KR20150076729A - The system which supports a managing process about a construction finishing time limit of a resources - Google Patents
The system which supports a managing process about a construction finishing time limit of a resources Download PDFInfo
- Publication number
- KR20150076729A KR20150076729A KR1020130165266A KR20130165266A KR20150076729A KR 20150076729 A KR20150076729 A KR 20150076729A KR 1020130165266 A KR1020130165266 A KR 1020130165266A KR 20130165266 A KR20130165266 A KR 20130165266A KR 20150076729 A KR20150076729 A KR 20150076729A
- Authority
- KR
- South Korea
- Prior art keywords
- cft
- information
- work group
- work
- module
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a construction finishing time limit (CFT) management support system. In the present invention, a communication pipeline for a work instruction team information device, an operator information device, ≪ a computer module capable of acquiring process source information including work group information related to a work group participating in a plant construction and material information related to a material attached to each work group, < After that, the computation module, which can set the CFT corresponding to each material attached to each work group according to the previously stored construction group finishing time limit (CFT) setting rule, After reading the CFT corresponding to each material attached to the work group, the corresponding CFT history is displayed in the table C / C / C / A / FFT information generating / storing > < < Workpiece CFT information providing request message is transmitted from the work instruction team information device, an operation corresponding to the material CFT information providing request message A computer module capable of extracting CFT information for each group affiliated material and transmitting the extracted CFT information for each work group sub-material to the work instruction team information device, and the like, It is possible to strictly control the CFT of each material attached to each work group without any difficulty and strictly manage it according to the requirements of the customer so that the large and small damage (eg, plant construction contractor / contractor) So that it can be easily guided.
Description
The present invention relates to a system for supporting a construction finishing time limit (CFT) for a material (for example, piping) more efficiently at a company (for example, a plant construction contractor / contractor) More specifically, the CFT of each material attached to each work group can be strictly managed in accordance with the requirements of the customer without any difficulty on the side of the work instruction team, so that it is possible for a company (for example, plant construction contractor / contractor) The present invention relates to a material CFT management support system capable of guiding the large and small damage caused by unreasonable management of the CFI to be easily avoided.
In recent years, as the technology related to heavy industry has advanced, the number of companies receiving and constructing large-scale plant construction both at home and abroad has also shown a rapid increase. Accordingly, the importance of various backup technologies that can more effectively support the construction of plant construction There is also a situation that is gradually expanding.
As a backup technique related to plant construction according to the conventional technique, for example, in Korean Patent Laid-Open No. 10-2004-41054 entitled " Plant System, Plant Monitoring Device and Plant Data Selection Method " <To prevent data that should not be read out among the plant data being transmitted to the outside, data that is not read from the side that is driving / monitoring / repairing the plant among the plant data transmitted to the outside Open No. 10-2005-96157 entitled " Method for Drying a Wind Power Plant " and a technique for protecting the plant data transmitted to the outside The wind power generation plant (2005.5.5, open to the public) is to support the construction of wind power generation facilities more easily and efficiently (Hereinafter referred to as " plant operating method and plant operation system ") (published on September 21, 2011) discloses < And a technique for suppressing the corrosion of the plant structural member, is disclosed in detail.
On the other hand, under such a conventional plant construction technology system, since various types of materials such as piping are input / constructed at the plant construction site, how to efficiently manage the CFT of the material according to the customer's demand The problem is very important to determine the construction quality of the entire plant construction.
However, in spite of this situation, the backup technology related to the conventional plant construction has not provided any means for strictly managing the CFI of the material according to the customer's requirements. Therefore, the company (for example, plant construction order / The contractor was forced to take large and small damages due to the unreasonable management of the material CFI.
Accordingly, it is an object of the present invention to provide an information processing apparatus and a method and system for performing the same in a communication pipeline of a work instruction team information device, a worker information device, A computer module capable of acquiring process source information including material information related to the material attached to the group, and <process source information of the completed process group source, According to the Construction Finishing Time limit setting rule, a computer module capable of setting a CFT corresponding to each material attached to each work group, < a CFT corresponding to each material attached to each work group, A computation module capable of generating / storing CFT information per work group sub-material expressed by table / text / image / numerator / graph>, <material CFT Extracting CFT information for each work group sub-material corresponding to the material CFT information providing request message from the CFT information for each working group sub-material when the beam providing request message is transmitted, And a computer module that can be transmitted to the work instruction team information device, and the like. Thus, the CFT of each material attached to each work group can be strictly determined without any difficulty on the work instruction team side (For example, a plant construction contractor / contractor) can easily avoid large and small damages caused by irrational management of material CFI.
Other objects of the present invention will become more apparent from the following detailed description and the accompanying drawings.
In order to achieve the above object, according to the present invention, there is provided a system and method for communicating with a work instruction team information device or a vendor period system server that is connected to a wired / wireless on-line network to transmit work group information related to a work group participating in a plant construction, A process source information acquisition module for acquiring process source information including material information related to a material; After reading the process source information, an operation for setting a CFT corresponding to each material attached to each work group in accordance with a previously set construction finishing time limit (CFT) setting rule for each work group affiliated material Group affiliated material-specific CFT configuration module; Communicates with the CFT setting module for each work group sub-material to read a CFT corresponding to each material attached to each work group, and then transmits the CFT data corresponding to each work group to the work group auxiliary material A CFT information generation module for each work group sub material for generating star CFT information; When the material CFT information provision request message is transmitted from the work instruction team information device, the CFT information for each work group sub material corresponding to the material CFT information provision request message is extracted from the CFT information for each work group sub material, And a CFT information providing module for each work group sub-material for transmitting the CFT information for each work group sub-material to the work instruction team information device.
In the present invention, within the communication pipeline of the work instruction team information device, the worker information device, the vendor period system server, etc. connected to the wired / wireless online network, the work group information related to the work group participating in the plant construction, <Computation module that can acquire process source information that contains material information related to material> <Reads completed process source information, and then reads Construction Source Finishing Time limit (CFT: Construction Finishing Time limit ) According to the setting rule, the computer module that can set the CFT corresponding to each material attached to each work group, < < CFT corresponding to each material attached to each work group, A computerized module capable of generating / storing CFT information per work group represented by text / image / numerical / graph, and <material CFT information provided from a work instruction team information device Group CFT information corresponding to the work group sub-material corresponding to the material CFT information providing request message from the CFT information for each working group sub-material when the message is transmitted, extracts the CFT information for each work group sub- In the implementation environment of the present invention, the CFT of each material attached to each work group without any difficulty on the work instruction team side is strictly adjusted to the customer's requirements In the end, a company (for example, a plant construction contractor / contractor) can easily avoid large and small damages caused by irrational management of material CFI.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an exemplary diagram conceptually showing a detailed configuration of a material CFT management support system according to the present invention; FIG.
2 is an exemplary view conceptually showing a posting pattern of a guide frame according to the present invention.
FIG. 3 and FIG. 4 are conceptual diagrams illustrating a detailed function execution procedure of the CFT management support system according to the present invention; FIG.
Hereinafter, a material CFT management support system according to the present invention will be described in more detail with reference to the accompanying drawings.
1, the CFT
At this time, the work instruction
In this situation, the operation
The guide
Of course, under the transmission / posting situation of the
As shown in FIG. 3, the process source
At this time, a process including the < work group information related to the work group participating in the plant construction > and the material information related to the material attached to each work group from the work instruction
In this way, in a situation where process source information including <work group information related to the work group participating in the plant construction> and <material information related to the material attached to each work group> is stored and managed, the CFT setting On the
Through the above-described procedure, the process source information (work group information related to the work group participating in the plant construction, material information related to the materials attached to each work group, etc.), CFT setting rules , The setting rule that the CC material belonging to the BB working group responsible for the AA sector should set the CFT to the CFT from the receipt date), and the like are read from the
In this way, the CFT corresponding to each material attached to each work group (for example, the CFT of the CC material belonging to the BB work group responsible for the AA sector is 60 days, the CFT of the FF material belonging to the EE work group responsible for the DD sector 85 days, etc.) is completed, the CFT information generation module for each
Through the above-described procedure, the CFT corresponding to each material attached to each work group set / generated by the work group sub material CFT setting module 106 (for example, the CFT corresponding to the BB work group responsible for the AA sector) The CFT of the CC material is 60 days, the CFT of the FF material belonging to the EE working group responsible for the DD sector is 85 days, etc.) is read out, the CFT information generation module for each working material sub- After the generation routine is advanced, the CFT information for each working material sub-material in which the corresponding CFT history is represented by table / character / image / numerator / graph is generated and then a series of data storage routines are advanced, The CFT information is stored in its own information storage area (see FIG. 3).
Thus, the CFT corresponding to each material attached to each work group (for example, the CFT of the CC material belonging to the BB work group responsible for the AA sector is 60 days, the FF material belonging to the EE work group responsible for the DD sector The CFT information of the work group sub-materials is generated / stored by the work group sub-material expressed by the table / character / image / receiver / graph, (2) communicates with the work instruction team information device (1) via the work instruction team information device (102), the wire / wireless online network (4) (See FIG. 3).
At this time, when it is confirmed that the material CFT information provision request message is transmitted from the work instruction
When the CFT information pertaining to the work group sub-material is stored in the CFT
In this manner, among the CFT information for each work group sub material generated / stored by the CFT
As described above, in the present invention, in the communication pipeline of the work instruction
As shown in FIG. 1, under the control system of the material CFT
At this time, the material-specific CFT
In this way, in a situation where the unique CFT information for each material, which is represented by a table / character / image / number / graph, is generated / stored, the unique CFT information for each material The
At this time, if it is confirmed that the unique CFT information providing request message for each material is transmitted from the work instruction
When it is confirmed through the above procedure that the CFT information to be provided to the work instruction team side among the pre-stored unique CFT information for each material has been checked, the unique CFT
When the unique CFT information for each material corresponding to the material specific CFT information providing request message is extracted from the material specific CFT information generated / stored by the material specific CFT
On the other hand, as shown in FIG. 4, the CFT
At this time, when it is determined / confirmed that the CFT of each work group subordinate material has arrived, or when it is determined / confirmed that the inherent CFT of each material has arrived, the CFT
In this way, for example, when the CFT of the CC material belonging to the BB working group responsible for the AA sector is completed three days later, the CFT of the FF material is terminated after two days, and so on The CFT alarm processing module reads the CFT information of the work group pertaining to the material, the intrinsic CFT information of each material, and the like, and stores the corresponding CFT alarm information in the form of text, image, And then communicates with the work instruction
As a result, under the performance of the above-described CFT
Such an invention has overall beneficial effects in many similar areas where material management is required.
Although specific embodiments of the present invention have been described and illustrated above, it is to be understood that the present invention may be embodied in many other specific forms without departing from the spirit or essential characteristics thereof.
Such modified embodiments should not be understood individually from the technical idea and viewpoint of the present invention, and such modified embodiments should be included in the appended claims of the present invention.
1: work instruction team information device 2: vendor period system server
3: worker information device 4: wired / wireless on-line network
100: Material CFT management support system 101: Material CFT management control module
102: Interface module 103: Operation information storage module
104: Guide frame management module 105: Process source information acquisition module
106: Workgroup Auxiliary Material-Specific CFT Settings Module
107: CFT information generation module for work group sub material
108: CFT information provision module for work group sub material
109: Material-specific CFT information generation module
110: Module for providing unique CFT information per material
200: guide frame
Claims (3)
After reading the process source information, an operation for setting a CFT corresponding to each material attached to each work group in accordance with a previously set construction finishing time limit (CFT) setting rule for each work group affiliated material Group affiliated material-specific CFT configuration module;
Communicates with the CFT setting module for each work group subordinate material to read a CFT corresponding to each material attached to each work group and then transmits the CFT data corresponding to the work group attachment material A CFT information generation module for each work group sub material for generating star CFT information;
When the material CFT information provision request message is transmitted from the work instruction team information device, the CFT information for each work group sub material corresponding to the material CFT information provision request message is extracted from the CFT information for each work group sub material, And a CFT information providing module for each work group sub material to transmit the CFT information for each work group sub material to the work instruction team information device.
Extracting unique CFT information for each material corresponding to the material specific CFT information providing request message from the material specific CFT information when the unique CFT information providing request message for each material is transmitted from the work instruction team information device, And a material-specific CFT information providing module for transmitting the material-specific CFT information to the work instruction team information device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130165266A KR20150076729A (en) | 2013-12-27 | 2013-12-27 | The system which supports a managing process about a construction finishing time limit of a resources |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130165266A KR20150076729A (en) | 2013-12-27 | 2013-12-27 | The system which supports a managing process about a construction finishing time limit of a resources |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20150076729A true KR20150076729A (en) | 2015-07-07 |
Family
ID=53789639
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020130165266A KR20150076729A (en) | 2013-12-27 | 2013-12-27 | The system which supports a managing process about a construction finishing time limit of a resources |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20150076729A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20210041148A (en) * | 2019-10-04 | 2021-04-15 | 주식회사 야크솔루션 | Construction process automatic management system using qr code |
-
2013
- 2013-12-27 KR KR1020130165266A patent/KR20150076729A/en not_active Application Discontinuation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20210041148A (en) * | 2019-10-04 | 2021-04-15 | 주식회사 야크솔루션 | Construction process automatic management system using qr code |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101789923B1 (en) | Wind farm supervision monitoring method | |
Kritzler et al. | The virtual twin: controlling smart factories using a spatially-correct augmented reality representation | |
CN107844098A (en) | A kind of digital factory management system and management method | |
CN102202085A (en) | Method and device for processing operation/maintenance work orders based on mobile terminal | |
CN106096872A (en) | A kind of factory's substandard product report processing system and method | |
CN109949018A (en) | Construction-engineering project management overall process tracing system | |
CN105069590A (en) | Factory order goods tracing and monitoring method | |
CN115860410A (en) | WeChat-based large civil engineering construction potential safety hazard management system | |
KR20150076729A (en) | The system which supports a managing process about a construction finishing time limit of a resources | |
JP2008052461A (en) | Power distribution construction management system | |
CN112288257A (en) | Operation monitoring and collecting system for intelligent manufacturing of ship industry | |
KR20150049840A (en) | The system which supports a managing process about a supply condition of a resources | |
KR20150076803A (en) | The system which supports a managing process about a construction preparation status | |
WO2021064877A1 (en) | Work management device, work management method, and recording medium | |
KR20150076739A (en) | The system which supports a managing process about a construction finishing time of a resources | |
KR20150084369A (en) | The system which supports a managing process about a transport condition of a resources | |
KR20130082842A (en) | The device which supports a inspection job of a product quality based on the wireless communication network | |
CN112101580A (en) | Method and system for realizing inspection and maintenance standardization | |
KR20150048393A (en) | The system which supports a managing process about a stock condition of a resources | |
KR20150077517A (en) | The system which supports a managing process about a resources supply | |
KR20140122416A (en) | Device which manages a quality inspection sheet about a field of plant construction work | |
KR20130140511A (en) | System for semi power plant management | |
KR20150076709A (en) | The system which supports a managing process about a additional supply history of a resources | |
KR20140127001A (en) | Device which manages a quality inspection schedule of a field of plant construction work | |
Brunner | Development and deployment of a data capture and reporting system for Onesteel Wire Products |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WITN | Withdrawal due to no request for examination |