KR840003125A - 원자력 발전소 감시방법 - Google Patents

원자력 발전소 감시방법 Download PDF

Info

Publication number
KR840003125A
KR840003125A KR1019820005839A KR820005839A KR840003125A KR 840003125 A KR840003125 A KR 840003125A KR 1019820005839 A KR1019820005839 A KR 1019820005839A KR 820005839 A KR820005839 A KR 820005839A KR 840003125 A KR840003125 A KR 840003125A
Authority
KR
South Korea
Prior art keywords
state
parameters
reactor
monitoring
function
Prior art date
Application number
KR1019820005839A
Other languages
English (en)
Other versions
KR900008661B1 (ko
Inventor
르 라뜨 귀이
Original Assignee
챨스 브루넹고
프라마토메 꽁빠뉘
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=9265588&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR840003125(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 챨스 브루넹고, 프라마토메 꽁빠뉘 filed Critical 챨스 브루넹고
Publication of KR840003125A publication Critical patent/KR840003125A/ko
Application granted granted Critical
Publication of KR900008661B1 publication Critical patent/KR900008661B1/ko

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/04Safety arrangements
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/08Regulation of any parameters in the plant
    • G21D3/10Regulation of any parameters in the plant by a combination of a variable derived from neutron flux with other controlling variables, e.g. derived from temperature, cooling flow, pressure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

내용 없음

Description

원자력 발전소 감시방법
본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음
제1도는 원자로 및 그 작동과 안전에 필요한 회로도.
제2도는 감시될 발전소를 구동시키는 제어실에 설치된 데스크도.
제3도는 상황 및 기능 상태를 나타내기 위해 사용된 장치의 확대도.

Claims (4)

  1. 발전소 구성물의 가동과 상태에 연관된 파라미터라고 불리워지는 양적 또는 질적인 정보를 수집하고, 이러한 파라미터들은 정상적 작동에 대응되는 참고 자료와 비교되며, 그리고 이러한 파라미터들과 참고 자료 사이에 존재하는 차이를 신호로 알리는 것을 포함하고 있는 원자력 발전소 감시 방법에 있어서 작동의 여러국면 또는 원자로의 정지에 대응되는 미리 결정된 상황의 조합은 노심에서 방출된 출력 레벨, 최초 유체의 물리적 파라미터 및 이 유체들의 시간에 대한 변화율, 혹은 원자로의 보호 또는 안전장치에 연관되는 가동에 대한 요구량에 종속토록 정의되며, 원자로의 작동 형태는 미리 결정된 상황중 어느 하나에 각 순간마다 연결시킴으로서 정의하며, 발전소를 감시키 위한 유용한 파라미터들은 발전소에서의 특별하고 긴요한 일의 실행에 연관되는 파라미터와 조건에 각각 일치하는 "함수"라고 불리우는 부-집합으로 분류되며, 각 함수의 파라미터에 대한 상태는 당해의 상황에서 함수를 수행하도록 분포키 위해 상태의 적절함을 나타내는 미리 결정된 분류에 의해 결정되며, 문제의 각 함수의 파라미터중 적어도 하나에 배치되는 가장 나쁜 상태는 이 함수에 배치되며, 상황의 전반적인 상태는 함수중 적어도 하나에는 가장 나쁜 상태가 배치되도록 결정하며, 상황의 전반적인 상태, 각 함수의 상태, 및 이 함수중 어느 하나의 상태의 변화에 관계되는 정보가 표시됨을 특징으로 하는 감시방법.
  2. 제1항에 따른 감시 방법에 있어서, 문제의 상황에서 특수적으로 재현되는 어떤 파라미터와 연관있는 정보가 표시됨을 특징으로 하는 감시방법.
  3. 제1항에 따른 발전소 감시 방법에 있어서, 함수를 실행하고 원자로의 안전과 안전장치 시스템을 효과적으로 주입키 위해 필요한 설비 항목의 상태에 연관되는 정보가 표시됨을 특징으로 하는 감시방법.
  4. 제1항에 따른 발전소 감시 방법에 있어서, 원자로의 안전 이용과 안전장치 시스템의 이용에 연관되는 정보가 표시되는 것을 특징으로 하는 감시방법.
    ※ 참고사항 : 최초출원 내용에 의하여 공개하는 것임.
KR8205839A 1981-12-31 1982-12-28 원자력 발전소 감시방법 KR900008661B1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR8124594A FR2519464A1 (fr) 1981-12-31 1981-12-31 Procede de surveillance d'une centrale de production d'electricite equipee d'un reacteur nucleaire
FR24594 1981-12-31

Publications (2)

Publication Number Publication Date
KR840003125A true KR840003125A (ko) 1984-08-13
KR900008661B1 KR900008661B1 (ko) 1990-11-26

Family

ID=9265588

Family Applications (1)

Application Number Title Priority Date Filing Date
KR8205839A KR900008661B1 (ko) 1981-12-31 1982-12-28 원자력 발전소 감시방법

Country Status (9)

Country Link
US (1) US4585609A (ko)
EP (1) EP0083546B1 (ko)
JP (1) JPS58120195A (ko)
KR (1) KR900008661B1 (ko)
DE (1) DE3265471D1 (ko)
ES (1) ES518682A0 (ko)
FR (1) FR2519464A1 (ko)
YU (1) YU286982A (ko)
ZA (1) ZA829095B (ko)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100596603B1 (ko) * 2004-01-09 2006-07-04 한국전력공사 원자로 핵계측 계통의 디지털 제어시스템 및 방법
KR100827567B1 (ko) * 2006-10-31 2008-05-07 한국전력공사 원자로 수위지시계통을 이용하지 않는 원자력발전소의 노심냉각 감시방법

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3314181A1 (de) * 1983-04-19 1984-10-25 Kraftwerk Union AG, 4330 Mülheim Verfahren zur ueberwachung der ermuedung von bauteilen, z.b. in kernkraftwerken
US4774050A (en) * 1986-04-10 1988-09-27 Westinghouse Electric Corp. Axial power distribution monitor and display using outputs from ex-core detectors and thermocouples
US5032978A (en) * 1986-05-05 1991-07-16 Westinghouse Electric Co. Status tree monitoring and display system
ES2043654T3 (es) * 1986-05-05 1994-01-01 Westinghouse Electric Corp Sistema de monitorizacion y presentacion visual de arboles de estados.
EP0275192A3 (en) * 1987-01-16 1989-07-19 General Electric Company Reconfigurable integrated controls and displays for a turbomachine
US4783307A (en) * 1987-03-05 1988-11-08 Commonwealth Edison Company Reactor control system verification
US4927594A (en) * 1988-08-10 1990-05-22 Westinghouse Electric Corp. Thermocouple based control rod position indication system
US5267278A (en) * 1989-11-02 1993-11-30 Combustion Engineering, Inc. Console for a nuclear control complex
US5227122A (en) * 1989-11-02 1993-07-13 Combustion Engineering, Inc. Display device for indicating the value of a parameter in a process plant
GB2272327B (en) * 1989-11-02 1994-09-28 Combustion Eng Display device
US5267277A (en) * 1989-11-02 1993-11-30 Combustion Engineering, Inc. Indicator system for advanced nuclear plant control complex
US5999583A (en) * 1996-04-29 1999-12-07 Westinghouse Electric Company Llc Method and apparatus for control rod drive mechanism analysis using coil current signals
US5963886A (en) * 1996-05-31 1999-10-05 Eskom Selective monitoring system
DE102004055107A1 (de) * 2004-11-15 2006-06-01 Abb Patent Gmbh System und Verfahren zur Status- und Fortschrittskontrolle eines technischen Prozesses oder eines technischen Projektes
EP2267650A1 (de) * 2009-06-25 2010-12-29 Hitachi Power Europe GmbH Zustandsorientierte Instandhaltung
JP5773565B2 (ja) * 2009-10-29 2015-09-02 三菱重工業株式会社 原子力発電プラントの運転支援装置及び運転支援方法
JP5631098B2 (ja) * 2010-08-02 2014-11-26 三菱重工業株式会社 原子力プラントの運転監視装置
CN103400623A (zh) * 2013-07-30 2013-11-20 中广核工程有限公司 核电站数字化仪控多样性保护方法和系统
CN103680654B (zh) * 2013-12-10 2016-08-17 中广核工程有限公司 用于核电厂主控室的控制方法及系统
US10191464B2 (en) * 2015-08-14 2019-01-29 Nuscale Power, Llc Notification management systems and methods for monitoring the operation of a modular power plant
FR3045179B1 (fr) * 2015-12-15 2018-01-26 Areva Np Dispositif electronique et procede de gestion de l'affichage de donnees pour le pilotage d'une centrale nucleaire, systeme de pilotage et produit programme d'ordinateur associes
CN106935285B (zh) * 2017-01-20 2018-06-01 中国核工业第五建设有限公司 Ap1000核电站安全壳形变检测方法
CN109473185B (zh) * 2018-11-13 2022-07-29 中国核动力研究设计院 一种自动化学停堆系统的测试装置及其测试方法
CN112687407B (zh) * 2020-12-28 2022-05-17 山东鲁能软件技术有限公司 一种核电站主泵状态监测诊断方法及系统

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1020481A (en) * 1961-09-08 1966-02-16 English Electric Co Ltd Alarm analysis system for a power station
US4318778A (en) * 1973-05-22 1982-03-09 Combustion Engineering, Inc. Method and apparatus for controlling a nuclear reactor
JPS6037919B2 (ja) * 1974-12-25 1985-08-29 株式会社東芝 原子力発電所の自動運転制御装置
US4007595A (en) * 1975-09-30 1977-02-15 Westinghouse Electric Corporation Dual turbine power plant and a reheat steam bypass flow control system for use therein
US4263654A (en) * 1976-09-28 1981-04-21 Hitachi, Ltd. System for determining the normal operating value of power plant data
CH619509A5 (ko) * 1977-01-31 1980-09-30 Bbc Brown Boveri & Cie
US4187144A (en) * 1977-05-23 1980-02-05 Westinghouse Electric Corp. Nuclear reactor power supply
US4290851A (en) * 1979-01-29 1981-09-22 The Babcock & Wilcox Company Nuclear reactor safety system
US4292129A (en) * 1979-02-14 1981-09-29 Westinghouse Electric Corp. Monitoring of operating processes
JPS55149900A (en) * 1979-05-11 1980-11-21 Hitachi Ltd Power control device for bwr type reactor
US4421716A (en) * 1980-12-29 1983-12-20 S. Levy, Inc. Safety monitoring and reactor transient interpreter
US4470948A (en) * 1981-11-04 1984-09-11 Westinghouse Electric Corp. Suppression of malfunction under water-solid conditions
US4459259A (en) * 1982-06-29 1984-07-10 The United States Of America As Represented By The United States Department Of Energy Digital computer operation of a nuclear reactor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100596603B1 (ko) * 2004-01-09 2006-07-04 한국전력공사 원자로 핵계측 계통의 디지털 제어시스템 및 방법
KR100827567B1 (ko) * 2006-10-31 2008-05-07 한국전력공사 원자로 수위지시계통을 이용하지 않는 원자력발전소의 노심냉각 감시방법

Also Published As

Publication number Publication date
FR2519464A1 (fr) 1983-07-08
EP0083546A1 (fr) 1983-07-13
KR900008661B1 (ko) 1990-11-26
FR2519464B1 (ko) 1984-02-24
US4585609A (en) 1986-04-29
ZA829095B (en) 1983-09-28
EP0083546B1 (fr) 1985-08-14
ES8405188A1 (es) 1984-05-16
ES518682A0 (es) 1984-05-16
JPS58120195A (ja) 1983-07-16
DE3265471D1 (en) 1985-09-19
YU286982A (en) 1991-04-30

Similar Documents

Publication Publication Date Title
KR840003125A (ko) 원자력 발전소 감시방법
JPS55131852A (en) Fail-safe unit of control computer
Guarro et al. The logic flowgraph: a new approach to process failure modeling and diagnosis for disturbance analysis applications
CA2225774C (en) Integrated self diagnostic control system
KR890004341A (ko) 비상 정지 장치의 고장시 가압수형 원자로의 보호 방법
JPS5617404A (en) Plant-state supervising method
KR870006585A (ko) 대부하손실에 무감각한 낙하봉 보호시스템 및 방법
Schuss Distributed control with universal program
KR960011748A (ko) 전력계통 보호계전기의 모니터링장치
CN113299419B (zh) 核电厂操纵员控制盘台的切换方法、装置、设备及介质
JPS6334482B2 (ko)
JPS614996A (ja) サンプポンプによる漏洩検知システム
DE19635225C2 (de) Temperaturkontrolleinrichtung für einen Computer
JPS57203130A (en) Data input controller
JPS5682955A (en) Multiple computer system
Greenberg Software Safety Using FTA Technique
Goethe ALARM ANALYSIS—AN APPROACH TO REDUCE INFORMATION LOAD FOR OPERATORS
JPS6441002A (en) Countermeasure device for abnormality of programmable controller
JPS60152989A (ja) 原子炉の核計装装置
JPS5736313A (en) Monitoring system
Lupton et al. Improving CANDU annunciation-Current R and D and future directions
JPS54158554A (en) Drainage pressure control device for feed-water heater and deairizer in power plant
Monta et al. Research and development for man-machine system of BWR nuclear power plants.
Feely et al. Review of tritium monitoring capabilities for application in effluent monitoring, process control monitoring and environmental surveillance for the New Production Reactors Program
JPS5482197A (en) Abnomal alarm supervisory equipment