KR20160048279A - Method for mounting thruster in semi-submergible rig - Google Patents

Method for mounting thruster in semi-submergible rig Download PDF

Info

Publication number
KR20160048279A
KR20160048279A KR1020140144264A KR20140144264A KR20160048279A KR 20160048279 A KR20160048279 A KR 20160048279A KR 1020140144264 A KR1020140144264 A KR 1020140144264A KR 20140144264 A KR20140144264 A KR 20140144264A KR 20160048279 A KR20160048279 A KR 20160048279A
Authority
KR
South Korea
Prior art keywords
thruster
lifting wire
lifting
strand
crane
Prior art date
Application number
KR1020140144264A
Other languages
Korean (ko)
Inventor
김태섭
한창근
Original Assignee
현대삼호중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대삼호중공업 주식회사 filed Critical 현대삼호중공업 주식회사
Priority to KR1020140144264A priority Critical patent/KR20160048279A/en
Publication of KR20160048279A publication Critical patent/KR20160048279A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The present invention relates to a method for mounting a thruster in a semi-submersible rig, which enables the installation of a thruster in a rig in a minimum water depth. According to an embodiment of the present invention, the method for mounting a thruster in a semi-submersible rig enables the easy installation of a thruster as the thruster in a horizontal state is moved in a horizontal direction and then is installed in a thruster room. Moreover, the present invention enables the installation of the thruster even in a condition that the minimum water depth required for a work is 10% less than a conventional condition required for a work where the thruster in a vertical state is moved in a horizontal direction and is installed in the thruster room.

Description

반잠수식 리그선의 스러스터 장착방법{Method for mounting thruster in semi-submergible rig}[0001] The present invention relates to a method of mounting a semi-submergible rig in a semi-

본 발명은 최소수심에서 리그선에 스러스터를 장착할 수 있는 반잠수식 리그선의 스러스터 장착방법에 관한 것이다.The present invention relates to a semi-submerged leash line thruster mounting method capable of mounting a thruster to a league line at a minimum water depth.

일반적으로 반잠수식 리그선은 자기위치 제어에 사용되는 추진장치가 스러스터(thruster)이며, 이러한 스러스터는 반잠수식 리그선을 진수한 후에 수중에서 스러스터룸의 리셉터클과 모터에 조립되는 것이 일반적이다.Generally, a semi-submersible rig line is a propulsion thruster used for magnetic position control, which is assembled to a receptacle and motor in a thruster room after launching a semi-submersible rig line It is common.

상기 반잠수식 리그선에는 스러스터룸이 형성되어 있으며, 이 스러스터룸의 하부에 스러스터의 상부구조물이 장착된다. 스러스터의 상부구조물에는 유압 파이프, 윤활유 파이프, 스티어링 기어 등의 충격에 약한 부품들이 설치되어 있으며, 이러한 부품들은 약간의 충격만 가해져도 손상될 우려가 있으므로 스러스터를 스러스터룸에 설치하기 위해 스러스터를 취급하는 중에 각별한 주의를 기울여야 한다.In the semi-submerged league line, a thruster room is formed, and the upper structure of the thruster is mounted on the lower part of the thruster room. The upper structure of the thruster is provided with parts with low impact resistance such as hydraulic pipes, lubricating oil pipes, and steering gears. These parts may be damaged even if a slight impact is applied. Therefore, the thruster should be installed in the thruster room Special care must be taken when handling the stirrer.

바지선의 크레인을 이용하여 스러스터를 설치하는 경우 스러스터를 해상의 바지선에 설치된 크레인의 로프에 매달은 상태에서 반잠수식 리그선의 상부에 설치된 위치의 로프에 로프 연결구를 매개하여 연결되는 인양 로프에 스러스터를 매달아 스러스터를 수중으로 입수시킨 다음, 반잠수식 리그선에 설치된 윈치를 작동시켜 인양로프를 당겨서 스러스터를 스러스터룸의 직하방에 위치시킨 다음, 끌어올리게 된다.If a thruster is installed using a crane on a barge, the thruster is suspended on the rope of the crane installed on the barge in the sea, and the hoisting rope connected to the rope installed in the upper part of the semi-submersible rig line through the rope connection After the thruster is hung, the thruster is taken in the water, and the winch on the semi-submersible rig line is operated to pull the lifting rope to place the thruster directly under the thruster room and then pull it up.

상기 윈치의 인양로프는 스러스터룸을 관통하여 그 하부로 나오도록 설치된다.The lifting rope of the winch is installed so as to extend through the thruster room to the lower part thereof.

바지선의 크레인의 로프를 스러스터의 상부 일측에 연결한 후 바지선의 크레인의 로프를 풀어 스러스터를 반잠수식 리그선의 수중에 접근시켜 수중에 입수시킨 상태에서 반잠수식 리그선의 인양 로프를 스러스터의 상부 타측에 연결한 후 바지선의 크레인에서는 로프를 풀고 반잠수식 리그선의 윈치에서는 인양로프를 감으면서 반잠수식 리그선의 인양로프가 스러스터를 그 상부 타측에서 측방으로 당겨서 스러스터룸의 직하방에 위치시키는 경우, 스러스터의 자체 무게의 하중 방향과 인양로프의 당기는 방향이 일직선을 이루지 않고 서로 어긋나므로 스러스터의 무게 중심잡기가 곤란하다.After connecting the rope of the crane of the barge to the upper part of the thruster, loosen the rope of the crane of the barge, and get the thruster in the water of semi-submersible rig line, The rope is released from the crane of the barge line and the lifting rope of the semi-submersible league line pulls the thruster from the other side of the upper part of the thruster room while winding the lifting rope in the winch of the semi-submersible league line, The load direction of the thruster's own weight and the pulling direction of the lifting rope do not form a straight line but are shifted from each other, so that it is difficult to center the thrusters.

상기 스러스터를 당길 때 스러스터의 무게중심을 잡지 못하면, 스러스터가 흔들리게 되며, 스러스터가 흔들리게 되면 스러스터의 상부구조물에 설치된 부품들이 바지선의 크레인의 로프와 반잠수식 리그선의 인양로프에 부딪혀 손상되므로 이를 방지하기 위해서는 반잠수식 리그선의 인양로프를 당길 때에 스러스터를 그 상부 구조물의 위쪽에 위치되게 무게 중심을 잡아 수평으로 유지하면서 당겨야 한다.If the center of gravity of the thruster is not caught when the thruster is pulled, the thruster is shaken. When the thruster is shaken, the components installed in the upper structure of the thruster are routed to the crane rope of the barge line and the lifting rope , It is necessary to pull the lifting rope of semi-submersible rigging line while holding the horizontal center of gravity of the thruster above the upper structure in order to prevent it from being damaged.

이렇게 스러스터를 그 상부 구조물이 위쪽에 위치되게 무게 중심을 잡아 수평으로 유지하면서 당기기 위해서는 스러스터를 끌어올리는 인양로프를 3개로 하여 각각 상하로 정밀하게 조절할 수 있어야 하나, 종래에서는 윈치의 인양로프를 연결하고 있으므로 윈치의 특성상 그 인양로프를 각각 상하로 정밀하게 조절하는데 한계가 있다.In order to pull the thrusters upward while keeping the center of gravity so that the upper structure is positioned at the upper side, it is necessary to be able to precisely adjust the upper and lower rails so as to pull up the thrusters. Due to the nature of the winch, there is a limit to precisely control the lifting rope up and down respectively.

그래서, 종래에는 그러스터를 수심 50m 이상의 깊은 수중으로 입수시킨 후, 반잠수식 리그선의 인양로프에 의해 스러스터를 상방으로 잡아당기는 방법을 사용했는데, 스러스터가 수심 50m 이상의 깊은 수중으로 입수되면 스러스터룸의 직하방과 스러스터가 이루는 각도가 매우 작게 되어서 스러스터의 자체 무게의 하중방향과 인양로프의 당기는 방향이 거의 일직선을 이루므로 스러스터의 무게 중심을 잡기가 비교적 쉽게 되어 스러스터를 당길 때 스러스터의 상부구조물에 설치된 부품들이 시추선의 인양로프에 부딪혀 손상되는 것을 어느 정도 감소시키고 있다.Thus, conventionally, a method of pulling a thruster upward by using a lifting rope of a semi-submerged league line was used after getting the gustor in deep water of 50m or more in depth, but when the thruster was obtained in deep water of 50m or more in depth Since the angle between the thrusters and the thrusters is very small, the direction of the weight of the thrusters and the pulling direction of the lifting ropes are made almost straight, so that the center of gravity of the thrusters is relatively easy to pull, Parts installed in the upper structure of the thruster are reduced to some extent by being hit by the lifting rope of the drill ship.

그러나, 이러한 방법도 윈치의 인양로프를 연결하고 있어 윈치의 특성상 그 인양로프를 각각 상하로 정밀하게 조절하는데 한계가 있으므로 스러스터를 그 상부 구조물이 위쪽에 위치되게 무게중심을 잡아 수평으로 유지하면서 당기지 못하는 문제점이 있다.However, this method also connects lifting ropes of winch. Due to the nature of the winch, there is a limitation in precisely adjusting the lifting ropes up and down, respectively. Therefore, keep the thrusters in the horizontal position There is a problem that can not be done.

이에 상기와 같은 문제를 해소하기 위하여 안출된 것으로는, 대한민국 등록특허 제10-0568613호(시추선의 스러스터 장착 장치 및 방법, 이하 종래 1)과 대한민국 등록특허 제10-0967816호(반잠수식 리그선의 스러스터 장착방법, 이하 종래 2) 및 대한민국 등록특허 제10-0978065호(시추선의 스러스터 장착방법, 이하 종래 3)가 있다.In order to solve the above problems, Korean Patent Registration No. 10-0568613 (apparatus and method for installing a thruster of a drill ship, hereinafter referred to as Conventional 1) and Korean Patent No. 10-0967816 (Semi- A method of mounting a thruster on a wire, hereinafter referred to as Conventional 2), and Korean Patent No. 10-0978065 (a method of mounting a thruster on a drill string, hereinafter referred to as Conventional 3).

이와 같은 종래기술 1과 3은 별도의 정반에 스러스터를 안착시킨 후 이를 바다에 입수시킨 상태에서 반잠수식 리그선(시추선)을 이동시켜 스러스트룸과 스러스터가 직 하방을 이루도록 배치한 상태에서 스러스터를 장착하므로 설치가 매우 어려울 뿐만 아니라 작업기간 및 비용이 과도하게 소요되는 문제가 있다.In the prior arts 1 and 3, the thrusters are seated on a separate platen, and then the semi-submersible leash line is moved in a state where the thrusters are placed in the sea so that the thrust rooms and the thrusters are disposed directly below There is a problem that it is very difficult to install because of the installation of the thruster, and the operation period and the cost are excessively required.

또한, 종래기술 2의 경우에는 스러스터를 수직에 가깝게 세운 상태에서 이를 바다에 입수시킨 다음 스러스터를 스러스터룸에 설치해야 하므로 어느 정도의 수심확보가 필수적이며, 수심이 확보되지 않은 상태에서 스러스터를 횡 방향으로 이동시킬 경우 해저에 스러스터의 하단이 맞닿아 스러스터가 손상을 입게 되는 치명적인 단점이 있다.In the case of the prior art 2, since the thruster is required to be installed in the thruster room after the thruster is set up close to the vertical and then taken to the sea, it is necessary to secure a certain depth of water. When the stirrer is moved in the lateral direction, there is a fatal disadvantage that the bottom of the thruster is brought into contact with the seabed so that the thruster is damaged.

본 발명은 상기와 같은 문제를 개선하기 위하여 안출된 것으로서, 최소수심에서 리그선에 스러스터를 장착할 수 있는 반잠수식 리그선의 스러스터 장착방법을 제공하려는데 그 목적이 있다.
SUMMARY OF THE INVENTION It is an object of the present invention to provide a method of mounting a thruster of a semi-submerged league line in which a thruster can be mounted on a league line at a minimum water depth.

상기 목적을 달성하기 위한 본 발명은,According to an aspect of the present invention,

리그선의 상판에 각각 구동가능한 제1·2·3스트랜드잭의 스트랜드가 스러스터룸을 사이에 두고 리그선의 선저를 관통하도록 설치하고, 스러스터를 구성하는 스티어링플랜지의 제1·2·3러그에 제1·2·3리프팅 와이어 어셈블리의 인보드 리프팅 와이어를 각각 설치한 상태에서 크레인의 인양와이어를 스러스터에 형성된 크레인용 러그에 연결한 다음 스러스터의 스티어링플랜지는 선체를 향하도록 하고 프로펠러는 해저를 향하도록 하여 뉘인 상태에서 인양와이어를 매개로 스러스터를 바다에 입수시키는 단계;The strands of the first, the second and the third strand jacks which can be driven respectively on the upper plate of the league line are installed so as to pass through the bottom of the league line with the thruster room therebetween and the first, second and third lugs of the steering flange constituting the thruster With the lifting wire of the first, second, and third lifting wire assemblies installed, connect the lifting wire of the crane to the crane lug formed on the thruster, and the steering flange of the thruster should face the hull. And a thruster is received in the sea via a lifting wire in a state where the lifting wire is oriented in a direction in which the lifting wire is directed;

상기 제1·2·3리프팅 어셈블리의 인보드 리프팅 와이어에 스트랜드를 각각 연결하는 단계;Connecting the strands to the inboard lifting wires of the first, second, and third lifting assemblies, respectively;

상기 크레인의 인양와이어를 풀어주면서 1·2·3리프팅 와이어 어셈블리를 제1·2·3스트랜드잭을 매개로 권취시켜 스러스터를 횡 방향으로 이동시키는 단계;Moving the lifting wire assembly through the first, second and third strand jacks while releasing the lifting wire of the crane to move the thrusters in the lateral direction;

상기 스러스터가 스러스터룸에 배치되면 제1리프팅 와이어 어셈블리를 제1스트랜드잭을 매개로 권취시켜 스러스터를 세우는 단계;Winding the first lifting wire assembly through the first strand jack to raise the thruster when the thruster is disposed in the thruster room;

상기 제1·2·3리프팅 와이어 어셈블리를 제1·2·3스트랜드잭을 매개로 권취시켜 스러스터를 스러스터룸에 장착하는 단계;를 포함하는 것을 특징으로 한다.
And winding the first and second lifting wire assemblies through a first, a second, and a third strand jack to mount the thruster to the thruster room.

상기 다른 목적을 달성하기 위한 본 발명은,According to another aspect of the present invention,

리그선의 상판에 각각 구동가능한 제1·2·3스트랜드잭의 스트랜드가 스러스터룸을 사이에 두고 리그선의 선저를 관통하도록 설치하고, 스러스터를 구성하는 스티어링플랜지의 제1·2·3러그에 제1·2·3리프팅 와이어 어셈블리의 인보드 리프팅 와이어를 각각 설치한 상태에서 크레인의 인양와이어를 스러스터에 형성된 크레인용 러그에 연결한 다음 스러스터의 스티어링플랜지는 선체를 향하도록 하고 프로펠러는 해저를 향하도록 하여 뉘인 상태에서 인양와이어를 매개로 스러스터를 바다에 입수시키는 단계;The strands of the first, the second and the third strand jacks which can be driven respectively on the upper plate of the league line are installed so as to pass through the bottom of the league line with the thruster room therebetween and the first, second and third lugs of the steering flange constituting the thruster With the lifting wire of the first, second, and third lifting wire assemblies installed, connect the lifting wire of the crane to the crane lug formed on the thruster, and the steering flange of the thruster should face the hull. And a thruster is received in the sea via a lifting wire in a state where the lifting wire is oriented in a direction in which the lifting wire is directed;

상기 제2·3리프팅 어셈블리의 인보드 리프팅 와이어에 스트랜드를 각각 연결하는 단계;Connecting the strands to the respective lifting wires of the second and third lifting assemblies;

상기 크레인의 인양와이어를 풀어 줌과 동시에 제2·3리프팅 와이어 어셈블리를 제2·3스트랜드잭을 매개로 권취시켜 스러스터를 수평으로 이동시키는 단계;Lifting the lifting wire of the crane while simultaneously winding the second and third lifting wire assemblies through the second and third strand jacks to horizontally move the thrusters;

상기 제1리프팅 어셈블리의 인보드 리프팅 와이어에 스트랜드를 연결한 다음 제1리프팅 와이어 어셈블리를 제1스트랜드잭을 매개로 권취시켜 스러스터를 수직하게 세우는 단계;Connecting the strand to the inboard lifting wire of the first lifting assembly and then winding the first lifting wire assembly through a first strand jack to vertically raise the thruster;

상기 크레인의 인양와이어를 풀어 줌과 동시에 제1·2·3리프팅 와이어 어셈블리를 제1·2·3스트랜드잭을 매개로 권취시켜 스러스터를 스러스터룸에 장착하는 단계;를 포함하는 것을 특징으로 한다.
And lifting the lifting wire of the crane while winding the first and second lifting wire assemblies through the first and second and third strand jacks to mount the thruster to the thruster room. do.

그리고, 상기 선체의 벽면에 인양와이어에 의한 쓸림을 방지하기 위한 보호커버를 설치시키는 단계를 더 포함하는 것을 특징으로 한다.
The method may further include the step of installing a protective cover on the wall surface of the hull so as to prevent rubbing by the lifting wire.

또한, 상기 인보드 리프팅 와이어와 스트랜드 사이에는 수직축을 중심으로 각각 회전이 가능하도록 이들을 상호 연결하는 회전고리를 설치시켜주는 단계를 더 포함하는 것을 특징으로 한다.
Further, the present invention is further characterized in that a rotating ring is interposed between the lifting wire and the strand so as to be rotatable about a vertical axis.

여기서, 상기 회전고리는, Here,

상기 인보드 리프팅 와이어에 끼워지는 제1핀을 매개로 회전가능하게 설치되는 제1회전체와; A first rotating body rotatably installed via a first pin fitted to the lifting wire;

상기 스트랜드에 일측이 끼워지는 제2핀을 매개로 회전가능하게 설치되고, 타측이 제1회전체에 설치되어 제1회전체를 중심으로 축 회전되는 제2회전체로 구성된 것을 특징으로 한다.
And a second rotating body rotatably installed via a second pin having one side inserted into the strand, the other side of which is provided on the first rotating body and is pivoted about the first rotating body.

본 실시 예에 의하면, 스러스터를 수평자세로 배치한 상태에서 횡 방향으로 이동시킨 후 스러스터룸에 장착함으로 설치가 쉽고, 특히 수직자세(종래기술)에서 횡 방향으로 이동시킨 후 스러스터룸에 장착하는 것보다 회전반경이 작기 때문에 작업에 요구되는 최소수심이 10% 이상 적은 조건에서도 장착이 가능해지는 이점이 있다.According to this embodiment, since the thruster is moved in the horizontal direction in the horizontal posture and then mounted in the thruster room, it is easy to install, and in particular, in the vertical posture (prior art) Since the turning radius is smaller than that of the mounting, it is possible to mount the apparatus even under the condition that the minimum water depth required for the operation is 10% or less.

또한, 제1·2·3리프팅 와이어 어셈블리를 구성하는 인보드 리프팅 와이어와 스트랜드 사이에 회전고리를 설치해 줌으로서 스러스터를 횡 방향으로 이동시키거나 스러스터로부터 제1·2·3리프팅 와이어 어셈블리를 분리시 제1·2·3리프팅 와이어 어셈블리가 꼬이는 문제를 근본적으로 해소할 수 있어 상당히 유용하다.
In addition, by installing a swivel ring between the inboard lifting wire and the strands that make up the first, second, and third lifting wire assemblies, move the thruster laterally or move the first, second, and third lifting wire assemblies from the thruster It is quite useful since it can fundamentally eliminate the problem of twisting the first, second, and third lifting wire assemblies during disconnection.

도 1은 본 발명에 따른 반잠수식 리그선의 개략 정면도.
도 2 및 도 3은 본 발명에 따른 반잠수식 리그선의 스러스터에 정면도 및 평면도.
도 4는 본 발명에 따른 반잠수식 리그선에서 제1·2·3리프팅 와이어 어셈블리를 도시한 정면도.
도 5a 내지 도 5h는 본 발명의 제1실시 예에 따른 반잠수식 리그선의 스러스터 장착과정을 순서대로 도시한 도면.
도 6a 내지 도 6h는 본 발명의 제2실시 예에 따른 반잠수식 리그선의 스러스터 장착과정을 순서대로 도시한 도면.
1 is a schematic front view of a semi-submersible rig line according to the present invention;
2 and 3 are a front view and a plan view of a thruster of a semi-submersible rig line according to the present invention.
4 is a front view of the first, second, and third lifting wire assemblies in a semi-submersible rig line according to the present invention.
FIGS. 5A to 5H are views sequentially illustrating a thruster mounting process of a semi-submerged league line according to a first embodiment of the present invention; FIG.
6A to 6H are views showing a process of installing a thruster of a semi-submerged league line according to a second embodiment of the present invention in order;

이하, 첨부된 도면에 의거하여 상세하게 설명한다.
Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 반잠수식 리그선의 개략 정면도이다.1 is a schematic front view of a semi-submersible rig line according to the present invention.

도 1을 참조하면, 반잠수식 리그선(1)의 하부에는 스러스터(30)가 수직하게 삽입될 수 있도록 하 방향으로 개구된 스러스터룸(11)이 구비되고, 상면에는 제1·2·3스트랜드잭(50a,50b,50c)이 설치되는 상판(12)이 구비되며, 내부에는 스러스터룸(11)을 사이에 두고 설치되며 제1·2·3스트랜드잭(50a,50b,50c)과 연결된 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)가 삽입관통되는 안내파이프(13)가 구비된다.1, there is a thruster room 11 opened downward so that the thruster 30 can be vertically inserted into the lower part of the semi-submerged league line 1, The first and second three-strand jacks 50a, 50b and 50c are installed inside the thruster room 11, and the first, second and third strand jacks 50a, 50b and 50c And a guide pipe 13 through which the first, second, and third lifting wire assemblies 40a, 40b, 40c are inserted.

또한, 상기 반잠수식 리그선(1)의 벽면(14)에는 보호커버(20)를 설치함이 바람직한데, 여기서, 보호커버(20)는 천 재질로서, 상하로 승강하는 인양와이어(W)에 의해 벽면(14)에 도색된 페인트가 손상(벗겨짐)되는 것을 방지하기 위한 용도로 이용되며, 보호커버(20)는 필요에 따라 공지의 다양한 부재들이 적용실시될 수 있다.The protection cover 20 is preferably made of a cloth material and has a lifting wire W lifted and lowered vertically. The protection cover 20 is provided on the wall surface 14 of the semi-submergible league line 1, The protective cover 20 is used for preventing the paint painted on the wall surface 14 from being damaged (peeled off) by the protective cover 20. Various known members can be applied to the protective cover 20 if necessary.

한편, 상기 제1·2·3스트랜드잭(50a,50b,50c)은 유압잭의 일종으로서 정밀하게 구동가능하며 기계 분야에서 널리 사용되는 기술 구성이므로 이에 대한 상세한 설명은 생략하기로 하며 도면에서도 간략하게 도시하였다.
The first, second, and third strand jacks 50a, 50b, and 50c are a type of hydraulic jack that can be precisely driven and widely used in the field of machinery. Therefore, a detailed description thereof will be omitted. Respectively.

도 2 및 도 3은 본 발명에 따른 반잠수식 리그선의 스러스터에 정면도 및 평면도이다.2 and 3 are a front view and a plan view of a thruster of a semi-submerged league line according to the present invention.

도 2 및 도 3을 참조하면, 상기 스러스터(30)는 반잠수식 리그선(1)의 자기위치 제어를 위해 사용되는 추진장치로서, 외면에 크레인용 러그(31a)가 구비된 바디(31)와, 바디(31)에 설치되며 크레인용 러그(31a)의 반대편에 배치되는 프로펠러(32)와, 프로펠러(32)의 둘레를 감싸 보호하는 프로펠러커버(34), 및 바디(31)의 상부에 회전가능하게 설치되며 제1·2·3러그(33a,33b,33c)가 일체로 구비된 스티어링 플랜지(33)로 구성되며, 상기 스티어링 플랜지(33)는 록킹핀(P)에 의해 회전이 제한된다.2 and 3, the thruster 30 is a propelling device used for controlling the magnetic position of the semi-submerged league line 1. The thruster 30 includes a body 31 having a crane lug 31a on its outer surface, A propeller 32 installed on the body 31 and disposed on the opposite side of the lug 31a for the crane 31, a propeller cover 34 for covering the periphery of the propeller 32 to protect the propeller 32, And the steering flange 33 is rotatably supported by the locking pin P so that the steering flange 33 can be rotated by the locking pin P. The first and second lugs 33a, 33b, Is limited.

또한, 상기 스티어링 플랜지(33)에는 가이드핀(35)이 일체로 구비된다.Further, the steering flange 33 is integrally provided with a guide pin 35.

여기서, 상기 크레인용 러그(31a)에는 크레인(C)의 인양와이어(W)가 설치된다.Here, the lifting wire (W) of the crane (C) is provided in the lug (31a) for the crane.

그리고, 상기 스티어링 플랜지(33)에 형성된 제1·2·3러그(33a,33b,33c) 중 제2·3러그(33b,33c)는 일측에 구비되며 제2·3리프팅 와이어 어셈블리(40b,40c)의 인보드 리프팅 와이어(41)의 일단에 구비된 체결부(41a)와 상호 체결되고, 제1러그(33a)는 타측에 구비되며 제1리프팅 와이어 어셈블리(40a)의 인보드 리프팅 와이어(41)의 일단에 구비된 체결부(41a)와 상호 체결된다.
The second and third lugs 33b and 33c of the first, second and third lugs 33a, 33b and 33c formed on the steering flange 33 are provided on one side and the second and third lifting wire assemblies 40b, Lifting wire 41 of the first lifting wire assembly 40a and the first lifting wire 41a of the first lifting wire assembly 40a are fastened together with the fastening portion 41a provided at one end of the lifting wire 41 of the first lifting wire assembly 40a, 41 are fastened to each other by a fastening portion 41a.

도 4는 본 발명에 따른 반잠수식 리그선에서 제1·2·3리프팅 와이어 어셈블리를 도시한 정면도이다.4 is a front view showing a first, a second, and a third lifting wire assembly in a semi-submerged league line according to the present invention.

도 4를 참조하면, 상기 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)는 인보드 리프팅 와이어(41)와 스트랜드(42)로 구성된다.Referring to FIG. 4, the first and second lifting wire assemblies 40a, 40b, and 40c are formed of an embedded lifting wire 41 and a strand 42.

상기 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)를 구성하는 인보드 리프팅 와이어(41)는 스티어링 플랜지(33)에 형성된 제1·2·3러그(33a,33b,33c)에 각각 연결되고, 스트랜드(42)는 제1·2·3스트랜드잭(50a,50b,50c)에 각각 연결된다.The lifting wire 41 constituting the first and second lifting wire assemblies 40a, 40b and 40c is connected to the first, second and third lugs 33a, 33b and 33c formed on the steering flange 33 Respectively, and the strands 42 are connected to the first, second, and third strand jacks 50a, 50b, and 50c, respectively.

한편, 상기 인보드 리프팅 와이어(41)와 스트랜드(42) 사이에는 회전고리(43)가 설치되는데, 회전고리(43)는 제1회전체(43a)와 제2회전체(43b)로 구성되며 제1회전체(43a)와 제2회전체(43b)는 수직축을 중심으로 서로 회전가능하게 연결된다.A rotating ring 43 is provided between the inboard lifting wire 41 and the strand 42. The rotating ring 43 is composed of a first rotating body 43a and a second rotating body 43b The first rotating body 43a and the second rotating body 43b are rotatably connected to each other about a vertical axis.

여기서, 상기 제1회전체(43a)는 인보드 리프팅 와이어(41)에 제1핀(P1)을 매개로 회전가능하게 연결되고, 제2회전체(43b)는 스트랜드(42)에 제2핀(P2)을 매개로 회전가능하게 연결된다.The first rotating body 43a is rotatably connected to the lifting wire 41 via a first pin P1 and the second rotating body 43b is rotatably connected to the strand 42 through a second pin (P2).

본 실시 예의 경우, 상기 제1회전체(43a)와 제2회전체(43b)는 수직축을 중심으로 제자리에서 회전이 가능하므로 인보드 리프팅 와이어(41) 또는 스트랜드(42)가 꼬이는 문제를 근본적으로 해소할 수 있다.Since the first rotating body 43a and the second rotating body 43b can be rotated in place around the vertical axis in the present embodiment, the problem of twisting the lifting wire 41 or the strand 42 is fundamentally Can be solved.

일 예로서, 상기 회전고리(43)가 설치되어 있지 않은 경우에는 스티어링 플랜지(33)의 제1·2·3러그(33a,33b,33c)에 체결된 인보드 리프팅 와이어(41)의 체결부(41a)를 해체시 인보드 리프팅 와이어(41)와 스트랜드(42)가 동시에 회전되기 때문에 꼬이는 문제가 있다.Lifting wire 41 fastened to the first, second, and third lugs 33a, 33b, and 33c of the steering flange 33, when the rotation ring 43 is not provided, Lifting wire 41 and strand 42 are twisted at the same time when disassembled.

하지만, 상기 회전고리(43)가 설치되어 있는 경우에는 인보드 리프팅 와이어(41)만 회전시키는 것이 가능해 인보드 리프팅 와이어(41) 및 스트랜드(42)가 꼬이는 문제를 근본적으로 해소를 해소할 수 있어 상당히 유용하다.
However, in the case where the rotation ring 43 is provided, only the inboard lifting wire 41 can be rotated, and the problem of twisting the inboard lifting wire 41 and the strand 42 can be fundamentally eliminated It is quite useful.

한편, 상기 인보드 리프팅 와이어(41)에는 테프론재질의 가이드부재(44)가 구비된다.On the other hand, the guide lifting wire 41 is provided with a guide member 44 made of Teflon.

여기서 상기 가이드부재(44)는 제1·2·3스트랜드잭(50a,50b,50c)에 의해 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)가 권취되는 과정에 안내파이프(13)와의 마찰로 인하여 안내파이프(13)가 손상될 우려가 상당히 높은데, 이를 가이드부재(44)가 잡아주므로 안내파이프(13)의 손상을 줄이고, 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)가 안내파이프(13) 내에서 흔들리는 것을 잡아주는 기능과 더불어서 리셉터클(미도시)과 스러스터(30)의 조립시 스러스터(30)의 흔들림을 잡아주어 가이드핀(35)이 리셉터클(미도시)의 하부 구멍과 순조롭게 조립될 수 있도록 하는 기능을 한다.
The guide member 44 is inserted into the guide pipe 13 during the winding of the first and second lifting wire assemblies 40a, 40b and 40c by the first and second and third strand jacks 50a, 50b and 50c. The guide pipe 44 catches the guide pipe 44 to reduce the damage of the guide pipe 13 and the first and second lifting wire assemblies 40a and 40b 40c catch the shaking of the thruster 30 in the assembling of the receptacle (not shown) and the thruster 30 so that the guide pin 35 comes into contact with the receptacle (not shown) (Not shown) to be smoothly assembled with the lower hole.

도 5a 내지 도 5h는 본 발명의 제1실시 예에 따른 반잠수식 리그선의 스러스터 장착과정을 순서대로 도시한 도면이다.FIGS. 5A to 5H are views sequentially illustrating a process of installing a thruster of a semi-submerged league line according to a first embodiment of the present invention.

도 5a에 도시된 바와 같이, 리그선(1)의 상판(12)에 설치된 제1·2·3스트랜드잭(50a,50b,50c)을 동작시켜 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)의 스트랜드(42)와 회전고리(43)가 안내파이프(13)로 관통되도록 하여 리그선(1)의 선저로 노출되도록 한다.The first and second and third lifting wire assemblies 40a and 40b are operated by operating first, second and third strand jacks 50a, 50b and 50c provided on the upper plate 12 of the league line 1, So that the strands 42 and the rotation hooks 43 of the guide lines 40a, 40b and 40c are passed through the guide pipe 13 to be exposed at the bottom of the rigid line 1.

그 다음 스러스터(30)를 준비하면 되는데, 이를 좀 더 상세하세 설명하면, 스러스터(30)를 구성하는 스티어링플랜지(33)의 제1·2·3러그(33a,33b,33c)에 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)의 인보드 리프팅 와이어(41)를 각각 설치한다.2 and 3 lugs 33a, 33b and 33c of the steering flange 33 constituting the thruster 30 are provided with the thrusters 30, Lifting wire assemblies 40a, 40b and 40c of the lifting wire assemblies 1, 2 and 3, respectively.

그리고, 크레인(C)의 인양와이어(W)를 스러스터(30)의 바디(31)에 형성된 크레인용 러그(31a)에 연결한다The lifting wire W of the crane C is connected to the crane lug 31a formed in the body 31 of the thruster 30

이때, 상기 스러스터(30)의 스티어링플랜지(33)는 리그선(1)의 선체를 향하도록 배치하고, 프로펠러(32)는 해저(B)를 향하도록(좀 더 바람직하게는 수면과 수평을 이루도록 배치함) 뉘어준다.At this time, the steering flange 33 of the thruster 30 is disposed so as to face the hull of the rigid line 1, and the propeller 32 is directed toward the sea bed B (more preferably, .

특히, 상기 스티어링플랜지(33)의 제2·3러그(33b,33c)는 상부에 위치하도록 하고, 제1러그(33a)는 하부에 위치하도록 함이 바람직하다.Particularly, it is preferable that the second and third lugs 33b and 33c of the steering flange 33 are located at the upper portion and the first lug 33a is located at the lower portion.

그 다음 크레인(C)의 인양와이어(W)를 매개로 스러스터(30)를 들어올린다.
Then, the thruster 30 is lifted via the lifting wire W of the crane C.

도 5b에 도시된 바와 같이, 상기 리그선(1)의 벽면(14)을 따라 인양와이어(W)를 내려주면서 스러스터(30)를 바다에 입수시켜 준다.As shown in FIG. 5B, the lifting wire W is lowered along the wall surface 14 of the rigid line 1, and the thruster 30 is received in the sea.

이때, 상기 리그선(1)의 벽면(14)과 인양와이어(W) 간에는 마찰이 발생하게 되며, 이로 인해 벽면(14)에 도색된 페인트가 벗겨지는 문제가 있는데, 이를 해소하기 위해 본 실시 예의 경우에는 리그선(1)의 벽면(14)에 보호커버(20)를 설치하여 페인트가 벗겨지는 문제를 최소화하였다.
At this time, friction occurs between the wall surface 14 of the rigging line 1 and the lifting wire W, and thus there is a problem that the painted paint peels off the wall surface 14. In order to solve this problem, The protective cover 20 is provided on the wall surface 14 of the rig line 1 to minimize the problem of peeling off the paint.

도 5c에 도시된 바와 같이, 상기 스러스터(30)의 스티어링플랜지(33)에 설치된 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)의 인보드 리프팅 와이어(41)에 스트랜드(42)를 각각 연결하면 되고, 만약, 스트랜드(42)에 회전고리(43)가 구비되어 있다면 회전고리(43)를 인보드 리프팅 와이어(41)에 연결하면 된다.Lifting wires 41 of the first and second lifting wire assemblies 40a, 40b and 40c provided on the steering flange 33 of the thruster 30 are provided with strands 42 The rotating ring 43 may be connected to the lifting wire 41. If the rotating ring 43 is provided in the strand 42,

본 실시 예의 경우, 상기 스트랜드(42)에 회전고리(43)가 결합되어 있어 회전고리(43)를 인보드 리프팅 와이어(41)에 제1핀(P1;도 4 참조)을 매개로 연결시켜 주었다.
The rotating ring 43 is coupled to the strand 42 so that the rotating ring 43 is connected to the lifting wire 41 via the first pin P1 .

도 5d 및 도 5e에 도시된 바와 같이, 상기 스러스터(30)에 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)가 모두 연결한 상태에서 크레인(C)의 인양와이어(W)를 서서히 풀어주면서 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)를 제1·2·3스트랜드잭(50a,50b,50c)을 매개로 권취시켜 주면, 이에 의해 스러스터(30)는 일정한 회전반경을 그리면서 횡 방향으로 이동하게 된다.The lifting wire W of the crane C is connected to the thrusters 30 while the first and second lifting wire assemblies 40a, 40b and 40c are connected to the thrusters 30, as shown in Figs. 5D and 5E. The third and the third lifting wire assemblies 40a, 40b and 40c are wound around the first and second and third strand jacks 50a, 50b and 50c while gradually releasing the thrusters 30, Moves in a lateral direction while drawing a certain radius of rotation.

그런데, 이와 같이 스러스터(30)를 이동시키는 과정에 스러스터(30)와 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c) 간에 간섭이 발생하는 경우가 종종 있으며, 좀 더 명확하게는, 제1리프팅 와이어 어셈블리(40a)와 스러스터(30) 간에 간섭이 일어나 스러스터(30)의 상부구조물을 간혹 손상시키는 경우가 있으므로 조심스럽게 스러스터(30)를 이동하는 것이 바람직하다.However, interference between the thruster 30 and the first and second lifting wire assemblies 40a, 40b and 40c often occurs during the movement of the thruster 30. As a result, It is preferable to carefully move the thruster 30 because interference may occur between the first lifting wire assembly 40a and the thruster 30 to occasionally damage the upper structure of the thruster 30. [

그리고, 상기 스러스터(30)를 스러스터룸(11)의 하부까지 이동시켜 주며, 스러스터룸(11)의 하부에 도달한 스러스터(30)는 수직상태에서 약간 기울어진 상태를 유지하게 된다.
The thruster 30 moves to the lower portion of the thruster room 11 and the thruster 30 reaching the lower portion of the thruster room 11 maintains a slight inclined state in the vertical state .

도 5f 및 도 5g에 도시된 바와 같이, 상기 제1리프팅 와이어 어셈블리(40a)를 제1스트랜드잭(50a)을 매개로 권취시켜 기울어진 스러스터(30)를 수직하게 세워준다.As shown in FIGS. 5F and 5G, the first lifting wire assembly 40a is wound around the first strand jack 50a so that the inclined thruster 30 is vertically erected.

그리고, 상기 스러스터(30)가 세워지면 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)를 제1·2·3스트랜드잭(50a,50b,50c)을 매개로 권취시켜 스러스터(30)를 승강시켜 줌으로서 스러스터룸(11)에 스러스터(30)가 배치될 수 있도록 한다.When the thruster 30 is raised, the first and second lifting wire assemblies 40a, 40b and 40c are wound around the first and second and third strand jacks 50a, 50b and 50c, So that the thruster 30 can be disposed in the thruster room 11 by raising and lowering the thruster 30.

상기 스러스터룸(11)에 스러스터(30)가 배치되면 스러스터(30)를 고정한다.
When the thruster 30 is disposed in the thruster room 11, the thruster 30 is fixed.

도 5h에 도시된 바와 같이, 상기 스러스터(30)를 스러스터룸(11)에 고정한 이후에는 스러스터(30)의 스티어링 플랜지(33)에 고정된 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)를 분리시켜 준다.5H, after the thruster 30 is fixed to the thruster room 11, the first and second lifting wire assemblies 40a (40a) fixed to the steering flange 33 of the thruster 30 , 40b, and 40c.

이때, 상기 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)를 분리시키는 방법은, 도 5g의 확대된 도면과 같이, 인보드 리프팅 와이어(41)의 상단부에 형성된 구멍으로 회전용 공구(T)를 삽입한 상태에서 인보드 리프팅 와이어(41)를 돌리게 되면 회전고리(43)의 제1회전체(43a)가 제2회전체(43b)를 중심으로 회전하게 되며, 이에 의해 스티어링 플랜지(33)로부터 인보드 리프팅 와이어(41)를 분리시킬 수 있게 되는 것이다.The method of separating the first and second lifting wire assemblies 40a, 40b and 40c includes a step of forming a hole formed in the upper end of the lifting wire 41, The first rotating body 43a of the rotating ring 43 is rotated around the second rotating body 43b by rotating the driven lifting wire 41 in a state of inserting the steering wheel T, Lifting wire 41 can be separated from the lifting wire 33. [

특히, 상기 회전고리(43)의 제1회전체(43a)와 제2회전체(43b)가 상호 회전가능한 구조를 이루고 있어 인보드 리프팅 와이어(41)를 회전시키더라도 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)가 꼬이는 문제를 해소할 수 있어 상당히 유용하다.Particularly, since the first rotating body 43a and the second rotating body 43b of the rotating ring 43 are mutually rotatable, even if the inboard lifting wire 41 is rotated, the first, second, and third lifting It is possible to solve the problem that the wire assemblies 40a, 40b and 40c are twisted, which is quite useful.

그리고, 상기 스티어링 플랜지(33)로부터 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)가 분리되면 제1·2·3스트랜드잭(50a,50b,50c)을 매개로 권취시켜 외부로 인출하면 된다.When the first and second lifting wire assemblies 40a, 40b, and 40c are separated from the steering flange 33, the first and second and third strand jacks 50a, 50b, It can be withdrawn.

또한, 상기 스러스터(30)의 크레인용 러그(31a)로부터 크레인(C)의 인양와이어(W)를 분리시켜 준다.Further, the lifting wire (W) of the crane (C) is separated from the crane lug (31a) of the thruster (30).

참고로, 상기 인양와이어(W)의 분리시기는 스러스터룸(11)에 스러스터(30)를 고정한 이후에 할 수도 있고, 도 5e에 도시된 바와 같이, 스러스터룸(11)의 하부에 스러스터(30)를 배치한 이후에 할 수도 있다.
The separation time of the lifting wire W may be performed after fixing the thruster 30 to the thruster room 11 or may be performed at a lower portion of the thruster room 11 as shown in FIG. Or after the thruster 30 is disposed.

한편, 앞서 설명한 제1실시 예와 이하에서 설명될 제2실시 예의 차이점은 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)의 설치시점에 있다.The difference between the first embodiment described above and the second embodiment described below is at the time of installing the first and second lifting wire assemblies 40a, 40b, and 40c.

좀 더 명확하게는, 제1실시 예의 경우에는 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)를 스러스터(30)에 모두 연결한 상태에서 스러스터(30)를 횡 방향으로 이동시키는 것이다.More specifically, in the case of the first embodiment, the thruster 30 is moved in the lateral direction while the first and second lifting wire assemblies 40a, 40b, and 40c are all connected to the thruster 30 I will.

이에 반하여, 제2실시 예는 제2·3리프팅 와이어 어셈블리(40b,40c)를 먼저 스러스터(30)에 설치하고, 스러스터(30)가 어느 정도 횡 방향으로 이동되면 이후에 제1리프팅 와이어 어셈블리(40a)를 설치함으로써 스러스터(30)와 제1리프팅 와이어 어셈블리(40a) 간에 간섭을 최소화시켜 스러스터(30)의 손상을 방지하고자 함에 있다.In contrast, in the second embodiment, the second and third lifting wire assemblies 40b and 40c are installed in the thruster 30 first, and when the thruster 30 is moved to some extent in the lateral direction, The assembly 40a minimizes interference between the thruster 30 and the first lifting wire assembly 40a to prevent damage to the thruster 30. [

따라서, 이하에서는 공통적인 부분(스러스터(30) 입수와 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)를 제1·2·3스트랜드잭(50a,50b,50c)을 이용하여 리그선(1)의 선저로 관통시키는 준비과정 및 스러스터룸(11)의 하부에 배치된 스러스터(30)를 승강시켜 스러스터룸(11)에 설치하고, 설치완료 후 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)를 스러스터(30)로부터 분리하는 과정)은 생략하고 이와 같이 차이점이 나타나는 부분을 도면을 예시로 들어 상세하게 설명한다.
Therefore, in the following description, a common part (the thruster 30 input and the first and second lifting wire assemblies 40a, 40b, and 40c) are connected to each other using the first, second, and third strand jacks 50a, 50b, and 50c And the thruster 30 disposed at the lower portion of the thruster room 11 is raised and lowered to be installed in the thruster room 11. After completion of the installation, 3 lifting wire assemblies 40a, 40b, and 40c from the thruster 30) will be omitted and the differences will be described in detail with reference to the drawings.

도 6a 내지 도 6d는 본 발명의 제2실시 예에 따른 반잠수식 리그선의 스러스터 장착과정을 순서대로 도시한 도면이다.FIGS. 6A to 6D are views sequentially showing a process of installing a thruster of a semi-submerged league line according to a second embodiment of the present invention.

도 6a에 도시된 바와 같이, 스러스터(30)의 스티어링플랜지(33)에 설치된 제2·3리프팅 와이어 어셈블리(40b,40c)의 인보드 리프팅 와이어(41)에 스트랜드(42)를 각각 연결하면 되고, 만약, 스트랜드(42)에 회전고리(43)가 구비되어 있다면 회전고리(43)를 인보드 리프팅 와이어(41)에 연결하면 된다.The strands 42 are connected to the inboard lifting wires 41 of the second and third lifting wire assemblies 40b and 40c provided on the steering flange 33 of the thruster 30 as shown in Fig. If the strands 42 are provided with the rotating ring 43, the rotating ring 43 may be connected to the lifting wire 41.

본 실시 예의 경우, 상기 스트랜드(42)에 회전고리(43)가 결합되어 있어 회전고리(43)를 인보드 리프팅 와이어(41)에 제1핀(P1;도 4 참조)을 매개로 연결시켜 주었다.
The rotating ring 43 is coupled to the strand 42 so that the rotating ring 43 is connected to the lifting wire 41 via the first pin P1 .

도 6b에 도시된 바와 같이, 상기 스러스터(30)에 제2·3리프팅 와이어 어셈블리(40b,40c)가 연결한 상태에서 크레인(C)의 인양와이어(W)를 서서히 풀어주면서 제2·3리프팅 와이어 어셈블리(40b,40c)를 제2·3스트랜드잭(50b,50c)을 매개로 권취시켜 주면, 이에 의해 스러스터(30)는 일정한 회전반경을 그리면서 횡 방향으로 이동하게 된다.6B, while the second and third lifting wire assemblies 40b and 40c are connected to the thruster 30, the lifting wire W of the crane C is gradually released, When the lifting wire assemblies 40b and 40c are wound by way of the second and third strand jacks 50b and 50c, the thrusters 30 are moved in the lateral direction while drawing a constant radius of rotation.

그리고, 상기 스러스터(30)를 스러스터룸(11)의 하부까지 이동시켜 주며, 스러스터룸(11)의 하부에 도달한 스러스터(30)는 수직상태에서 약간 기울어진 상태를 유지하게 된다.
The thruster 30 moves to the lower portion of the thruster room 11 and the thruster 30 reaching the lower portion of the thruster room 11 maintains a slight inclined state in the vertical state .

도 6c 및 도 6d에 도시된 바와 같이, 상기 스러스터(30)의 스티어링플랜지(33)에 설치된 제1리프팅 와이어 어셈블리(40a)의 인보드 리프팅 와이어(41)에 스트랜드(42)를 각각 연결하면 되며, 본 실시 예의 경우에는 스트랜드(42)에 회전고리(43)가 결합되어 있어 회전고리(43)를 제1리프팅 와이어 어셈블리(40a)의 인보드 리프팅 와이어(41)에 제1핀(P1;도 4 참조)을 매개로 연결시켜 주었다.The strands 42 are connected to the inboard lifting wire 41 of the first lifting wire assembly 40a provided on the steering flange 33 of the thruster 30 as shown in Figs. 6C and 6D The rotating ring 43 is coupled to the strand 42 so that the rotating ring 43 is connected to the lifting wire 41 of the first lifting wire assembly 40a by the first pin P1. See Fig. 4).

그 다음 상기 제1리프팅 와이어 어셈블리(40a)를 제1스트랜드잭(50a)을 매개로 권취시켜 기울어진 스러스터(30)를 수직하게 세워주면 되고, 그 이후에 과정은 앞선 제1실시 예로 대신한다.Then, the first lifting wire assembly 40a is wound around the first strand jack 50a to vertically tilt the thruster 30, and the process thereafter is replaced with the first embodiment .

따라서, 본 실시 예에 의하면, 상기 제2·3리프팅 와이어 어셈블리(40b,40c)를 먼저 스러스터(30)에 설치하고, 스러스터(30)가 어느 정도 횡 방향으로 이동되면 이후에 제1리프팅 와이어 어셈블리(40a)를 설치함으로써 스러스터(30)와 제1리프팅 와이어 어셈블리(40a) 간에 간섭을 최소화시켜 스러스터(30)의 손상을 방지할 수 있기 때문에 상당히 유용한 작업방법이라 할 수 있다.
Therefore, according to the present embodiment, the second and third lifting wire assemblies 40b and 40c are installed in the thruster 30 first. When the thruster 30 is moved to a certain extent in the lateral direction, The wire assembly 40a minimizes the interference between the thrusters 30 and the first lifting wire assembly 40a to prevent damage to the thrusters 30. This is a very useful working method.

본 실시 예에 의하면, 상기 스러스터(30)를 수평자세로 배치한 상태에서 횡 방향으로 이동시킨 후 스러스터룸(11)에 장착함으로 설치가 쉽고, 특히 수직자세(종래기술)에서 횡 방향으로 이동시킨 후 스러스터룸(11)에 장착하는 것보다 작업에 요구되는 최소수심이 10% 이상 적은 조건에서도 장착이 가능해지는 이점이 있다.According to the present embodiment, since the thruster 30 is arranged in the horizontal posture and laterally moved in the horizontal posture, the thruster 30 is mounted in the thruster room 11, There is an advantage that it is possible to mount even in a condition that the minimum water depth required for the operation is 10% or less than that in the thruster room 11 after it is moved.

또한, 상기 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)를 구성하는 인보드 리프팅 와이어(41)와 스트랜드(42) 사이에 회전고리(43)를 설치해 줌으로서 스러스터(30)를 횡 방향으로 이동시키거나 스러스터(30)로부터 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)를 분리시 제1·2·3리프팅 와이어 어셈블리(40a,40b,40c)가 꼬이는 문제를 근본적으로 해소할 수 있어 상당히 유용하다.
The thrusters 30 may be provided by providing a rotation ring 43 between the strands 42 and the lifting wires 41 constituting the first and second lifting wire assemblies 40a, 2, 3 lifting wire assemblies 40a, 40b, 40c are twisted when the first and second lifting wire assemblies 40a, 40b, 40c are separated from the thrusters 30, It is quite useful because it can fundamentally solve the problem.

본 발명은 기재된 구체적인 실시 예에 대해서만 상세히 설명되었지만 본 발명의 기술사상범위 내에서 다양하게 변형 및 수정할 수 있음은 당업자에 있어서 당연한 것이며, 이러한 변형 및 수정이 첨부된 특허청구범위에 속함은 당연한 것이다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as defined by the appended claims.

1: 반잠수식 리그선 11: 스러스터룸 12: 상판
13: 안내파이프 14: 벽면 20: 보호커버
30: 스러스터 31: 바디 31a: 크레인용 러그
32: 프로펠러 33: 스티어링 플랜지 35: 가이드핀
33a,33b,33c: 제1·2·3러그 34: 프로펠러 커버
40a,40b,40c: 제1·2·3리프팅 와이어 어셈블리
41: 인보드 리프팅 와이어 42: 스트랜드 43: 회전고리
43a: 제1회전체 43b: 제2회전체 44: 가이드부재
50a,50b,50c: 제1·2·3스트랜드잭
T: 회전용 공구 C: 크레인 W: 인양와이어
1: semi-submerged league line 11: thruster room 12: top plate
13: guide pipe 14: wall surface 20: protective cover
30: Thruster 31: Body 31a: Crane lug
32: propeller 33: steering flange 35: guide pin
33a, 33b, 33c: first, second, and third lugs 34: propeller cover
40a, 40b, 40c: first, second, and third lifting wire assemblies
41: Invaded lifting wire 42: Strand 43: Swivel ring
43a: first rotating member 43b: second rotating member 44: guide member
50a, 50b, 50c: first, second, and third strand jacks
T: Tool for turning C: Crane W: Lifting wire

Claims (5)

리그선의 상판에 각각 구동가능한 제1·2·3스트랜드잭의 스트랜드가 스러스터룸을 사이에 두고 리그선의 선저를 관통하도록 설치하고, 스러스터를 구성하는 스티어링플랜지의 제1·2·3러그에 제1·2·3리프팅 와이어 어셈블리의 인보드 리프팅 와이어를 각각 설치한 상태에서 크레인의 인양와이어를 스러스터에 형성된 크레인용 러그에 연결한 다음 스러스터의 스티어링플랜지는 선체를 향하도록 하고 프로펠러는 해저를 향하도록 하여 뉘인 상태에서 인양와이어를 매개로 스러스터를 바다에 입수시키는 단계;
상기 제1·2·3리프팅 어셈블리의 인보드 리프팅 와이어에 스트랜드를 각각 연결하는 단계;
상기 크레인의 인양와이어를 풀어주면서 1·2·3리프팅 와이어 어셈블리를 제1·2·3스트랜드잭을 매개로 권취시켜 스러스터를 횡 방향으로 이동시키는 단계;
상기 스러스터가 스러스터룸에 배치되면 제1리프팅 와이어 어셈블리를 제1스트랜드잭을 매개로 권취시켜 스러스터를 세우는 단계;
상기 제1·2·3리프팅 와이어 어셈블리를 제1·2·3스트랜드잭을 매개로 권취시켜 스러스터를 스러스터룸에 장착하는 단계;를 포함하는 것을 특징으로 하는 반잠수식 리그선의 스러스터 장착방법.
The strands of the first, the second and the third strand jacks which can be driven respectively on the upper plate of the league line are installed so as to pass through the bottom of the league line with the thruster room therebetween and the first, second and third lugs of the steering flange constituting the thruster With the lifting wire of the first, second, and third lifting wire assemblies installed, connect the lifting wire of the crane to the crane lug formed on the thruster, and the steering flange of the thruster should face the hull. And a thruster is received in the sea via a lifting wire in a state where the lifting wire is oriented in a direction in which the lifting wire is directed;
Connecting the strands to the inboard lifting wires of the first, second, and third lifting assemblies, respectively;
Moving the lifting wire assembly through the first, second and third strand jacks while releasing the lifting wire of the crane to move the thrusters in the lateral direction;
Winding the first lifting wire assembly through the first strand jack to raise the thruster when the thruster is disposed in the thruster room;
And winding the first and second lifting wire assemblies through a first, a second, and a third strand jack to mount the thruster to the thruster room. Way.
리그선의 상판에 각각 구동가능한 제1·2·3스트랜드잭의 스트랜드가 스러스터룸을 사이에 두고 리그선의 선저를 관통하도록 설치하고, 스러스터를 구성하는 스티어링플랜지의 제1·2·3러그에 제1·2·3리프팅 와이어 어셈블리의 인보드 리프팅 와이어를 각각 설치한 상태에서 크레인의 인양와이어를 스러스터에 형성된 크레인용 러그에 연결한 다음 스러스터의 스티어링플랜지는 선체를 향하도록 하고 프로펠러는 해저를 향하도록 하여 뉘인 상태에서 인양와이어를 매개로 스러스터를 바다에 입수시키는 단계;
상기 제2·3리프팅 어셈블리의 인보드 리프팅 와이어에 스트랜드를 각각 연결하는 단계;
상기 크레인의 인양와이어를 풀어 줌과 동시에 제2·3리프팅 와이어 어셈블리를 제2·3스트랜드잭을 매개로 권취시켜 스러스터를 수평으로 이동시키는 단계;
상기 제1리프팅 어셈블리의 인보드 리프팅 와이어에 스트랜드를 연결한 다음 제1리프팅 와이어 어셈블리를 제1스트랜드잭을 매개로 권취시켜 스러스터를 수직하게 세우는 단계;
상기 크레인의 인양와이어를 풀어 줌과 동시에 제1·2·3리프팅 와이어 어셈블리를 제1·2·3스트랜드잭을 매개로 권취시켜 스러스터를 스러스터룸에 장착하는 단계;를 포함하는 것을 특징으로 하는 반잠수식 리그선의 스러스터 장착방법.
The strands of the first, the second and the third strand jacks which can be driven respectively on the upper plate of the league line are installed so as to pass through the bottom of the league line with the thruster room therebetween and the first, second and third lugs of the steering flange constituting the thruster With the lifting wire of the first, second, and third lifting wire assemblies installed, connect the lifting wire of the crane to the crane lug formed on the thruster, and the steering flange of the thruster should face the hull. And a thruster is received in the sea via a lifting wire in a state where the lifting wire is oriented in a direction in which the lifting wire is directed;
Connecting the strands to the respective lifting wires of the second and third lifting assemblies;
Lifting the lifting wire of the crane while simultaneously winding the second and third lifting wire assemblies through the second and third strand jacks to horizontally move the thrusters;
Connecting the strand to the inboard lifting wire of the first lifting assembly and then winding the first lifting wire assembly through a first strand jack to vertically raise the thruster;
And lifting the lifting wire of the crane while winding the first and second lifting wire assemblies through the first and second and third strand jacks to mount the thruster to the thruster room. A method of mounting a thruster of a semi-submerged league line.
제1항 또는 제2항에 있어서,
선체의 벽면에 인양와이어에 의한 쓸림을 방지하기 위한 보호커버를 설치시키는 단계를 더 포함하는 것을 특징으로 하는 반잠수식 리그선의 스러스터 장착방법.
3. The method according to claim 1 or 2,
Further comprising the step of installing a protective cover on the wall surface of the hull so as to prevent sweeping by the lifting wire.
제1항 또는 제2항에 있어서,
상기 인보드 리프팅 와이어와 스트랜드 사이에는 수직축을 중심으로 각각 회전이 가능하도록 이들을 상호 연결하는 회전고리를 설치시켜주는 단계를 더 포함하는 것을 특징으로 하는 반잠수식 리그선의 스러스터 장착방법.
3. The method according to claim 1 or 2,
Further comprising the step of installing a rotation ring between the inboard lifting wire and the strand so as to be rotatable about a vertical axis respectively.
제4항에 있어서,
상기 회전고리는,
상기 인보드 리프팅 와이어에 끼워지는 제1핀을 매개로 회전가능하게 설치되는 제1회전체와;
상기 스트랜드에 일측이 끼워지는 제2핀을 매개로 회전가능하게 설치되고, 타측이 제1회전체에 설치되어 제1회전체를 중심으로 축 회전되는 제2회전체로 구성된 것을 특징으로 하는 반잠수식 리그선의 스러스터 장착방법.
5. The method of claim 4,
The rotation ring
A first rotating body rotatably installed via a first pin fitted to the lifting wire;
And a second rotating body rotatably mounted via a second pin having one side inserted into the strand, the other side being provided on the first rotating body and being pivotally rotated about the first rotating body. A method of mounting a thruster of a type of league line.
KR1020140144264A 2014-10-23 2014-10-23 Method for mounting thruster in semi-submergible rig KR20160048279A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140144264A KR20160048279A (en) 2014-10-23 2014-10-23 Method for mounting thruster in semi-submergible rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140144264A KR20160048279A (en) 2014-10-23 2014-10-23 Method for mounting thruster in semi-submergible rig

Publications (1)

Publication Number Publication Date
KR20160048279A true KR20160048279A (en) 2016-05-04

Family

ID=56021839

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140144264A KR20160048279A (en) 2014-10-23 2014-10-23 Method for mounting thruster in semi-submergible rig

Country Status (1)

Country Link
KR (1) KR20160048279A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107399409A (en) * 2016-05-20 2017-11-28 中集海洋工程研究院有限公司 The installation method of ocean platform propeller
CN110171525A (en) * 2019-05-29 2019-08-27 广船国际有限公司 The stringing method of gondola
CN111268056A (en) * 2020-03-09 2020-06-12 招商局重工(江苏)有限公司 Method for installing guide cover of large ore carrier

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107399409A (en) * 2016-05-20 2017-11-28 中集海洋工程研究院有限公司 The installation method of ocean platform propeller
CN110171525A (en) * 2019-05-29 2019-08-27 广船国际有限公司 The stringing method of gondola
CN111268056A (en) * 2020-03-09 2020-06-12 招商局重工(江苏)有限公司 Method for installing guide cover of large ore carrier

Similar Documents

Publication Publication Date Title
JP7025433B2 (en) Deep sea hoisting system and method
US7770655B2 (en) Conductor casing installation by anchor handling/tug/supply vessel
EP1509672B1 (en) Apparatuses and methods of deploying and installing subsea equipment
JP2020514205A5 (en)
US20040258482A1 (en) Subsea connection apparatus
RU2182883C2 (en) Deep-water load-lowering device
KR20160048279A (en) Method for mounting thruster in semi-submergible rig
EP2425095B1 (en) Subsea system
KR20160067305A (en) Shackle device for hull surface cleaning robot
KR100967816B1 (en) Method for mounting thruster in semi-submergible rig
KR20120132218A (en) Structure Having Thruster Water Tight Cover of Vessels and Method depositing Thruster Having the same
KR100978065B1 (en) Method for mounting thruster in drillship
JP3746590B2 (en) Underwater vehicle detaching device
US4278041A (en) Anchor handling guides
US10240407B2 (en) Method and system for wireline intervention in a subsea well from a floating vessel
WO2011148184A2 (en) Well intervention method and apparatus
KR20190121594A (en) Hook apparatus for crane and operating method of the same
NO20170862A1 (en) A mooring system
KR101334353B1 (en) Pipe handlring device and drillship including the same
WO2017095229A9 (en) Method for replacing flexible products whilst installation vessel is positioned away from platform
EP3464152B1 (en) Anti-twist frame, vessel and method for lowering an object in a water body
JPH09136688A (en) Length variable mooring winch device and method for extending mooring line
GB2212189A (en) Sub-sea equipment running arrangement
KR20130029844A (en) Strand jack foundation for installing thruster

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application