KR20180003680A - Metal frame insert modular concrete buildings and its construction method - Google Patents

Metal frame insert modular concrete buildings and its construction method Download PDF

Info

Publication number
KR20180003680A
KR20180003680A KR1020160082485A KR20160082485A KR20180003680A KR 20180003680 A KR20180003680 A KR 20180003680A KR 1020160082485 A KR1020160082485 A KR 1020160082485A KR 20160082485 A KR20160082485 A KR 20160082485A KR 20180003680 A KR20180003680 A KR 20180003680A
Authority
KR
South Korea
Prior art keywords
concrete
slab
wall
metal frame
insert metal
Prior art date
Application number
KR1020160082485A
Other languages
Korean (ko)
Inventor
소진
이재복
Original Assignee
소진
이재복
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 소진, 이재복 filed Critical 소진
Priority to KR1020160082485A priority Critical patent/KR20180003680A/en
Publication of KR20180003680A publication Critical patent/KR20180003680A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34815Elements not integrated in a skeleton
    • E04B1/3483Elements not integrated in a skeleton the supporting structure consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34869Elements for special technical purposes, e.g. with a sanitary equipment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/08Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of metal, e.g. sheet metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/10Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products
    • E04C2/12Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products of solid wood
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/44Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
    • E04C2/46Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose specially adapted for making walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/44Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
    • E04C2/50Self-supporting slabs specially adapted for making floors ceilings, or roofs, e.g. able to be loaded
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Mechanical Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Health & Medical Sciences (AREA)
  • Epidemiology (AREA)
  • Public Health (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to a metal frame insert modular concrete building capable of quickly and easily constructing a building, minimizing construction costs, increasing durability of the building, and protecting a user from external electromagnetic waves; and a construction method thereof. According to the present invention, the building comprises: an insert metal frame (20) formed in an upper side of a bottom slab (10) by two to six metal frames; a concrete outer wall (30) deposited on a side surface of the insert metal frame (20); a concrete slab (40) deposited on an upper part of the insert metal frame (20); and a window and a door formed on one side of the concrete outer wall (30). Accordingly, molds for the inside of a wall and a lower side of a ceiling are excluded, thereby providing an effect of reducing construction cost and enhancing constructability and safety. Moreover, since the insert metal frame (20) is installed inside the wall and the ceiling, thereby preventing a human body from being exposed to harmful concrete and blocking electromagnetic waves, thus providing an effect of enhancing a users health.

Description

금속프레임 인서트 모듈러 콘크리트 건축물 및 그 시공방법{Metal frame insert modular concrete buildings and its construction method}Technical Field [0001] The present invention relates to a metal frame insert, a modular concrete structure,

본 발명은 금속프레임 인서트 모듈러 콘크리트 건축물 및 그 시공방법에 관한 것으로서, 더욱 상세하게는 건축물에 있어서, 바닥슬라브의 상측에 2개 내지 6개의 금속프레임으로 이루어진 인서트금속프레임과 상기 인서트금속프레임의 측면에 타설되는 콘크리트외벽, 상기 인서트금속프레임의 상부에 타설된는 콘크리트슬라브, 상기 콘크리트외벽의 일측에 형성되는 창문과 출입문으로 구성하여서, 건축물의 시공을 신속하고 용이하게 시공하며 시공원가를 최소화하며 그 내구성을 향상시키고 외부의 전자파로부터 사용자를 보호할 수 있도록 함을 목적으로 한 것이다.
The present invention relates to a metal frame insert modular concrete structure and a method of constructing the same. More particularly, the present invention relates to an insert metal frame having two to six metal frames on the upper side of a floor slab, A concrete slab placed on the upper part of the insert metal frame, a window formed on one side of the concrete outer wall, and a door, so that the construction of the building can be quickly and easily constructed, the construction cost is minimized, And to protect the user from external electromagnetic waves.

일반적으로, 건축물은 내부에 거주가 가능하게 공간을 형성하고 외부환경으로부터 사용자를 보호하는 역활을 하는 것이다.Generally, a building forms a space in which it can reside and protects the user from the external environment.

이상과 같은 건축물은 바닥슬라브와 벽체 및 천장슬라브로 구성되고, 벽체에 창문과 출입문이 형성되는 것이다.The above-mentioned building is composed of a floor slab, a wall, and a ceiling slab, and a window and a door are formed on the wall.

그리고 건축물의 내부에는 벽지와 같은 내장재를 시공하여 사용하고 있다.Inside the building, interior materials such as wallpaper are constructed and used.

한편, 상기한 바와 같은 종래의 건축물은 그 시공에 있어서 내측과 외측에 거푸집을 설치하고 상기 내,외측 거푸집 사이에 철근을 배근하고 콘크리트몰탈을 타설하여 벽체를 형성하고, 천장슬라브의 경우에는 하측에 거푸집을 설치하고, 상기 거푸집의 상부에 철근을 배근한 후 콘크리트몰탈을 부어 천장슬라브를 시공한 것이다.Meanwhile, in the conventional structure as described above, a mold is installed on the inside and outside of the building, a reinforcing bar is inserted between the inside and outside molds, a concrete mortar is installed to form a wall, and in the case of a ceiling slab, A mold was installed, a reinforcing bar was placed on the upper part of the mold, and a concrete mortar was poured to construct a ceiling slab.

그러나, 상기한 바와 같은 종래의 건축물은 벽체와 천장슬라브가 시공상태에서 인체에 유익하지 않은 유해물질이 배출되는 콘크리트가 직접노출되게 구성되는 문제점이 있었다.However, in the above-mentioned conventional building, there is a problem that the concrete in which the harmful substances, which are not beneficial to the human body, is directly exposed in the construction state of the wall and the ceiling slab.

또한, 종래의 건축물은 벽체 및 천장슬라브를 구성하는 콘크리트가 전자파와 같은 유해전파를 차단하지 못하여 실내 거주자에게 외부의 전자파로부터 보호하지 못하는 문제점이 있었다.In addition, in the conventional structure, the concrete constituting the wall and the ceiling slab can not block harmful radio waves such as electromagnetic waves, and thus can not protect the residents from external electromagnetic waves.

또한, 종래의 건축물은 타설된 콘크리트몰타이 경화되기 이전까지는 거푸집에 의하여 하중이 지지되어 안전에 주의를 기울이지 않으면 거푸집이 붕괴되어 안전사고가 발생하는 문제점이 있었다.In addition, in the conventional structure, the load is supported by the formwork before the concrete molten concrete is poured, and if the safety is not paid attention, the form collapses and safety accident occurs.

또한, 종래 건축물은 그 시공에 있어 벽체의 내측과 천장슬라브의 하측을 구성하는 거푸집을 철거하여야 하므로 작업에 많은 시간이 소요되는 문제점이 있었다.In addition, in the conventional construction, since the form of the inner side of the wall and the lower side of the ceiling slab must be removed in the construction, it takes a lot of time for the work.

대한민국 특허 제10-1324518호Korean Patent No. 10-1324518

이에, 본 발명은 상기한 바와 같은 종래의 건축물이 벽체와 천장슬라브가 시공상태에서 인체에 유익하지 않은 유해물질이 배출되는 콘크리트가 직접노출되게 구성되는 문제점과 벽체 및 천장슬라브를 구성하는 콘크리트가 전자파와 같은 유해전파를 차단하지 못하여 실내 거주자에게 외부의 전자파로부터 보호하지 못하는 문제점, 타설된 콘크리트몰타이 경화되기 이전까지는 거푸집에 의하여 하중이 지지되어 안전에 주의를 기울이지 않으면 거푸집이 붕괴되어 안전사고가 발생하는 문제점 및 건축물의 시공에 있어 벽체의 내측과 천장슬라브의 하측을 구성하는 거푸집을 철거하여야 하므로 작업에 많은 시간이 소요되는 문제점을 해결할 수 있도록 한 것이다.Accordingly, it is an object of the present invention to solve the above-described problems of the prior art structure in which the wall and ceiling slab are directly exposed to concrete discharged from harmful substances which are not beneficial to the human body, and that the concrete constituting the wall and ceiling slab is an electromagnetic wave , It is not possible to protect the residents from external electromagnetic waves due to failure to prevent the harmful radio waves such as fire and the like. The concrete is supported by the mold until the concrete is hardened before the mortar is secured. If the safety is not paid attention to the safety, In order to solve the problem and the construction of the building, it is necessary to dismantle the inner side of the wall and the lower side of the ceiling slab, so that it takes much time to solve the problem.

즉, 본 발명은 건축물에 있어서, 바닥슬라브의 상측에 2개 내지 6개의 금속프레임으로 이루어진 인서트금속프레임과 상기 인서트금속프레임의 측면에 타설되는 콘크리트외벽, 상기 인서트금속프레임의 상부에 타설된는 콘크리트슬라브, 상기 콘크리트외벽의 일측에 형성되는 창문과 출입문으로 구성한 것을 특징으로 하는 것이다.That is, according to the present invention, there is provided a building comprising: an insert metal frame made of two to six metal frames on the upper side of a bottom slab; a concrete outer wall laid on a side surface of the insert metal frame; a concrete slab A window formed on one side of the concrete outer wall, and a door.

따라서, 본 발명은 바닥슬라브의 상측에 2개 내지 6개의 금속프레임으로 이루어진 인서트금속프레임과 상기 인서트금속프레임의 측면에 타설되는 콘크리트외벽, 상기 인서트금속프레임의 상부에 타설된는 콘크리트슬라브, 상기 콘크리트외벽의 일측에 형성되는 창문과 출입문으로 구성함으로써, 시공과정에 벽체의 내측과 천장의 하측 거푸집이 삭제되어 시공성과 시공원가 및 안전성이 향상되는 효과를 가지고, 벽체 및 천장의 내측으로 인서트금속프레임이 구비되어 인체에 유해한 콘크리트의 노출이 방지되고 전자파를 차단하여 사용자의 건강이 증진되는 효과를 갖는 것이다.Accordingly, the present invention provides a method of manufacturing an insert metal frame, comprising: an insert metal frame made of two to six metal frames on the top of a bottom slab; a concrete outer wall laid on a side surface of the insert metal frame; a concrete slab placed on an upper portion of the insert metal frame; The inner side of the wall and the lower side of the ceiling are removed to improve the workability, the construction cost, and the safety, and the insert metal frame is provided inside the wall and the ceiling. So that the exposure of the harmful concrete is prevented and the health of the user is improved by blocking electromagnetic waves.

도 1 은 본 발명에 따른 공정을 보인 예시도.
도 2 는 본 발명에 따른 기초콘크리트타설과정의 예시도.
도 3 은 본 발명에 따른 금속프레임인서트과정의 예시도.
도 4 는 본 발명에 따른 외벽시공과정의 예시도.
도 5 는 본 발명에 따른 슬라브시공과정의 예시도.
도 6 은 본 발명에 따른 거푸집제거과정의 예시도.
도 7 은 본 발명에 따른 인서트금속프레임의 예시도.
도 8 은 본 발명에 따른 거푸집지지 상태의 상세 예시도.
도 9 는 본 발명에 따른 거푸집지지구의 예시도.
도 10 은 본 발명에 따른 시공완료 상태 예시도.
BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 is an illustration of a process according to the present invention.
FIG. 2 is a view illustrating an example of a foundation concrete pouring process according to the present invention; FIG.
3 is an exemplary view of a metal frame insert process according to the present invention;
4 is an exemplary view of an outer wall construction process according to the present invention.
5 is an exemplary view of a slab construction process according to the present invention.
6 is a diagram illustrating an example of a die removal process according to the present invention.
7 is an illustration of an insert metal frame in accordance with the present invention.
FIG. 8 is a detailed view of a form supporting state according to the present invention; FIG.
Figure 9 is an illustration of an embodiment of a formwork according to the present invention;
Fig. 10 is an example of a completed state according to the present invention; Fig.

이하, 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 시공과정에 벽체의 내측과 천장의 하측 거푸집이 삭제되어 시공성과 시공원가 및 안전성이 향상되도록 하고, 벽체 및 천장의 내측으로 인서트금속프레임이 구비되어 인체에 유해한 콘크리트의 노출이 방지되고 전자파를 차단하여 사용자의 건강이 증진되도록 한 것으로서, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.In the present invention, the inner side of the wall and the lower side of the ceiling are removed to improve workability, cost and safety, and an insert metal frame is provided inside the wall and ceiling to prevent exposure of harmful concrete to the human body. The term or word used in the present specification and claims should not be construed to be limited to a conventional or dictionary meaning and the inventor is not allowed to make his own invention in the best way It should be interpreted in the meaning and concept consistent with the technical idea of the present invention based on the principle that the concept of the term can be appropriately defined in order to explain it.

따라서, 본 명세서에 기재된 실시 예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시 예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.
Therefore, the embodiments described in the present specification and the configurations shown in the drawings are merely the most preferred embodiments of the present invention, and not all of the technical ideas of the present invention are described. Therefore, It should be understood that various equivalents and modifications may be present.

즉, 본 발명은 건축물에 있어서, 바닥슬라브(10)의 상측에 2개 내지 6개의 금속프레임으로 이루어진 인서트금속프레임(20)과 상기 인서트금속프레임(20)의 측면에 타설되는 콘크리트외벽(30), 상기 인서트금속프레임(20)의 상부에 타설된는 콘크리트슬라브(40), 상기 콘크리트외벽(30)의 일측에 형성되는 창문과 출입문으로 구성한 것이다.
That is, according to the present invention, in a building, an insert metal frame 20 made of two to six metal frames and a concrete outer wall 30 laid on a side surface of the insert metal frame 20 are formed on the top of the bottom slab 10, A concrete slab 40 placed on the upper portion of the insert metal frame 20, and a window and a door formed on one side of the concrete outer wall 30.

여기서, 상기 바닥슬라브(10)에는 배수관로(51)가 인서트 성형된 것이다.
Here, a drain pipe 51 is insert-molded in the bottom slab 10.

그리고, 상기 인서트금속프레임(20)은 기둥을 형성하는 기둥프레임(21)과 상기 기둥프레임(21)의 하부을 연결하는 하부연결바(22)와 상기 기둥프레임(21)의 상단을 연결하는 상부연결바(23), 상기 기둥프레임(21)의 측면을 연결하는 벽체판재(24) 및 기둥프레임(21)의 상부를 마감하는 천장판재(25)로 구성하는 것이다.The insert metal frame 20 includes a column frame 21 forming a column and a lower connection bar 22 connecting the lower portion of the column frame 21 and an upper connection A wall plate member 24 connecting the side surfaces of the column frame 21 and a ceiling plate member 25 closing the upper portion of the column frame 21.

상기 벽체판재(24)는 금속 또는 목재로 형성하여 실시할 수 있는 것이다.The wall plate 24 may be formed of metal or wood.

상기 벽체판재(24)는 전자파 차단효과를 극대화하고자 할 경우에는 금속판으로 실시함이 바람직한 것이다.In order to maximize the electromagnetic wave shielding effect, the wall plate 24 is preferably made of a metal plate.

상기 벽체판재(24)에는 콘크리트외벽(30) 시공을 위한 거푸집을 고정할 수 있게 외면으로 돌출되는 거푸집고정바(52)를 등간격으로 돌출형성하여 실시할 수 있는 것이다.The wall plate 24 may be formed by protruding the form fixing bars 52 protruding outwardly at regular intervals so as to fix the form for constructing the concrete outer wall 30.

또한, 상기 천장판재(25)는 콘크리트슬라브(40) 타설시 지지력을 갖게 금속판재로 형성하여 실시함이 바람직한 것이다.
It is preferable that the ceiling plate 25 is made of a metal plate having a supporting force when the concrete slab 40 is poured.

또한, 상기 콘크리트외벽(30)은 철근과 골재로 형성된 것이다.The concrete outer wall 30 is formed of reinforcing bars and aggregate.

또한, 상기 콘크리트슬라브(40)는 철근과 골재로 형성되고 일측 단부에 다른 일측으로 하향경사지게 형성하여 실시하거나, 중앙부에서 양측으로 구배지게 형성하여 실시할 수 있는 것이다.
The concrete slabs 40 may be formed of reinforcing bars and aggregates and may be formed at one side of the concrete slab 40 so as to be inclined downward to the other side, or may be formed to be sloped to both sides of the central slab 40.

한편, 상기 벽체판재(24)와 콘크리트외벽(30) 사이에는 단열을 위한 단열층(60)을 형성하여 실시할 수 있는 것이다.Meanwhile, a heat insulating layer 60 for heat insulation may be formed between the wall plate 24 and the concrete outer wall 30.

상기 천장판재(25)와 콘크리트슬라브(40) 사이에는 단열을 위한 단열층(60)을 형성하여 실시할 수 있는 것이다.
A heat insulating layer 60 for heat insulation may be formed between the ceiling plate 25 and the concrete slab 40.

이하, 본 발명의 시공방법에 대하여 설명하면 다음과 같다.Hereinafter, a construction method of the present invention will be described.

즉, 본 발명은 건축물의 시공방법에 있어서, 바닥슬라브(10)의 상측에 2개 내지 6개의 금속프레임으로 이루어진 인서트금속프레임(20)과 상기 인서트금속프레임(20)의 측면에 타설되는 콘크리트외벽(30), 상기 인서트금속프레임(20)의 상부에 타설된는 콘크리트슬라브(40), 상기 콘크리트외벽(30)의 일측에 형성되는 창문과 출입문으로 구성된 건축물은 시공면의 바닥을 고르게 정리하는 정지하는 바닥정지과정(110)과 바닥정지된 시공면에 오수 및 하수관과 수도관을 배관하는 배관과정(120), 상기 배관과정(120)을 완료하고 시공면에 건축면적보다 넓게 콘크리트를 타설하여 기초콘크리트부를 형성하는 기초콘크리트타설과정(130), 상기 기초콘크리트의 상부에 2 개 내지 6개로 구성되는 인서트금속프레임(20)을 안착시키는 금속프레임인서트과정(140), 상기 인서트된 인서트금속프레임(20)의 외측에 외벽거푸집을 설치하는 거푸집설치과정(150), 상기 거푸집의 외면에 기초콘크리트에 등간격으로 고정된 거푸집지지구(70)로 지지하는 거푸집지지과정(160), 상기 인서트금속프레임(20)과 거푸집 사이에 콘크리트몰탈을 타설하고 콘크리트외벽(30)을 시공하는 외벽시공과정(170), 상기 인서트금속프레임(20)의 상부에 콘크리트몰탈을 타설하여 콘크리트슬라브(40)를 시공하는 슬라브시공과정(180), 타설된 콘크리트외벽(30)과 콘크리트슬라브(40)을 일정시간 양생시키는 양생과정(190), 커푸집을 제거하는 거푸집제거과정(200), 도어와 창문 및 내장을 시공하는 내장시공과정(210)으로 이루어진 것이다.
That is, according to the present invention, there is provided a method of constructing a building, comprising the steps of: providing an insert metal frame (20) having two to six metal frames on the top of a bottom slab (10) A concrete slab 40 placed on the upper portion of the insert metal frame 20, a window formed on one side of the concrete outer wall 30, and a door, A piping process 120 for piping the sewage, sewage pipe and water pipe to the bottom stopping process 110 and the floor stopping floor after the completion of the piping process 120 and placing the concrete over the construction area so as to make the basic concrete part A metal frame insert process 140 for placing an insert metal frame 20 composed of two to six on the foundation concrete, A molding process 150 for installing an outer wall mold on the outer side of the insert metal frame 20 and a die supporting process 160 for supporting the outer metal mold 20 on the outer surface of the die with the die 70, An outer wall construction process 170 in which a concrete mortar is installed between the insert metal frame 20 and a formwork and a concrete outer wall 30 is installed and a concrete mortar is placed on the insert metal frame 20 to form a concrete slab A curing process 190 for curing the concrete outer wall 30 and the concrete slab 40 for a certain period of time, a mold removal process 200 for removing the curtain wall, a door and windows And a built-in construction process 210 for constructing the interior.

여기서, 상기 거푸집지지구(70)는 기초슬라브에 고정되는 슬라브고정대(71)와 상기 슬라브고정대(71)의 전단에서 수직으로 형성되는 거푸집지지대(72), 상기 거푸집지지대(72)의 상단에서 슬라브고정대(71)로 경사지게 연결 결합되는 연결지지구(73)로 구성된 것이다.The die 70 includes a slab fixing base 71 fixed to the base slab and a die support 72 formed vertically at the front end of the slab fixing base 71. The slab fixing base 71 is formed at the upper end of the die support 72, And a connection support portion 73 connected slantingly to the fixing table 71. [

상기 슬라브고정대(71)에는 기초슬라브에 앙카 고정을 위한 앙카공(71a)을 형성되고, 상기 거푸집지지대(72)에는 거푸집고정바(52)가 결속되는 고정바결속공(72a)이 형성된 것이다.
An anchor hole 71a for fixing an anchor is formed on the slab fixing base 71 and a fixing bar binding hole 72a for fixing the form fixing bar 52 is formed on the die support base 72. [

이하, 본 발명의 적용실시과정에 대하여 설명하면 다음과 같다.Hereinafter, the application process of the present invention will be described.

상기한 바닥정지과정(110)과 배관과정(120), 기초콘크리트타설과정(130), 금속프레임인서트과정(140), 거푸집설치과정(150), 거푸집지지과정(160), 외벽시공과정(170), 슬라브시공과정(180), 양생과정(190), 거푸집제거과정(200) 및 내장시공과정(210)을 통하여 바닥슬라브(10)의 상측에 2개 내지 6개의 금속프레임으로 이루어진 인서트금속프레임(20)과 상기 인서트금속프레임(20)의 측면에 타설되는 콘크리트외벽(30), 상기 인서트금속프레임(20)의 상부에 타설된는 콘크리트슬라브(40), 상기 콘크리트외벽(30)의 일측에 형성되는 창문과 출입문으로 구성된 건축물은 시공과정에 벽체의 내측과 천장의 하측 거푸집이 삭제되어 시공성과 시공원가 및 안전성이 향상되는 것이다.The bottom stopping process 110 and the piping process 120, the basic concrete placement process 130, the metal frame insert process 140, the mold installation process 150, the mold support process 160, An insert metal frame 18 made of two to six metal frames is disposed on the bottom slab 10 through a slab construction process 180, a curing process 190, a mold removal process 200, A concrete slab 40 placed on an upper portion of the insert metal frame 20 and a concrete slab 40 formed on a side of the concrete outer wall 30, In the case of a building consisting of a window and a door, the inner side of the wall and the lower side of the ceiling are removed during the construction process, thereby improving workability, construction cost, and safety.

그리고, 벽체 및 천장의 내측으로 인서트금속프레임(20)이 구비되어 인체에 유해한 콘크리트의 노출이 방지되고 전자파를 차단하여 사용자의 건강이 증진되는 것이다.
In addition, the insert metal frame 20 is provided inside the walls and the ceiling to prevent exposure of the harmful concrete to the human body, thereby blocking the electromagnetic waves and improving the health of the user.

10 : 바닥슬라브
20 : 인서트금속프레임
21 : 기둥프레임 22 : 하부연결바
23 : 상부연결바 24 : 벽체판재 25 :천장판재
30 : 콘크리트외벽
40 : 콘크리트슬라브
51 : 배수관로
52 : 거푸집고정바
60 : 단열층
70 : 거푸집지지구
71 : 슬라브고정대 71a: 앙카공
72 : 거푸집지지대 72a: 고정바결속공
73 : 연결지지구
110 : 바닥정지과정 120 : 배관과정
130 : 기초콘크리트타설과정 140 : 금속프레임인서트과정
150 : 거푸집설치과정 160 : 거푸집지지과정
170 : 외벽시공과정 180 : 슬라브시공과정
190 : 양생과정 200 : 거푸집제거과정
210 : 내장시공과정
10: Floor slab
20: Insert metal frame
21: column frame 22: lower connection bar
23: upper connection bar 24: wall plate 25: ceiling plate
30: Concrete outer wall
40: Concrete slab
51: To the drain pipe
52: Formwork fixing bar
60: insulating layer
70: Planet Earth
71: Slab fixing table 71a: Anchor ball
72: die support 72a: fixed bar binding ball
73: Connected District
110: Floor stopping process 120: Piping process
130: Foundation concrete placement process 140: Metal frame insert process
150: Formwork installation process 160: Formwork support process
170: External wall construction process 180: Slab construction process
190: Curing process 200: Die removal process
210: Interior construction process

Claims (6)

건축물에 있어서;
바닥슬라브(10)의 상측에 2개 내지 6개의 금속프레임으로 이루어진 인서트금속프레임(20)과 상기 인서트금속프레임(20)의 측면에 타설되는 콘크리트외벽(30), 상기 인서트금속프레임(20)의 상부에 타설된는 콘크리트슬라브(40), 상기 콘크리트외벽(30)의 일측에 형성되는 창문과 출입문으로 구성하고;
상기 바닥슬라브(10)에는 배수관로(51)가 인서트 형성되며;
상기 인서트금속프레임(20)은 기둥을 형성하는 기둥프레임(21)과 상기 기둥프레임(21)의 하부을 연결하는 하부연결바(22)와 상기 기둥프레임(21)의 상단을 연결하는 상부연결바(23), 상기 기둥프레임(21)의 측면을 연결하는 벽체판재(24) 및 기둥프레임(21)의 상부를 마감하는 천장판재(25)로 구성한 것을 특징으로 하는 금속프레임 인서트 모듈러 콘크리트 건축물.

For buildings;
An insert metal frame 20 made of two to six metal frames and a concrete outer wall 30 placed on the side of the insert metal frame 20 on the upper side of the bottom slab 10, A concrete slab 40 placed on the upper part, a window formed on one side of the concrete outer wall 30, and a door;
A drain pipe (51) is inserted in the bottom slab (10);
The insert metal frame 20 includes a column frame 21 forming a column and a lower connecting bar 22 connecting the lower portion of the column frame 21 and an upper connecting bar 22 connecting the upper end of the column frame 21 23), a wall plate member (24) connecting the side surfaces of the column frame (21), and a ceiling plate member (25) closing the upper part of the column frame (21).

제 1 항에 있어서;
상기 벽체판재(24)와 천장판재(25)는 금속 또는 목재로 형성하며,
상기 벽체판재(24)에는 콘크리트외벽(30) 시공을 위한 거푸집을 고정할 수 있게 외면으로 돌출되는 거푸집고정바(52)를 등간격으로 돌출형성한 것을 특징으로 하는 금속프레임 인서트 모듈러 콘크리트 건축물.

The method of claim 1, further comprising:
The wall plate 24 and the ceiling plate 25 are made of metal or wood,
Wherein the wall plate member (24) is formed with a form fixing bar (52) protruding outwardly so as to fix a form for constructing the concrete outer wall (30) at regular intervals.

제 1 항에 있어서;
상기 콘크리트슬라브(40)는 철근과 골재로 형성되고 일측 단부에 다른 일측으로 하향경사지게 형성한 것과 중앙부에서 양측으로 구배지게 형성한 것 중 어느 하나를 선택적으로 구성한 것을 특징으로 하는 금속프레임 인서트 모듈러 콘크리트 건축물.
The method of claim 1, further comprising:
Wherein the concrete slab (40) is formed of reinforcing bars and aggregate, and is formed at one side of the concrete slab (40) so as to be inclined downward to the other side and to be formed at both sides of the concrete slab .
제 1 항에 있어서;
상기 벽체판재(24)와 콘크리트외벽(30) 사이 및 상기 천장판재(25)와 콘크리트슬라브(40) 사이에는 단열을 위한 단열층(60)을 형성한 것을 특징으로 하는 금속프레임 인서트 모듈러 콘크리트 건축물.
The method of claim 1, further comprising:
Wherein a heat insulating layer (60) for heat insulation is formed between the wall plate material (24) and the concrete outer wall (30) and between the ceiling plate material (25) and the concrete slab (40).
건축물의 시공방법에 있어서;
바닥슬라브(10)의 상측에 2개 내지 6개의 금속프레임으로 이루어진 인서트금속프레임(20)과 상기 인서트금속프레임(20)의 측면에 타설되는 콘크리트외벽(30), 상기 인서트금속프레임(20)의 상부에 타설된는 콘크리트슬라브(40), 상기 콘크리트외벽(30)의 일측에 형성되는 창문과 출입문으로 구성된 건축물은 시공면의 바닥을 고르게 정리하는 정지하는 바닥정지과정(110)과 바닥정지된 시공면에 오수 및 하수관과 수도관을 배관하는 배관과정(120), 상기 배관과정(120)을 완료하고 시공면에 건축면적보다 넓게 콘크리트를 타설하여 기초콘크리트부를 형성하는 기초콘크리트타설과정(130), 상기 기초콘크리트의 상부에 2 개 내지 6개로 구성되는 인서트금속프레임(20)을 안착시키는 금속프레임인서트과정(140), 상기 인서트된 인서트금속프레임(20)의 외측에 외벽거푸집을 설치하는 거푸집설치과정(150), 상기 거푸집의 외면에 기초콘크리트에 등간격으로 고정된 거푸집지지구(70)로 지지하는 거푸집지지과정(160), 상기 인서트금속프레임(20)과 거푸집 사이에 콘크리트몰탈을 타설하고 콘크리트외벽(30)을 시공하는 외벽시공과정(170), 상기 인서트금속프레임(20)의 상부에 콘크리트몰탈을 타설하여 콘크리트슬라브(40)를 시공하는 슬라브시공과정(180), 타설된 콘크리트외벽(30)과 콘크리트슬라브(40)을 일정시간 양생시키는 양생과정(190), 커푸집을 제거하는 거푸집제거과정(200), 도어와 창문 및 내장을 시공하는 내장시공과정(210)으로 이루어진 것을 특징으로 하는 금속프레임 인서트 모듈러 콘크리트 건축물의 시공방법.
In a construction method of a building,
An insert metal frame 20 made of two to six metal frames and a concrete outer wall 30 placed on the side of the insert metal frame 20 on the upper side of the bottom slab 10, A concrete slab 40 placed on the upper part of the concrete slab 40, a window formed on one side of the concrete outer wall 30, and a door, includes a floor stopping step 110 for stopping the bottom of the construction surface evenly, (130) for completing the piping process (120) and forming a basic concrete part by pouring concrete wider than the building area on the construction surface, A metal frame insert process (140) for placing an insert metal frame (20) consisting of 2 to 6 pieces on the top of concrete, an outer metal frame (20) on the outer side of the insert metal frame A mold supporting process 160 for supporting a mold with a molding fixture 70 fixed at an equal interval to the base concrete on the outer surface of the mold, a process of installing a mold 150 between the insert metal frame 20 and a mold, An outer wall construction process 170 for installing a concrete mortar and constructing a concrete outer wall 30, a slab construction process 180 for installing a concrete slab 40 by placing a concrete mortar on the insert metal frame 20, A curing process 190 for curing the concrete outer wall 30 and the concrete slab 40 for a predetermined period of time, a molding removal process 200 for removing the curtain wall, and a built-in construction process 210 for installing the door, The method of claim 1,
제 5 항에 있어서;
상기 거푸집지지구(70)는 기초슬라브에 고정되는 슬라브고정대(71)와 상기 슬라브고정대(71)의 전단에서 수직으로 형성되는 거푸집지지대(72), 상기 거푸집지지대(72)의 상단에서 슬라브고정대(71)로 경사지게 연결 결합되는 연결지지구(73)로 구성되고,
상기 슬라브고정대(71)에는 기초슬라브에 앙카 고정을 위한 앙카공(71a)을 형성되고, 상기 거푸집지지대(72)에는 거푸집고정바(52)가 결속되는 고정바결속공(72a)이 형성된 것으로 이루어진 것을 특징으로 하는 금속프레임 인서트 모듈러 콘크리트 건축물의 시공방법.
The method of claim 5, further comprising:
The formwork unit 70 includes a slab fixing base 71 fixed to the base slab and a molding support 72 formed vertically at a front end of the slab fixing base 71. The slab fixing base 71, And a connection support portion 73 slantingly connected to the connection support portion 71,
An anchor hole 71a for fixing an anchor is formed on the slab fixing base 71 and a fixing bar binding hole 72a for fixing the form fixing bar 52 is formed on the die support 72 Wherein the method comprises the steps of:
KR1020160082485A 2016-06-30 2016-06-30 Metal frame insert modular concrete buildings and its construction method KR20180003680A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160082485A KR20180003680A (en) 2016-06-30 2016-06-30 Metal frame insert modular concrete buildings and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160082485A KR20180003680A (en) 2016-06-30 2016-06-30 Metal frame insert modular concrete buildings and its construction method

Publications (1)

Publication Number Publication Date
KR20180003680A true KR20180003680A (en) 2018-01-10

Family

ID=60998545

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160082485A KR20180003680A (en) 2016-06-30 2016-06-30 Metal frame insert modular concrete buildings and its construction method

Country Status (1)

Country Link
KR (1) KR20180003680A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102600523B1 (en) * 2023-05-08 2023-11-10 주식회사 엘에스폼웍 combined wall support device and combined wall construction method using the butt wall support device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102600523B1 (en) * 2023-05-08 2023-11-10 주식회사 엘에스폼웍 combined wall support device and combined wall construction method using the butt wall support device

Similar Documents

Publication Publication Date Title
EP1347110B1 (en) Concrete building construction form unit, method of constructing a concrete building, and concrete building constructed by using concrete building construction form
JP2009299296A (en) Fire-resistive covering structure, mounting bracket for alc panel, and alc panel fixing method
KR20180003680A (en) Metal frame insert modular concrete buildings and its construction method
KR101508960B1 (en) A method for constructing a window sash on the outside insulation wall of structure
KR20110124476A (en) Assembly trench and trench structure using the same
JP2011069178A (en) Indoor evacuation facility having earthquake resistance and fire resistance
JP6514785B2 (en) Window frame insulation method for building a warm house
KR100814732B1 (en) Manufacturing method of light weight precast concrete wall panel and the panel manufactured by the same method
KR101588381B1 (en) Reinforced concrete structure constructing method of integral wall surface using the pipe frame
KR20170000255A (en) Construction method for bathroom and Bathroom using the same
KR100693244B1 (en) the finishing-insulation-board using construction for slab of ceiling And the slab structure of ceiling usig it And the construction method thereof
KR200392664Y1 (en) Aerated concrete block and floor structure used the said
KR102264712B1 (en) module type bathroom and building method using the same
JP2000213092A (en) Concrete building with opening and construction thereof
KR0131314Y1 (en) Wall panel for a concrete unit bath room
KR102264711B1 (en) module type bathroom and building method using the same
KR102300731B1 (en) External thermal insulation system and external insulation construction method using the same
CN220598792U (en) Double-mould-shell self-heat-insulating component and energy-saving wall body comprising same
KR102271152B1 (en) Manufacturing Method of Factory-made Integrated Toilet Module
JPH0626131A (en) Execution method of precast concrete block with sound absorbing material
KR102583751B1 (en) Fixed structure for the completed toilet
KR101968288B1 (en) fixing support for fire hydrant box
KR20050079383A (en) A mold assembly apparatus for wall construction a building
AU2017100301A4 (en) A Building Panel
KR100504350B1 (en) A method manufacturing of building

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application