 2, from above the overlay layer 5, the pavement layer 4 around the manhole frame 1 is circularly shaped by a road cutting machine (not shown). It is cut to the depth of the upper surface.

상기 맨홀틀(1) 주위를 절단함에 있어서, 원통형상으로 절단하는 경우에는, 예를들면 일본국 특공소 제61-52283호 공보에 개시되어 있는 바와 같은 원통형상 비트를 구비한 노면원형 절단기를 이용할 수 있다.When cutting around the manhole frame 1, when cutting into a cylindrical shape, for example, a road surface circular cutter having a cylindrical bit as disclosed in Japanese Patent Application Laid-Open No. 61-52283 can be used. Can be.

또, 오버레이층으로부터 절단중심을 특정(特定)하기 위하여 공지의 금속 탐지기 등을 사용하여 내부의 맨홀로 덮개의 위치를 탐사하여도 좋다.In addition, in order to specify the cutting center from the overlay layer, a position of the cover of the inner manhole may be explored using a known metal detector or the like.

이어서, 오버레이층(5)을 덮개(2) 상부로부터 박리시키고, 박리재(3) 및 덮개(2)를 철거하여 개방하고, 이 개방부위(20)를 통하여 공지의 맨홀틀 박리기(8)가 통과해 들어가서 절단포장판(7) 및 맨홀틀(1)이 위쪽으로 일거에 들려져서 철거하며, 이 때에 상기 절단포장판(7)은 파쇄된다.Subsequently, the overlay layer 5 is peeled off from the upper part of the cover 2, the peeling material 3 and the cover 2 are removed and opened, and the known manhole frame peeler 8 is opened through this open part 20. Passes through and the cutting packaging plate 7 and the manhole frame 1 are lifted upwards and removed, and at this time, the cutting packaging plate 7 is crushed.

이 파쇄는 브레이커를 사용하여 철거되어도 좋으나 작업성이 향상이나 소음진동의 방지 등의 관점에서 일본국 특공소 제 61-33933호 공보에 개시되어 있는 바와 같이 맨홀틀에 부착한 채로 철거되는 것이 바람직하다.This crushing may be removed using a breaker, but it is preferable to remove it with a manhole frame as disclosed in Japanese Patent Application No. 61-33933 from the standpoint of improving workability and preventing noise and vibration. .

즉, 상기 절단포장판(7) 및 맨홀틀(1)을 일체적으로 철거하기 위하여, 예를들면 일본국 실개소 제 59-156942호 공보나 실개소 제 59-193679 호 공보에 개시되어 있는 바와 같이 맨홀틀과 맨홀 기벽과의 사이에 맨홀틀 내부에서 방사상으로 직경이 확대되는 쐐기체나 아암을 삽입하도록 한 맨홀틀 인상기나 맨홀틀 박리기 등을 필요에 따라 선택적으로 이용할 수 있다.That is, in order to integrally remove the cutting packaging plate 7 and the manhole frame 1, for example, as disclosed in Japanese Patent Application Laid-Open No. 59-156942 or Japanese Patent Application Laid-Open No. 59-193679. Similarly, a manhole lifter or a manhole frame peeler which inserts a wedge body or an arm with a radially enlarged diameter inside the manhole frame between the manhole frame and the manhole base wall can be selectively used as necessary.

제 3 도를 참조하면, 맨홀 기초벽(6) 위에는 시공시의 높이 조정을 가능하게 하는 고정기초(9)가 소정 높이로 구축됨과 동시에 이 고정기초(9) 위에 맨홀틀(1)이 설치된다.Referring to FIG. 3, the manhole frame 1 is installed on the manhole base wall 6 at the same time as the fixed foundation 9 that allows height adjustment during construction is constructed at a predetermined height. .

상기 고정기초(9)는 큰폭 조정이 가능한, 예를들면 프리캐스트 콘크리트(precast concrete)로 구성한 두께가 두꺼운 조(粗)조정재와, 비교적 미세조정이 가능한, 예를들면 열경화성 수지의 일종인 에폭시계 레진 콘크리트(epoxy resin concrete)로 구성한 얇은 두께의 미(微)조정재와의 조합으로 구성되어 있다.The fixed base 9 is a thick coarse adjustment material composed of precast concrete, for example, which is largely adjustable, and an epoxy system, which is a kind of thermosetting resin, which is relatively fine-adjustable, for example. It is composed of a combination of thin and fine adjustment material composed of epoxy resin concrete.

상기 프리캐스트 콘크리트란, 콘크리트가 굳은 후에 제자리에 옮겨 놓거나 또는 조립하는 콘크리트 부재, 즉 공장 등에서 미리 제조된 콘크리트 제품으로서 현장에 운반하여 사용하는 콘크리트 부재로서 공기의 대폭단축이 가능하고 공사공해의 방제, 관리비 절감을 할 수 있는 것을 말한다.The precast concrete is a concrete member that is moved or assembled into place after the concrete is hardened, that is, a concrete member that is transported and used on site as a concrete product manufactured in advance in a factory, and can greatly shorten the air and prevent construction pollution, This means that you can reduce the administrative costs.

마지막으로 제 4 도에 나타난 바와 같이, 상기 맨홀틀(1) 주위의 공간부(30)에 통상의 포장재(10)가 오버레이층(5)의 높이까지 타설됨으로써 본 발명의 오버레이 공법의 전공정이 완료된다.Finally, as shown in FIG. 4, the conventional packaging material 10 is poured into the space 30 around the manhole frame 1 to the height of the overlay layer 5, thereby completing the entire process of the overlay process of the present invention. do.

상기 맨홀틀(1)은, 이전에 철거된 것도 사용가능하지만 바람직하게는 곧 바로 사용가능하도록 미리 전처리된 별도의 것이 사용된다.The manhole frame 1 may be a previously dismantled one, but preferably a separate one pre-treated so as to be ready for use immediately.

이어서, 본 발명의 효과에 대하여 상세하게 설명한다.Next, the effect of this invention is demonstrated in detail.

본 발명의 오버레이 공법은 원형절단공사, 철거공사, 복구공사, 교통개방까지의 공정을 일련화하여 1공정으로 시스템화할 수 있다.The overlay method of the present invention can be systemized in a single process by serializing the process up to circular cutting, demolition work, restoration work, traffic opening.

이 시스템화에 의하여 단일 작업반이 1공정으로 시공할 수 있게 되고, 시공도중에 현장을 임시복구하지 않아도 되며, 또한 현장을 방치하는 일이 없이 작업을 계속할 수 있게 된다.This system enables a single workbench to be constructed in one process, eliminating the need for temporary restoration of the site during construction, and continuing work without leaving the site.

그리고 맨홀상부 정비공사의 공장이라고도 할 수 있는 전용공구, 기계, 재료를 탑재한 3대의 오버레이 공법 시스템차량이 일괄시공하기 때문에 시공시간을 크게 단축할 수 있게 된다.In addition, the three overlay process system vehicles equipped with dedicated tools, machines, and materials, which can be referred to as the factories of the upper part of the manhole, will be greatly reduced in construction time.

또, 본 발명의 오버레이 공법에 의하면, 74dB(A) 이하의 저소음이 달성된다. 즉, 종래공법에서는 절단공정에 의하여 주위를 사각형으로 절단하고, 파쇄공정에 있어서는 콘크리트 브레이커를 사용하기 때문에, 큰 소음이나 진동이 발생하였으나, 본 발명의 오버레이 공법에서는 공정중에 가장 큰 소음이 발생하는 절단공정에 있어서 저소음화된 원형절단 커터로 필요 최소면적을 절단함으로써 저소음·저진동으로 또한 빠르게 절단한다.Moreover, according to the overlay method of this invention, low noise of 74 dB (A) or less is achieved. That is, in the conventional method, since the periphery is cut into a square by a cutting process and a concrete breaker is used in the crushing process, a large noise or vibration is generated, but in the overlay method of the present invention, a cutting is generated that generates the largest noise during the process. In the process, the low noise circular cutting cutter cuts the required minimum area and cuts quickly with low noise and low vibration.

철거공정에 있어서도 트럭기중기로 맨홀을 주위의 아스팔트 덩어리와 함께 빼내기 때문에 소음·진동이 거의 발생하지 않게 된다.Even in the demolition process, the truck crane pulls out the manhole together with the surrounding asphalt mass, so that noise and vibration are hardly generated.

또, 전압에도 저소음·저진동의 원호전압기를 사용하여 소음·진동을 방지한다.In addition, a low noise and low vibration circular voltage generator is used for the voltage to prevent noise and vibration.

본 발명의 오버레이 공법의 노면절단시에 발생하는 시공소음은 『기계측 7m 4방향 에너지 평균 74dB(A) 이하』임이 확인되었다.It was confirmed that the construction noise generated at the cutting of the road surface of the overlay method of the present invention was `` less than 74dB (A) of 7m four-way energy average on the machine side. ''

또 본 발명의 오버레이 공법은 보수가 용이하다.In addition, the overlay method of the present invention is easy to repair.

종래, 도로건설 공사에 따른 맨홀의 유지보수는 포장 오버레이 공사, 절삭 오버레이 공사, 포장 교체공사, 포장 신설공사 등에 있어서 여러가지 문제를 발생시켰다.Conventionally, maintenance of manholes due to road construction has caused various problems in pavement overlay construction, cutting overlay construction, pavement replacement construction, pavement construction, and the like.

예를들면, 포장 신설공사에서는 맨홀을 넣은 구멍부가 볼록형상으로 되어 남아 있기 때문에 차량이나 중기계 등의 작업성이 현저하게 저하되거나 또한 조정재 부분이 파손되거나 하여 그 보수나 이동의 어긋남을 수정할 필요가 있었다.For example, in the new paving construction, the hole in which the manhole is inserted remains convex, so the workability of a vehicle or heavy machinery, etc. is remarkably deteriorated, or the adjustment part is damaged, and it is necessary to correct the misalignment of repair or movement. there was.

그러나, 본 발명의 오버레이 공법은, 종래 공법에서는 필요했던 맨홀공사에 따른 임시복구나 공사의 일시 중단이 필요없고 전면적인 포장의 완료 후에 탐지기로 맨홀위치를 확인함으로써 시공을 가능하게 한다.However, the overlay method of the present invention enables construction by checking the manhole position with a detector after completion of the entire paving process without the need for temporary restoration or construction of the manhole construction required by the conventional construction method.

또, 뚜껑높이 조절 또는 교환공사를 포장공사 후에 하기 때문에, 단차가 발생하지 않아 교통의 안전도 확보할 수 있다.In addition, since the lid height adjustment or replacement work is carried out after the paving work, no step is generated, thereby ensuring the safety of traffic.

또, 도로포장의 종횡단의 경사에 맞춰서 시공하기 때문에 마무리는 노면과의 평탄성을 실현할 수 있다.In addition, since the construction is performed in accordance with the inclination of the longitudinal and horizontal cross sections of the road pavement, the finish can realize flatness with the road surface.

그리고 맨홀에 신경쓰지 않고 포장공사를 할 수 있기 때문에 충분한 포장전압도 가능해지므로 포장의 밀도를 만족시킬 수 있다.And since the paving work can be carried out without worrying about the manhole, sufficient paving voltage is also possible, thereby satisfying the density of the paving.

이와 같이 본 발명의 오버레이 공법에 의하면, 먼저 오버레이층을 선시공하고 맨홀틀 부위를 절단하여 맨홀틀 전체를 들어낸 후 고정기초를 시공하며 공간부에 포장재를 타설하는 것으로 되기 때문에, 시공하고자 하는 공사구간의 포장표면에 맨홀틀이 있더라도 조심스럽게 공사를 할 필요가 없어 작업성이 현저하게 향상되며, 단차가 형성되지 않으므로 공사소음 발생이 낮아지며 시공구간의 지역주민, 보행자, 통행차량 및 공사작업자 등에 대하여 환경 및 안전이 확보되어 저공해화를 실현할 수 있다.As described above, according to the overlay method of the present invention, the overlay layer is first constructed and the manhole frame is cut to lift the whole manhole frame, and then the fixed foundation is constructed and the paving material is poured into the space. Even if there is a manhole frame on the pavement surface, the workability is remarkably improved since there is no need to construct the construction carefully, and the step noise is not formed, resulting in low construction noise and environment for local residents, pedestrians, traffic vehicles and construction workers in the construction zone. And safety can be secured and low pollution can be achieved.

또, 본 발명의 고정기초는 이중구조, 즉 두께가 두꺼운 조 조정재와, 비교적 미세조정이 가능한, 얇은 두께의 미 조정재와의 조합으로 구성되는 고정기초이기 때문에, 종래의 단일체 구성의 벽돌이나 블록의 점지지에 비하여 높이조정이 정밀해지고 안정성을 도모하며, 면지지(面支持)로 전체 부품을 지지하기 때문에 높은 평탄성을 유지하여 내구성을 크게 향상하는 효과가 있다.In addition, since the fixed foundation of the present invention is a fixed foundation composed of a dual structure, that is, a combination of a thick crude adjustment material and a thin non-adjustment material that is relatively fine-adjustable, Compared with the point support, the height adjustment is more precise and the stability is achieved, and since the entire part is supported by the surface support, it maintains high flatness and greatly improves durability.

Claims (1)

맨홀틀 주위를 오버레이하는 오버레이 공법에 있어서, 상기 맨홀틀(1) 및 덮개(2)의 표면에 박리재(3)가 피복됨과 동시에 포장층(4) 표면 및 상기 박리재(3) 표면이 오버레이층(5)으로 오버레이되는 제 1 공정과, 상기 오버레이층(5) 위에서부터 맨홀 기초벽 상면 깊이까지 절단되는 제 2 공정과, 상기 오버레이층(5)을 덮개(2) 상부로부터 박리시키고 박리재(3) 및 덮개(2)를 철거하고 개방한 후 절단포장판(7) 및 맨홀틀(1)을 철거하는 공지의 제 3 공정과, 맨홀 기벽(6) 위에 두께가 조(粗)조정재와 비교적 미세조정이 가능한 얇은 두께의 미(微)조정재와의 조합으로 구성되는 고정기초(9)가 구축되는 제 4 공정과, 상기 고정기초(9) 위에 상기 맨홀틀(1)이 설치되는 제 5 공정과, 상기 맨홀틀(1) 주위의 공간부(30)에 통상의 포장재(10)가 오버레이층(5)의 높이까지 타설되는 공지의 제 6 공정으로 이루어지는 것을 특징으로 하는 오버레이 공법.In the overlay method of overlaying around the manhole frame, the release material 3 is coated on the surfaces of the manhole frame 1 and the cover 2 and the surface of the packaging layer 4 and the surface of the release material 3 are overlayed. A first process overlaid with the layer 5, a second process cut from the overlay layer 5 to a depth of the upper surface of the manhole base wall, and the overlay layer 5 is peeled off from the top of the lid 2, and the release material (3) and the known third step of removing the cutting packaging plate (7) and the manhole frame (1) after removing and opening the cover (2), the thickness adjustment on the manhole base wall (6) A fourth step of constructing a fixed foundation 9 composed of a combination of a fine adjustment material having a relatively fine thickness, and a fifth of the manhole frame 1 provided on the fixed foundation 9. Process and the usual packaging material 10 is poured into the space 30 around the manhole frame 1 to the height of the overlay layer 5. Overlay method, characterized in that a known comprising a sixth step.
KR1019920000756A 1992-01-20 1992-01-20 Overlay method for height adjustable manhole KR960004915B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019920000756A KR960004915B1 (en) 1992-01-20 1992-01-20 Overlay method for height adjustable manhole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019920000756A KR960004915B1 (en) 1992-01-20 1992-01-20 Overlay method for height adjustable manhole

Publications (1)

Publication Number Publication Date
KR960004915B1 true KR960004915B1 (en) 1996-04-17

Family

ID=19328109

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019920000756A KR960004915B1 (en) 1992-01-20 1992-01-20 Overlay method for height adjustable manhole

Country Status (1)

Country Link
KR (1) KR960004915B1 (en)

Similar Documents

Publication Publication Date Title
US5318376A (en) Manhole frame
JP3522268B2 (en) Frame replacement method including manhole cover
CN101392497B (en) Wellhead maintenance method and device thereof
KR960004915B1 (en) Overlay method for height adjustable manhole
JP3841958B2 (en) Replacement method of concrete bridge to steel bridge
KR100374540B1 (en) Method of Manhole Repair and Used the Method of Equipment
KR960004916B1 (en) Overlay method for height adjustable manhole
JPH08218410A (en) Repair method of foundation of fluid storage tank
JP2623491B2 (en) Cutting overlay method
KR950014584B1 (en) Pavement method
JP3171675U (en) Anti-sinking floor slab with maneuvering prevention function
CN201155112Y (en) Wellhead height adjustment joint mat for maintaining the wellhead
KR101705310B1 (en) Precast concrete panels and precast concrete panels with cast-in-place concrete composite road paving method
JP3615123B2 (en) Repair method of road installation on paved road
JP2874573B2 (en) Rail foundation and its repair method
JP3644949B2 (en) Overlay method, cutting overlay method and pavement method
JP4392001B2 (en) Manhole cover frame replacement method
JPH06146213A (en) Height restoration method of sunk concrete pavement slab
JP3040025U (en) Highly adjustable manhole
KR20200123519A (en) Manhole height adjustment repair work method
JPH09273116A (en) Expansion joint bearing body for steel highway bridge, construction of expansion joint-mounting section of the bridge, and execution method of expansion joint in the bridge
KR200306639Y1 (en) Manhole housing
JP3171670U (en) Preventing subsidence around the manhole
CN114703901B (en) Construction method of rain sewage well lid
JP2003247202A (en) Technique for preventing peeling of pavement around structure such as manhole cover supporting frame

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
G160 Decision to publish patent application
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20080417

Year of fee payment: 13

LAPS Lapse due to unpaid annual fee