KR20210055391A - Application service system for managing project and comunication - Google Patents

Application service system for managing project and comunication Download PDF

Info

Publication number
KR20210055391A
KR20210055391A KR1020190141778A KR20190141778A KR20210055391A KR 20210055391 A KR20210055391 A KR 20210055391A KR 1020190141778 A KR1020190141778 A KR 1020190141778A KR 20190141778 A KR20190141778 A KR 20190141778A KR 20210055391 A KR20210055391 A KR 20210055391A
Authority
KR
South Korea
Prior art keywords
project
feedback
participant
management unit
progress
Prior art date
Application number
KR1020190141778A
Other languages
Korean (ko)
Other versions
KR102256072B1 (en
Inventor
김문숙
Original Assignee
주식회사 사람과가치연구소
김문숙
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 사람과가치연구소, 김문숙 filed Critical 주식회사 사람과가치연구소
Priority to KR1020190141778A priority Critical patent/KR102256072B1/en
Publication of KR20210055391A publication Critical patent/KR20210055391A/en
Application granted granted Critical
Publication of KR102256072B1 publication Critical patent/KR102256072B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1091Recording time for administrative or management purposes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063118Staff planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1093Calendar-based scheduling for persons or groups

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to an application service system for project management and communication and the technical objective of the present invention is to implement a computer program which enables each of the multiple participants to register the progress of each task of a project in real-time to check and share the same through a visual method and exchanges opinions on the progress of an individual task or the project with other participants, thereby facilitating comprehensive checking for the detailed progress of the project and making the planned project progress. For example, the application service system comprises: a project management unit receiving individual task progress information of a project in progress from each participant to share and manage the progress and schedule of the project among the participants; a feedback management unit requesting and registering feedback of a message form among the participants on the progress of the project shared through the project management unit; a notification service unit providing a notification service for project registration through the project management unit and a feedback request through the feedback management unit; and a participant personal management unit managing and providing individual task information for each participant on the basis of the individual task progress information of the project and managing participation activities with respect to check-in/check-out for each participant.

Description

프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템{APPLICATION SERVICE SYSTEM FOR MANAGING PROJECT AND COMUNICATION}Application service system for project management and communication {APPLICATION SERVICE SYSTEM FOR MANAGING PROJECT AND COMUNICATION}

본 발명의 실시예는 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템에 관한 것이다.An embodiment of the present invention relates to an application service system for project management and communication.

다수의 인원이 참여하는 프로젝트를 진행함에 있어서 다수의 참여자가 하나의 프로젝트의 각 과제 별 진행상황에 대한 기록, 피드백 및 공유를 위해 각자 작업한 내용이 저장된 파일을 파일서버, 이메일, 클라우드 서버(Cloud Server) 또는 단톡방 등을 통해 업로드 및 다운로드 하여 서로 교환함으로써 작업내용의 협업이나 공유가 이루어지고 있다.In the process of a project in which a large number of people participate, a file server, e-mail, and cloud server (cloud server) where a number of participants saves their work for recording, feedback, and sharing on the progress of each task in a single project. Server) or through a chat room, uploading and downloading, and exchanging with each other, collaboration or sharing of work contents is achieved.

그러나 이러한 방법은, 각각의 참여자가 전체적인 내용이 아닌 부분적인 내용만을 이용하게 되므로, 해당 프로젝트의 전체적인 진행상황이나 흐름을 파악하기 쉽지 않고, 참여자의 개별 과제에 대하여 문서나 이미지를 이용해 의견을 직접 주고받으며 프로젝트 과정을 기록하는 과정에 있어서 제한이 많기 때문에 프로젝트의 진행상황을 개별 과제 별로 정확히 파악하는데 한계가 있다.However, in this method, since each participant uses only partial contents, not the whole contents, it is not easy to grasp the overall progress or flow of the project, and directly give opinions using documents or images on each participant's task. There are many limitations in the process of receiving and recording the project process, so there is a limit to accurately grasp the progress of the project for each individual task.

더욱이, 프로젝트 관리를 위한 의사결정이나 개인 의견을 주고 받는 과정은 대부분 별도의 시스템을 이용하거나, 오프라인을 통해 직접 만나서 해결해야 하므로, 다수의 프로젝트 참여자가 한꺼번에 같은 장소에 모이는 경우에는 시간적, 공간적 제약이 커지는 문제가 있다.Moreover, since most of the process of making decisions for project management or exchanging personal opinions must be resolved by using a separate system or meeting in person through offline, time and space constraints are limited when multiple project participants are gathered in the same place at the same time. There is a growing problem.

공개특허공보 제10-2017-0109458호(공개일자: 2017년09월29일)Unexamined Patent Publication No. 10-2017-0109458 (Publication date: September 29, 2017) 공개특허공보 제10-2019-0014364호(공개일자: 2019년02월12일)Unexamined Patent Publication No. 10-2019-0014364 (Publication date: February 12, 2019)

본 발명의 실시예는, 다수의 참여자 각자가 실시간으로 프로젝트의 개별 과제에 대한 진행상황을 등록하여 시각적인 방식을 통해 확인 및 공유하고, 다른 참여자들로부터 개별 과제의 진행상황 또는 프로젝트에 대한 의견을 주고받는 어플리케이션을 구현함으로써 프로젝트의 세부적인 진행상황에 대한 총괄적인 확인이 용이하며 계획적인 프로젝트가 진행되도록 하는 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템을 제공한다.In an embodiment of the present invention, each of a plurality of participants registers the progress of an individual project of a project in real time, checks and shares it through a visual method, and receives the progress of the individual project or an opinion on the project from other participants. By implementing the exchange application, it is easy to comprehensively check the detailed progress of the project, and it provides an application service system for project management and communication that enables the planned project to proceed.

본 발명의 실시예에 따른 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템은, 참여자로부터 진행중인 프로젝트의 개별과제 진행정보를 각각 등록 받아 참여자 간에 프로젝트의 진행상황과 진행일정을 공유 및 관리하는 프로젝트 관리부; 상기 프로젝트 관리부를 통해 공유되는 프로젝트의 진행상황에 대하여 참여자 간에 메시지 형식의 피드백을 등록하여 요청하는 피드백 관리부; 상기 프로젝트 관리부를 통한 프로젝트 등록, 상기 피드백 관리부를 통한 피드백 요청에 대한 알림 서비스를 제공하는 알림 서비스부; 및 상기 프로젝트의 개별과제 진행정보를 기반으로 참여자 별로 개별과제정보를 관리하여 제공하고, 참여자 별로 체크인-아웃에 대한 참여 활동을 관리하는 참여자 개인 관리부를 포함한다.An application service system for project management and communication according to an embodiment of the present invention includes: a project management unit that receives individual project progress information of an ongoing project from a participant, and shares and manages a project progress status and a progress schedule among participants; A feedback management unit for registering and requesting feedback in the form of a message between participants on the progress of a project shared through the project management unit; A notification service unit providing a notification service for a project registration through the project management unit and a feedback request through the feedback management unit; And a participant personal management unit that manages and provides individual task information for each participant based on the individual task progress information of the project, and manages participation activities for check-in-out for each participant.

또한, 상기 프로젝트 관리부는, 프로젝트 명칭, 조직 명칭, 프로젝트 관리자 또는 리더, 프로젝트 참여자, 및 프로젝트 시작일과 종료일에 대한 정보를 입력 받아 프로젝트를 생성하는 프로젝트 생성부; 상기 프로젝트 시작일과 종료일에 대한 프로젝트 기간, 및 참여자가 관리자 또는 리더로 등록된 프로젝트, 진행중인 프로젝트, 완료된 프로젝트, 참여자 관련 전체 프로젝트로 분류된 프로젝트 유형에 따른 조건을 선택하여 프로젝트를 검색하는 프로젝트 검색부; 프로젝트의 명칭과 진행상황 그래프를 포함하는 프로젝트 요약정보를 프로젝트 카드 형식 또는 리스트 형식으로 제공하고, 상기 프로젝트 요약정보 각각에 대하여 참여자 별 개별과제 진행정보를 카드 형식 또는 타임라인 형식으로 제공하며, 참여자 별로 프로젝트 과제에 대한 완료, 추가 및 삭제를 관리하는 프로젝트 상세정보 제공부; 및 프로젝트 별로 참여자에 대한 추가 및 삭제를 관리하는 프로젝트 참여자 관리부를 포함할 수 있다.In addition, the project management unit may include a project generation unit for generating a project by receiving information on a project name, an organization name, a project manager or leader, a project participant, and a project start date and end date; A project search unit for searching for a project by selecting a project period for the project start date and end date, and a condition according to a project type classified into a project in which a participant is registered as a manager or leader, an ongoing project, a completed project, and all projects related to a participant; Project summary information including the project name and progress graph is provided in the form of a project card or list, and individual task progress information for each participant is provided in the form of a card or timeline for each of the above project summary information. Project detail information providing unit that manages completion, addition, and deletion of project assignments; And a project participant management unit that manages addition and deletion of participants for each project.

또한, 상기 피드백 관리부는, 프로젝트의 특정 참여자를 지정하여 개별과제에 대한 키워드 및 기 등록된 프로젝트의 개별과제를 선택 받고, 선택된 프로젝트의 개별과제에 대한 메시지 형식의 피드백을 입력 받아 해당 개별과제의 참여자에게 피드백을 요청하는 피드백 작성 및 요청부; 상기 피드백 작성 및 요청부를 통해 등록된 피드백에 대한 상세정보를 참여자 개인, 수신, 발신, 전체 별로 각각 분류하여 제공하고, 피드백을 요청한 참여자 또는 피드백을 요청 받은 참여자를 검색어로 입력 받아 제공하는 피드백 상세정보 제공부; 및 상기 피드백 상세정보 제공부를 통해 제공되는 피드백 상세정보에 대하여 참여자로부터 코멘트를 등록 받고 관리하는 피드백 커뮤니케이션 서비스부를 포함할 수 있다.In addition, the feedback management unit designates a specific participant of the project, selects a keyword for an individual task and an individual task of a previously registered project, receives feedback in the form of a message about the individual task of the selected project, and receives the feedback of the individual task. A feedback writing and requesting unit for requesting feedback from the customer Detailed information on the feedback registered through the feedback writing and requesting unit is categorized and provided by individual participants, received, sent, and all, and detailed feedback information provided by inputting the participant who requested the feedback or the participant who requested the feedback as a search word. Providing unit; And a feedback communication service unit that registers and manages comments from participants with respect to the detailed feedback information provided through the detailed feedback information providing unit.

또한, 상기 알림 서비스부는, 상기 프로젝트 관리부를 통한 프로젝트의 등록, 상기 피드백 관리부를 통한 피드백의 요청, 및 참여자의 체크인-아웃에 대한 카테고리 별로 알림 메시지를 리스트화하여 각각 제공하는 알림 메시지 관리부; 및 상기 알림 메시지 관리부를 통해 제공되는 알림 메시지의 확인 유무 또는 리액션 유무에 따라 알림 메시지를 상이하게 표시하는 알림 메시지 표시부를 포함할 수 있다.In addition, the notification service unit may include a notification message management unit for listing and providing notification messages by category for registration of a project through the project management unit, a request for feedback through the feedback management unit, and check-in-out of participants; And a notification message display unit differently displaying a notification message according to whether a notification message provided through the notification message management unit is checked or whether there is a reaction.

또한, 상기 참여자 개인 관리부는, 참여자의 프로필, 참여자의 체크인-아웃, 및 참여자의 프로젝트 별 개별과제 리스트를 제공 및 관리하는 개인 참여정보 관리부; 및 참여자의 체크인-아웃에 따른 참여 활동 지수에 기초하여 일정 포인트가 적립되어 레벨이 책정되며, 참여자의 체크인 날짜 별로 참여자의 감정 정보를 입력 받아 관리하는 개인 참여활동 관리부를 포함할 수 있다.In addition, the participant personal management unit may include a personal participation information management unit for providing and managing a participant's profile, a check-in-out of the participant, and a list of individual tasks for each participant's project; And a level is determined by accumulating certain points based on the participation activity index according to the check-in-out of the participant, and a personal participation activity management unit receiving and managing emotion information of the participant for each check-in date of the participant.

또한, 프로젝트의 참여자 정보의 확인이 가능하고, 상기 프로젝트 관리부를 통해 공유되는 프로젝트의 과제진행상황에 대하여 각 참여자에게 메시지 형식의 피드백을 등록하여 요청하고, 프로젝트의 참여자에게 체크 아웃을 요청하기 위한 프로젝트의 관리자 페이지를 제공하는 관리자 프로젝트 관리부를 더 포함할 수 있다.In addition, it is possible to check the information of the participants of the project, to register and request feedback in the form of a message to each participant on the project progress of the project shared through the project management unit, and to request checkout from the project participants. It may further include a manager project management unit that provides a manager page of.

본 발명에 따르면, 다수의 참여자 각자가 실시간으로 프로젝트의 개별 과제에 대한 진행상황을 등록하여 시각적인 방식을 통해 확인 및 공유하고, 다른 참여자들로부터 개별 과제의 진행상황 또는 프로젝트에 대한 의견을 주고받는 어플리케이션을 구현함으로써 프로젝트의 세부적인 진행상황에 대한 총괄적인 확인이 용이하며 계획적인 프로젝트가 진행되도록 하는 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템을 제공할 수 있다.According to the present invention, each of the plurality of participants registers the progress of the individual project of the project in real time, checks and shares it through a visual method, and exchanges opinions on the progress of the individual project or the project from other participants. By implementing the application, it is easy to comprehensively check the detailed progress of the project, and it is possible to provide an application service system for project management and communication that enables the planned project to proceed.

도 1은 본 발명의 실시예에 따른 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템에 대한 개요도이다.
도 2는 본 발명의 실시예에 따른 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템의 전체 구성을 나타낸 블록도이다.
도 3은 본 발명의 실시예에 따른 프로젝트 관리부의 세부 구성을 나타낸 블록도이다.
도 4는 본 발명의 실시예에 따른 피드백 관리부의 세부 구성을 나타낸 블록도이다.
도 5는 본 발명의 실시예에 따른 알림 서비스부의 세부 구성을 나타낸 블록도이다.
도 6은 본 발명의 실시예에 따른 참여자 개인 관리부의 세부 구성을 나타낸 블록도이다.
도 7 및 도 8은 본 발명의 실시예에 따른 회원 관리부의 실행화면을 나타낸 도면이다.
도 9 내지 도 31은 본 발명의 실시예에 따른 프로젝트 관리부의 실행 화면을 나타낸 도면이다.
도 도 32는 본 발명의 실시예에 따른 알림 서비스부의 실행 화면을 나타낸 도면이다.
도 33 및 도 41은 본 발명의 실시예에 따른 참여자 개인 관리부의 실행 화면을 나타낸 도면이다.
도 41 내지 도 44는 본 발명의 실시예에 따른 관리자 프로젝트 관리부의 실행 화면을 나타낸 도면이다.
1 is a schematic diagram of an application service system for project management and communication according to an embodiment of the present invention.
2 is a block diagram showing the overall configuration of an application service system for project management and communication according to an embodiment of the present invention.
3 is a block diagram showing a detailed configuration of a project management unit according to an embodiment of the present invention.
4 is a block diagram showing a detailed configuration of a feedback management unit according to an embodiment of the present invention.
5 is a block diagram showing a detailed configuration of a notification service unit according to an embodiment of the present invention.
6 is a block diagram showing a detailed configuration of a participant personal management unit according to an embodiment of the present invention.
7 and 8 are views showing an execution screen of a member management unit according to an embodiment of the present invention.
9 to 31 are views showing execution screens of a project management unit according to an embodiment of the present invention.
32 is a diagram illustrating an execution screen of a notification service unit according to an embodiment of the present invention.
33 and 41 are views showing execution screens of a participant personal management unit according to an embodiment of the present invention.
41 to 44 are views showing execution screens of a manager project management unit according to an embodiment of the present invention.

본 명세서에서 사용되는 용어에 대해 간략히 설명하고, 본 발명에 대해 구체적으로 설명하기로 한다.The terms used in the present specification will be briefly described, and the present invention will be described in detail.

본 발명에서 사용되는 용어는 본 발명에서의 기능을 고려하면서 가능한 현재 널리 사용되는 일반적인 용어들을 선택하였으나, 이는 당 분야에 종사하는 기술자의 의도 또는 판례, 새로운 기술의 출현 등에 따라 달라질 수 있다. 또한, 특정한 경우는 출원인이 임의로 선정한 용어도 있으며, 이 경우 해당되는 발명의 설명 부분에서 상세히 그 의미를 기재할 것이다. 따라서 본 발명에서 사용되는 용어는 단순한 용어의 명칭이 아닌, 그 용어가 가지는 의미와 본 발명의 전반에 걸친 내용을 토대로 정의되어야 한다.Terms used in the present invention have selected general terms that are currently widely used as possible while taking functions of the present invention into consideration, but this may vary according to the intention or precedent of a technician working in the field, the emergence of new technologies, and the like. In addition, in certain cases, there are terms arbitrarily selected by the applicant, and in this case, the meaning of the terms will be described in detail in the description of the corresponding invention. Therefore, the terms used in the present invention should be defined based on the meaning of the term and the overall contents of the present invention, not a simple name of the term.

명세서 전체에서 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있음을 의미한다. 또한, 명세서에 기재된 "...부", "모듈" 등의 용어는 적어도 하나 이상의 기능이나 동작을 처리하는 단위를 의미하며, 이는 하드웨어 또는 소프트웨어로 구현되거나 하드웨어와 소프트웨어의 결합으로 구현될 수 있다.When a part of the specification is said to "include" a certain component, it means that other components may be further included rather than excluding other components unless specifically stated to the contrary. In addition, terms such as "... unit" and "module" described in the specification mean a unit that processes at least one function or operation, which may be implemented as hardware or software or a combination of hardware and software. .

아래에서는 첨부한 도면을 참고하여 본 발명의 실시예에 대하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다. Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those of ordinary skill in the art may easily implement the present invention. However, the present invention may be implemented in various different forms and is not limited to the embodiments described herein. In the drawings, parts irrelevant to the description are omitted in order to clearly describe the present invention, and similar reference numerals are attached to similar parts throughout the specification.

도 1은 본 발명의 실시예에 따른 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템에 대한 개요도이고, 도 2는 본 발명의 실시예에 따른 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템의 전체 구성을 나타낸 블록도이고, 도 3은 본 발명의 실시예에 따른 프로젝트 관리부의 세부 구성을 나타낸 블록도이고, 도 4는 본 발명의 실시예에 따른 피드백 관리부의 세부 구성을 나타낸 블록도이고, 도 5는 본 발명의 실시예에 따른 알림 서비스부의 세부 구성을 나타낸 블록도이고, 도 6은 본 발명의 실시예에 따른 참여자 개인 관리부의 세부 구성을 나타낸 블록도이고, 도 7 및 도 8은 본 발명의 실시예에 따른 회원 관리부의 실행화면을 나타낸 도면이고, 도 9 내지 도 31은 본 발명의 실시예에 따른 프로젝트 관리부의 실행 화면을 나타낸 도면이고, 도 도 32는 본 발명의 실시예에 따른 알림 서비스부의 실행 화면을 나타낸 도면이고, 도 33 및 도 41은 본 발명의 실시예에 따른 참여자 개인 관리부의 실행 화면을 나타낸 도면이고, 도 41 내지 도 44는 본 발명의 실시예에 따른 관리자 프로젝트 관리부의 실행 화면을 나타낸 도면이고, 1 is a schematic diagram of an application service system for project management and communication according to an embodiment of the present invention, and FIG. 2 is a block diagram showing the overall configuration of an application service system for project management and communication according to an embodiment of the present invention. 3 is a block diagram showing a detailed configuration of a project management unit according to an embodiment of the present invention, FIG. 4 is a block diagram showing a detailed configuration of a feedback management unit according to an embodiment of the present invention, and FIG. A block diagram showing a detailed configuration of a notification service unit according to an embodiment, FIG. 6 is a block diagram showing a detailed configuration of a participant personal management unit according to an embodiment of the present invention, and FIGS. 7 and 8 are A diagram showing an execution screen of a member management unit, FIGS. 9 to 31 are diagrams showing an execution screen of a project management unit according to an embodiment of the present invention, and FIG. 32 is an execution screen of a notification service unit according to an embodiment of the present invention. 33 and 41 are views showing an execution screen of a participant personal management unit according to an embodiment of the present invention, and FIGS. 41 to 44 are views showing an execution screen of a manager project management unit according to an embodiment of the present invention ego,

도 1을 참조하면, 본 실시예에 따른 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템(100)은 참여자(관리자, 리더, 일반 참여자로 구성)의 통신단말(10A, 10B)에 설치된 어플리케이션 형태로 구현될 수 있으며, 인터넷을 통해 프로젝트 관리서버(20)와 연결되어 참여자가 기록한 각종 정보들을 저장 관리하며 이를 어플리케이션 혹은 프로젝트 관리서버(20)에서 프로젝트 별로 가공하여 관리 운영할 수 있다.Referring to FIG. 1, the application service system 100 for project management and communication according to the present embodiment may be implemented in the form of an application installed in the communication terminals 10A and 10B of participants (composed of a manager, a leader, and a general participant). In addition, it is connected to the project management server 20 through the Internet to store and manage various information recorded by the participant, and it can be processed and managed for each project in the application or the project management server 20.

본 실시예에 따른 프로젝트 관리를 위한 어플리케이션이 설치되는 통신단말(10A, 10B)은 PCS(Personal Communication System), GSM(Global System for Mobile communications), PDC(Personal Digital Cellular), PHS(Personal Handyphone System), PDA(Personal Digital Assistant), IMT(International Mobile Telecommunication)-2000, CDMA(Code Division Multiple Access)-2000, W-CDMA(W-Code Division Multiple Access), Wibro(Wireless Broadband Internet) 단말, 스마트폰(smartphone), 스마트 패드(smart pad), 타블렛 PC(Tablet PC) 등과 같은 휴대통신기기 뿐만 아니라, 일반 PC를 포함할 수도 있다.The communication terminals 10A and 10B on which the application for project management according to the present embodiment is installed are PCS (Personal Communication System), GSM (Global System for Mobile communications), PDC (Personal Digital Cellular), PHS (Personal Handyphone System) , PDA (Personal Digital Assistant), IMT (International Mobile Telecommunication)-2000, CDMA (Code Division Multiple Access)-2000, W-CDMA (W-Code Division Multiple Access), Wibro (Wireless Broadband Internet) terminal, smartphone ( smartphone), a smart pad, a tablet PC, etc., as well as a general PC.

또한, 프로젝트 관리서버(20)는 하드웨어적으로는 통상적인 웹 서버와 동일한 구성을 가지며, 소프트웨어적으로는 C, C++, Java, Visual Basic, Visual C 등과 같은 다양한 형태의 언어를 통해 구현되어 여러 가지 기능을 하는 프로그램 모듈을 포함할 수 있다. 또한, 일반적인 서버용 하드웨어에 도스(dos), 윈도우(window), 리눅스(linux), 유닉스(unix), 매킨토시(macintosh) 등의 운영 체제에 따라 다양하게 제공되고 있는 웹 서버 프로그램을 이용하여 구현될 수 있다.In addition, the project management server 20 has the same configuration as a typical web server in terms of hardware, and is implemented through various types of languages such as C, C++, Java, Visual Basic, Visual C, etc. in software. It may include a functional program module. In addition, it can be implemented using web server programs that are variously provided according to operating systems such as dos, windows, linux, unix, and macintosh in general server hardware. have.

또한, 프로젝트 관리서버(20)는 네트워크를 통해 애완동물 보호자의 통신단말(10)과 각각 연결되며, 이러한 네트워크의 일 예에는 RF, 3GPP(3rd Generation Partnership Project) 네트워크, LTE(Long Term Evolution) 네트워크, 5GPP(5rd Generation Partnership Project) 네트워크, WIMAX(World Interoperability for Microwave Access) 네트워크, 인터넷(Internet), LAN(Local Area Network), Wireless LAN(Wireless Local Area Network), WAN(Wide Area Network), PAN(Personal Area Network), 블루투스(Bluetooth) 네트워크, NFC 네트워크, 위성 방송 네트워크, 아날로그 방송 네트워크, DMB(Digital Multimedia Broadcasting) 네트워크 등이 포함되나 이에 한정되지는 않는다.In addition, the project management server 20 is connected to the communication terminal 10 of the pet guardian through a network, respectively, and examples of such networks include RF, 3GPP (3rd Generation Partnership Project) network, and LTE (Long Term Evolution) network. , 5GPP (5rd Generation Partnership Project) network, WIMAX (World Interoperability for Microwave Access) network, Internet, LAN (Local Area Network), Wireless LAN (Wireless Local Area Network), WAN (Wide Area Network), PAN ( Personal Area Network), a Bluetooth network, an NFC network, a satellite broadcasting network, an analog broadcasting network, a Digital Multimedia Broadcasting (DMB) network, and the like.

도 2를 참조하면, 본 발명의 실시예에 따른 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템(100)은 회원 관리부(110), 프로젝트 관리부(120), 피드백 관리부(130), 알림 서비스부(140), 참여자 개인 관리부(150) 및 관리자 프로젝트 관리부(160) 중 적어도 하나를 포함한다.Referring to FIG. 2, an application service system 100 for project management and communication according to an embodiment of the present invention includes a member management unit 110, a project management unit 120, a feedback management unit 130, and a notification service unit 140. , Includes at least one of the individual participant management unit 150 and the manager project management unit 160.

상기 회원 관리부(110)는, 프로젝트 회사등록, 참여자 별로 로그인, 로그아웃, 회원가입 등의 처리를 수행할 수 있다. The member management unit 110 may register a project company, log in, log out, and register as a member for each participant.

예를 들어, 도 7에 도시된 바와 같이 최초 어플리케이션 실행 시 로그인 화면이 제공되며, 해당 화면 내 아이디(이메일 주소 등)와 비밀번호를 입력할 수 있도록 하며, 아이디 또는 비밀번호가 기억나지 않는 경우, 아이디 입력 후 인증 메일을 통해 임시 비밀번호를 발급 받은 후, 이용할 비밀번호를 재 설정할 수 있다.For example, as shown in Fig. 7, a login screen is provided when the first application is executed, and an ID (email address, etc.) and a password in the screen can be entered. If the ID or password is not remembered, input the ID After receiving a temporary password through the authentication e-mail, you can reset the password to be used.

또한, 도 8에 도시된 바와 같이, 회원가입 시 아이디(중복확인 필수), 비밀번호, 이름, 회사 소속, 회사코드를 입력하여 회원가입 절차를 진행할 수 있다. 회사코드는 관리 사이트에서 회사 별로 별도 발급 받을 수 있으며, 선택적으로 입력하여 회원가입 절차를 진행할 수 있다. In addition, as shown in FIG. 8, when registering as a member, an ID (requires duplicate confirmation), a password, a name, a company affiliation, and a company code may be entered to proceed with the membership registration process. The company code can be issued separately for each company on the management site, and can be entered selectively to proceed with the membership registration process.

상기 프로젝트 관리부(120)는, 참여자로부터 진행중인 프로젝트의 개별과제 진행정보를 각각 등록 받아 참여자 간에 프로젝트의 진행상황과 진행일정을 공유 및 관리할 수 있다.The project management unit 120 may receive individual project progress information of an ongoing project from participants, and share and manage the progress status and progress schedule of the project among participants.

이를 위해, 프로젝트 관리부(120)는 프로젝트 생성부(121), 프로젝트 검색부(122), 프로젝트 상세정보 제공부(123) 및 프로젝트 참여자 관리부(124) 중 적어도 하나를 포함할 수 있다.To this end, the project management unit 120 may include at least one of a project generation unit 121, a project search unit 122, a project detailed information providing unit 123, and a project participant management unit 124.

상기 프로젝트 생성부(121)는, 프로젝트 명칭, 조직 명칭, 프로젝트 관리자 또는 리더, 프로젝트 참여자, 및 프로젝트 시작일과 종료일에 대한 정보를 입력 받아 프로젝트를 생성할 수 있다.The project generator 121 may generate a project by receiving information on a project name, an organization name, a project manager or leader, a project participant, and a project start date and end date.

예를 들어, 도 9 및 도 10에 도시된 바와 같이 프로젝트명, 조직명, 프로젝트 매니저(관리자), 프로젝트 리더(또는 관리자가 될 수 있음), 프로젝트 멤버 초대(참여자 선택), 프로젝트 시작일/종료일을 각각 입력할 수 있다. 이후, 'Objective' 항목에는 프로젝트에서 달성하고자 하는 목표를 입력할 수 있으며, 'Key Results' 항목에는 목표 실현 시 해당 상황을 수치화한 내용을 입력하고, 'Keyword' 항목에는 프로젝트와 관련된 키워드를 입력할 수 있다. 또한, 프로젝트에 대한 공개범위(전체공개 또는 멤버공개)를 설정하여 프로젝트를 생성 또는 추가할 수 있다.For example, as shown in Figs. 9 and 10, the project name, organization name, project manager (manager), project leader (or can be a manager), project member invitation (participant selection), and project start/end dates. Each can be entered. After that, in the'Objective' field, you can enter the goal you want to achieve in the project, in the'Key Results' field, you can enter the numerical content of the situation when the goal is realized, and in the'Keyword' field, you can enter keywords related to the project. I can. In addition, you can create or add a project by setting the disclosure scope (open to all or open to members) for the project.

상기 프로젝트 검색부(122)는, 프로젝트 시작일과 종료일에 대한 프로젝트 기간, 및 참여자가 관리자 또는 리더로 등록된 프로젝트, 진행중인 프로젝트, 완료된 프로젝트, 참여자 관련 전체 프로젝트로 분류된 프로젝트 유형에 따른 조건을 선택하여 프로젝트를 검색할 수 있다.The project search unit 122 selects a project period for a project start date and an end date, and conditions according to a project type classified into a project in which a participant is registered as a manager or leader, an ongoing project, a completed project, and all projects related to participants. You can search for a project.

예를 들어, 도 11 및 도 12에 도시된 바와 같이 '조회기간'과 '유형선택'에 따른 두 가지 방식으로 프로젝트를 검색할 수 있다. 여기서, '조회기간' 방식의 검색은 제시된 특정 개월 수를 선택하여 해당 개월 수 내에 진행되고 있는 프로젝트를 검색하거나, 조회기간에 대한 텍스트를 직접 입력하는 방식을 통해 검색할 수 있다. 그리고, '유형선택' 방식은 '나의 프로젝트', '진행중인 프로젝트', '완료된 프로젝트', '전체 프로젝트'와 같이 특정 유형 별로 분류된 프로젝트 그룹 단위의 검색이 가능하다. For example, as shown in FIGS. 11 and 12, it is possible to search for a project in two ways according to'retrieval period' and'type selection'. Here, the search in the'retrieval period' method may be performed by selecting a specific number of months presented and searching for a project in progress within that number of months, or through a method of directly inputting text for the inquiry period. In addition, the'select type' method enables searching in units of project groups classified by specific type, such as'My Project','In Progress','Completed Project', and'All Projects'.

한편, '조회기간' 방식을 통한 검색 시 제시된 특정 개월 수를 선택하는 경우 날짜선택 대화상자를 이용하여 입력할 수 있으며, 프로젝트 관련 키워드를 직접 입력하는 방식의 조회도 가능하다.On the other hand, in the case of selecting a specific number of months presented when searching through the'inquiry period' method, it can be entered using the date selection dialog box, and inquiries by directly entering project-related keywords are also possible.

상기 프로젝트 상세정보 제공부(123)는, 프로젝트의 명칭과 진행상황 그래프를 포함하는 프로젝트 요약정보를 프로젝트 카드 형식 또는 리스트 형식으로 제공하고, 해당 프로젝트 요약정보 각각에 대하여 참여자 별 개별과제 진행정보를 카드 형식 또는 타임라인 형식으로 제공하며, 참여자 별로 프로젝트 과제에 대한 완료, 추가 및 삭제를 관리할 수 있다.The project detailed information providing unit 123 provides project summary information including a project name and progress graph in a project card format or a list format, and individual task progress information for each participant in a card for each corresponding project summary information. It is provided in a format or timeline format, and it is possible to manage completion, addition, and deletion of project assignments for each participant.

예를 들어, 도 13 및 도 14에 도시된 바와 같이 프로젝트 상세정보 메인 화면에는 진행 중인 프로젝트 명칭과 기본 정보가 미리보기 방식으로 표시되고, 대한 진행률(상태값)이 바 또는 원형 등의 그래픽으로 표시될 수 있으며, 각 프로젝트의 미리보기 정보가 카드 형식(도 13) 또는 리스트 형식(도 14)으로 제공될 수 있다. 또한, 각 프로젝트에 프로젝트에 대한 진행률은 해당 프로젝트의 참여자 별 과제 진행결과에 대한 평균 값이 산출되어 그래픽으로 표시될 수 있다. 또한, 프로젝트 관리자 또는 리더의 페이지인 경우 프로젝트의 종료(조기종료), 계속 진행 등의 진행상황을 입력할 수 있다. For example, as shown in Figs. 13 and 14, the project detail information main screen displays the project name and basic information in progress in a preview method, and the progress (status value) is displayed in a graphic such as a bar or circle. The preview information of each project may be provided in a card format (FIG. 13) or a list format (FIG. 14). In addition, for each project, the progress rate for the project may be displayed graphically by calculating the average value of the project progress result for each participant of the project. In addition, in the case of the project manager or leader's page, you can enter the progress of the project, such as the end of the project (early termination) and continuation.

또한, 도 15 내지 도 17에 도시된 바와 같이 특정 프로젝트에 대한 상세 보기 페이지를 제공할 수 있으며, 해당 페이지에는 참여자 별 과제, 나의 과제, 나의 과제 추가, 프로젝트 수정/완료/삭제 등의 편집 등의 기능이 제공될 수 있다.In addition, as shown in Figs. 15 to 17, a detailed view page for a specific project can be provided, and the page includes assignments for each participant, my assignments, adding my assignments, editing, such as editing/completion/deletion of projects, etc. Functions can be provided.

한편, 도 18 및 도 19에 도시된 바와 같이 '나의 과제 추가' 항목 또는 '프로젝트 과제 +' 항목 선택 시 해당 프로젝트와 과제명을 선택하여 참여자 자신의 과제를 추가할 수 있고, 도 20 및 도 21에 도시된 바와 같이, 프로젝트 과제에서 안테나 모양의 찾기 버튼을 선택하면 '진행중인 과제', '완료된 과제', '나의 과제'의 목록이 팝업 창을 통해 표시되고, 원하는 카테고리로 분류된 과제 항목을 선택하면 해당 과제에 대한 프로젝트 상세정보를 타임라인 또는 리스트 형식으로 표시하여 제공할 수 있다.On the other hand, as shown in FIGS. 18 and 19, when selecting the'Add my task' item or the'Project task +'item, the participant's own task can be added by selecting the project and task name, and FIGS. 20 and 21 As shown in, if you select the antenna-shaped find button in the project assignment, the list of'In Progress','Completed Assignments', and'My Assignments' is displayed through a pop-up window, and the assignment items classified into the desired category are selected. If you do, you can display and provide detailed project information about the project in the form of a timeline or a list.

한편, 도 22에 도시된 바와 같이, 진행중인 과제, 완료된 과제, 나의 과제 등으로 각 과제 별 상태분류에 따른 필터링이 가능하며, 필터링된 프로젝트의 과제들이 표시될 수 있다.On the other hand, as shown in FIG. 22, filtering according to the status classification for each task is possible with tasks in progress, tasks completed, and my tasks, and tasks of the filtered project can be displayed.

상기 프로젝트 참여자 관리부(124)는 프로젝트 별로 참여자에 대한 추가 및 삭제를 관리할 수 있다.The project participant management unit 124 may manage addition and deletion of participants for each project.

예를 들어, 도 23에 도시된 바와 같이 '참여인원' 버튼을 선택하면, 해당 프로젝트에 참여하는 인원들의 리스트가 해당 참여자의 과제진행상황 등을 포함하여 표시되고, 도 24에 도시된 바와 같이 프로젝트 참여자는 해당 프로젝트의 멤버를 추가 및 초대할 수 있으며, 프로젝트 관리자 또는 리더는 프로젝트 참여자의 인원을 초대, 확인, 제외, 퇴사처리(제외 처리)를 할 수 있다. For example, as shown in FIG. 23, when the'number of participants' button is selected, a list of people participating in the project is displayed, including the project progress status of the participant, and the project as shown in FIG. 24 Participants can add and invite members of the project, and project managers or leaders can invite, check, exclude, and leave (exclusion processing) the number of project participants.

상기 피드백 관리부(130)는, 프로젝트 관리부(120)를 통해 공유되는 프로젝트의 진행상황에 대하여 참여자 간에 메시지 형식의 피드백을 등록하여 요청할 수 있다.The feedback management unit 130 may register and request feedback in the form of a message between participants regarding the progress of a project shared through the project management unit 120.

이를 위해, 피드백 관리부(130)는 피드백 작성 및 요청부(131), 피드백 상세정보 제공부(132) 및 피드백 커뮤니케이션 서비스부(133) 중 적어도 하나를 포함할 수 있다.To this end, the feedback management unit 130 may include at least one of a feedback writing and requesting unit 131, a detailed feedback information providing unit 132, and a feedback communication service unit 133.

상기 피드백 작성 및 요청부(131)는, 프로젝트의 특정 참여자를 지정하여 개별과제에 대한 키워드 및 기 등록된 프로젝트의 개별과제를 선택 받고, 선택된 프로젝트의 개별과제에 대한 메시지 형식의 피드백을 입력 받아 해당 개별과제의 참여자에게 피드백을 요청할 수 있다.The feedback writing and requesting unit 131 designates a specific participant of a project, selects a keyword for an individual task and an individual task of a previously registered project, receives feedback in a message format for the individual task of the selected project, and corresponds to the corresponding You can ask for feedback from participants in individual tasks.

예를 들어, 도 25에 도시된 바와 같이, 프로젝트의 참여자를 선택하면 해당 참여자에게 '피드백 작성하기' 버튼을 선택하면 해당 프로젝트 명과 과제를 선택한 후, 피드백 내용을 메시지 형태로 작성하는 입력 창을 포함하는 페이지로 전환되며, 피드백 내용을 모두 작성하면 '피드백 보내기' 버튼을 선택하여 피드백을 전달할 수 있다. 이때, 어플리케이션에서 제공하는 이모티콘도 함께 전송 가능하다. For example, as shown in FIG. 25, when a project participant is selected, when the'Create Feedback' button is selected for the participant, the project name and task are selected, and an input window for writing the feedback content in the form of a message is included. The page is switched to, and when all the feedback is written, you can send the feedback by selecting the'Send Feedback' button. At this time, the emoticon provided by the application can also be transmitted.

한편, 도 26에 도시된 바와 같이 받는 이, 프로젝트 명, 과제, 키워드, 피드백 작성 항목이 각각 표시되어 해당 항목을 입력한 후 피드백을 받을 해당 참여자에게 피드백이 전송될 수 있다. 이와 같은 방식으로 피드백 작성 시 도 27에 도시된 바와 같이 피드백 받는 이, 프로젝트, 과제, 키워드를 선택하는 방식을 통해 기본 항목을 입력할 수 있다. Meanwhile, as shown in FIG. 26, the recipient, the project name, the assignment, the keyword, and the feedback creation item are displayed respectively, and after inputting the corresponding item, the feedback may be transmitted to the corresponding participant who will receive the feedback. When writing the feedback in this way, as shown in FIG. 27, the basic item may be input through a method of selecting a person receiving feedback, a project, an assignment, and a keyword.

한편, 도 28에 도시된 바와 같이, 받는이, 프로젝트, 과제, 키워드를 각각 입력 받고, 피드백 작성 버튼을 선택하면 입력 창과 함께 키보드 인터페이스가 표시될 수 있다.Meanwhile, as shown in FIG. 28, when a recipient, a project, an assignment, and a keyword are respectively input and a feedback creation button is selected, a keyboard interface may be displayed along with an input window.

상기 피드백 상세정보 제공부(132)는, 피드백 작성 및 요청부(131)를 통해 등록된 피드백에 대한 상세정보를 참여자 개인, 수신, 발신, 전체 별로 각각 분류하여 제공하고, 피드백을 요청한 참여자 또는 피드백을 요청 받은 참여자를 검색어로 입력 받아 제공할 수 있다.The detailed feedback information providing unit 132 categorizes and provides detailed information on the feedback registered through the feedback writing and requesting unit 131 for each individual participant, receiving, sending, and overall, and the participant or feedback requesting the feedback. The participant who has been requested for can be provided by inputting it as a search word.

예를 들어, 도 289에 도시된 바와 같이, 기본적으로 어느 참여자가 어떤 내용의 피드백을 요청해왔는지에 대한 피드백 상세정보를 확인할 수 있으며, 피드백 중요도에 따른 별 점도 함께 확인 가능하다. 또한, 이러한 피드백 상세정보는 전체보기, 수신 별로 보기, 발신 별로 보기, 피드백 분석 등으로 분류하여 확인할 수 있으며, 피드백을 전송한 참여자가 작성한 코멘트를 메시지 형식으로 확인하고 응답할 수 있도록 해당 피드백을 기준으로 두 참여자 간의 채팅 기능을 제공할 수 있으며, 해당 피드백을 다른 참여자에게도 공개되어 그에 대한 댓글을 남길 수 있도록 구성될 수도 있다. 상술한 피드백 전체보기, 수신 별로 보기, 발신 별로 보기, 피드백 분석 기능은 에 참여자 개인 관리부(150)에서도 이용 가능한 기능이다.For example, as shown in FIG. 289, it is possible to check detailed feedback information on which participant has requested the feedback of what content, and a star according to the importance of the feedback can be checked together. In addition, such detailed feedback information can be checked by classifying it into full view, view by reception, view by sender, and feedback analysis, and the comments made by the participant who sent the feedback can be checked and responded in the form of a message. As a result, a chat function between two participants can be provided, and the corresponding feedback can be disclosed to other participants, so that a comment can be left. The above-described view of all feedback, view by reception, view by transmission, and feedback analysis functions are functions available in the individual participant management unit 150 as well.

한편, 도 29에 도시된 바와 같이 등록된 피드백은 수정 및 삭제 가능하다.Meanwhile, as shown in FIG. 29, the registered feedback can be modified and deleted.

상기 피드백 커뮤니케이션 서비스부(133)는, 피드백 상세정보 제공부(132)를 통해 제공되는 피드백 상세정보에 대하여 참여자로부터 코멘트를 등록 받고 관리할 수 있다. 이는, 피드백을 기준으로 두 참여자 간의 채팅 기능에 관한 것으로, 피드백을 받은 참여자와 피드백을 준 참여자 간의 채팅을 통한 커뮤니케이션을 형성하며, 이에 대한 내용이 게시글로 등록되면서 도 30에 도시된 바와 같이 다른 참여자들의 댓글도 작성할 수 있다. 또한, 작성된 댓글은 수정 및 삭제도 가능하다. The feedback communication service unit 133 may register and manage a comment from a participant with respect to the detailed feedback information provided through the detailed feedback information providing unit 132. This relates to a chat function between two participants based on the feedback, and forms communication through chat between the participant who received the feedback and the participant who gave the feedback. You can also write comments of people. In addition, written comments can be edited and deleted.

한편, 피드백이나 댓글 등의 메시지 작성 시 도 31에 도시된 바와 같이 칭찬, 위로, 분노 등의 카테고리 별로 다양한 표정의 이모티콘을 추가하여 상황이나 의사를 보다 효과적으로 전달할 수 있다.On the other hand, when writing a message such as feedback or comment, as shown in FIG. 31, emoticons with various facial expressions may be added for each category such as praise, consolation, and anger, so that situations or intentions can be more effectively communicated.

상기 알림 서비스부(140)는, 프로젝트 관리부(120)를 통한 프로젝트 등록, 피드백 관리부(130)를 통한 피드백 요청, 및 프로젝트 관리부(120)의 참여자 체크인-아웃에 대한 알림 서비스를 제공할 수 있다.The notification service unit 140 may provide a notification service for project registration through the project management unit 120, a feedback request through the feedback management unit 130, and check-in-out of a participant of the project management unit 120.

이를 위해, 알림 서비스부(140)는 알림 메시지 관리부(141)와 알림 메시지 표시부(142) 중 적어도 하나를 포함할 수 있다.To this end, the notification service unit 140 may include at least one of a notification message management unit 141 and a notification message display unit 142.

상기 알림 메시지 관리부(141)는, 프로젝트 관리부(120)를 통한 프로젝트의 등록, 피드백 관리부(130)를 통한 피드백의 요청, 및 프로젝트 관리부(120)의 참여자 체크인-아웃에 대한 카테고리 별로 알림 메시지를 리스트화하여 각각 제공할 수 있다.The notification message management unit 141 lists notification messages by category for registration of a project through the project management unit 120, a request for feedback through the feedback management unit 130, and check-in-out for participants of the project management unit 120 It can be provided separately.

예를 들어, 도 32에 도시된 바와 같이 피드백에 대한 응답을 요청하는 알림 메시지가 시간 순서대로 표시되며, 각 알림 메시지에 대한 읽음 표시에 대한 상태를 팝업 창을 통해 변경할 수 있다. 또한, 피드백에 대한 읽은 피드백과 읽지 않은 피드백이 구분되도록 표시될 수 있으며, 피드백 내용 중 체크인 요청에 대한 피드백을 선택하면 체크아웃 요청 페이지로 전환되어, 일정(날짜, 시간 등) 변경이 가능하다.For example, as shown in FIG. 32, notification messages requesting a response to feedback are displayed in chronological order, and the status of the read indication for each notification message can be changed through a pop-up window. In addition, read feedback and unread feedback on the feedback may be displayed to be distinguished, and if a feedback on a check-in request is selected among the feedback contents, the check-out request page is switched, and a schedule (date, time, etc.) can be changed.

또한, 알림 메시지의 종류 즉 프로젝트, 피드백/댓글, 체크인(체크인 요청, 체크인 일정 변경 등)의 카테고리 별로 구분하여 표시할 수 있으며, 해당 알림 메시지 항목을 선택하면 해당 화면으로 이동할 수 있다.In addition, the types of notification messages, that is, projects, feedback/comments, and check-in (check-in request, check-in schedule change, etc.) can be categorized and displayed, and when a corresponding notification message item is selected, a corresponding screen can be moved.

상기 알림 메시지 표시부(142)는, 알림 메시지 관리부(141)를 통해 제공되는 알림 메시지의 확인 유무 또는 리액션 유무에 따라 알림 메시지를 상이하게 표시할 수 있다.The notification message display unit 142 may display a notification message differently depending on whether a notification message provided through the notification message management unit 141 is checked or whether there is a reaction.

예를 들어, 프로젝트, 피드백/댓글, 체크인 별로 각기 다른 아이콘을 사용하여 카테고리를 분류할 수 있고, 각 카테고리에 대한 알림 메시지를 확인하였는지 여부와, 리액션 즉 실제 해당 메시지를 확인했는지 또는 하지 않았는지와 같은 참여자 리액션에 따라 알림 메시지 리스트 항목에서 보이는 프로필을 상이하게 구분하여 표시할 수 있다.For example, you can classify categories using different icons for each project, feedback/comment, and check-in. According to the reaction of the same participant, the profiles displayed in the notification message list item can be displayed differently.

상기 참여자 개인 관리부(150)는, 프로젝트의 개별과제 진행정보를 기반으로 참여자 별로 개별과제정보를 관리하여 제공하고, 참여자 별로 체크인-아웃에 대한 참여 활동을 관리할 수 있다.The participant personal management unit 150 may manage and provide individual task information for each participant based on the individual task progress information of the project, and manage participation activities for check-in-out for each participant.

이를 위해, 참여자 개인 관리부(150)는 개인 참여정보 관리부(151)와 개인 참여활동 관리부(152) 중 적어도 하나를 포함할 수 있다.To this end, the participant personal management unit 150 may include at least one of a personal participation information management unit 151 and an individual participation activity management unit 152.

상기 개인 참여정보 관리부(151)는 참여자의 프로필, 프로젝트 관리부(120)의 참여자 체크인-아웃, 및 참여자의 프로젝트 별 개별과제 리스트를 제공 및 관리할 수 있다.The personal participation information management unit 151 may provide and manage a profile of a participant, a check-in-out of a participant of the project management part 120, and an individual task list for each participant's project.

예를 들어, 도 33 및 도 34에 도시된 바와 같이 개인 프로필을 설정 및 변경할 수 있으며, 나의 과제 부분에서 과제 완료, 과제 수정/삭제, 과제 피드백 요청 기능을 제공할 수 있다.For example, as shown in FIGS. 33 and 34, a personal profile may be set and changed, and a function of completing an assignment, correcting/deleting an assignment, and requesting a feedback on an assignment may be provided in the My assignment part.

또한, 도 34에 도시된 바와 같이 나의 과제에 대한 수정/삭제가 가능하며, 과제 피드백 요청 시 피드백 요청 내용을 문장 선택 형식으로 입력하여 피드백을 요청할 수 있다.In addition, as shown in FIG. 34, it is possible to modify/delete my assignment, and when requesting the assignment feedback, the feedback request content may be input in a sentence selection format to request feedback.

상기 개인 참여활동 관리부(152)는, 참여자 체크인-아웃에 따른 참여 활동 지수에 기초하여 일정 포인트가 적립되어 레벨이 책정되며, 참여자 체크인 날짜 별로 참여자의 감정 정보를 입력 받아 관리할 수 있다.The personal participation activity management unit 152 may accumulate certain points and determine a level based on the participation activity index according to the participant check-in-out, and receive and manage emotion information of the participant for each participant check-in date.

예를 들어, 도 도 35에 도시된 바와 같이, 데일리 체크인 페이지를 통해 개인의 감정을 용기, 성취, 자부, 행복, 만족, 희망, 불안, 분노, 수치, 불행, 슬픔, 절망 등의 버튼을 선택하거나 한 줄의 텍스트로 작성하여 표시할 수 있으며, 체크인 시 시스템에서 제공하는 아이템(포도)을 획득할 수 있다. 또한, 획득된 누적 아이템 현황과 감정을 확인할 수 있다. For example, as shown in FIG. 35, through the daily check-in page, select buttons such as courage, achievement, self-confidence, happiness, satisfaction, hope, anxiety, anger, shame, unhappiness, sadness, despair, etc. Or, it can be displayed in a single line of text, and items (grapes) provided by the system can be obtained at check-in. In addition, it is possible to check the status and emotions of the accumulated items acquired.

또한, 도 36 및 도 37에 도시된 바와 같이 프로젝트 체크아웃 기능을 제공할 수 있으며, '리뷰 작성' 시 해당 참여자 체크 아웃에 대한 리뷰를 작성하여 요청할 수 있으며, 작성된 리뷰는 수정 및 삭제가 가능하며, 도 38에 도시된 바와 같이 프로젝트 체크아웃 페이지를 통해 특정 참여자에 대한 체크아웃을 요청하고, 도 39에 도시된 바와 같이 해당 일정(날짜, 시간)을 선택할 수 있다. 체크아웃 요청 시, 도 40에 도시된 바와 같이 해당 참여자의 페이지에서 프로젝트 체크아웃에 대한 요청 내역이 보여지며, 해당 요청 내역을 상세히 확인할 수 있다.In addition, as shown in Figs. 36 and 37, a project checkout function can be provided, and when'writing a review', a review can be written and requested for the participant's checkout, and the written review can be edited and deleted. , As shown in FIG. 38, a checkout request for a specific participant may be requested through the project checkout page, and a corresponding schedule (date and time) may be selected as shown in FIG. 39. When a checkout request is made, as shown in FIG. 40, the request details for the project checkout are displayed on the participant's page, and the request details can be checked in detail.

한편, 도 41에 도시된 바와 같이, 해당 캐릭터(포도)에는 획득한 아이템의 개수에 따른 레벨 표시(ex. Lv1. 포도상자, Lv2. 포도주스, Lv3. 포도아이스크림, Lv4. 포도 잼, Lv5. 포도와인)가 될 수 있으며, 해당 캐릭터 또한 레벨에 따라 상이한 모습으로 점차 변경될 수 있다. 이러한 레벨 업을 위한 포인트는 체크인을 통해 획득한 아이템 개수에 따라 진행될 수 있다. 또한, 데일리 체크인 날짜와 그에 따른 감정이 이모티콘 등으로 표시될 수 있다.On the other hand, as shown in Fig. 41, the character (grape) displays the level according to the number of acquired items (ex. Lv1. Grape Box, Lv2. Grape Juice, Lv3. Grape Ice Cream, Lv4. Grape Jam, Lv5. Grape wine), and the character can also be gradually changed to a different appearance depending on the level. Points for leveling up may proceed according to the number of items acquired through check-in. In addition, the daily check-in date and emotions corresponding thereto may be displayed as an emoticon or the like.

한편, 마이페이지에는 참여자 프로젝트 내 개별 과제뿐만 아니라, 진행중인 프로젝트나 완료된 프로젝트 등 특정 기준에 따른 프로젝트 상세정보를 열람할 수 있으며, 각 과제에 대한 추가, 완료, 수정, 삭제 등에 대한 상태를 팝업 창을 통해 변경 및 설정할 수 있다.On the other hand, on My Page, you can view detailed project information according to specific criteria, such as ongoing or completed projects, as well as individual assignments within the participant's project, and a pop-up window showing the status of addition, completion, modification, deletion, etc. for each assignment. Can be changed and set through.

상기 관리자 프로젝트 관리부(160)는 프로젝트의 참여자 정보의 확인이 가능하고, 상기 프로젝트 관리부를 통해 공유되는 프로젝트의 과제진행상황에 대하여 각 참여자에게 메시지 형식의 피드백을 등록하여 요청하고, 프로젝트의 참여자에게 체크 아웃을 요청하기 위한 프로젝트의 관리자 페이지를 제공할 수 있다. 예를 들어, 도 42 내지 도 44에 도시된 바와 같이 프로젝트 팀장의 마이페이지 화면으로 들어가면, 자신이 관리자로 등록된 프로젝트의 참여자 정보 즉 팀원 정보를 제공하며, 팀원들에 대한 프로젝트, 과제, 피드백 등에 대한 상세정보를 열람하고, 피드백, 프로젝트 추가/수정/삭제와, 프로젝트에 대한 전반적인 일정 조정, 완료, 그리고 피드백 작성 및 참여자 체크아웃 요청 등을 실행할 수 있다. The manager project management unit 160 can check the information of the participants of the project, registers and requests feedback in the form of a message to each participant on the project progress of the project shared through the project management unit, and checks the project participants. You can provide the project's admin page for requesting out. For example, as shown in Figs. 42 to 44, when entering the My Page screen of the project team leader, information on the participant of the project in which he is registered as a manager, that is, team member information, is provided, and projects, tasks, feedback, etc. for the team members are provided. You can view detailed information about, feedback, add/modify/delete projects, adjust and complete the overall schedule for the project, write feedback, and request checkout for participants.

이상에서 설명한 것은 본 발명에 의한 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템을 실시하기 위한 하나의 실시예에 불과한 것으로서, 본 발명은 상기 실시예에 한정되지 않고, 이하의 특허청구범위에서 청구하는 바와 같이 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변경 실시가 가능한 범위까지 본 발명의 기술적 정신이 있다고 할 것이다.What has been described above is only one embodiment for implementing an application service system for project management and communication according to the present invention, and the present invention is not limited to the above embodiment, as claimed in the claims below. Without departing from the gist of the present invention, anyone of ordinary skill in the field to which the present invention pertains will have the technical spirit of the present invention to the extent that various changes can be implemented.

100: 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템
110: 회원 관리부
120: 프로젝트 관리부
121: 프로젝트 생성부
122: 프로젝트 검색부
123: 프로젝트 상세정보 제공부
124: 프로젝트 참여자 관리부
130: 피드백 관리부
131: 피드백 작성 및 요청부
132: 피드백 상세정보 제공부
133: 피드백 커뮤니케이션 서비스부
140: 알림 서비스부
141: 알림 메시지 관리부
142: 알림 메시지 표시부
150: 참여자 개인 관리부
151: 개인 참여정보 관리부
152: 개인 참여활동 관리부
160: 관리자 프로젝트 관리부
10: 참여자의 통신단말
20: 프로젝트 관리서버
100: Application service system for project management and communication
110: Member Management Department
120: Project Management Department
121: project generation unit
122: Project search section
123: Project detail information provider
124: Project Participant Management Department
130: feedback management unit
131: Feedback writing and request section
132: Feedback detail information providing unit
133: Feedback Communication Services Department
140: notification service unit
141: notification message management unit
142: notification message display unit
150: Participant Personal Management Department
151: Personal Participation Information Management Department
152: Individual participatory activity management department
160: manager project management department
10: Participant's communication terminal
20: project management server

Claims (6)

참여자로부터 진행중인 프로젝트의 개별과제 진행정보를 각각 등록 받아 참여자 간에 프로젝트의 진행상황과 진행일정을 공유 및 관리하는 프로젝트 관리부;
상기 프로젝트 관리부를 통해 공유되는 프로젝트의 진행상황에 대하여 참여자 간에 메시지 형식의 피드백을 등록하여 요청하는 피드백 관리부;
상기 프로젝트 관리부를 통한 프로젝트 등록, 상기 피드백 관리부를 통한 피드백 요청에 대한 알림 서비스를 제공하는 알림 서비스부; 및
상기 프로젝트의 개별과제 진행정보를 기반으로 참여자 별로 개별과제정보를 관리하여 제공하고, 참여자 별로 체크인-아웃에 대한 참여 활동을 관리하는 참여자 개인 관리부를 포함하는 것을 특징으로 하는 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템.
A project management unit that receives the individual project progress information of the ongoing project from the participants, and shares and manages the progress of the project and the schedule between the participants;
A feedback management unit for registering and requesting feedback in the form of a message between participants on the progress of a project shared through the project management unit;
A notification service unit providing a notification service for a project registration through the project management unit and a feedback request through the feedback management unit; And
An application for project management and communication, comprising a participant personal management unit that manages and provides individual task information for each participant based on the individual task progress information of the project, and manages participation activities for check-in-out for each participant. Service system.
제1 항에 있어서,
상기 프로젝트 관리부는,
프로젝트 명칭, 조직 명칭, 프로젝트 관리자 또는 리더, 프로젝트 참여자, 및 프로젝트 시작일과 종료일에 대한 정보를 입력 받아 프로젝트를 생성하는 프로젝트 생성부;
상기 프로젝트 시작일과 종료일에 대한 프로젝트 기간, 및 참여자가 관리자 또는 리더로 등록된 프로젝트, 진행중인 프로젝트, 완료된 프로젝트, 참여자 관련 전체 프로젝트로 분류된 프로젝트 유형에 따른 조건을 선택하여 프로젝트를 검색하는 프로젝트 검색부;
프로젝트의 명칭과 진행상황 그래프를 포함하는 프로젝트 요약정보를 프로젝트 카드 형식 또는 리스트 형식으로 제공하고, 상기 프로젝트 요약정보 각각에 대하여 참여자 별 개별과제 진행정보를 카드 형식 또는 타임라인 형식으로 제공하며, 참여자 별로 프로젝트 과제에 대한 완료, 추가 및 삭제를 관리하는 프로젝트 상세정보 제공부; 및
프로젝트 별로 참여자에 대한 추가 및 삭제를 관리하는 프로젝트 참여자 관리부를 포함하는 것을 특징으로 하는 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템.
The method of claim 1,
The project management unit,
A project generation unit for generating a project by receiving information on a project name, an organization name, a project manager or leader, a project participant, and a project start date and end date;
A project search unit for searching for a project by selecting a project period for the project start date and end date, and a condition according to a project type classified into a project in which a participant is registered as a manager or leader, an ongoing project, a completed project, and all projects related to participants;
Project summary information including the project name and progress graph is provided in the form of a project card or list, and individual task progress information for each participant is provided in the form of a card or timeline for each of the above project summary information. Project detail information providing unit that manages completion, addition, and deletion of project assignments; And
An application service system for project management and communication, comprising a project participant management unit that manages addition and deletion of participants for each project.
제1 항에 있어서,
상기 피드백 관리부는,
프로젝트의 특정 참여자를 지정하여 개별과제에 대한 키워드 및 기 등록된 프로젝트의 개별과제를 선택 받고, 선택된 프로젝트의 개별과제에 대한 메시지 형식의 피드백을 입력 받아 해당 개별과제의 참여자에게 피드백을 요청하는 피드백 작성 및 요청부;
상기 피드백 작성 및 요청부를 통해 등록된 피드백에 대한 상세정보를 참여자 개인, 수신, 발신, 전체 별로 각각 분류하여 제공하고, 피드백을 요청한 참여자 또는 피드백을 요청 받은 참여자를 검색어로 입력 받아 제공하는 피드백 상세정보 제공부; 및
상기 피드백 상세정보 제공부를 통해 제공되는 피드백 상세정보에 대하여 참여자로부터 코멘트를 등록 받고 관리하는 피드백 커뮤니케이션 서비스부를 포함하는 것을 특징으로 하는 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템.
The method of claim 1,
The feedback management unit,
By designating specific participants of the project, selecting keywords for individual tasks and individual tasks of the previously registered project, receiving feedback in the form of a message for the individual tasks of the selected project, and writing feedback requesting feedback from the participants of the individual tasks And a request unit;
Detailed information on the feedback registered through the feedback writing and requesting unit is categorized and provided by individual participants, received, sent, and all, and detailed feedback information provided by inputting the participant who requested the feedback or the participant who requested the feedback as a search word. Providing unit; And
And a feedback communication service unit for registering and managing comments from participants with respect to detailed feedback information provided through the detailed feedback information providing unit.
제1 항에 있어서,
상기 알림 서비스부는,
상기 프로젝트 관리부를 통한 프로젝트의 등록, 상기 피드백 관리부를 통한 피드백의 요청, 및 참여자의 체크인-아웃에 대한 카테고리 별로 알림 메시지를 리스트화하여 각각 제공하는 알림 메시지 관리부; 및
상기 알림 메시지 관리부를 통해 제공되는 알림 메시지의 확인 유무 또는 리액션 유무에 따라 알림 메시지를 상이하게 표시하는 알림 메시지 표시부를 포함하는 것을 특징으로 하는 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템.
The method of claim 1,
The notification service unit,
A notification message management unit for listing and providing notification messages for each category for registration of a project through the project management unit, a request for feedback through the feedback management unit, and check-in-out of a participant; And
And a notification message display unit differently displaying a notification message according to whether a notification message provided through the notification message management unit is checked or reacted.
제1 항에 있어서,
상기 참여자 개인 관리부는,
참여자의 프로필, 참여자의 체크인-아웃, 및 참여자의 프로젝트 별 개별과제 리스트를 제공 및 관리하는 개인 참여정보 관리부; 및
참여자의 체크인-아웃에 따른 참여 활동 지수에 기초하여 일정 포인트가 적립되어 레벨이 책정되며, 참여자의 체크인 날짜 별로 참여자의 감정 정보를 입력 받아 관리하는 개인 참여활동 관리부를 포함하는 것을 특징으로 하는 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템.
The method of claim 1,
The participant personal management unit,
A personal participation information management unit that provides and manages a participant's profile, a check-in-out of a participant, and a list of individual tasks for each participant's project; And
Project management, characterized in that it includes a personal participation activity management unit that receives and manages the participant's emotion information for each participant's check-in date, and the level is determined by accumulating certain points based on the participation activity index according to the participant's check-in-out. And application service system for communication.
제1 항에 있어서,
프로젝트의 참여자 정보의 확인이 가능하고, 상기 프로젝트 관리부를 통해 공유되는 프로젝트의 과제진행상황에 대하여 각 참여자에게 메시지 형식의 피드백을 등록하여 요청하고, 프로젝트의 참여자에게 체크 아웃을 요청하기 위한 프로젝트의 관리자 페이지를 제공하는 관리자 프로젝트 관리부를 더 포함하는 것을 특징으로 하는 프로젝트 관리 및 커뮤니케이션을 위한 어플리케이션 서비스 시스템.
The method of claim 1,
Project manager for checking project participant information, registering and requesting feedback in the form of a message to each participant about the project progress of the project shared through the project management unit, and requesting checkout from project participants An application service system for project management and communication, further comprising a manager project management unit providing a page.
KR1020190141778A 2019-11-07 2019-11-07 Application service system for managing project and comunication KR102256072B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190141778A KR102256072B1 (en) 2019-11-07 2019-11-07 Application service system for managing project and comunication

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190141778A KR102256072B1 (en) 2019-11-07 2019-11-07 Application service system for managing project and comunication

Publications (2)

Publication Number Publication Date
KR20210055391A true KR20210055391A (en) 2021-05-17
KR102256072B1 KR102256072B1 (en) 2021-05-26

Family

ID=76137308

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190141778A KR102256072B1 (en) 2019-11-07 2019-11-07 Application service system for managing project and comunication

Country Status (1)

Country Link
KR (1) KR102256072B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230000138A (en) * 2021-06-24 2023-01-02 라인플러스 주식회사 Method, computer device, and computer program to pick and display messages in messaging-based social network service
KR102538057B1 (en) * 2021-12-14 2023-05-30 주식회사 넥스텝스튜디오 Information provision system for building management

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102432747B1 (en) * 2021-10-27 2022-08-17 주식회사 이퀄썸 Method, device and system for managing performance indicator of organizational member
KR102451139B1 (en) * 2022-02-10 2022-10-06 온크리에이션 주식회사 Project management method for clothes design and server

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101264303B1 (en) * 2011-05-20 2013-05-22 (주)알앤디프로젝트 designed System of Process chart for Project management
KR20140083232A (en) * 2012-12-26 2014-07-04 (주)지이피 A project management map (map) to control the management items with the correlation and traceability between the project management items in units of work items, which is the minimum unit of work classification system (WBS)
KR20150096191A (en) * 2014-02-14 2015-08-24 대전대학교 산학협력단 Project management system
KR101619844B1 (en) * 2014-04-07 2016-05-11 엑스퍼타임 주식회사 Method and apparatus for managing communication by project
KR20170109458A (en) 2016-03-21 2017-09-29 주식회사 이니션 Method for providing online flatform service capable of recording, cooperation, sharing, learning and trading
KR20180138295A (en) * 2017-06-21 2018-12-31 최재호 Hierarchical project management apparatus
KR20190014364A (en) 2017-08-02 2019-02-12 한국과학기술원 Project process sharing system and method
KR101959791B1 (en) * 2017-08-25 2019-07-15 오스템임플란트 주식회사 Business Management System, Method And Recording Medium

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101264303B1 (en) * 2011-05-20 2013-05-22 (주)알앤디프로젝트 designed System of Process chart for Project management
KR20140083232A (en) * 2012-12-26 2014-07-04 (주)지이피 A project management map (map) to control the management items with the correlation and traceability between the project management items in units of work items, which is the minimum unit of work classification system (WBS)
KR20150096191A (en) * 2014-02-14 2015-08-24 대전대학교 산학협력단 Project management system
KR101619844B1 (en) * 2014-04-07 2016-05-11 엑스퍼타임 주식회사 Method and apparatus for managing communication by project
KR20170109458A (en) 2016-03-21 2017-09-29 주식회사 이니션 Method for providing online flatform service capable of recording, cooperation, sharing, learning and trading
KR20180138295A (en) * 2017-06-21 2018-12-31 최재호 Hierarchical project management apparatus
KR20190014364A (en) 2017-08-02 2019-02-12 한국과학기술원 Project process sharing system and method
KR101959791B1 (en) * 2017-08-25 2019-07-15 오스템임플란트 주식회사 Business Management System, Method And Recording Medium

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230000138A (en) * 2021-06-24 2023-01-02 라인플러스 주식회사 Method, computer device, and computer program to pick and display messages in messaging-based social network service
US11855945B2 (en) 2021-06-24 2023-12-26 LINE Plus Corporation Method, computer device, and non-transitory computer-readable recording medium to pick and display message in messaging-based social network service
KR102538057B1 (en) * 2021-12-14 2023-05-30 주식회사 넥스텝스튜디오 Information provision system for building management

Also Published As

Publication number Publication date
KR102256072B1 (en) 2021-05-26

Similar Documents

Publication Publication Date Title
KR102256072B1 (en) Application service system for managing project and comunication
US20160224939A1 (en) Systems and methods for managing tasks
US8639552B1 (en) Systems and methods for creating and sharing tasks
US9117196B2 (en) System and method for relevant business networking based in controlled relevancy groups, responsibilites and measured performance
US7644088B2 (en) Systems and methods for retrieving data
US20130305160A1 (en) Methods and apparatus for management and viewing of calendar event participant data
US20200052921A1 (en) Collaborative communications environment with participant flexibility
US8868660B2 (en) Electronic communication work flow manager system, method and computer program product
US20150134389A1 (en) Systems and methods for automatic suggestions in a relationship management system
Cummings Leading groups from a distance: How to mitigate consequences of geographic dispersion
US10038658B2 (en) Communication streams
US20180204183A1 (en) Apparatus and method for processing work activity based on work object
KR101948030B1 (en) Server and user device for managing social network of user
US20100205025A1 (en) Innovation management
Kwan et al. Process-oriented knowledge management: a case study
US20150363895A1 (en) System and method for managing online information by a community manager
US20160086290A1 (en) Social project management
Martínez Sánchez et al. The Implementation of new technologies in internal communication: A study of the main platforms and applications
KR102382073B1 (en) A management system of a website in which home correspondence and notification can be delivered to a user's terminal through a network
Ahmad et al. Reinforcing the status quo in organizations through mobile instant messaging (MIM)
US20240154927A1 (en) Smart events framework
US20230353651A1 (en) Identifying suggested contacts for connection
US20240232516A1 (en) Generating Structured Data Containers for Communication Platform
US20240232806A1 (en) Integrating Structured Data Containers into Virtual Spaces for Communication Platform
US20240236026A1 (en) Integrating structured data containers via templates for communication platform

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant