CN103302629B - PT insures replacer - Google Patents

PT insures replacer Download PDF

Info

Publication number
CN103302629B
CN103302629B CN201310219186.5A CN201310219186A CN103302629B CN 103302629 B CN103302629 B CN 103302629B CN 201310219186 A CN201310219186 A CN 201310219186A CN 103302629 B CN103302629 B CN 103302629B
Authority
CN
China
Prior art keywords
cutting ferrule
clip
rod
connecting rod
right cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310219186.5A
Other languages
Chinese (zh)
Other versions
CN103302629A (en
Inventor
周兆辉
苏丛辉
师威
刘立强
周建军
赵之洞
刘伟良
袁继森
尹翠华
宋晓军
檀志峰
安英娟
李立宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Power Supply Branch Guo Wang Hebei Electric Power Corp Zhao County
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Original Assignee
Power Supply Branch Guo Wang Hebei Electric Power Corp Zhao County
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power Supply Branch Guo Wang Hebei Electric Power Corp Zhao County, State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd filed Critical Power Supply Branch Guo Wang Hebei Electric Power Corp Zhao County
Priority to CN201310219186.5A priority Critical patent/CN103302629B/en
Publication of CN103302629A publication Critical patent/CN103302629A/en
Application granted granted Critical
Publication of CN103302629B publication Critical patent/CN103302629B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)
  • Connections Effected By Soldering, Adhesion, Or Permanent Deformation (AREA)

Abstract

The invention discloses a kind of PT and insure replacer, comprise the link be welded as a whole by mutually perpendicular horizon bar and vertical rod, the outer end of horizon bar is threaded the adjusting screw(rod) parallel with vertical rod, the right cutting ferrule of the fixing welding in below of the corresponding horizon bar in vertical rod lower end, right cutting ferrule comprises the vertical links of the lower end being welded on vertical rod, be connected to the right clip be positioned at below horizon bar of interlinking lever end, right clip is coordinate the arcuate structure clamping insulating sleeve tube wall groove, right cutting ferrule is flexibly connected a left cutting ferrule, left cutting ferrule comprises the connecting rod parallel with the connecting rod of right cutting ferrule, and the left clip of the arcuate structure equal with right clip radian.The present invention have be convenient to one man operation, operating time short, change the high feature of efficiency, be applicable to the dismounting of the insulating sleeve of different tube diameters.

Description

PT insures replacer
Technical field
The present invention relates in a kind of power industry and keep in repair use instrument, the instrument of a kind of dismounting PT insurance specifically.
Background technology
Induction type voltage transformer (also known as PT) is the visual plant of transformer station, and it adopts electromagnetic induction principle that the high voltage of electrical network main equipment is converted to low-voltage.Causing body to damage and failure propagation when there is internal fault for preventing PT inductance coil, needing to arrange high pressure P T insurance at PT mains side.PT insurance arranges a protective tube in an insulating sleeve endoporus, and the tube wall of insulating sleeve presents the annular projection of multiple rule, forms multiple tracks groove between projection.The electric conductor place at protective tube two ends is provided with spring, arranges the end cap of pressing spring at the two ends of insulating sleeve.In order to better be connected with end cap, respectively there is the together flange identical with insulating sleeve tube wall bulge-structure at the two ends of insulating sleeve, the inner side of flange is provided with catch, end cap is fastened on the outside of flange, be bolted between catch and end cap, thus end cap is fixed on the two ends of insulating sleeve, and protective tube is compressed.Boss with holes is also provided with, for connecting electric wire at the center of the lateral surface of end cap.
Current electric power system 35kV equipment is still based on outwork, and 35kV equipment PT protective tube fusing phenomenon happens occasionally, and thus changing protective tube is still commonplacely to work frequently.Changing in the process of protective tube in the past, insulating sleeve is vertically installed on utility poles, and have spring between end cap and catch, therefore 2 people are at least needed to carry out dismounting, people's both hands hold end cap and catch with a firm grip to keep invariant position between the two, another person is by the bolt between screwdriver dismounting catch and end cap, and it exists following problem: need many people to carry out; The caliber of insulating sleeve is not quite similar, and needs different dismantling devices; Change about 45 ~ 60 minutes consuming time of a phase insurance; Part transformer station 35kV voltage transformer framework cannot bear the weight of many people; Part transformer substation framework area is less, and staff cannot stand firm; Rely on the strength of staff hand to overcome insurance top cover elastic force, it is even to be not easy maintenance dynamics, causes screw unbalance stress, causes mounting process not high, likely cause insurance loose contact, insulating sleeve enters the problems such as rainwater.
Summary of the invention
The technical issues that need to address of the present invention are to provide one and are convenient to that one man operation, operating time are short, to change efficiency high, and the PT being applicable to different insulative sleeve pipe caliber insures replacer.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is:
PT insures replacer, comprises the link be welded as a whole by mutually perpendicular horizon bar and vertical rod, and the outer end of described horizon bar is threaded the adjusting screw(rod) parallel with vertical rod; The right cutting ferrule of the fixing welding in below of the corresponding horizon bar in described vertical rod lower end, right cutting ferrule comprises the vertical links of the lower end being welded on vertical rod, is connected to the right clip be positioned at below horizon bar of interlinking lever end, and right clip is coordinate the arcuate structure clamping insulating sleeve tube wall groove; Right cutting ferrule is flexibly connected a left cutting ferrule, and left cutting ferrule comprises the left clip of the connecting rod parallel with the connecting rod of right cutting ferrule and the arcuate structure equal with right clip radian;
The middle part of the connecting rod of described left cutting ferrule is fixedly welded with sleeve, arranges tie down screw in sleeve, and the position welding of the corresponding sleeve in middle part of the connecting rod of right cutting ferrule locks the locking nut of screw rod.
Improvement of the present invention is: the outer end of described adjusting screw(rod) and tie down screw is welded with cross bar handle.
Further improvement of the present invention is: the adjusting nut of welding cooperation adjusting screw(rod) is fixed in the outer end of described horizon bar.
Further improvement of the present invention is: arrange some felt pads inside the clip of described right cutting ferrule and left cutting ferrule.
Further improvement of the present invention is: the connecting rod of described right cutting ferrule is welded with the positioner coordinated with left cutting ferrule, positioner comprise two both sides being up and down vertically welded in the connecting rod of right cutting ferrule respectively and hard metal bar or sheet metal.
Further improvement of the present invention is: the clip also comprising the connecting rod of connecting rod for clamping right cutting ferrule and left cutting ferrule.
Another kind of the present invention improves and is: the clip of described left cutting ferrule and right cutting ferrule is fasten mutually as circular semicircular arc structure.
Owing to have employed technique scheme, the technological progress that the present invention obtains is:
It is parallel with vertical rod that the present invention establishes threaded adjusting screw(rod) to be threaded through horizon bar, because vertical rod is vertical with horizon bar, then adjusting screw(rod) is vertical with horizon bar, the active force that adjusting screw(rod) acts on the end cap of insulating sleeve is vertical single active force, therefore make the screw uniform force between catch and end cap, mounting process is high.Right cutting ferrule is flexibly connected with left cutting ferrule, by regulating the tightness of right cutting ferrule and left cutting ferrule, making left cutting ferrule and right cutting ferrule well act on the groove of insulating sleeve tube wall, clamping insulating sleeve effective.By the cooperation of adjusting screw(rod), left cutting ferrule and right cutting ferrule, the screw between installation or removal catch and end cap, simple and convenient, singlely can to complete.
The present invention is provided with sleeve in the middle part of through the connecting rod being welded on left cutting ferrule and the tie down screw matched with the locking nut in the middle part of the connecting rod being welded on right cutting ferrule, distance between the right cutting ferrule of free adjustment and left cutting ferrule, is applicable to the dismounting of the insulating sleeve of different tube diameters.And due to the structure of left clip and right clip be arcuate structure, for being applicable to the dismounting of the insulating sleeve of different tube diameters, when regulating the distance between right cutting ferrule and left cutting ferrule, it is better that the clip of arcuate structure and the groove of insulating sleeve contact effect.
The connecting rod of right cutting ferrule of the present invention is welded with positioner, make to overlap when being subject to tensile force as the right cutting ferrule of insulating sleeve tube wall groove and left cutting ferrule, right cutting ferrule and left cutting ferrule are in the same face all the time, left cutting ferrule and right cutting ferrule can not be out of shape because of unbalance stress, affect and of the present inventionly repeatedly to use.
Adjusting screw(rod) of the present invention and tie down screw outer end are welded with whippletree handle, only need less power and rotatablely to tighten when it uses, time saving and energy saving.
Inside the clip of left cutting ferrule of the present invention and right cutting ferrule, felt pad is set, when making left cutting ferrule and right cutting ferrule act on the groove on insulating sleeve tube wall, can not Damage to insulation sleeve pipe.
The present invention is provided with the clip of the connecting rod of connecting rod for clamping right cutting ferrule and left cutting ferrule, when the arcuate structure of left cutting ferrule and right cutting ferrule is installed on insulating sleeve tube wall groove, clip and tie down screw double action are in cutting ferrule, and cutting ferrule better acts on insulating sleeve, clamping good fixing effect.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of another embodiment of the invention.
Wherein, 1, adjusting screw(rod), 2, adjusting nut, 3, link, 31, vertical rod, 32, horizon bar, 4, right cutting ferrule, 5, positioner, 6, locking nut, 7 sleeves, 8, tie down screw, 9, left cutting ferrule, 10, clip.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further details:
Embodiment 1
PT insures replacer, and structural representation as shown in Figure 1, comprises the link 3 be welded as a whole by vertical rod 31 and horizon bar 32, and horizon bar 32 is orthogonal with vertical rod 31.The outer end of described horizon bar 32 arranges an adjusting screw(rod) 1, and adjusting screw(rod) is threaded with horizon bar, and adjusting screw(rod) and vertical rod be arranged in parallel.The outer end of adjusting screw(rod) 1 is welded with cross bar handle, on horizon bar corresponding adjusting screw(rod) screwed hole below weld adjusting nut 2, during use, adjusting screw(rod) 1 compresses the end cap of insulating sleeve.The lower end of described vertical rod 31 is fixedly welded with right cutting ferrule 4, and the below of the corresponding horizon bar 32 of right cutting ferrule 4, right cutting ferrule 4 comprises connecting rod, right clip, and connecting rod is vertically welded in the lower end of vertical rod 31, right clamp connection is at interlinking lever end and be positioned at the below of horizon bar 32, and right clip is an arcuate structure.Vertical rod 31 lower end arranges the left cutting ferrule 9 be flexibly connected with right cutting ferrule 4, and left cutting ferrule 9 comprises connecting rod, left clip, and connecting rod is parallel with the connecting rod of right cutting ferrule 4, and left clip is and right clip radian, arcuate structure that arc length is all equal.Left cutting ferrule 9 and right cutting ferrule 4 are flexibly connected in same plane, and the clip of left cutting ferrule 9 and right cutting ferrule 4 is for being installed in the same groove of insulating sleeve tube wall.The length of horizon bar 32 is greater than end cap radius, and the length of vertical rod 31 is greater than horizon bar 32, and the right cutting ferrule 4 be welded in the present embodiment on vertical rod 31 is installed in the 4th road groove of insulating sleeve.
The middle part of the connecting rod of described left cutting ferrule 9 is fixedly welded with sleeve 7, arranges tie down screw 8 in sleeve 7, and the position welding locking nut 6 of the corresponding sleeve 7 in middle part of the connecting rod of right cutting ferrule 4, locking nut 6 locks screw rod 8 and uses.Tie down screw 8 is welded with cross bar handle, and tie down screw 8 is threaded with locking nut 6 through sleeve 7.
Described left cutting ferrule 9 and right cutting ferrule 4 are provided with protective layer, and protective layer is the coarse felt pad be fixed on inside clip or the coarse flexible pipe be enclosed within outside clip.Protective layer is to be arranged on inside clip and four of positional symmetry identical coarse felt pads in the present embodiment.
The connecting rod of described right cutting ferrule 4 is welded with the positioner 5 coordinated with left cutting ferrule 9, and positioner 5 comprises two hard metal bars or the sheet metal that two are vertically welded in the upper and lower both sides of connecting rod respectively, and two metallic rod or sheet metal are positioned at same plane.When right cutting ferrule 4 is installed in insulating sleeve groove with the clip of left cutting ferrule 9, the connecting rod of left cutting ferrule 9 is positioned at positioner 5 just.
Be provided with clip 10 between the connecting rod of described right cutting ferrule 4 and the connecting rod of left cutting ferrule 9, clip 10 is positioned at clip end, for clamping left cutting ferrule 9 and right cutting ferrule 4 further.
When dismounting PT insures, the clip of left cutting ferrule 9 of the present invention and right cutting ferrule 4 is installed on the both sides of the same groove of insulating sleeve tube wall respectively, rotational lock screw rod 8, make the connecting rod of left cutting ferrule 9 slowly enter into positioner 5 on right cutting ferrule 4 simultaneously, when insulating sleeve is connected tighter with cutting ferrule, tighten tie down screw 8, and clip 10 is snapped fit onto on the connecting rod of right cutting ferrule 4 and the connecting rod of left cutting ferrule 9, clip 10 is positioned at the end of clip so that better clamp insulating sleeve; Rotate adjusting screw(rod) 1, adjusting screw(rod) 1 one end is on insulating sleeve end cap, tightens adjusting screw(rod) 1, compress the spring at protective tube two ends, use screwdriver and the screw between dismantled and assembled catch and end cap, thus PT insurance is dismantled or installed.
Embodiment 2
Another kind of PT insures the structural representation of replacer as shown in Figure 2, be with the difference of embodiment 1: left clip and right clip are and fasten mutually as circular semi arch structure, in actual use, the caliber that the insulating sleeve of protective tube is housed is not quite similar, but conventional use only has several, therefore can according to the size of customary insulation casing recess caliber, make a series of with insulating sleeve fit depressions and clip is the replacer of semi arch structure, because clip and sleeve pipe are all circular, clip can contact fully with sleeve pipe and clamp, therefore semicircular arc structure clip clamp better effects if.

Claims (4)

1.PT insures replacer, it is characterized in that: comprise the link (3) be welded as a whole by mutually perpendicular horizon bar (32) and vertical rod (31), the adjusting screw(rod) (1) that the outer end of described horizon bar (32) is threaded parallel with vertical rod (31); The below right cutting ferrule of fixing welding (4) of the corresponding horizon bar (32) in described vertical rod (31) lower end, right cutting ferrule (4) comprises the vertical links of the lower end being welded on vertical rod (31), is connected to the right clip being positioned at horizon bar (32) below of interlinking lever end, and right clip is coordinate the arcuate structure clamping insulating sleeve tube wall groove; The upper left cutting ferrule of flexible connection one (9) of right cutting ferrule (4), left cutting ferrule (9) comprises the left clip of the connecting rod parallel with the connecting rod of right cutting ferrule (4) and the arcuate structure equal with right clip radian;
The middle part of the connecting rod of described left cutting ferrule (9) is fixedly welded with sleeve (7), arrange tie down screw (8) in sleeve (7), the position welding of the corresponding sleeve (7) in middle part of the connecting rod of right cutting ferrule (4) locks the locking nut (6) of screw rod (8);
The outer end of described adjusting screw(rod) (1) and tie down screw (8) is welded with cross bar handle;
The fixing welding in outer end of described horizon bar (32) coordinates the adjusting nut (2) of adjusting screw(rod) (1);
The connecting rod of described right cutting ferrule (4) is welded with the positioner (5) coordinated with left cutting ferrule (9), positioner (5) comprises hard metal bar or the sheet metal that two are vertically welded in the both sides up and down of the connecting rod of right cutting ferrule (4) respectively.
2. PT according to claim 1 insures replacer, it is characterized in that: arrange some felt pads inside the clip of described right cutting ferrule (4) and left cutting ferrule (9).
3. PT according to claim 1 insures replacer, it is characterized in that: the clip (10) also comprising the connecting rod of connecting rod for clamping right cutting ferrule (4) and left cutting ferrule (9).
4. PT according to claim 1 insures replacer, it is characterized in that: the clip of described left cutting ferrule (9) and right cutting ferrule (4) is fasten mutually as circular semicircular arc structure.
CN201310219186.5A 2013-06-04 2013-06-04 PT insures replacer Active CN103302629B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310219186.5A CN103302629B (en) 2013-06-04 2013-06-04 PT insures replacer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310219186.5A CN103302629B (en) 2013-06-04 2013-06-04 PT insures replacer

Publications (2)

Publication Number Publication Date
CN103302629A CN103302629A (en) 2013-09-18
CN103302629B true CN103302629B (en) 2015-12-02

Family

ID=49128571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310219186.5A Active CN103302629B (en) 2013-06-04 2013-06-04 PT insures replacer

Country Status (1)

Country Link
CN (1) CN103302629B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103531381B (en) * 2013-10-10 2015-06-03 益和电气集团股份有限公司 Clamp for mounting small nozzle of GIS (Gas Insulated Switchgear) switch arc extinguishing chamber
CN104924269B (en) * 2015-06-10 2016-09-28 沈阳拓荆科技有限公司 Ceramic ring is installed and takes out frock

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0529906A1 (en) * 1991-08-23 1993-03-03 General Electric Company CRD endcap tool
CN2751981Y (en) * 2004-09-27 2006-01-18 中国石油天然气股份有限公司 Special portable traction device for leather belt wheel
CN201089146Y (en) * 2007-08-20 2008-07-23 江西铜业集团公司 Special withdrawal tool for non-flanged sleeve parts
CN201808026U (en) * 2010-08-31 2011-04-27 山西太钢不锈钢股份有限公司 End cover compacting device of diesel locomotive brake cylinder
CN202185890U (en) * 2011-06-07 2012-04-11 平高集团有限公司 Screwing tool for moment of force

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000120625A (en) * 1998-10-12 2000-04-25 Maeda Corp Hose connector pressure fitting device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0529906A1 (en) * 1991-08-23 1993-03-03 General Electric Company CRD endcap tool
CN2751981Y (en) * 2004-09-27 2006-01-18 中国石油天然气股份有限公司 Special portable traction device for leather belt wheel
CN201089146Y (en) * 2007-08-20 2008-07-23 江西铜业集团公司 Special withdrawal tool for non-flanged sleeve parts
CN201808026U (en) * 2010-08-31 2011-04-27 山西太钢不锈钢股份有限公司 End cover compacting device of diesel locomotive brake cylinder
CN202185890U (en) * 2011-06-07 2012-04-11 平高集团有限公司 Screwing tool for moment of force

Also Published As

Publication number Publication date
CN103302629A (en) 2013-09-18

Similar Documents

Publication Publication Date Title
CN104868403A (en) Portable 120-to-400mm2 aluminum conductor steel reinforced cable shunting clamp and use method thereof
CN103618266A (en) Electrifying defect eliminating tool of drainage plate
CN104535804A (en) Portable current transformer test clamp
CN207149733U (en) A kind of discharge device of a capacitor
CN204516914U (en) Earthing device when distribution line and equipment interruption maintenance
CN103302629B (en) PT insures replacer
CN204205093U (en) Electricity testing grounding ring
CN102873656B (en) Transformer nut remover
CN205724749U (en) The wall bushing that a kind of dirt exclusion capabilities is strong
CN201440584U (en) Ground potential replacement device for tension tower insulators and accessories in power transmission line
CN203357386U (en) PT secure disassembling device
KR101573004B1 (en) Insulator for supporting aerial power distribution line
CN202846407U (en) Transformer nut dismounting device
CN115719672A (en) Small-capacity intelligent oil-immersed transformer
CN203589614U (en) Drainage plate live-line defect-eliminating tool
CN203398619U (en) Line arrester replacing device
CN203720228U (en) Electroprobe connecting rod
CN206331993U (en) A kind of 35 kilovoltage transformer limiting fuse wiring end cap devices
CN207765393U (en) A kind of bushing apparatus for voltage transformer high voltage safety tube
CN103700475A (en) Voltage transformer fuse mounting base
CN205583338U (en) Multifunctional cable clamp
CN204156106U (en) The earth connection clamping unit that a kind of nuclear bridge is special
CN103762517A (en) High-voltage ground wire installation method
CN103000469B (en) PT (Potential Transformer) safety device
CN204287302U (en) GDY-II type high voltage electroscope insulated handle lengthens connector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
CB02 Change of applicant information

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: State Grid Hebei Electric Power Company

Applicant after: Power supply branch, Guo Wang Hebei Electric Power Corporation Zhao County

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: Hebei Electric Power Corporation

Applicant before: Zhaoxian Power Supply Co., Ltd.

CB03 Change of inventor or designer information

Inventor after: Zhou Zhaohui

Inventor after: Song Xiaojun

Inventor after: Tan Zhifeng

Inventor after: An Yingjuan

Inventor after: Li Lining

Inventor after: Su Conghui

Inventor after: Shi Wei

Inventor after: Liu Liqiang

Inventor after: Zhou Jianjun

Inventor after: Zhao Zhidong

Inventor after: Liu Weiliang

Inventor after: Yuan Jisen

Inventor after: Yin Cuihua

Inventor before: Su Conghui

Inventor before: Shi Wei

Inventor before: Liu Liqiang

Inventor before: Zhou Jianjun

Inventor before: Liu Weiliang

Inventor before: Yuan Jisen

Inventor before: Zhou Zhaohui

Inventor before: Yin Cuihua

Inventor before: Song Xiaojun

COR Change of bibliographic data
GR01 Patent grant