KR20150076729A KR1020130165266A KR20130165266A KR20150076729A KR 20150076729 A KR20150076729 A KR 20150076729A KR 1020130165266 A KR1020130165266 A KR 1020130165266A KR 20130165266 A KR20130165266 A KR 20130165266A KR 20150076729 A KR20150076729 A KR 20150076729A
Authority
KR
South Korea
Prior art keywords
cft
information
work group
work
module
Prior art date
Application number
KR1020130165266A
Other languages
Korean (ko)
Inventor
김진성
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020130165266A priority Critical patent/KR20150076729A/en
Publication of KR20150076729A publication Critical patent/KR20150076729A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a construction finishing time limit (CFT) management support system. In the present invention, a communication pipeline for a work instruction team information device, an operator information device, &Lt; a computer module capable of acquiring process source information including work group information related to a work group participating in a plant construction and material information related to a material attached to each work group, &lt; After that, the computation module, which can set the CFT corresponding to each material attached to each work group according to the previously stored construction group finishing time limit (CFT) setting rule, After reading the CFT corresponding to each material attached to the work group, the corresponding CFT history is displayed in the table C / C / C / A / FFT information generating / storing &gt; &lt; < Workpiece CFT information providing request message is transmitted from the work instruction team information device, an operation corresponding to the material CFT information providing request message A computer module capable of extracting CFT information for each group affiliated material and transmitting the extracted CFT information for each work group sub-material to the work instruction team information device, and the like, It is possible to strictly control the CFT of each material attached to each work group without any difficulty and strictly manage it according to the requirements of the customer so that the large and small damage (eg, plant construction contractor / contractor) So that it can be easily guided.

Description

[Background Art] [0002] The present invention relates to a system for supporting the completion of material construction,

The present invention relates to a system for supporting a construction finishing time limit (CFT) for a material (for example, piping) more efficiently at a company (for example, a plant construction contractor / contractor) More specifically, the CFT of each material attached to each work group can be strictly managed in accordance with the requirements of the customer without any difficulty on the side of the work instruction team, so that it is possible for a company (for example, plant construction contractor / contractor) The present invention relates to a material CFT management support system capable of guiding the large and small damage caused by unreasonable management of the CFI to be easily avoided.

In recent years, as the technology related to heavy industry has advanced, the number of companies receiving and constructing large-scale plant construction both at home and abroad has also shown a rapid increase. Accordingly, the importance of various backup technologies that can more effectively support the construction of plant construction There is also a situation that is gradually expanding.

As a backup technique related to plant construction according to the conventional technique, for example, in Korean Patent Laid-Open No. 10-2004-41054 entitled &quot; Plant System, Plant Monitoring Device and Plant Data Selection Method &quot; <To prevent data that should not be read out among the plant data being transmitted to the outside, data that is not read from the side that is driving / monitoring / repairing the plant among the plant data transmitted to the outside Open No. 10-2005-96157 entitled &quot; Method for Drying a Wind Power Plant &quot; and a technique for protecting the plant data transmitted to the outside The wind power generation plant (2005.5.5, open to the public) is to support the construction of wind power generation facilities more easily and efficiently (Hereinafter referred to as &quot; plant operating method and plant operation system &quot;) (published on September 21, 2011) discloses &lt; And a technique for suppressing the corrosion of the plant structural member, is disclosed in detail.

On the other hand, under such a conventional plant construction technology system, since various types of materials such as piping are input / constructed at the plant construction site, how to efficiently manage the CFT of the material according to the customer's demand The problem is very important to determine the construction quality of the entire plant construction.

However, in spite of this situation, the backup technology related to the conventional plant construction has not provided any means for strictly managing the CFI of the material according to the customer's requirements. Therefore, the company (for example, plant construction order / The contractor was forced to take large and small damages due to the unreasonable management of the material CFI.

Korean Patent Laid-Open No. 10-2004-41054 (Name: plant system, method of selecting plant monitoring apparatus and plant data) (Published on May 13, 2004) Korean Patent Laid-Open No. 10-2005-96157 (entitled "Method of Drying a Wind Power Plant and Wind Power Plant Constructed According to It") Korean Patent Laid-Open No. 10-2011-104098 (Name: Plant Operation Method and Plant Operation System) (Published on September 21, 2011)

Accordingly, it is an object of the present invention to provide an information processing apparatus and a method and system for performing the same in a communication pipeline of a work instruction team information device, a worker information device, A computer module capable of acquiring process source information including material information related to the material attached to the group, and <process source information of the completed process group source, According to the Construction Finishing Time limit setting rule, a computer module capable of setting a CFT corresponding to each material attached to each work group, &lt; a CFT corresponding to each material attached to each work group, A computation module capable of generating / storing CFT information per work group sub-material expressed by table / text / image / numerator / graph>, <material CFT Extracting CFT information for each work group sub-material corresponding to the material CFT information providing request message from the CFT information for each working group sub-material when the beam providing request message is transmitted, And a computer module that can be transmitted to the work instruction team information device, and the like. Thus, the CFT of each material attached to each work group can be strictly determined without any difficulty on the work instruction team side (For example, a plant construction contractor / contractor) can easily avoid large and small damages caused by irrational management of material CFI.

Other objects of the present invention will become more apparent from the following detailed description and the accompanying drawings.

In order to achieve the above object, according to the present invention, there is provided a system and method for communicating with a work instruction team information device or a vendor period system server that is connected to a wired / wireless on-line network to transmit work group information related to a work group participating in a plant construction, A process source information acquisition module for acquiring process source information including material information related to a material; After reading the process source information, an operation for setting a CFT corresponding to each material attached to each work group in accordance with a previously set construction finishing time limit (CFT) setting rule for each work group affiliated material Group affiliated material-specific CFT configuration module; Communicates with the CFT setting module for each work group sub-material to read a CFT corresponding to each material attached to each work group, and then transmits the CFT data corresponding to each work group to the work group auxiliary material A CFT information generation module for each work group sub material for generating star CFT information; When the material CFT information provision request message is transmitted from the work instruction team information device, the CFT information for each work group sub material corresponding to the material CFT information provision request message is extracted from the CFT information for each work group sub material, And a CFT information providing module for each work group sub-material for transmitting the CFT information for each work group sub-material to the work instruction team information device.

In the present invention, within the communication pipeline of the work instruction team information device, the worker information device, the vendor period system server, etc. connected to the wired / wireless online network, the work group information related to the work group participating in the plant construction, <Computation module that can acquire process source information that contains material information related to material> <Reads completed process source information, and then reads Construction Source Finishing Time limit (CFT: Construction Finishing Time limit ) According to the setting rule, the computer module that can set the CFT corresponding to each material attached to each work group, &lt; < CFT corresponding to each material attached to each work group, A computerized module capable of generating / storing CFT information per work group represented by text / image / numerical / graph, and <material CFT information provided from a work instruction team information device Group CFT information corresponding to the work group sub-material corresponding to the material CFT information providing request message from the CFT information for each working group sub-material when the message is transmitted, extracts the CFT information for each work group sub- In the implementation environment of the present invention, the CFT of each material attached to each work group without any difficulty on the work instruction team side is strictly adjusted to the customer's requirements In the end, a company (for example, a plant construction contractor / contractor) can easily avoid large and small damages caused by irrational management of material CFI.

BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an exemplary diagram conceptually showing a detailed configuration of a material CFT management support system according to the present invention; FIG.
2 is an exemplary view conceptually showing a posting pattern of a guide frame according to the present invention.
FIG. 3 and FIG. 4 are conceptual diagrams illustrating a detailed function execution procedure of the CFT management support system according to the present invention; FIG.

Hereinafter, a material CFT management support system according to the present invention will be described in more detail with reference to the accompanying drawings.

1, the CFT management support system 100 according to the present invention includes a work instruction team information device 1, a worker information management device 2, The procedure of acquiring / storing the process source information, the procedure of setting up the CFT for each work material, the process of generating / storing the CFT information per work group sub material, while communicating with the information device 3 and the vendor periodical server 2, A material CFT management control module 101 that collectively controls the entire supply / distribution process of the CFT information per work group sub material, etc., an operation information storage module 103 under the control of the material CFT management control module 101, A frame management module 104, a process source information acquisition module 105, a CFT setting module 106 for each work group sub material, a CFT information generation module 107 for each work group sub material, a CFT information provision module A unique CFT information generation module 109 for each material, The unique CFT information providing module 110 and the CFT alarm processing module 111 are closely combined.

At this time, the work instruction team information device 1 includes a smart phone managed by each person in charge of a work instruction team (for example, a team instructing each work group responsible for the work of each sector of the plant construction site) A tablet PC, a desktop PC, a notebook computer, a PDA, and the like. The operator information device 3 is managed by each worker belonging to each work group responsible for the work of each sector belonging to the plant construction site (E.g., smart phone, tablet PC, desktop PC, notebook computer, PDA, etc.), and the company period system server 2 stores various information related to the plant construction (e.g., facility information, drawing information, worker information, , Work schedule information, job history information, personnel information, management information, business information, logistics information, etc.).

In this situation, the operation information storage module 103 may store various operation information required for the material CFT management support service according to the present invention, for example, registration information of the work instruction team information device 1, registration information of the worker information device 3 , The registration information of each person in charge of the work instruction team, the registration information of each worker, the CFT setting rule for each work group sub material (for example, the CC material belonging to the BB work group in charge of the AA sector, A setting rule that the XX day from the receipt date should be set to the CFT, etc.), a unique CFT for each material (for example, a unique CFT for each material), program resource information for forming a communication session, Image / program / program information for generating the program resource information for the guide frame 200 (shown in FIG. 2), and the like.

The guide frame management module 104 communicates with the work instruction team information device 1 via the interface module 102 and the wired or wireless online network 3 and transmits the work instruction team information device 1 When a guide frame transmission request message for the generation of the guide frame 200 is transmitted from the operating information storage module 103 to the operating information storage module 103 and the text / image / video / program And then generates the guide frame 200 as shown in FIG. 2 on the basis of the extracted character / image / video / program information and outputs the generated guide frame 200 to the work instruction team information device 1 ).

Of course, under the transmission / posting situation of the guide frame 200, each person in charge of the work instruction team can perform various procedures necessary for him / herself , A procedure for inputting process source information, a procedure for receiving / confirming the CFT of each sub-material belonging to each work group, etc.) can be normally performed without difficulty.

As shown in FIG. 3, the process source information acquiring module 105 receives a work instruction team information device (hereinafter, referred to as &quot; work information &quot;) via the interface module 102, 1), the business entity server 2, etc., and receives from them <process group information related to the work group participating in the plant construction> and <process source information including the <material information related to the materials attached to each work group> It is checked whether or not the data is transmitted.

At this time, a process including the < work group information related to the work group participating in the plant construction > and the material information related to the material attached to each work group from the work instruction team information device 1, In the case where it is confirmed that the source information has been transmitted, the process source information acquisition module 105 side receives / receives / obtains the process source information and stably stores and manages the obtained process source information in its own information storage area, So that the CFT management support procedure of the material CFT can be normally performed without any problem (refer to FIG. 2).

In this way, in a situation where process source information including <work group information related to the work group participating in the plant construction> and <material information related to the material attached to each work group> is stored and managed, the CFT setting On the module 106 side, communication with the process source information acquisition module 105 is performed, and the process source information (< work group information related to the work group participating in the plant construction >, & And the like), and also communicates with the operation information storage module 103 to read CFT setting rules (e.g., AA sector) for each work group sub-material stored in the information storage area thereof And a setting rule that the CC material belonging to the BB working group in charge should set the CFT to the XX date from the date of receipt) (refer to FIG. 3) .

Through the above-described procedure, the process source information (work group information related to the work group participating in the plant construction, material information related to the materials attached to each work group, etc.), CFT setting rules , The setting rule that the CC material belonging to the BB working group responsible for the AA sector should set the CFT to the CFT from the receipt date), and the like are read from the CFT setting module 106 for each working group sub material, The CFT setting rule for each group affiliated material (for example, the CC material belonging to the BB working group responsible for the AA sector, the setting rule that XX days from the receipt date should be set to the CFT, etc.) , And a procedure for setting a CFT corresponding to each material attached to each work group is performed (see FIG. 3).

In this way, the CFT corresponding to each material attached to each work group (for example, the CFT of the CC material belonging to the BB work group responsible for the AA sector is 60 days, the CFT of the FF material belonging to the EE work group responsible for the DD sector 85 days, etc.) is completed, the CFT information generation module for each work material sub-material 107 side communicates with the CFT setting module 106 for each work group sub material to set each of the work groups set / (For example, the CFT of the CC material belonging to the BB working group responsible for the AA sector is 60 days, the CFT of the FF material belonging to the EE working group responsible for the DD sector is 85 days, etc.) corresponding to each material (See FIG. 3).

Through the above-described procedure, the CFT corresponding to each material attached to each work group set / generated by the work group sub material CFT setting module 106 (for example, the CFT corresponding to the BB work group responsible for the AA sector) The CFT of the CC material is 60 days, the CFT of the FF material belonging to the EE working group responsible for the DD sector is 85 days, etc.) is read out, the CFT information generation module for each working material sub- After the generation routine is advanced, the CFT information for each working material sub-material in which the corresponding CFT history is represented by table / character / image / numerator / graph is generated and then a series of data storage routines are advanced, The CFT information is stored in its own information storage area (see FIG. 3).

Thus, the CFT corresponding to each material attached to each work group (for example, the CFT of the CC material belonging to the BB work group responsible for the AA sector is 60 days, the FF material belonging to the EE work group responsible for the DD sector The CFT information of the work group sub-materials is generated / stored by the work group sub-material expressed by the table / character / image / receiver / graph, (2) communicates with the work instruction team information device (1) via the work instruction team information device (102), the wire / wireless online network (4) (See FIG. 3).

At this time, when it is confirmed that the material CFT information provision request message is transmitted from the work instruction team information device 1, the CFT information provision module 108 for each work group sub material submits the message and then transmits the received material CFT information (See FIG. 3). The CFT information is stored in the CFT information of the work group sub-material.

When the CFT information pertaining to the work group sub-material is stored in the CFT information providing module 108 of the work group sub-material through the above-described procedure, Group CFT information generation module 107 and extracts CFT information for each work group sub-material corresponding to the material CFT information provision request message among the CFT information for each work group sub material generated / stored by this module (See FIG. 3).

In this manner, among the CFT information for each work group sub material generated / stored by the CFT information generation module 107 for each work group sub material, the CFT information for each work group sub material corresponding to the material CFT information provision request message is extracted , The CFT information providing module 108 for each work group sub material provides communication with the work instruction team information device 1 via the interface module 102 and the online wireless network 4, (See FIG. 3). As a result, each worker who belongs to the work instruction team can send the CFT information for each work material to the work instruction team information device 1 without any difficulty (For example, the CFT of the CC material belonging to the BB working group responsible for the AA sector is 60 days, the EE responsible for the DD sector And the CFT of the FF material belonging to the work group is 85 days, etc.).

As described above, in the present invention, in the communication pipeline of the work instruction team information device 1, the worker information device 3, the vendor period system server 2 and the like connected to the wired / wireless online network 4, A computer module capable of acquiring process source information including work group information related to a participating work group and material information related to a material attached to each work group, Computation module that can set the CFT corresponding to each material attached to each work group according to the setting rule of Construction Finishing Time limit (CFT) for each work group, <Each material attached to each work group A computation module capable of generating / storing CFT information for each work group sub-material expressed by a table / character / image / numerator / graph after reading the corresponding CFT corresponding to the work instruction team information device 1 ) Lobu Extracting CFT information for each work group sub-material corresponding to the material CFT information provision request message from the CFT information for each work group sub-material when the material CFT information provision request message is transmitted, And a computer module capable of transmitting the information to the work instruction team information device 1 are systematically arranged in the work environment of the work instruction team information device 1. Therefore, in the implementation environment of the present invention, CFT can be strictly managed according to the customer's requirements. As a result, companies (for example, plant construction contractors / contractors) can easily avoid large and small damages caused by irrational management of material CFI.

As shown in FIG. 1, under the control system of the material CFT management control module 101, in addition to the above-described respective computation modules, a material specific CFT information generation module 109, a material- (110), a CFT alarm processing module (111), and the like.

At this time, the material-specific CFT information generation module 109 communicates with the operation information storage module 103 and acquires a unique CFT for each material (for example, a unique CFT for each material) stored in the information storage area thereof After the data is read, a series of data generating routines are executed on the basis of the CFT information, and the CFT information for each material is represented by table / character / image / number / graph, And proceeds to a process of storing the generated unique CFT information for each material in its own information storage area (refer to FIG. 3).

In this way, in a situation where the unique CFT information for each material, which is represented by a table / character / image / number / graph, is generated / stored, the unique CFT information for each material The module 110 communicates with the work instruction team information device 1 via the interface module 102 and the wired / wireless online network 4 and receives the unique information from the work instruction team information device 1 A procedure for checking whether the CFT information provision request message has been transmitted is proceeded (see FIG. 3).

At this time, if it is confirmed that the unique CFT information providing request message for each material is transmitted from the work instruction team information device 1, the unique CFT information providing module 110 for each material receives the message, The CFT information providing request message is read and the CFT information to be provided to the work instruction team side is checked from among the stored unique CFT information for each material (refer to FIG. 3).

When it is confirmed through the above procedure that the CFT information to be provided to the work instruction team side among the pre-stored unique CFT information for each material has been checked, the unique CFT information providing module 110 for each material generates the unique CFT information for each material And generates a unique CFT information for each material corresponding to the material specific CFT information providing request message from the unique CFT information generated / stored by the communication module 109 3).

When the unique CFT information for each material corresponding to the material specific CFT information providing request message is extracted from the material specific CFT information generated / stored by the material specific CFT information generation module 109, The unique CFT information providing module 110 communicates with the work instruction team information device 1 via the interface module 102 and the wire / wireless online network 4 to transmit the extracted unique CFT information per material to the work instruction team information device 1, (See FIG. 3). As a result, each staff member belonging to the work instruction team can perform the procedure of transmitting the work instruction team information device 1 without any difficulty by an extremely simple procedure of watching the work instruction team information device 1 It is possible to easily confirm the details related to the material CFT (for example, the unique CFT details determined for each material).

On the other hand, as shown in FIG. 4, the CFT alarm processing module 111, which operates in cooperation with the above-described computation modules, includes a CFT information generation module 107 for each work group affiliated material, a unique CFT information generation module 109 for each material ) And reads the CFT information for each working group sub material, the unique CFT information for each material, etc., and proceeds to check whether the CFT of each work group auxiliary material has arrived, whether or not the unique CFT of each material has arrived, etc. do.

At this time, when it is determined / confirmed that the CFT of each work group subordinate material has arrived, or when it is determined / confirmed that the inherent CFT of each material has arrived, the CFT alarm processing module 111 advances a series of data generation routines, For example, if the CFT of the CC material belonging to the BB working group responsible for the AA sector is terminated after 3 days, the CFT of the FF material is terminated after 2 days, and the description such as &quot; / Image / voice, and the like (see FIG. 4).

In this way, for example, when the CFT of the CC material belonging to the BB working group responsible for the AA sector is completed three days later, the CFT of the FF material is terminated after two days, and so on The CFT alarm processing module reads the CFT information of the work group pertaining to the material, the intrinsic CFT information of each material, and the like, and stores the corresponding CFT alarm information in the form of text, image, And then communicates with the work instruction team information device 1 and the worker information device 3 via the interface module 102 and the wired / wireless online network 4 to output the generated CFT alarm information To the work instruction team information device 1, the worker information device 3, and the like (see FIG. 4).

As a result, under the performance of the above-described CFT alarm processing module 111, each worker belonging to the work instruction team or each worker belonging to the work group receives, for example, <AA sector mounted on the CFT alarm information without any difficulty The CFT of the CC material belonging to the BB working group of the BB work group is terminated after three days, and the CFT of the FF material is finished after two days, so that the character / image / voice such as ‥‥‥> The fact that the CFT has arrived can be easily identified and the corresponding follow-up action can be taken quickly.

Such an invention has overall beneficial effects in many similar areas where material management is required.

Although specific embodiments of the present invention have been described and illustrated above, it is to be understood that the present invention may be embodied in many other specific forms without departing from the spirit or essential characteristics thereof.

Such modified embodiments should not be understood individually from the technical idea and viewpoint of the present invention, and such modified embodiments should be included in the appended claims of the present invention.

1: work instruction team information device 2: vendor period system server
3: worker information device 4: wired / wireless on-line network
100: Material CFT management support system 101: Material CFT management control module
102: Interface module 103: Operation information storage module
104: Guide frame management module 105: Process source information acquisition module
106: Workgroup Auxiliary Material-Specific CFT Settings Module
107: CFT information generation module for work group sub material
108: CFT information provision module for work group sub material
109: Material-specific CFT information generation module
110: Module for providing unique CFT information per material
200: guide frame

Claims (3)

A work instruction information unit connected to a wired / wireless on-line network, and a communication unit for communicating with a vendor period system server to generate a process source information including work group information related to the work group participating in the plant construction and material information related to the material attached to each work group A process source information acquisition module for acquiring the process source information;
After reading the process source information, an operation for setting a CFT corresponding to each material attached to each work group in accordance with a previously set construction finishing time limit (CFT) setting rule for each work group affiliated material Group affiliated material-specific CFT configuration module;
Communicates with the CFT setting module for each work group subordinate material to read a CFT corresponding to each material attached to each work group and then transmits the CFT data corresponding to the work group attachment material A CFT information generation module for each work group sub material for generating star CFT information;
When the material CFT information provision request message is transmitted from the work instruction team information device, the CFT information for each work group sub material corresponding to the material CFT information provision request message is extracted from the CFT information for each work group sub material, And a CFT information providing module for each work group sub material to transmit the CFT information for each work group sub material to the work instruction team information device.
The method of claim 1, further comprising: reading unique CFTs for each material previously created and generating unique CFT information for each material that generates unique CFT information for each material in which the corresponding CFT history is represented by table / character / image / A module;
Extracting unique CFT information for each material corresponding to the material specific CFT information providing request message from the material specific CFT information when the unique CFT information providing request message for each material is transmitted from the work instruction team information device, And a material-specific CFT information providing module for transmitting the material-specific CFT information to the work instruction team information device.
The method of claim 1 or 2, further comprising: communicating with the CFT information generation module for each work group sub material or the material specific CFT information generation module to read the CFT information for each work group sub material or the unique CFT information for each material , The CFT of each work group fitting material is checked whether or not the CFT of each material has arrived, and when the CFT of each work group fitting material has arrived, or when it is confirmed that the inherent CFT of each material has arrived, the CFT Further comprising a CFT alarm processing module for generating alarm information and transmitting the generated CFT alarm information to a work instruction team information device or worker information device connected to the wired / .
KR1020130165266A 2013-12-27 2013-12-27 The system which supports a managing process about a construction finishing time limit of a resources KR20150076729A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130165266A KR20150076729A (en) 2013-12-27 2013-12-27 The system which supports a managing process about a construction finishing time limit of a resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130165266A KR20150076729A (en) 2013-12-27 2013-12-27 The system which supports a managing process about a construction finishing time limit of a resources

Publications (1)

Publication Number Publication Date
KR20150076729A true KR20150076729A (en) 2015-07-07

Family

ID=53789639

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130165266A KR20150076729A (en) 2013-12-27 2013-12-27 The system which supports a managing process about a construction finishing time limit of a resources

Country Status (1)

Country Link
KR (1) KR20150076729A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210041148A (en) * 2019-10-04 2021-04-15 주식회사 야크솔루션 Construction process automatic management system using qr code

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210041148A (en) * 2019-10-04 2021-04-15 주식회사 야크솔루션 Construction process automatic management system using qr code

Similar Documents

Publication Publication Date Title
KR101789923B1 (en) Wind farm supervision monitoring method
Kritzler et al. The virtual twin: controlling smart factories using a spatially-correct augmented reality representation
CN107844098A (en) A kind of digital factory management system and management method
CN102202085A (en) Method and device for processing operation/maintenance work orders based on mobile terminal
CN106096872A (en) A kind of factory&#39;s substandard product report processing system and method
CN109949018A (en) Construction-engineering project management overall process tracing system
CN105069590A (en) Factory order goods tracing and monitoring method
CN115860410A (en) WeChat-based large civil engineering construction potential safety hazard management system
KR20150076729A (en) The system which supports a managing process about a construction finishing time limit of a resources
JP2008052461A (en) Power distribution construction management system
CN112288257A (en) Operation monitoring and collecting system for intelligent manufacturing of ship industry
KR20150049840A (en) The system which supports a managing process about a supply condition of a resources
KR20150076803A (en) The system which supports a managing process about a construction preparation status
WO2021064877A1 (en) Work management device, work management method, and recording medium
KR20150076739A (en) The system which supports a managing process about a construction finishing time of a resources
KR20150084369A (en) The system which supports a managing process about a transport condition of a resources
KR20130082842A (en) The device which supports a inspection job of a product quality based on the wireless communication network
CN112101580A (en) Method and system for realizing inspection and maintenance standardization
KR20150048393A (en) The system which supports a managing process about a stock condition of a resources
KR20150077517A (en) The system which supports a managing process about a resources supply
KR20140122416A (en) Device which manages a quality inspection sheet about a field of plant construction work
KR20130140511A (en) System for semi power plant management
KR20150076709A (en) The system which supports a managing process about a additional supply history of a resources
KR20140127001A (en) Device which manages a quality inspection schedule of a field of plant construction work
Brunner Development and deployment of a data capture and reporting system for Onesteel Wire Products

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination