KR20170115359A - Cross Arm Descending Device And Method For The none power cut construction In The power distribution lines - Google Patents

Cross Arm Descending Device And Method For The none power cut construction In The power distribution lines Download PDF

Info

Publication number
KR20170115359A
KR20170115359A KR1020160042917A KR20160042917A KR20170115359A KR 20170115359 A KR20170115359 A KR 20170115359A KR 1020160042917 A KR1020160042917 A KR 1020160042917A KR 20160042917 A KR20160042917 A KR 20160042917A KR 20170115359 A KR20170115359 A KR 20170115359A
Authority
KR
South Korea
Prior art keywords
iron
moving
bare
fixing
descender
Prior art date
Application number
KR1020160042917A
Other languages
Korean (ko)
Inventor
서정연
Original Assignee
주식회사 성진
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 성진 filed Critical 주식회사 성진
Priority to KR1020160042917A priority Critical patent/KR20170115359A/en
Publication of KR20170115359A publication Critical patent/KR20170115359A/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/02Devices for adjusting or maintaining mechanical tension, e.g. take-up device
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B17/00Insulators or insulating bodies characterised by their form
    • H01B17/02Suspension insulators; Strain insulators
    • H01B17/06Fastening of insulator to support, to conductor, or to adjoining insulator
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • H02G7/053Suspension clamps and clips for electric overhead lines not suspended to a supporting wire
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers

Landscapes

  • Electric Cable Installation (AREA)

Abstract

배전선로에서 각종 설비에 많은 부분 철을 아연으로 도금하여 사용하며,아연으로 도금한 철은 대략 30년 정도 경과하면 부식이 발생하여 보수 또는 교체를 해야하다. 그리고 근래 각종 정보 통신기기, 산업시설, 보안 등 여러 분야에서 전기를 사용하기 때문에 지속적인 전기의 공급이 요구되어 전기사업자인 한전은 중단없는 전기공급에 각별히 신경을 쓰고 있으며 설비의 유지 및 관리에 무정전 공법을 적극 도입하여 활용하고 있다.
철을 아연으로 도금한 설비로 70~80년대에 생산되어 현장에 설치된 완철에서 이미 상당 부분 부식이 진행되어 교체할 필요가 있으며, 완철은 전주에서 애자를 통하여 전선을 지지하는 설비로 전선을 지지하는 형태에 따라서 인류 내장 직선개소로 분류되며, 내장 및 직선개소에서 완철을 교체하는 용도의 장치는 몇몇이 개발되어 있으나 인류개소의 완철을 교체하는 장치에 관한 선행하는 기술이 아직까지 개발되어 있지 않은 것으로 보여진다.
이에 본 발명은 인류주에서 완철에 가해지는 불평형 하중을 완화하거나 해소하여 완철을 안전하게 아래로 내리고 교체할 수 있도록 기능하는 장치 및 공법를 제공하고자 한다.
In distribution lines, many parts of iron are plated with zinc in various facilities, and iron which is plated with zinc has to be repaired and replaced after about 30 years. In recent years, electricity is used in various fields such as various information communication devices, industrial facilities, security, etc. Therefore, KEPCO, which is an electric company, is paying special attention to supply electricity without interruption. Are introduced and utilized.
It is a facility where iron is plated with zinc and it is produced in the 70 ~ 80s. It has already been corroded and replaced with the wasted iron which is installed in the field. Wanchul is a facility that supports electric wires through insulators in Jeonju. Some of these devices have been developed for the purpose of replacing solid iron in built-in and straight-line locations, although the prior art of a device for replacing solid iron in human places has not yet been developed .
Accordingly, the present invention is intended to provide a device and a method for relieving or eliminating the unbalanced load applied to the bare iron in the human body so that the bare iron can be safely lowered and replaced.

Description

무정전 배전공사용 완철하강 장치 및 공법{Cross Arm Descending Device And Method For The none power cut construction In The power distribution lines}Technical Field [0001] The present invention relates to a method and apparatus for reducing power consumption,

배전선로에서 무정전으로 완철을 교체하는 장치 및 공법에 관한 것이다.And more particularly, to a device and a method for replacing coarse iron in a distribution line by uninterrupted power.

배전선로에서 각종 설비에 많은 부분 철을 아연으로 도금하여 사용하며, 아연으로 도금한 철은 대략 30년 정도 경과하면 부식이 발생하여 보수 또는 교체를 해야하다.In distribution lines, many parts of iron are plated with zinc in various facilities, and iron which is plated with zinc has to be repaired and replaced after about 30 years.

그리고 근래 각종 정보 통신기기, 산업시설, 보안 등 여러 분야에서 전기를 사용하기 때문에 지속적인 전기의 공급이 요구되어 전기사업자인 한전은 중단없는 전기공급에 각별히 신경을 쓰고 있으며 설비의 유지 및 관리에 무정전 공법을 적극 도입하여 활용하고 있다.In recent years, electricity is used in various fields such as various information communication devices, industrial facilities, security, etc. Therefore, KEPCO, which is an electric company, is paying special attention to supply electricity without interruption. Are introduced and utilized.

철을 아연으로 도금한 설비로 70~80년대에 생산되어 현장에 설치된 완철에서 이미 상당 부분 부식이 진행되어 교체할 필요가 있으며, 완철은 전주에서 애자를 통하여 전선을 지지하는 설비로 전선을 지지하는 형태에 따라서 인류 내장 직선개소로 분류되며, 내장 및 직선개소에서 완철을 교체하는 용도의 장치는 몇몇이 개발되어 있으나 인류개소의 완철을 교체하는 장치에 관한 선행하는 기술이 아직까지 개발되어 있지 않은 것으로 보여진다. It is a facility where iron is plated with zinc and it is produced in the 70 ~ 80s. It has already been corroded and replaced with the wasted iron which is installed in the field. Wanchul is a facility that supports electric wires through insulators in Jeonju. Some of these devices have been developed for the purpose of replacing solid iron in built-in and straight-line locations, although the prior art of a device for replacing solid iron in human places has not yet been developed .

이에 배전선로에서 무정전으로 인류개소의 완철을 교체하는 데에 이용하는 장치 및 공법에 관하여 검토하고자 한다Therefore, we would like to examine the equipment and the method used to replace the bridges of human places from the distribution lines to the uninterrupted

상기의 장치 및 공법을 고안하기 위하여, To design the above apparatus and method,

배전선로에서 인류개소의 완철을 교체하는 공정을 살펴보면, 완철을 전주에 고정하는 완철밴드의 고정 볼트를 풀어 완철을 아래로 내리고 원래의 자리에 새로운 완철을 설치하여 현수애자를 이동하고 기존 완철을 철거하는데, 완철을 아래로 내리는 과정에서 전기설비의 무게 및 전선의 장력에 따른 하중이 불평형하여 완철이 기울거나 회전하게 된다.If you look at the process of replacing the soldering iron of the human race spot in the distribution line, unscrew the fixing bolt of the wax iron band fixing the wax iron to the pole, lower the wax iron and install the new wax iron at the original spot, However, in the course of lowering the brass, the load due to the weight of the electrical equipment and the tension of the wire is unbalanced, so that the brass is inclined or rotated.

이에 본 발명은 인류개소에서 완철에 가해지는 불평형 하중을 완화하거나 해소하여 완철을 안전하게 아래로 내리고 교체할 수 있도록 기능하는 장치 및 공법를 제공하고자 한다.Accordingly, the present invention provides a device and a method for relieving or eliminating the unbalanced load applied to the brass in the human body, thereby safely lowering and replacing the brass rail.

상기 목적을 달성하기 위하여,In order to achieve the above object,

본 발명은 배전선로에서 무정전으로 완철을 교체하는 장치에 있어서,The present invention relates to an apparatus for replacing coarse iron in a distribution line by uninterrupted power,

양 측면 상하부에 고정용 밴드를 구비하여 전주의 둘레 면에 고정되고, 상하 단에 직사각형의 베이스(12)와 나사 축(13)의 상하 단이 축고정(14)으로 고정되고, 나사 축(13)과 이동구(15)가 결합되며 이동구(15)의 측면에 구비된 결합용 고리와 절연암타이(16)의 일 측이 결합하는 완철하강기(4)와;The base 12 and the upper and lower ends of the screw shaft 13 are fixed at the upper and lower ends by shaft fixing 14 and are fixed to the peripheral surfaces of the screw shaft 13 And a moving iron (15) coupled to the moving arm (15) and a coupling ring provided on a side surface of the moving rod (15) and a side of the insulating arm tie (16);

일 측이 상기 이동구(15) 측면의 결합용 고리와 결합하고, 타 측이 크람프(17)로 완철(2)과 연결되는 절연암타이(16)를; 포함하여 구성한다.An insulating arm tie 16 having one side engaged with a coupling ring on the side of the moving tool 15 and the other side connected to the bare iron 2 with a crump 17; .

그리고 배전선로에서 무정전으로 완철을 교체하는 공법에 있어서,In the method of replacing the bare iron from the distribution line by uninterruptible power,

전주(1)에서 완철(2)의 아래에 완철하강기(4)를 양 측면 상하부에 구비된 고정용 밴드로 고정하고, 완철하강기(4) 이동구(15)의 측면에 구비된 결합용 고리와 절연암타이(16)의 일 측과 결합하고, 절연암타이(16)의 타 측이 크람프(17)를 구비하여 완철(2)과 결합하는 완철하강 장치설치 단계(S101); 전주(1)를 기준으로 2상이 설치된 쪽 외측 상의 현수애자(5)를 연결거리 조절 기능을 지닌 쇄클(5)로 연결거리를 조절하므로서 전선(7)의 장력을 완화하여 내측으로 일정 거리 이동설치 또는 내측 상의 현수애자(6)를 완철(2)의 중심으로 이동하여 설치하는 현수애자(6) 이동설치 단계(S102); 완철(2)을 전주(1)에 고정하는 완철밴드(3)가 전주(1)면에서 아래로 이동이 가능하도록 결합을 조금 푸는 완철밴드(3)의 결합완화 단계(S103); 완철하강기(4)의 나사 축(13)을 활선 바켓트럭에 구비된 랜치로 구동하여 이동구(15)를 아래로 이동하므로서 절연암타이(16)을 통하여 연결된 완철(2)을 아래로 이동시키는 완철(2) 하강이동 단계(S104); 완철밴드(3)의 결합을 강화하여 완철(2)을 다시 전주(1)에 고정하는 완철밴드(3)의 결합강화 단계(S105); 완철(2)을 아래로 이동시킨 자리에 새로운 완철(2)을 설치하는 완철설치 단계(S106); 활선 장선기(도시생략)를 이용하여 아래로 이동한 완철(2)에서 새로 설치한 완철(2)로 현수애자(6)를 이동시켜서 설치하는 현수애자(6) 이동설치 단계(S107); 아래로 이동된 완철(2)과 공사와 관련한 기구를 철거하는 마무리 단계(S108);를 포함하여 구성한다.The full iron descender 4 is fixed to the electric pole 1 under the solid iron 2 by fixing bands provided on the upper and lower sides of both sides and the coupling ring provided on the side of the full iron descender 4 A step (S101) of installing a coarse iron lowering device coupled with one side of the insulating tie 16 and having the other side of the insulating tie 16 having a crumb 17 and joining with the bare iron 2; The tension of the wire (7) is relaxed by adjusting the connection distance by means of the shackle (5) having the function of adjusting the connection distance, so that the tension of the wire (7) (6) moving and installing a suspending insulator (6) by moving the suspending insulator (6) on the inner side to the center of the solid iron (2); A coupling relieving step (S103) of the coarse iron band 3 in which the coarse iron band 3 for fixing the coarse iron 2 to the electric pole 1 is slightly loosened so as to be able to move downward from the electric pole face; The screw shaft 13 of the full steel descender 4 is driven by a wrench provided in the live wire bucket truck to move the moving tool 15 downward to move the wrought iron 2 connected through the insulating arm tie 16 downward (2) descending movement step S104; Reinforcing step (S105) of the wrought iron band (3) for strengthening the bonding of the wrought iron band (3) and fixing the wrought iron (2) back to the electric pole (1); A step (S106) of installing a new barrel (2) at a position where the barrel (2) is moved downward; A suspension mounting step (S107) of moving the suspending insulator (6) by moving the suspension insulator (6) from a bare iron (2) moved downward using a live wire girder (not shown) to a newly installed bare iron (2); And a finishing step (S108) of removing the wrought iron (2) moved downward and the mechanism related to the construction.

상기 본 발명의 과제의 해결 수단에 따르면, According to the solution of the problem of the present invention,

무정전 배전공사에서 2상이 설치된 쪽의 현수애자를 전선의 장력을 조절하고 이동하여 설치하고, 완철하강기가 절연암타이를 통하여 완철를 지지하도록 하며, 설치된 전선의 작은 길이 변화에도 장력이 크게 변하는 특성을 이용하면, 완철을 아래로 내리는 과정에서 완철이 기울거나 회전하는 것을 억제할 수 있으며 나사 축과 이동구의 기계식 결합에 의한 작동으로 완철을 안전하게 아래로 내리고 교체할 수 있는 효과가 있다. In the uninterruptible power distribution work, the tension of the wire installed on the side where the two phases are installed is adjusted and moved, and the complete steel descender supports the coarse iron through the insulation arm tie, and the tension is greatly changed It is possible to suppress the tilting or rotation of the tilting iron in the process of lowering the tilting iron downward, and it is possible to safely lower and replace the tilting iron by the operation by the mechanical coupling between the screw shaft and the tilting sphere.

도 1은 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 장치의 구성를 나타내는 도면이다.
도 2는 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 장치의 완철하강기 분해를 나타내는 도면이다.
도 3은 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 장치의 설치를 나타내는 도면이다.
도 4는 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 장치를 이용한 완철의 이동을 나타내는 도면이다.
도 5는 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 공법의 단계 구성를 나타내는 도면이다.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view showing the construction of an unloading / unloading apparatus for uninterruptible power supply according to an embodiment of the present invention; FIG.
FIG. 2 is a view showing a full-bar descender disassembly of the unloading-and-unloading apparatus according to the embodiment of the present invention.
FIG. 3 is a view showing the installation of the unloading and dropping apparatus for uninterruptible power supply according to the embodiment of the present invention.
FIG. 4 is a view illustrating the movement of a wrought iron using the unloading apparatus according to the embodiment of the present invention.
FIG. 5 is a view showing a step configuration of the unloading and unloading method according to the embodiment of the present invention.

본 발명을 설명함에 있어서, 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 설명을 생략한다.In the following description of the present invention, a detailed description of related arts will be omitted when it is determined that the gist of the present invention may be unnecessarily obscured.

이하, 첨부된 도면들을 참조하여 본 발명의 실시을 위한 구체적인 내용을 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 장치의 구성를 나타내는 도면이다.BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view showing the construction of an unloading / unloading apparatus for uninterruptible power supply according to an embodiment of the present invention; FIG.

도 2는 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 장치의 완철하강기 분해를 나타내는 도면이다.FIG. 2 is a view showing a full-bar descender disassembly of the unloading-and-unloading apparatus according to the embodiment of the present invention.

도 1내지 도 2를 참조하여 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 장치의 구성에 대하여 상세히 설명한다.1 to 2, a detailed description will be given of the construction of the unloading and dropping apparatus for uninterruptible power distribution according to the embodiment of the present invention.

양 측면 상하부에 고정용 밴드를 구비하여 전주(1)의 둘레 면에 고정되고, 상하 단에 직사각형의 베이스(12)와 나사 축(13)의 상하 단이 축고정(14)으로 고정되고, 나사 축(13)과 이동구(15)가 결합되며 이동구(15)의 측면에 구비된 결합용 고리와 절연암타이(16)의 일 측이 결합하되, 나사 축(13)이 회전하여 이동구(15)를 상하로 이동시키도록 기능하는 완철하강기(4)와;The base 12 and the upper and lower ends of the screw shaft 13 are fixed to the shaft fixing 14 at the upper and lower ends thereof with fixing bands on the upper and lower sides of both sides thereof. A shaft 13 and a moving rod 15 are coupled to each other and a coupling ring provided on a side surface of the moving rod 15 is coupled to one side of the insulating arm tie 16, (4) functioning to move up and down the main body (15) vertically;

일 측이 상기 이동구(15) 측면의 결합용 고리와 결합하고, 타 측이 크람프(17)를 구비하여 완철(2)과 연결되되, 전주(1)를 기준으로 좌우측 전기설비의 무게로 인한 하중을 부담하여 완철(3)이 아래로 이동하는 과정에서 기울지 않도록 기능하는 절연암타이(16)를; 포함하여 구성한다.And the other side is connected to the bare iron 2 by the crumb 17 and the other side is connected to the bare iron 2 by the weight of the left and right electric equipment on the basis of the electric pole 1 An insulating arm tie 16 functioning to bear the load due to the load and not to tilt in the process of moving the brass iron 3 downward; .

상기 완철하강기(4)에 있어서,In the full-steel descender 4,

양 측면 상하부에 고정용 밴드를 구비하여 전주의 둘레 면에 고정되고, 일 면이 베이스(12)와 결합하며 단부 면에 결합용 홀을 구비하는 고정부(11)와;A fixing part (11) fixed to the circumferential surface of the pole with a fixing band on both upper and lower sides thereof, a fixing part (11) having one surface coupled with the base (12) and a coupling hole on the end surface;

단부 면에 결합용 홀을 구비하여 축고정(14)으로 상기 고정부(11) 단부 면의 홀과 결합하되, 나사 축(13)이 회전하여 이동구(15)가 상하로 이동할 시 이동구(15)의 회전을 제한하도록 기능하는 회전 방지턱을 구비한 베이스(12)와;And has a coupling hole at an end surface thereof and is coupled with a hole of the end surface of the fixing part 11 by a shaft fixing 14 so that when the screw shaft 13 rotates and the moving part 15 moves up and down, 15); a base (12) having a rotation barb;

몸체가 나사 봉이되, 양측 단부가 상기 베이스(12)와 함께 축고정(14)으로 상기 고정부(11) 단부 면의 홀에 고정되고, 중심부를 관통하여 형성되는 너트 홀을 구비한 이동구(15)와 결합하되, 회전하여 이동구(15)를 상하로 이동시키도록 기능하는 나사 축(13)과;(11) of the fixed part (11) with the base (12) and a nut hole formed through the center part, the body A screw shaft 13 which is coupled to the moving member 15 and rotates to move the moving member 15 up and down;

몸체 중심부의 너트 홀이 상기 나사 축(13)과 결합하고, 일 측면에 2구 결합용 고리와 두 측면에 1구 결합용 고리를 구비하여 절연암타이(16)의 일 측과 결합하되, 나사 축(13)의 회전으로 절연암타이(16)를 통하여 완철(2)을 상하로 이동시키도록 기능하는 이동구(15)를; 포함하여 구성한다.
A nut hole at the center of the body is coupled with the screw shaft (13), and has a two-hole coupling ring on one side and a one-hole coupling ring on two sides to join with one side of the insulation tie (16) (15) functioning to move the wrought iron (2) up and down through the insulation arm tie (16) by rotation of the shaft (13); .

도 3은 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 장치의 설치를 나타내는 도면이다.FIG. 3 is a view showing the installation of the unloading and dropping apparatus for uninterruptible power supply according to the embodiment of the present invention.

도 4는 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 장치를 이용한 완철의 이동를 나타내는 도면이다.FIG. 4 is a view illustrating the movement of the wrought iron using the unloading apparatus for uninterruptible power supply according to the embodiment of the present invention.

도 5는 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 공법의 단계 구성를 나타내는 도면이다.FIG. 5 is a view showing a step configuration of the unloading and unloading method according to the embodiment of the present invention.

도 3은 전주에서 교체하고자 하는 완철의 하단에 완철하강 장치의 설치를 나타내고, 도 4는 도 3의 공정에 연속하여 완철하강 장치를 이용한 완철의 이동을 나타내는 도면이고, 도 5는 공법의 단계 구성을 나타내는 도면이다.FIG. 3 is a view showing the installation of a bare iron descending device at the lower end of a wrought iron to be replaced in the electric pole, FIG. 4 is a view showing the movement of the wrought iron using the bare iron descending device in succession to the process of FIG. 3, Fig.

도 3과 도 4내지 도5를 참조하여 본 발명의 실시 예에 따른 무정전 배전공사용 완철하강 공법의 단계 구성에 대하여 상세히 설명한다.3 and 4 to 5, a detailed description will be made of a step configuration of the unloading and unloading method according to the embodiment of the present invention.

본 발명의 공법은 보통장주 3상 인류개소에서 공법의 단계를 구성한 예로서,The method of the present invention is an example of constructing the steps of the public method in a common ancestral three-

전주(1)에서 완철(2)의 아래에 완철하강기(4)를 양 측면 상하부에 구비된 고정용 밴드로 고정하고, 완철하강기(4) 이동구(15)의 측면에 구비된 결합용 고리와 절연암타이(16)의 일 측과 결합하고, 절연암타이(16)의 타 측이 크람프(17)를 구비하여 완철(2)의 둘레 면과 결합하는 완철하강 장치설치 단계(S101);The full iron descender 4 is fixed to the electric pole 1 under the solid iron 2 by fixing bands provided on the upper and lower sides of both sides and the coupling ring provided on the side of the full iron descender 4 A step (S101) of installing a coarse iron lowering device coupled with one side of the insulating tie 16, and the other side of the insulating tie 16 is provided with a crumb 17 to engage with the circumferential surface of the bare steel 2;

전주(1)를 기준으로 2상이 설치된 쪽 외측 상의 현수애자(5)를 연결거리 조절 기능을 지닌 쇄클(5)로 연결거리를 조절하므로서 전선(7)의 장력을 완화하여 내측으로 일정 거리 이동설치 또는 내측 상의 현수애자(6)를 완철(2)의 중심으로 이동하여 설치하는 현수애자(6) 이동설치 단계(S102);The tension of the wire (7) is relaxed by adjusting the connection distance by means of the shackle (5) having the function of adjusting the connection distance, so that the tension of the wire (7) (6) moving and installing a suspending insulator (6) by moving the suspending insulator (6) on the inner side to the center of the solid iron (2);

완철(2)을 전주(1)에 고정하는 완철밴드(3)가 전주(1)면에서 아래로 이동이 가능하도록 결합을 조금 푸는 완철밴드(3)의 결합완화 단계(S103);A coupling relieving step (S103) of the coarse iron band 3 in which the coarse iron band 3 for fixing the coarse iron 2 to the electric pole 1 is slightly loosened so as to be able to move downward from the electric pole face;

완철하강기(4)의 나사 축(13)을 활선 바켓트럭에 구비된 랜치로 구동하여 이동구(15)를 아래로 이동하므로서 절연암타이(16)을 통하여 연결된 완철(2)을 아래로 이동시키는 완철(2) 하강이동 단계(S104);The screw shaft 13 of the full steel descender 4 is driven by a wrench provided in the live wire bucket truck to move the moving tool 15 downward to move the wrought iron 2 connected through the insulating arm tie 16 downward (2) descending movement step S104;

완철밴드(3)의 결합을 강화하여 완철(2)을 다시 전주(1)에 고정하는 완철밴드(3)의 결합강화 단계(S105);Reinforcing step (S105) of the wrought iron band (3) for strengthening the bonding of the wrought iron band (3) and fixing the wrought iron (2) back to the electric pole (1);

완철(2)을 아래로 이동시킨 자리에 새로운 완철(2)을 설치하는 완철설치 단계(S106);A step (S106) of installing a new barrel (2) at a position where the barrel (2) is moved downward;

활선 장선기(도시생략)를 이용하여 아래로 이동한 완철(2)에서 새로 설치한 완철(2)로 현수애자(6)를 이동시켜서 설치하는 현수애자(6) 이동설치 단계(S107);A suspension mounting step (S107) of moving the suspending insulator (6) by moving the suspension insulator (6) from a bare iron (2) moved downward using a live wire girder (not shown) to a newly installed bare iron (2);

아래로 이동된 완철(2)과 공사와 관련한 기구를 철거하는 마무리 단계(S108);를 포함하여 구성한다. And a finishing step (S108) of removing the wrought iron (2) moved downward and the mechanism related to the construction.

상기와 같이 본 발명은 전주를 기준으로 2상이 설치된 쪽의 현수애자를 전선의 장력을 조절하고 이동하여 설치하므로서, 완철에 가해지는 일 측의 2상과 타 측의 1상 간에 전기설비로의 무게로 인한 불평형 수직하중과 전선의 장력으로 인한 불평형 하중을 완화 또는 해소한다.As described above, according to the present invention, since the tension of the electric wire is adjusted and moved by installing the suspending insulator on the side where the two phases are installed on the basis of the electric pole, the weight of the electric equipment between the two phases on one side and the one side on the other side To compensate for or compensate for unbalanced vertical loads due to unbalanced vertical loads and unbalanced loads due to tension of wires.

그리고 완철하강기가 절연암타이를 통하여 완철를 지지하므로 완철밴드의 결합을 완화하여 완철을 아래로 내리는 과정에서 완철이 기우는 것을 방지하도록 기능한다.And since the crown iron reducer supports the crown iron through the insulation arm tie, it functions to prevent the crown iron from tilting in the process of lowering the crown iron by reducing the coupling of the crown bands.

또한 전선의 장력으로 인하 불평형 하중이 조절되어 크지 않고, 설치된 전선의 작은 길이 변화에도 장력이 크게 변하는 특성이 있어 완철을 아래로 내리는 과정에서 회전하는 것을 억제할 수 있고, 나사 축과 이동구의 기계식 결합에 의한 작동으로 완철을 안전하게 아래로 내리고 교체할 수 있도록 기능한다.In addition, since the unbalanced load is reduced by the tension of the wire and the tension is greatly changed even when the length of the installed wire is small, the rotation can be suppressed in the course of lowering the wire, To safely lower and replace wrought iron.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시 예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시 예에 의하여 본 발명의 기술 사상의 범위에 한정되는 것은 아니다.The foregoing description is merely illustrative of the technical idea of the present invention, and various changes and modifications may be made by those skilled in the art without departing from the essential characteristics of the present invention. Therefore, the embodiments disclosed in the present invention are intended to illustrate rather than limit the scope of the present invention, and are not intended to limit the scope of the present invention.

본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다. The scope of protection of the present invention should be construed according to the following claims, and all technical ideas within the scope of equivalents should be construed as falling within the scope of the present invention.

1 : 전주 2 : 완철
3 : 완철밴드 4 : 완철하강기
5 : 쇄클 6 : 현수애자
7 : 전선
11 : 고정부 12 : 베이스
13 : 나사 축 14 : 축고정
15 : 이동구 16 : 절연암타이
17 : 크람프
1: Jeonju 2: Wanchul
3: Wrought iron band 4:
5: Shackle 6: Suspension insulator
7: Wires
11: fixing part 12: base
13: Screw shaft 14: Fixed shaft
15: Moving sphere 16: Insulated arm tie
17: Crump

Claims (2)

배전선로에서 무정전으로 완철을 교체하는 장치에 있어서,
양 측면 상하부에 고정용 밴드를 구비하여 전주(1)의 둘레 면에 고정되고, 상하 단에 직사각형의 베이스(12)와 나사 축(13)의 상하 단이 축고정(14)으로 고정되고, 나사 축(13)과 이동구(15)가 결합되며 이동구(15)의 측면에 구비된 결합용 고리와 절연암타이(16)의 일 측이 결합하는 완철하강기(4)와;
일 측이 상기 이동구(15) 측면의 결합용 고리와 결합하고, 타 측이 크람프(17)를 구비하여 완철(2)과 연결되는 절연암타이(16)를; 포함하여 구성하는 무정전 배전공사용 완철하강 장치.
1. An apparatus for replacing coarse iron in an electric distribution line by uninterrupted power,
The base 12 and the upper and lower ends of the screw shaft 13 are fixed to the shaft fixing 14 at the upper and lower ends thereof with fixing bands on the upper and lower sides of both sides thereof. A full iron descender 4 to which the shaft 13 and the moving tool 15 are coupled and the one side of the insulating arm tie 16 is engaged with the coupling ring provided on the side surface of the moving tool 15;
An insulating arm tie 16 having one side engaged with a coupling ring on the side of the moving tool 15 and the other side having a crump 17 connected to the bare metal 2; An uninterruptible power supply using an uninterruptible power supply comprising:
배전선로에서 무정전으로 완철을 교체하는 공법에 있어서,
전주(1)에서 완철(2)의 아래에 완철하강기(4)를 양 측면 상하부에 구비된 고정용 밴드로 고정하고, 완철하강기(4) 이동구(15)의 측면에 구비된 결합용 고리와 절연암타이(16)의 일 측과 결합하고, 절연암타이(16)의 타 측이 크람프(17)를 구비하여 완철(2)의 둘레 면과 결합하는 완철하강 장치설치 단계(S101); 전주(1)를 기준으로 2상이 설치된 쪽 외측 상의 현수애자(5)를 연결거리 조절 기능을 지닌 쇄클(5)로 연결거리를 조절하므로서 전선(7)의 장력을 완화하여 내측으로 일정 거리 이동설치 또는 내측 상의 현수애자(6)를 완철(2)의 중심으로 이동하여 설치하는 현수애자(6) 이동설치 단계(S102); 완철(2)을 전주(1)에 고정하는 완철밴드(3)가 전주(1)면에서 아래로 이동이 가능하도록 결합을 조금 푸는 완철밴드(3)의 결합완화 단계(S103); 완철하강기(4)의 나사 축(13)을 활선 바켓트럭에 구비된 랜치로 구동하여 이동구(15)를 아래로 이동하므로서 절연암타이(16)을 통하여 연결된 완철(2)을 아래로 이동시키는 완철(2) 하강이동 단계(S104); 완철밴드(3)의 결합을 강화하여 완철(2)을 다시 전주(1)에 고정하는 완철밴드(3)의 결합강화 단계(S105); 완철(2)을 아래로 이동시킨 자리에 새로운 완철(2)을 설치하는 완철설치 단계(S106); 활선 장선기(도시생략)를 이용하여 아래로 이동한 완철(2)에서 새로 설치한 완철(2)로 현수애자(6)를 이동시켜서 설치하는 현수애자(6) 이동설치 단계(S107); 아래로 이동된 완철(2)과 공사와 관련한 기구를 철거하는 마무리 단계(S108);를 포함하여 구성하는 무정전 배전공사용 완철하강 공법.
In a method of replacing a bare wire from a distribution line by uninterruptible power,
The full iron descender 4 is fixed to the electric pole 1 under the solid iron 2 by fixing bands provided on the upper and lower sides of both sides and the coupling ring provided on the side of the full iron descender 4 A step (S101) of installing a coarse iron lowering device coupled with one side of the insulating tie 16, and the other side of the insulating tie 16 is provided with a crumb 17 to engage with the circumferential surface of the bare steel 2; The tension of the wire (7) is relaxed by adjusting the connection distance by means of the shackle (5) having the function of adjusting the connection distance, so that the tension of the wire (7) (6) moving and installing a suspending insulator (6) by moving the suspending insulator (6) on the inner side to the center of the solid iron (2); A coupling relieving step (S103) of the coarse iron band 3 in which the coarse iron band 3 for fixing the coarse iron 2 to the electric pole 1 is slightly loosened so as to be able to move downward from the electric pole face; The screw shaft 13 of the full steel descender 4 is driven by a wrench provided in the live wire bucket truck to move the moving tool 15 downward to move the wrought iron 2 connected through the insulating arm tie 16 downward (2) descending movement step S104; Reinforcing step (S105) of the wrought iron band (3) for strengthening the bonding of the wrought iron band (3) and fixing the wrought iron (2) back to the electric pole (1); A step (S106) of installing a new barrel (2) at a position where the barrel (2) is moved downward; A suspension mounting step (S107) of moving the suspending insulator (6) by moving the suspension insulator (6) from a bare iron (2) moved downward using a live wire girder (not shown) to a newly installed bare iron (2); And a finishing step (S108) of removing the bridges (2) moved downward and the mechanisms related to the construction.
KR1020160042917A 2016-04-07 2016-04-07 Cross Arm Descending Device And Method For The none power cut construction In The power distribution lines KR20170115359A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160042917A KR20170115359A (en) 2016-04-07 2016-04-07 Cross Arm Descending Device And Method For The none power cut construction In The power distribution lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160042917A KR20170115359A (en) 2016-04-07 2016-04-07 Cross Arm Descending Device And Method For The none power cut construction In The power distribution lines

Publications (1)

Publication Number Publication Date
KR20170115359A true KR20170115359A (en) 2017-10-17

Family

ID=60298191

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160042917A KR20170115359A (en) 2016-04-07 2016-04-07 Cross Arm Descending Device And Method For The none power cut construction In The power distribution lines

Country Status (1)

Country Link
KR (1) KR20170115359A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593636A (en) * 2019-09-18 2019-12-20 合肥海银杆塔有限公司 Composite cross arm with rotatable adjustment function
KR102241896B1 (en) * 2019-10-15 2021-04-20 한국전력공사 Wire moving apparatus of line post insulator for fixing supporting bar

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593636A (en) * 2019-09-18 2019-12-20 合肥海银杆塔有限公司 Composite cross arm with rotatable adjustment function
CN110593636B (en) * 2019-09-18 2024-03-08 合肥海银杆塔有限公司 Rotatable composite cross arm
KR102241896B1 (en) * 2019-10-15 2021-04-20 한국전력공사 Wire moving apparatus of line post insulator for fixing supporting bar

Similar Documents

Publication Publication Date Title
CN103086278A (en) Sliding type gantry crane and application thereof
CN106058768B (en) A kind of distribution line of wire overhead abandons line and protects lever apparatus
US10974939B2 (en) Inductor to control transient currents during energized bond on
KR20170115359A (en) Cross Arm Descending Device And Method For The none power cut construction In The power distribution lines
CN106505466A (en) A kind of lift insulator crossarm of distribution uninterrupted operation and its operational method
CN204382187U (en) A kind of contact net inclined cantilever insulator replacement tool
CN203699735U (en) Hydraulic assembly type lifting device
US9502160B2 (en) Corona-free cap assembly
KR101823663B1 (en) Insulator structure of high voltage distribution line
KR101806526B1 (en) Insulator for fixing aerial power line to electric pole
CN103825222A (en) Tool for changing 220kV narrow base tower strain insulator string with charges
KR100604714B1 (en) A cover of support cable using telegraph pole
JP4986466B2 (en) Transformer insulation support spacer
CN203813320U (en) Tool for live exchange of 220 kV narrow base tower strain insulator string
JP2013126304A (en) Lightning arrester and lightning protection power transmission line system
CN203813334U (en) Right-angle yoke plate clamp for live exchange of 220 kV strain insulator string
CN105932602B (en) The method that three-phase conducting wire charges lifter and replaces insulator using the lifter
CN105449612A (en) A conductive wire insulation support plate apparatus
KR101206495B1 (en) Connection support apparatus for changing pylon
CN103825223A (en) Tool and working method for live change of 220KV narrow base tower strain insulator string
CN110614609A (en) Bolt fastener
CN105680394B (en) A kind of gold utensil and its application method of electrification code wire
CN204668772U (en) Distribution box
CN203631778U (en) Electric power cable terminal with adjustable contact surface
CN103825221A (en) Live working phase spacing control device on equipotential wire