KR101588381B1 - Reinforced concrete structure constructing method of integral wall surface using the pipe frame - Google Patents
Reinforced concrete structure constructing method of integral wall surface using the pipe frame Download PDFInfo
- Publication number
- KR101588381B1 KR101588381B1 KR1020140112851A KR20140112851A KR101588381B1 KR 101588381 B1 KR101588381 B1 KR 101588381B1 KR 1020140112851 A KR1020140112851 A KR 1020140112851A KR 20140112851 A KR20140112851 A KR 20140112851A KR 101588381 B1 KR101588381 B1 KR 101588381B1
- Authority
- KR
- South Korea
- Prior art keywords
- cement board
- reinforcing
- concrete
- base structure
- reinforced concrete
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/64—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
- E04B2/68—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete made by filling-up wall cavities
Abstract
Description
The present invention relates to a method of constructing a wall reinforced concrete structure using a pipe framework, and more particularly, to a method of constructing a reinforced concrete (RC) structure by pouring and curing a concrete by integrating the wall surface of the cement board, It is possible to omit the process of installing and dismantling the formwork, the flattening work, and the finishing material installation, thereby greatly shortening the entire construction period.
Particularly, the present invention can greatly improve the vibration resistance by forming a basic frame using pipes, and it is also possible to install a wall-embedded electrical product such as an electric outlet or a fire-fighting device on a cement board, form a heat insulating layer The present invention relates to a method of constructing a wall-integrated reinforced concrete structure using a pipe frame, which is capable of easily performing additional thermal insulation work and severe electric wiring work after curing of concrete.
Reinforced Concrete (RC) is a structure that reinforces reinforcing materials and reinforced concrete to improve the strength and weakness of each reinforcing concrete. It can be used to construct various shapes of structures, easy to purchase materials, high durability and high fire resistance It is applied to various buildings.
In case of the reinforced concrete structure, since the weight of the building is large, the steel reinforced concrete structure is applied to the high-rise buildings. In addition, there are structures such as precast concrete and prestressed concrete, Structure is applied.
As described above, the reinforced concrete structure that is widely applied to most buildings is constructed by arranging a mold such as a wooden plate or an iron plate on elements of a wall, a column, a beam and the like designed in advance, , Concrete is poured into the curing process.
However, such a reinforced concrete structure has a problem that the entire construction period and construction cost are increased due to the installation and dismantling of the formwork, the concrete pouring and curing, the flattening work on the wall or the floor, the thermal insulation construction, and the finishing material installation .
In order to solve such a problem, Korean Patent Registration No. 10-1351106 entitled " Internal Insulation Construction Structure of Reinforced Concrete Wall and Method of Construction ", and Korean Patent Registration No. 10-0383795, a steel bridge is connected and fixed to a reinforced concrete column The connection structure and the construction method therefor are known as prior arts for shortening the construction period but it is not a fundamental solution in that the concrete works after the concrete curing, the thermal insulation construction and the finishing material installation work are required.
In order to solve the above-mentioned problems, the present invention is to provide a cement board structure in which the walls of the cement board are integrally laid and cured, thereby eliminating the steps of installing and disassembling the formwork, planing and installing the finish material The present invention provides a method of constructing a reinforced concrete structure with a wall by using a pipe frame to greatly shorten the entire construction period.
Particularly, in the present invention, since a basic frame is formed by a bolt fastening method using a pipe, a basic frame (base structure) can be installed very easily, and the durability and safety of the structure can be greatly improved The present invention provides a method of constructing a reinforced concrete structure with a wall by using a pipe frame.
In addition, the present invention can be realized by installing a wall-embedded electrical product such as an electrical outlet or a fire-fighting device on a cement board and forming a heat insulating layer by spraying in addition to electric wiring, The present invention provides a method of constructing a wall-integral reinforced concrete structure using a pipe frame.
In order to accomplish the above object, a method of constructing a wall-integrated reinforced concrete structure using a pipe framework according to the present invention comprises: a base structure assembling step of forming a skeleton of a structure using a pipe; Forming a reinforcing bar structure for reinforcing the reinforcing bars in the base structure; Installing a cement board outside the base structure; And a concrete pouring and curing step of pouring and curing the concrete inside the cement board, wherein the forming of the reinforcing steel structure comprises: a step of forming at least two pipes facing each other in the pipe constituting the horizontal frame of the base structure, A reinforcing spacer mounting process in which the spacers are juxtaposed to face each other; And a reinforcing spacer fastening step of fastening and fastening the two reinforcing spacers to each other, wherein the reinforcing spacer is integrally formed with the spacing support portion and the fitting portion, Wherein the cement board is installed at a position spaced apart from the outer side of the base structure by the spacing support portion, A Method of Construction of Reinforced Concrete Structures with Integrated Wall by using Pipe Frames.
delete
The reinforcement spacer may have at least one engaging portion formed on at least one side of an upper surface and a lower surface thereof, and the connecting bar may include a bolt. In the reinforcing spacer fastening process, The joining portions of the two opposing reinforcing spacers can be connected by connecting the bolts to form a part of the structure.
delete
The step of installing the cement board may include a step of forming a heat insulating layer by spraying a heat insulating material between the cement board and the base structure separated by the spacing support portion.
In addition, the heat insulating layer forming step forms a heat insulating layer so that at least a part of the pipe is embedded from the inner side of the cement board, and the concrete pouring and curing step may include at least another part of the pipe embedded in the concrete.
Further, between the cement board installation step and the concrete pouring and curing step, electric wires are installed in the base structure, and an electric appliance installed on the outer side of the indoor side cement board of the cement board, Wiring and electrical product installation steps.
According to the above-mentioned solution, the present invention has an advantage that it is possible to omit the process of installing and dismantling the formwork, the flattening work, and the finishing material installation, thereby greatly shortening the entire construction period.
Particularly, the present invention has an advantage that a basic frame (base structure) can be installed very easily by forming a basic frame by a bolt fastening method using a pipe.
In addition, the present invention has an effect of improving the durability and safety of the structure by improving the vibration resistance by adding the pipe framework to the reinforcement method which relies on the reinforcement.
The present invention also provides an advantage of facilitating additional work such as electric wiring work which has been complicated after concrete curing, by installing wall-embedded electrical products or fire-fighting equipment and performing electric wiring work before pouring and curing of concrete .
In addition, the present invention forms a heat insulating layer by spraying method to prevent the breakage of the heat insulating material generated in the process of curing the concrete after the curing of concrete, the occurrence of gaps between the heat insulating materials and the occurrence of the non- In addition, there is an advantage that fire resistance, sound insulation, sound insulation and the like can be greatly improved.
As a result, the present invention can greatly reduce the entire construction cost and the construction period in the construction of the reinforced concrete structure, and can be applied to various types of structures, .
Accordingly, it is possible to improve the reliability and competitiveness in the field of reinforced concrete structure, particularly in the construction of buildings using reinforced concrete, as well as in similar or related fields.
FIG. 1 is a flowchart illustrating an embodiment of a method of constructing a wall-integrated reinforced concrete structure using a pipe frame according to an embodiment of the present invention.
FIGS. 2 to 5 are views showing a specific embodiment for explaining FIG. 1. FIG.
6 is a flowchart showing an embodiment of step 'S200' of FIG.
FIGS. 7 and 8 are views showing a specific embodiment for explaining step 'S200' of FIG.
FIG. 9 is a flowchart showing an embodiment of step 'S300' of FIG.
FIG. 10 is a view showing a specific embodiment for explaining step 'S300' of FIG.
11 is a flowchart showing another embodiment of a method of constructing a wall-integrated reinforced concrete structure using a pipe framework according to the present invention.
An example of a method of constructing a wall-integrated reinforced concrete structure using a pipe frame according to the present invention can be variously applied, and a preferred embodiment will be described with reference to the accompanying drawings.
Hereinafter, the pipes and the like shown in the drawings can be formed to extend in the longitudinal direction. It is needless to say that the construction of the pipes and the like is not limited to the proportional length shown in the drawings even if the construction is omitted.
1 is a flowchart showing an embodiment of a method of constructing a wall-integrated reinforced concrete structure using a pipe frame according to the present invention, and FIGS. 2 to 5 are views showing a concrete embodiment for explaining FIG.
Referring to FIGS. 1 and 2, a
The
The
The
The
The
2, the
When the formation of the
When the formation of the reinforcing steel structure is completed, the
The
As a result, the
When the installation of the
In the following, in describing the constructions shown in the drawings, the space where the concrete is poured and cured is described as an inner side and the space excluding the inner side space is described as an outer side on the basis of FIG. 5, And the opposite direction to the indoor side and the indoor side will be described as the outdoor side.
FIG. 6 is a flowchart showing an embodiment of step 'S200' of FIG. 1, and FIGS. 7 and 8 are views illustrating a specific embodiment for explaining step 'S200' of FIG.
Referring to FIG. 6, the step of forming a reinforcing steel structure (step S200) may include a reinforcement step (step S210), a reinforcing spacer installing step (step S220), and a reinforcing spacer fastening step (step S230).
7 and 8, the reinforcing function of the reinforcing
Referring to FIG. 7, the reinforcing
The reinforcing
7, in order to improve the coupling force with the
When the reinforcing
To this end, at least one
As a result, by connecting the connecting
In addition, the two reinforcing
At this time, the
FIG. 9 is a flowchart showing an embodiment of step 'S300' of FIG. 1, and FIG. 10 is a diagram illustrating a specific embodiment for explaining step 'S300' of FIG.
Referring to FIG. 9, the cement board installation step (step S300) may include a cement board spacing step (step S310) and a heat insulating layer forming step (step S320).
10, the
The
In this case, when the separate heat insulating material is processed, the thermal insulating effect may be deteriorated due to breakage of the heat insulating material generated in the process of installing the heat insulating material, generation of a gap between the heat insulating materials,
Accordingly, the present invention solves the problems that arise in the process of constructing the
When the
On the other hand, when the
10, the
Of course, even in the case where the
Therefore, in the present invention, since the
11 is a flowchart showing another embodiment of a method of constructing a wall-integrated reinforced concrete structure using a pipe frame according to the present invention.
11, when the installation of the
Therefore, by performing the wiring work before the concrete pouring and curing, the wiring work can be performed more easily, and the arrangement of the electric wires and the like can be efficiently performed.
The method of constructing a wall-integrated reinforced concrete structure using a pipe frame according to the present invention has been described above. It will be understood by those of ordinary skill in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.
It is to be understood, therefore, that the embodiments described above are in all respects illustrative and not restrictive.
100: base structure 101:
102: adiabatic space part 103:
110: Horizontal frame
111: vertical pipe 112: horizontal pipe
120: vertical frame
121: vertical pipe 122: intermediate connector
200: Rebar
300: Cement board
400: Spacer for reinforcement
410: spacing support 420:
430: coupling part 450: connection bar
500: insulating layer
Claims (7)
Forming a reinforcing bar structure for reinforcing the reinforcing bars in the base structure;
Installing a cement board outside the base structure; And
And a concrete pouring and curing step of pouring and curing concrete inside the cement board,
In the reinforcing bar forming step,
A reinforcing spacer installing step of arranging the reinforcing spacers side by side so as to face the at least two pipes facing each other among the pipes constituting the horizontal frame of the base structure; And
And a reinforcing spacer fastening step of fastening and fastening the two reinforcing spacers to each other,
The reinforcing spacer is formed integrally with the spacing support portion and the fitting portion,
In the reinforcing spacer installation process,
Wherein the spacing support portion is protruded to the outside of the horizontal frame to fit the fitting portion to the horizontal frame,
In the cement board installation step,
Wherein the cement board is installed at a distance from the outer side of the base structure by the spacing support part.
The reinforcing spacer has at least one engaging portion formed on at least one side of the upper surface and the lower surface,
Wherein the connecting bar comprises a bolt,
In the reinforcing spacer fastening process,
Wherein the joint of the two reinforcing spacers facing each other is connected by the bolts so that the bolts are part of the reinforcing steel structure.
In the cement board installation step,
And forming a heat insulating layer by spraying a heat insulating material between the cement board and the base structure spaced apart by the spacing support portion, thereby forming a heat insulating layer.
In the heat insulating layer forming process,
A heat insulating layer is formed so that at least a part of the pipe is embedded from the inner side of the cement board,
The concrete pouring and curing step comprises:
Wherein at least a portion of the pipe is filled with concrete. ≪ RTI ID = 0.0 > 11. < / RTI >
Between the cement board installing step and the concrete pouring and curing step,
Further comprising the steps of installing electrical wiring and electrical appliances for wiring the electric wires inside the base structure and installing the electric appliances connected to the electric wires on the outer surface of the indoor cement board of the cement board Construction Method of Reinforced Concrete Structure with Wall -
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020140112851A KR101588381B1 (en) | 2014-08-28 | 2014-08-28 | Reinforced concrete structure constructing method of integral wall surface using the pipe frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020140112851A KR101588381B1 (en) | 2014-08-28 | 2014-08-28 | Reinforced concrete structure constructing method of integral wall surface using the pipe frame |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101588381B1 true KR101588381B1 (en) | 2016-01-25 |
Family
ID=55307044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020140112851A KR101588381B1 (en) | 2014-08-28 | 2014-08-28 | Reinforced concrete structure constructing method of integral wall surface using the pipe frame |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101588381B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101806831B1 (en) * | 2017-03-24 | 2017-12-08 | 김우영 | Dismounting foam assembly integrated with insulation materials and building construction method using the same |
KR20200027329A (en) | 2018-09-04 | 2020-03-12 | 백두산업 주식회사 | Aseismicity wall permanent form unit and Wall construction method using the same |
KR102266168B1 (en) * | 2021-01-12 | 2021-06-17 | (주)주현개발 | Construction method of reinforced concrete frame structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100383795B1 (en) | 2000-08-31 | 2003-05-16 | 현대산업개발 주식회사 | connection structure of fixing and connecting steel girder in reinforcement concrete column and construction method |
KR100759368B1 (en) * | 2006-11-01 | 2007-09-19 | 김길영 | Prefabricating permanent form unit and wall construction method using the same |
KR20110040493A (en) * | 2009-10-14 | 2011-04-20 | 노동신 | Permanent formwork for reinforced concrete |
KR101351106B1 (en) | 2011-10-21 | 2014-01-14 | 김경완 | Construction structure for inner-insulation of reinforced concrete wall and construction method thereof |
-
2014
- 2014-08-28 KR KR1020140112851A patent/KR101588381B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100383795B1 (en) | 2000-08-31 | 2003-05-16 | 현대산업개발 주식회사 | connection structure of fixing and connecting steel girder in reinforcement concrete column and construction method |
KR100759368B1 (en) * | 2006-11-01 | 2007-09-19 | 김길영 | Prefabricating permanent form unit and wall construction method using the same |
KR20110040493A (en) * | 2009-10-14 | 2011-04-20 | 노동신 | Permanent formwork for reinforced concrete |
KR101351106B1 (en) | 2011-10-21 | 2014-01-14 | 김경완 | Construction structure for inner-insulation of reinforced concrete wall and construction method thereof |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101806831B1 (en) * | 2017-03-24 | 2017-12-08 | 김우영 | Dismounting foam assembly integrated with insulation materials and building construction method using the same |
KR20200027329A (en) | 2018-09-04 | 2020-03-12 | 백두산업 주식회사 | Aseismicity wall permanent form unit and Wall construction method using the same |
KR102266168B1 (en) * | 2021-01-12 | 2021-06-17 | (주)주현개발 | Construction method of reinforced concrete frame structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101182536B1 (en) | Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose | |
US8813445B2 (en) | Support beam structure capable of extending span and reducing height of ceiling structure and installing method thereof | |
KR101457077B1 (en) | Reformed concrete filled tube column structure | |
KR101588381B1 (en) | Reinforced concrete structure constructing method of integral wall surface using the pipe frame | |
WO2014126544A1 (en) | Horizontal and vertical reinforcement used on columns and structural walls in buildings | |
JP5574328B2 (en) | Tokai seismic wall and its construction method | |
KR101355926B1 (en) | Reusable waffle type slab form assembly | |
KR20120013739A (en) | Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab | |
JP5865567B2 (en) | Connecting slab and its construction method | |
KR101105883B1 (en) | Basic mat constructing method of high rise concrete structure | |
KR101880813B1 (en) | A sandwitch pc pannel structure and construction method of structure using thereof | |
JP2007009427A (en) | Construction method of reinforced concrete building | |
KR101445286B1 (en) | PC-SF Method for Construction Duration Reduction of Typical Floor | |
WO2014182262A1 (en) | Beams, columns and beam-column joints structural elements innovation | |
KR100768081B1 (en) | Columnless structure of apartment buildings | |
KR101372410B1 (en) | Slab construction for the block | |
KR100612662B1 (en) | Steel-frame assembly body production method of ferroconcrete infrastructure | |
KR101140627B1 (en) | Construction method of concrete building | |
JP5872332B2 (en) | Seismic reinforcement method for buildings | |
JP5964026B2 (en) | Reinforced slab structure and its construction method | |
JP6849491B2 (en) | Exposed column base structure of steel columns and its construction method | |
KR100452977B1 (en) | Joint structure and construction method of RC beam and slab for slim floor system | |
KR102461466B1 (en) | Construction method of reinforced concrete structure using triangular stud frame | |
JP6261333B2 (en) | Seismic reinforcement method | |
RU2368742C1 (en) | Method for manufacturing of wall-ceiling structure in reinforced concrete version |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20181202 Year of fee payment: 4 |