KR20170017194A - Cut and cover retain of earth using light weight decking panel and support plate, and method for constructing this same - Google Patents
Cut and cover retain of earth using light weight decking panel and support plate, and method for constructing this same Download PDFInfo
- Publication number
- KR20170017194A KR20170017194A KR1020150110765A KR20150110765A KR20170017194A KR 20170017194 A KR20170017194 A KR 20170017194A KR 1020150110765 A KR1020150110765 A KR 1020150110765A KR 20150110765 A KR20150110765 A KR 20150110765A KR 20170017194 A KR20170017194 A KR 20170017194A
- Authority
- KR
- South Korea
- Prior art keywords
- pedestal
- column
- plate
- ground
- support
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
- E02D17/083—Shoring struts
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The present invention relates to a temporary retention paved structure and a construction method through a lightweight base plate and a pedestal. It can be constructed on a narrow back road such as a residential area, and it is possible to construct a pipeline even if the pavement construction work is reduced. In case of difficulty in installing the transverse strut due to interference of the obstacles (top, sewer pipe, gas pipe, communication pipe, etc.), the improvement of the corresponding method has secured the structural safety such as preventing collapse of the lower excavation part, And to improve safety significantly.
The present invention relates to an excavation type earth retaining structure comprising a plurality of pillars (10) installed on both left and right sides of a ground excavation part (1) with a predetermined distance therebetween, A soil plate 20 installed at one or more stages between the struts; A pedestal 30 installed at an upper portion of the struts; A crossbeam (40) arranged in a direction transverse to the pedestals and supporting the pedestals at a predetermined distance from each other; And a pedestal (50) installed between the cross beams to support the pedestal. The pedestal (50) includes a bottom (31) that is seated on a bottom surface by a submerged wave and supports the pedestal at the bottom, And a wall portion 32 which is formed on one side of both widthwise sides of the base plate. The base plate is interposed between the side beams and both sides in the left and right direction are mounted on the base. The pedestal is connected to the pillar via a pillar connection (groove, hole, connecting piece) or is inserted and fixed in the ground.
Description
More particularly, the present invention relates to a method and apparatus for constructing a ground structure, such as a water supply and drainage pipe, a transmission line and a gas pipe line, in a new construction and maintenance of an underground channel, The present invention relates to an installation type retention structure and a construction method using the same.
Generally, it is necessary to make terrain of ground for construction and repair of pipelines such as water supply and drainage, and it is important to carry out the grounding work for such pipelines in a narrow roadway, such as a residential area, .
Therefore, it is a common practice to install a lounger to prevent pedestrians and vehicles from falling.
The earth retaining structure according to the related art includes a plurality of supports provided on both left and right side wall surfaces of the underground excavator with a certain distance therebetween, a soil plate installed between the supports, a brace supported by the supports on both sides, As shown in Fig.
Patent Document 10-1026836 discloses a structure in which an upper excavating portion having a transverse width wider than a lower excavating portion from a starting position of the lower excavating portion to the ground is formed; A bottom wall formed by excavated soil walls of the lower excavation section and including a thumb pile disposed at an interval in the longitudinal direction and a soil plate sandwiched between the vertically disposed thumb piles; A supporting angle extending in the longitudinal direction and bent in a bend is provided on each of the step portions existing in the ground due to the lateral width difference between the lower excavating portion and the upper excavating portion; A transverse mold to support the secondary panel is disposed laterally across the upper excavation so that the opposite ends thereof rest on the support angles; Since the bottom panel is disposed on the upper part of the horizontal mold, the bottom panel is disposed on the upper part of the horizontal mold to cover the upper excavation part. Since the supporting angle is only settled on the ground, there is a problem in that the fluidity of the retaining walls is increased due to a large fluctuation even in a small settlement of the ground due to the lack of a supporting base.
In addition, since the support angle and the pile are separated from each other, the structural stability of the pile foundation is secured by supporting the pile support on the thumb pile at the time of installation. However, the underground obstacle buried in the existing urban residential area , Gas pipes, communication pipes, etc.), it is difficult to secure the safety of the lower drilling rig due to the difficulty in installing the transverse strut, and safety accidents and human accidents due to the collapse of the drilling rig are generated.
The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to provide a water supply system capable of constructing on a narrow road such as a residential area, , Gas pipe, communication pipe, etc.), it is possible to secure the structural safety by preventing the collapse of the lower excavation part to improve the robustness and safety of the earthquake. It is aimed to provide an installation type pavement and a construction method using a pillar and a pedestal.
The present invention relates to an excavation type earth retaining structure comprising: a plurality of support columns erected on both left and right sides of a ground excavation unit with a predetermined distance therebetween; A soil plate installed at one or more stages between the struts; A pedestal installed at an upper portion of the struts; A cross bar arranged at a predetermined distance from each other and supporting the pedestals, the cross bars being arranged in a direction transverse to the pedestals; And a pedestal mounted on the pedestal between the transverse beams to support the pedestal. The pedestal is mounted on a bottom surface of the pedestal by means of a submerged trough and supports a bottom of the pedestal on a bottom of the pedestal, And the upper and lower flat plates are interposed between the cross beams and both sides in the width direction are seated on the pedestal.
And the pedestal is connected to the support through the support link.
And the pedestal is fixed to the ground through a fixing key.
The present invention relates to a method of constructing a retention type earth retaining structure via a lightweight base plate and a pedestal, A second step of constructing a pillar on both left and right sides of the excavating part formed through the first step with a predetermined distance from each other along the forward and backward directions; A third step of installing a soil plate between the pillars constructed through the second step; A floor formed of a bottom surface seated by a ground wave device and a wall portion formed on one side of the widthwise side of the bottom portion is installed on the top of the pillars, ; A fifth step of installing a plurality of beams in a direction transverse to the pedestals on both sides installed through the fourth step; A step of installing a flat plate in a space between the cross beams installed through the fifth step such that the left and right sides of the flat plate are seated on the bottom of the pedestal so that the pedestal is installed at the same height as the cross bar and the pedestal .
According to the present invention, it is possible to construct on a narrow roadway such as a residential area through a stable installation of a small-sized but also a small-sized, but also an open-type, It prevents a fall accident, and it can be installed at the same height as the roadside with the beam, so that it is possible to shorten the air flow and reduce construction cost.
In addition, when the support is connected to the support to support the support, the stability of the retaining structure is secured by keeping the construction state without the subsidence, and if the support is fixed to the ground and the behavior or settlement of the ground occurs, . ≪ / RTI >
In addition, due to the underground buried in the existing urban residential area, there is an effect of preventing the collapse of the hypothetical case and human casualties through the pedestal and the pillar connection part due to the unconfirmed structural safety of the lower pedestrian bridge due to the non-installed pedestal.
1 and 2 are a cross-sectional view and an exploded perspective view, respectively, of a retractable earth retaining clay through a lightweight liner and a pedestal according to Embodiment 1 of the present invention.
3 and 4 are a sectional view and an exploded perspective view, respectively, of a retractable earth retaining structure via a lightweight liner and a pedestal according to a second embodiment of the present invention.
5 and 6 are a cross-sectional view and an exploded perspective view, respectively, of a retractable earth retaining clay through a lightweight liner and a pedestal according to a third embodiment of the present invention.
FIGS. 7 to 9 are respectively a sectional view and an exploded perspective view and a modified view of a retractable earth retaining structure via a lightweight liner and a pedestal according to a second embodiment of the present invention. FIG.
10 and 11 are a sectional view and an exploded perspective view, respectively, of a detachable earth retaining structure via a lightweight liner and a pedestal according to a fifth embodiment of the present invention.
≪ Example 1 >
As shown in Figs. 1 and 2, the open-type earth retaining pavement through the lightweight louver board and the pedestal according to the present embodiment is formed in a front-rear direction (a piping direction of a pipeline or the like) A
The
The
The
It is preferable that the
The pedestal (30) is provided with a fixing piece (33) for fixing the beam (40).
The
Although only one of the
The
It is also possible that the
The
The
As described above, the
The
Therefore, the upper portion of the
As described above, according to the present embodiment, it is possible to install the underground drilling unit 1 without drilling the underground drilling unit 1 deeper than the conventional one, because the
The
The construction method of the openable type earth retaining pavement through the lightweight liner and the pedestal according to the present embodiment is as follows.
1. Terracotta.
In the case of new construction such as water supply and drainage, the excavation section (1) is constructed at a certain width and depth by excavating the ground in accordance with the pipeline of the pipeline, and when repairing the pipeline installed in the ground, (1).
2. Holding construction.
A plurality of
3. Installation of soil board.
The
4. Install the pedestal.
A
It is possible to mount the
The
5. Install the crossbar.
The cross beams 40 are arranged in the direction transverse to the excavating
6. Installation of door plates.
Through the above process, a void space of a predetermined size is formed between the cross beams 40 at a predetermined interval (the thickness of the cross beam 40), and the
The left and right sides of the
The
≪ Example 2 >
3 and 4, the supporting
A connecting projection (11) is protruded from the upper end of the support (10). In the case where the
The connection protrusions 11 are formed to protrude from the upper surface of the
The
The
The position and shape of the connecting
The other configurations are the same as those of the first embodiment.
≪ Example 3 >
5 and 6, the supporting
The
The connecting
According to the present embodiment, the support bars 40 and the
The other configurations are the same as those of the first embodiment.
<Example 4>
7 and 8, the supporting
The
Although the fixing
The fixing
The fixing
The fixing
The other configurations are the same as those of the first embodiment.
≪ Example 5 >
10 and 11, the
Therefore, the
The
The fixing
The fixing
The construction methods of the second to fifth embodiments are entirely the same as those of the first embodiment except that the second embodiment is further constructed in accordance with each embodiment. In the second embodiment, when the
1: excavation part, 2: pedestal mounting part
10: column, 11: connecting projection
20: turntable, 30: pedestal
31: bottom portion, 32: wall portion
33: fastening piece, 34: connecting hole
35: connecting piece, 36: settling key
40: beam, 50:
60: Props,
Claims (9)
A soil plate 20 installed at one or more stages between the struts;
A pedestal 30 installed at an upper portion of the struts;
A crossbeam (40) arranged in a direction transverse to the pedestals and supporting the pedestals at a predetermined distance from each other;
(50) installed between the cross beams to support the pedestal as a support base,
The pedestal is composed of a bottom part (31) which is seated on a bottom surface by a submerged floor wave and supports the pedestal plate at a bottom part, and a wall part (32) which is installed on one side of the widthwise side of the bottom part,
Wherein the lining plate is installed between the cross beams and both lateral sides thereof are seated on the pedestal.
A second step of constructing a pillar on both left and right sides of the excavating part formed through the first step with a predetermined distance from each other along the forward and backward directions;
A third step of installing a soil plate between the pillars constructed through the second step;
A floor formed of a bottom surface seated by a ground wave device and a wall portion formed on one side of the widthwise side of the bottom portion is installed on the top of the pillars, ;
A fifth step of installing a plurality of beams in a direction transverse to the pedestals on both sides installed through the fourth step;
And a step of installing a flat plate in a space between the cross beams installed through the fifth step such that the left and right sides of the flat plate are seated on the bottom of the pedestal so that the pedestal is installed at the same height as the crossbars and the pedestal A construction method of temporary retention pavement using laminates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150110765A KR101751496B1 (en) | 2015-08-05 | 2015-08-05 | Cut and cover retain of earth using light weight decking panel and support plate, and method for constructing this same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150110765A KR101751496B1 (en) | 2015-08-05 | 2015-08-05 | Cut and cover retain of earth using light weight decking panel and support plate, and method for constructing this same |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20170017194A true KR20170017194A (en) | 2017-02-15 |
KR101751496B1 KR101751496B1 (en) | 2017-06-27 |
Family
ID=58111953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150110765A KR101751496B1 (en) | 2015-08-05 | 2015-08-05 | Cut and cover retain of earth using light weight decking panel and support plate, and method for constructing this same |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101751496B1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110042856A (en) * | 2019-05-07 | 2019-07-23 | 东华理工大学 | A kind of open caisson and excavation method for barrier lake dredging flow groove mechanical excavation |
CN110106890A (en) * | 2019-05-16 | 2019-08-09 | 中国十七冶集团有限公司 | A kind of device and method of deep trench side slope safety protection and emergency escape |
CN110158604A (en) * | 2019-06-19 | 2019-08-23 | 北京城建北方集团有限公司 | Support construction method at foundation pit riding track |
CN110904977A (en) * | 2019-12-31 | 2020-03-24 | 中铁建设集团市政工程有限公司 | Municipal foundation pit supporting system and construction method thereof |
KR102300070B1 (en) * | 2020-12-28 | 2021-09-08 | (주)세한테크 | Lining board installation structure |
CN116607364A (en) * | 2023-07-19 | 2023-08-18 | 华侨大学 | Construction vehicle supporting platform arranged on upper part of foundation pit crown beam |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101026836B1 (en) | 2010-08-04 | 2011-04-04 | 주식회사 국민씨아이 | Structure for open cut excavation using light weight composite lining boards, and their construction methods |
-
2015
- 2015-08-05 KR KR1020150110765A patent/KR101751496B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101026836B1 (en) | 2010-08-04 | 2011-04-04 | 주식회사 국민씨아이 | Structure for open cut excavation using light weight composite lining boards, and their construction methods |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110042856A (en) * | 2019-05-07 | 2019-07-23 | 东华理工大学 | A kind of open caisson and excavation method for barrier lake dredging flow groove mechanical excavation |
CN110042856B (en) * | 2019-05-07 | 2024-01-23 | 东华理工大学 | Open caisson for mechanical excavation of barrier lake drainage groove and excavation method |
CN110106890A (en) * | 2019-05-16 | 2019-08-09 | 中国十七冶集团有限公司 | A kind of device and method of deep trench side slope safety protection and emergency escape |
CN110158604A (en) * | 2019-06-19 | 2019-08-23 | 北京城建北方集团有限公司 | Support construction method at foundation pit riding track |
CN110158604B (en) * | 2019-06-19 | 2021-07-02 | 北京城建北方集团有限公司 | Construction method of supporting structure at underpass of foundation pit |
CN110904977A (en) * | 2019-12-31 | 2020-03-24 | 中铁建设集团市政工程有限公司 | Municipal foundation pit supporting system and construction method thereof |
CN110904977B (en) * | 2019-12-31 | 2021-06-01 | 中铁建设集团基础设施建设有限公司 | Municipal foundation pit supporting system and construction method thereof |
KR102300070B1 (en) * | 2020-12-28 | 2021-09-08 | (주)세한테크 | Lining board installation structure |
CN116607364A (en) * | 2023-07-19 | 2023-08-18 | 华侨大学 | Construction vehicle supporting platform arranged on upper part of foundation pit crown beam |
CN116607364B (en) * | 2023-07-19 | 2023-09-15 | 华侨大学 | Construction vehicle supporting platform arranged on upper part of foundation pit crown beam |
Also Published As
Publication number | Publication date |
---|---|
KR101751496B1 (en) | 2017-06-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101751496B1 (en) | Cut and cover retain of earth using light weight decking panel and support plate, and method for constructing this same | |
KR100948501B1 (en) | Extension footpath for retaining wall and it's construnction method | |
US6332303B1 (en) | Method of building underground structure | |
JP5701435B1 (en) | Temporary partition structure that can be diverted to a permanent partition structure or a structure having other functions | |
KR101656367B1 (en) | Temporary Construction Method of Soil Arresting Structure for Laying Pipe Below Rood | |
KR101202609B1 (en) | A Sidewalk Enlargement Installation for Slope Way | |
KR101144137B1 (en) | Underground structure construction method without middle temporary pile | |
JP2012036720A (en) | Open-cut excavation structure using lining panel, and open-cut excavation construction method | |
KR101688048B1 (en) | Assembly type protection wall device and, method for constructing conduit line using this same | |
JP4092662B2 (en) | Bridge construction method | |
KR102035995B1 (en) | Frame support system using temporary strut for top-down method and construction method thereof | |
KR101632840B1 (en) | Construction method of underground road way having drain structure of temporary and permanent wall | |
KR101042982B1 (en) | Method for constructing sidewalk enlargement installation | |
KR101005469B1 (en) | The method which expands the pedestrian passage | |
JP5688040B2 (en) | Partition structure | |
KR100928500B1 (en) | Device fixing structure of walking way | |
KR100592416B1 (en) | How to secure the sidewalk and widen the roadway using concrete retaining wall blocks and truss-shaped pedestals on narrow roads | |
JPH10280305A (en) | Overhanging sidewalk structure | |
KR101155155B1 (en) | Underground structure construction method using teporary center pile | |
KR101378097B1 (en) | Deck plate | |
JP5527865B1 (en) | Temporary sidewalk laying board | |
KR101124348B1 (en) | Extension sidewalk for slope | |
KR100744972B1 (en) | Earth of building land-side protection wall structure | |
JP5688039B2 (en) | Partition structure | |
KR101202608B1 (en) | Method for Installing Sidewalk Enlargement Installation for Slope Way |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |