KR20130141186A - Concrete placing apparatus for utility-pipe conduit - Google Patents

Concrete placing apparatus for utility-pipe conduit Download PDF

Info

Publication number
KR20130141186A
KR20130141186A KR1020120064401A KR20120064401A KR20130141186A KR 20130141186 A KR20130141186 A KR 20130141186A KR 1020120064401 A KR1020120064401 A KR 1020120064401A KR 20120064401 A KR20120064401 A KR 20120064401A KR 20130141186 A KR20130141186 A KR 20130141186A
Authority
KR
South Korea
Prior art keywords
concrete
tunnel
forming
cavity
screed
Prior art date
Application number
KR1020120064401A
Other languages
Korean (ko)
Other versions
KR101436132B1 (en
Inventor
태갑성
Original Assignee
유한회사 엘씨건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유한회사 엘씨건설 filed Critical 유한회사 엘씨건설
Priority to KR1020120064401A priority Critical patent/KR101436132B1/en
Publication of KR20130141186A publication Critical patent/KR20130141186A/en
Application granted granted Critical
Publication of KR101436132B1 publication Critical patent/KR101436132B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/34Horizontally-travelling moulds for making walls blockwise or section-wise

Abstract

The present invention relates to a concrete placing apparatus of a concrete conduit formed in a tunnel and a lead haunch part of lining concrete and a constructing method thereof and, more specifically, a concrete placing apparatus of a concrete conduit formed in a tunnel and a lead haunch part of lining concrete and a constructing method thereof including: a main body that has a feeding part on the top so as to store concrete therein, wherein the feeding part has a first feeding part and a second feeding part by a partition wall formed in the middle; a first screed that is formed on the front and rear sides of the main body and has a first forming part having a shape corresponding to a tunnel conduit, a lead haunch part, and a conduit on the foundation ground to form the tunnel conduit, the lead haunch part, and the conduit on the foundation ground formed in the tunnel by receiving concrete from the first feeding part; a second screed that is formed on the side surface of the first screed formed on the rear side of the main body and has a second forming unit having a shape corresponding to a lid support concrete wall so as to form, on the external wall of the common duct, the lid support concrete wall for supporting a lid which covers the conduit by receiving concrete from the second feeding part; a concrete finisher attaching part that is coupled to one side surface of the main body; and a vibrator attaching part that is installed in a concrete storing space in the main body.

Description

터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드 헌치부의 콘크리트 기계타설 장치 및 시공방법{CONCRETE PLACING APPARATUS FOR UTILITY-PIPE CONDUIT}TECHNICAL FIELD [0001] The present invention relates to a concrete pouring apparatus and a concrete pouring apparatus for a concrete pouring apparatus,

본 발명은 터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드 헌치부의 콘크리트 기계타설 장치 및 시공방법에 관한 것으로, 더욱 상세하게는 터널 내에서 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드헌치부의 시공 장치에 있어서, 내부에 콘크리트를 수납할 수 있도록 몰드 중앙 및 상부에 투입구가 형성되되 중앙에 형성된 분리벽을 통해 제1투입구와 제2투입구가 형성되는 본체와; 상기 본체의 전·후방에 형성되는 것으로, 상기 제1투입구로부터 콘크리트를 공급받아 터널 내에 형성된 기초지반 또는 기초콘크리트 위에 터널 공동구와 리드헌치부 및 공동구를 형성할 수 있도록 상기 터널 공동구와 리드헌치부 및 공동구와 대응되는 형상으로 이루어지는 제1포밍부가 형성되는 제1스크리드와; 상기 본체의 후방에 형성된 제1스크리드의 측면에 형성되는 것으로, 상기 제2투입구로부터 콘크리트를 공급받아 상기 공동구의 외벽에 공동구를 덮는 뚜껑을 지지할 수 있도록 뚜껑 지지 콘크리트 벽체를 형성하기 위한 제2포밍부가 형성되는 제2스크리드와; 상기 본체의 일측면에 결합되는 콘크리트휘니셔 부착구; 및 상기 본체 내의 콘크리트 수납공간에 설치되는 바이브레이터 부착구;를 포함하여 이루어지는 것을 특징으로 하는 터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드헌치부의 콘크리트 기계타설 장치 및 시공방법에 관한 것이다.The present invention relates to a concrete mechanical placing device and a construction method of the concrete cavities and the lining concrete lead hunt portion formed in the tunnel, and more particularly to the construction device of the concrete cavities and lining concrete lead hunt portion The main body has an inlet formed in the center and the upper part of the mold so as to accommodate the concrete therein, and the first inlet and the second inlet are formed through a partition wall formed at the center thereof. It is formed in the front and rear of the main body, and receives the concrete from the first inlet, so that the tunnel cavity and lead hunting and the hollow hole on the base ground or foundation concrete formed in the tunnel to form the tunnel cavity and lead hunting and A first screed formed with a first forming part formed in a shape corresponding to the cavity; It is formed on the side of the first screed formed on the rear of the main body, the second for forming a lid support concrete wall to receive the concrete from the second inlet to support the lid covering the cavity in the outer wall of the cavity A second screed in which a forming part is formed; A concrete finishing attachment coupled to one side of the main body; And a vibrator attaching portion provided in a concrete accommodating space in the main body. [0002] The present invention relates to an apparatus for installing a concrete machine and a method of constructing a concrete pouring portion of a lining concrete in a tunnel.

통상, 고속도로와 같은 자동차 전용도로에는 터널 공동구를 기계 타설 시공하여 이들의 활용을 통신 및 전력선 등을 배치하여 터널 내 조명 및 유지관리에 필요한 필요수단으로 활용하고 있으며 운전자가 시인성 확보 등을 유지하기 위하여 대부분의 터널 공동구 상단에 빛을 유발시키는 데리네이터등도 설치하는 등 터널 공동구는 여러 가지로 활용되고 있다.Generally, on the roads for automobiles such as highways, tunnel constructions are installed in machinery, and these are used as necessary means for lighting and maintenance in tunnels by arranging communications and power lines. In order to maintain the visibility of drivers Most of the tunnels are installed in the upper part of the tunnel, and the tunnels are used in various ways.

철도 터널에서는 통상의 터널 공동구 시공방법이 인력으로 시공되는 실정이며, 인력 시공시 목수 및 철근공, 콘크리트 타설공의 부족한 인력난 등으로 공기가 지연되고, 공사비가 많이 소요되는 문제점이 있으며 이를 극복하고자 수차례 철도터널에서의 콘크리트 터널 공동구 기계 타설 시공을 도전하였으나 대부분 실패하는 사례로 끝났으나 어려운 상황을 종래의 방법을 변경하여 시공함으로써 일반 도로에서와 똑같은 품질로 시공할 수 있도록 구성하고 있다.In railway tunnels, the usual method of constructing tunnel joints is performed by manpower. In the case of manpower construction, air is delayed due to lack of carpenters, steel barrels, and concrete pouring holes, and construction cost is high. The concrete tunnel tunnel in the railroad tunnel was challenged to install the machine but most of it failed, but it is constructed so that it can be constructed with the same quality as that on the general road by changing the difficult situation by changing the conventional method.

통상적으로 철도터널에 설치되는 콘크리트 공동구 구조에 의한 공동구는 도 1에 도시한 바와 같이 배수로 구성부분의 바닥면까지는 인력 타설로써 준비를 하는 과정이고 인력 타설 완료 후 1차 기계타설을 라이닝 벽체의 리드 헌치부 시공이음부의 수팽창지수제 설치부까지 시공된다.As shown in Fig. 1, the joint hole of the concrete tunnel structure installed in a railroad tunnel is a process of preparing a manhole by placing the manhole to the bottom surface of the drainage passage structure. It is applied to the installation part of the water expansion index of the mouth part of the tooth construction.

그러나, 배수로 뚜껑부위의 받침 역할을 하는 폭 8cm, 높이 15cm의 콘크리트 구조물이 기계타설시 면이 형성되어 유지되고 있지않으므로 기계타설시 이부분을 제외하고 시공하면서 후에 인력타설하기 위하여 철근 막대를 꼽아놓은 상태에서 기계타설이 마무리 되어지는 상황이다. However, since the concrete structure with the width of 8cm and height of 15cm, which serves as the support of the lid part of the drainage, is not formed and retained when the machine is poured, it is necessary to place the reinforcing bar In this state, machine pouring is completed.

이러한 종래의 터널 공동구를 형성하기 위한 타설방법으로는 대한민국 공개특허공보 제10-2009-0108104호에 "터널의 공동구 시공방법 및 이 방법으로 시공된 공동구"가 개시되어 있다.As a pouring method for forming such a conventional tunnel tunnel, Korean Patent Laid-Open No. 10-2009-0108104 discloses a tunnel tunnel construction method and a tunnel constructed by this method.

상기의 시공방법은 터널의 바닥 가장자리에 이 터널의 길이방향을 따라 콘크리트를 타설하여 공동구바닥을 마련하는 바닥형성단계와; 상기 터널의 내벽 하단에 이 터널의 길이방향을 따라 콘크리트를 타설하여 상기 공동구바닥 상에 공동구외벽을 마련하는 외벽형성단계와; 상기 공동구바닥 상에 콘크리트 타설 사전작업으로 준비하여 둔 블록상의 공동구내벽 복수 개를 상기 터널의 내벽과 마주하도록 일렬로 배열하는 내벽형성단계로 구성된다.The method includes the steps of: forming a bottom of a tunnel on a bottom edge of a tunnel by pouring concrete along a longitudinal direction of the tunnel; An outer wall forming step of placing a concrete at the lower end of the inner wall of the tunnel along the longitudinal direction of the tunnel to provide a cavity outer wall on the bottom of the cavity; And an inner wall forming step of arranging a plurality of inner walls of the cavity on the blocks arranged in a line so as to face the inner wall of the tunnel prepared on the bottom of the cavity by preliminary work of concrete casting.

상기의 시공방법은 공동구의 내벽을 구성하는 조립식 블록을 콘크리트 타설 사전작업에 의하여 마련하고, 이 준비한 블록을 현장에서 조립하는 방식으로 내벽을 형성하여 터널의 공동구 타설작업을 마무리하였다.In the above construction method, a prefabricated block constituting an inner wall of a hollow is prepared by a preliminary work of concrete pouring, and an inner wall is formed by assembling the prepared block in the field, thus completing a tunnel pouring work.

그러나, 상기의 시공방법은 기초지반 위에 공동구의 내벽과 외벽을 별개로 형성하기 위한 작업이 반드시 이루어져야 하며, 공동구 내벽과 바닥 및 인접한 공동구 내벽끼리의 틈새를 모르타르로 밀봉해야 하는 작업이 동반되므로 번거로운 문제점이 있었다.However, in the above-described construction method, work for forming the inner wall and the outer wall of the cavity separately from each other must be performed on the foundation foundation, and the operation for sealing the gap between the inner wall and the bottom of the cavity and the inner wall of the adjacent cavity is accompanied by troublesome problems .

본 발명은 상기와 같은 문제점을 해결하기 위하여 발명된 것으로, 기존의 터널공동구 기계타설시 몰드 호퍼 장치 방법으로는 철도터널 공동구 뚜껑 받침용 기둥까지는 면을 형성하지 못하므로 기존의1호퍼 방법에 뚜껑 받침용 기둥을 타설하기 위한 제2호퍼의 구성으로 그동안 인력타설로 마무리 되어지는 부분을 기계타설로 마무리하고, 라이닝 리드헌치부의 접속부의 무근콘크리트 구간과 철근보강구간에서도 수팽창지수제를 설치할 수 있는 타설장치 및 이를 이용한 시공방법을 제공하는데 그 목적을 갖는다.SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems, and it is an object of the present invention to provide a mold hopper device for inserting a conventional tunnel junction box machine, In the structure of the second hopper for piling the column, the part to be finished by the application of the manpower is finished by mechanical installation, and the water expansion index can be installed also in the section of the non-reinforced concrete and the reinforcement section of the connecting portion of the lining lead- And an object of the present invention is to provide a pouring apparatus and a construction method using the same.

상기와 같은 문제점을 해결하기 위하여 본 발명은 터널 내에서 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드헌치부의 콘크리트 기계타설 장치에 있어서, 내부에 콘크리트를 수납할 수 있도록 몰드 중앙 및 상부에 투입구가 형성되되 중앙에 형성된 분리벽을 통해 제1투입구와 제2투입구가 형성되는 본체와; 상기 본체의 전·후방에 형성되는 것으로, 상기 제1투입구로부터 콘크리트를 공급받아 터널 내에 형성된 기초지반 또는 기초콘크리트 위에 터널 공동구와 리드헌치부 및 공동구를 형성할 수 있도록 상기 터널 공동구와 리드헌치부 및 공동구와 대응되는 형상으로 이루어지는 제1포밍부가 형성되는 제1스크리드와; 상기 본체의 후방에 형성된 제1스크리드의 측면에 형성되는 것으로, 상기 제2투입구로부터 콘크리트를 공급받아 상기 공동구의 외벽에 공동구를 덮는 뚜껑을 지지할 수 있도록 뚜껑 지지 콘크리트 벽체를 형성하기 위한 제2포밍부가 형성되는 제2스크리드와; 상기 본체의 일측면에 결합되는 콘크리트휘니셔 부착구; 및 상기 본체 내의 콘크리트 수납공간에 설치되는 바이브레이터 부착구;를 포함하여 이루어지는 것을 특징으로 한다.In order to solve the problems described above, the present invention is a concrete mechanical placing device in the concrete cavity formed in the tunnel and the lining concrete lead-hunting device, the inlet is formed in the center and the upper mold to accommodate the concrete therein A main body in which a first inlet and a second inlet are formed through a partition wall formed at the center; It is formed in the front and rear of the main body, and receives the concrete from the first inlet, so that the tunnel cavity and lead hunting and the hollow hole on the base ground or foundation concrete formed in the tunnel to form the tunnel cavity and lead hunting and A first screed formed with a first forming part formed in a shape corresponding to the cavity; It is formed on the side of the first screed formed on the rear of the main body, the second for forming a lid support concrete wall to receive the concrete from the second inlet to support the lid covering the cavity in the outer wall of the cavity A second screed in which a forming part is formed; A concrete finishing attachment coupled to one side of the main body; And a vibrator attachment hole provided in the concrete receiving space in the main body.

또한, 상기 본체의 후방에는 상기 리드 헌치부의 상단에 "

Figure pat00001
" 형상의 수팽창지수제 투입홈을 형성할 수 있도록 이와 대응되는 형상으로 이루어지는 누름판이 결합되는 것을 특징으로 한다.Further, at the rear of the main body,
Figure pat00001
And a pressure plate having a shape corresponding to that of the "shape "

또한, 터널 내에 형성되는 공동구 및 리드헌치부의 시공방법에 있어서, 상기 공동구 및 리드헌치부를 형성할 위치를 정하고 철근을 배근하는 철근 배근단계와; 상기 공동구와 리드 헌치부의 표면 형성을 위해 그와 대응되는 형상으로 이루어지는 제1스크리드와, 상기 공동구의 외벽에 상측으로 돌출되는 뚜껑 지지 콘크리트 벽체를 형성하기 위한 제2스크리드가 구비되는 타설장치가 장치된 콘크리트휘니셔를 사용하여 상기 타설장치를 배근부에 세팅하는 콘크리트 휘니셔 세팅단계와; 상기 타설장치로 콘크리트를 공급하면서 콘크리트휘니셔를 진행시켜 콘크리트를 연속적으로 타설하는 단계로써, 상기 제1스크리드를 통해 공동구와 리드헌치부의 표면을 형성하는 제1포밍부 형성단계 및 상기 제2스크리드를 통해 상기 공동구의 일측 외벽에 뚜껑 지지 콘크리트벽체를 형성하는 제2포밍부 형성단계로 이루어지는 콘크리트 타설단계;를 포함하여 이루어지는 것을 특징으로 한다.In addition, the construction method of the hollow ball and the lead hunt portion formed in the tunnel, the reinforcement step of determining the position to form the cavity ball and lead hunt portion and reinforce the reinforcement; A pouring device comprising a first screed formed in a shape corresponding thereto for forming surfaces of the cavity and lead haunches, and a second screed for forming a lid support concrete wall protruding upward from the outer wall of the cavity. A concrete finisher setting step of setting the placing apparatus using the installed concrete finisher to the reinforcement part; Continuously pouring concrete by advancing a concrete finisher while supplying concrete to the pouring device, a first forming part forming step of forming a surface of a cavity and a lead hunting part through the first screed and the second And a concrete pouring step comprising a second forming part forming step of forming a lid support concrete wall on one outer wall of the cavity through the screed.

본 발명은 기존 철도터널의 기초 및 라이닝 리드 헌치부의 인력타설 부분을 기계화 시공하고, 기존 인력 시공에 비해 공사비의 획기적 감소를 달성할 수 있다.The present invention can mechanically construct the foundation of existing railway tunnels and the placement of the manpower in the lining lead section and achieve a drastic reduction in the construction cost compared to existing manpower construction.

또한, 본 발명은 콘크리트휘니셔의 평균 타설속도로 기계타설 공정이 연속하여 이루어짐으로써 공기의 단축이 현저하여 공기를 절감 할 수 있고, 콘크리트휘니셔에 의한 시공이 이루어짐으로 신속하고 균일한 품질로 시공할 수 있는 효과를 갖는다.In addition, since the machine is continuously installed at the average putting speed of the concrete finishing machine, the shortening of the air can be remarkably shortened and air can be saved. By the construction by the concrete finishing, .

도 1은 본 발명에 따른 공동구의 현장타설을 나타내는 예시도.
도 2 내지 8은 본 발명에 따른 타설장치의 예시도.
도 9 내지 10은 본 발명의 실시예를 나타내는 예시도.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an illustration showing an on-site installation of a cavity according to the present invention; FIG.
Figures 2 to 8 are illustrations of a pouring device according to the present invention.
Figs. 9 to 10 are illustrations showing an embodiment of the present invention. Fig.

이하, 설명되는 실시 예들은 본 발명의 기술적인 특징을 이해시키기에 가장 적합한 실시 예들을 기초로 하여 설명될 것이며, 설명되는 실시 예들에 의해 본 발명의 기술적인 특징이 제한되는 것이 아니라, 이하, 설명되는 실시 예들과 같이 본 발명이 구현될 수 있다는 것을 예시하는 것이다. 따라서, 본 발명은 아래 설명된 실시 예들을 통해 본 발명의 기술 범위 내에서 다양한 변형 실시가 가능하며, 이러한 변형 실시 예는 본 발명의 기술 범위 내에 속한다 할 것이다. 그리고 이하 설명되는 실시 예의 이해를 돕기 위하여 첨부된 도면에 기재된 부호에 있어서, 각 실시 예에서 동일한 작용을 하게 되는 구성요소 중 관련된 구성요소는 동일 또는 연장 선상의 숫자로 표기하였다.Hereinafter, exemplary embodiments will be described based on embodiments best suited to an understanding of the technical features of the present invention, and the technical features of the present invention are not limited by the illustrated embodiments, And that the present invention may be implemented with other embodiments. Therefore, it is intended that the present invention covers the modifications and variations of this invention provided they come within the scope of the appended claims and their equivalents. In order to facilitate understanding of the embodiments to be described below, in the reference numerals shown in the accompanying drawings, among the components that perform the same function in the embodiments, the related components are denoted by the same or an extension line number.

상기와 같은 본 발명의 특징들에 대한 이해를 돕기 위하여, 이하 본 발명의 실시예와 관련된 터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드 헌치부의 콘크리트 기계타설 장치에 대하여 보다 상세하게 설명하도록 한다.In order to facilitate understanding of the features of the present invention as described above, a concrete pouring apparatus of a concrete pouring section and a lining concrete lid forming part in a tunnel according to an embodiment of the present invention will be described in detail.

본 발명은 터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드 헌치부의 콘크리트 기계타설 장치 및 시공방법에 관한 것으로, 더욱 상세하게는 터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드헌치부의 콘크리트 기계타설 장치에 있어서, 내부에 콘크리트를 수납할 수 있도록 몰드 중앙 및 상부에 투입구가 형성되되 중앙에 형성된 분리벽(11)을 통해 제1투입구(12)와 제2투입구(13)가 형성되는 본체(10)와; 상기 본체(10)의 전·후방에 형성되는 것으로, 상기 제1투입구(12)로부터 콘크리트를 공급받아 터널 내에 형성된 기초지반 또는 기초콘크리트 위에 터널 공동구(102)와 리드헌치부(103) 및 공동구(120)를 형성할 수 있도록 상기 터널 공동구(102) 및 리드헌치부(103) 및 공동구(120)와 대응되는 형상으로 이루어지는 제1포밍부(40)가 형성되는 제1스크리드(41)와; 상기 본체(10)의 후방에 형성된 제1스크리드(41)의 측면에 형성되는 것으로, 상기 제2투입구(13)로부터 콘크리트를 공급받아 상기 공동구(120)의 외벽에 공동구를 덮는 뚜껑을 지지하기 위한 뚜껑 지지 콘크리트벽체(121)를 형성하기 위한 제2포밍부(50)가 형성되는 제2스크리드(51)와; 상기 본체의 일측면에 결합되는 콘크리트휘니셔 부착구(20); 및 상기 본체 내의 콘크리트 수납공간에 설치되는 바이브레이터 부착구(30);를 포함하여 이루어지는 것을 특징으로 하는 터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트 리드헌치부의 콘크리트 기계타설 장치 및 시공방법에 관한 것이다.
The present invention relates to a concrete mechanical placing device and a construction method of the concrete locator formed in the tunnel and the lead hauling portion of the lining concrete, and more specifically, the concrete mechanical placing device of the lead hunt portion of the concrete cavity and lining concrete formed in the tunnel In the main body 10 in which the inlet is formed in the center and top of the mold to accommodate the concrete therein, but the first inlet 12 and the second inlet 13 are formed through the separation wall 11 formed in the center. Wow; It is formed in the front and rear of the main body 10, the concrete receiving the concrete from the first inlet 12, the tunnel cavity sphere 102, the lead hunting unit 103 and the hollow ball on the foundation ground or foundation concrete formed in the tunnel ( A first screed 41 having a first forming part 40 formed in a shape corresponding to the tunnel cavity ball 102, the lead hunting part 103, and the cavity ball 120 so as to form 120; And is formed on the side of the first screed 41 formed on the rear side of the main body 10 so as to receive a concrete from the second charging port 13 and support a cap covering the cavity on the outer wall of the cavity 120 A second screed 51 formed with a second forming portion 50 for forming a lid-supporting concrete wall 121 for the lid-supporting concrete wall 121; Concrete finisher attachment hole 20 is coupled to one side of the main body; And a vibrator attachment hole (30) installed in the concrete storage space in the main body; and a concrete mechanical placing device and a construction method of the concrete hollow ball and lining concrete lead hunting unit formed in the tunnel comprising a.

먼저, 터널 시공은 천공, 라이닝 콘크리트 타설, 공동구 및 배수구 시공, 도로 포장 순으로 이루어지며, 천공작업 이후에는 인력에 의해 기초지반(101)을 타설하고, 기초지반(101) 위에 터널 공동구(102)와 터널 라이닝 리드 헌치부(103) 그리고 콘크리트 라이닝(104)이 1차 기계타설에 의해 형성되며, 상기 공동구(120)의 외측에 배수로(140)가 형성되며, 상기 배수로(140)의 외벽을 형성하기 위한 2차 기계타설작업이 이루어진다.First, the tunnel construction is performed in the order of perforation, lining concrete pouring, cavity and drainage construction, road pavement, and after the drilling work, the foundation ground 101 is poured by manpower, and the tunnel cavity 102 on the foundation ground 101. And the tunnel lining lead haunches 103 and concrete lining 104 is formed by the primary mechanical casting, the drainage passage 140 is formed on the outside of the cavity 120, and forms the outer wall of the drainage passage 140 Second machine casting work is done.

본 발명은 상기 기초지반(101) 위에 터널 공동구(102)와 리드 헌치부(103) 및 공동구(120)를 형성하는 1차 기계타설작업을 위한 타설장치에 관한 것으로, 본 발명에 따른 본체(10)는 내부에 콘크리트 수납실이 형성된 박스 형상으로 이루어지며, 본체의 상부 일측에는 콘크리트를 투입하기 위한 투입구가 형성된다.The present invention relates to a pouring apparatus for a primary machine pouring operation in which a tunnel cavity 102, a lead spike portion 103 and a cavity 120 are formed on the foundation foundation 101, Is formed in a box shape in which a concrete housing chamber is formed, and an inlet for injecting concrete is formed at one side of the upper portion of the main body.

상기 투입구는 상기 터널 공동구(102)와 리드 헌치부(103)를 형성하기 위해 상기 제1포밍부(40)에 콘크리트를 공급하는 제1투입구(12)와, 상기 공동구(120)를 덮기 위한 뚜껑을 지지할 수 있도록 상기 공동구(120)의 외벽에 뚜껑 지지 콘크리트 벽체(121)를 형성하기 위한 제2포밍부(50)에 콘크리트를 공급하는 제2투입구(13)로 이루어진다.The inlet is a first inlet 12 for supplying concrete to the first forming part 40 to form the tunnel cavity hole 102 and the lead haunch 103, and a lid for covering the cavity hole 120 It consists of a second inlet 13 for supplying concrete to the second forming unit 50 for forming a lid support concrete wall 121 on the outer wall of the cavity 120 to support the.

상기 제1투입구(12)와 제2투입구(13)의 사이에는 공급되는 콘크리트가 상기 제1포밍부(40)와 제2포밍부(50)로 분배되어 공급될 수 있도록 분리벽(11)이 형성된다.The separating wall 11 is provided between the first inlet 12 and the second inlet 13 so that the concrete supplied to the first forming unit 40 and the second forming unit 50 can be distributed. .

상기 제1투입구(12) 하부에는 콘크리트가 수납되는 제1콘크리트 수납실(14)이 형성되며, 상기 제1콘크리트 수납실(14)은 상기 제1포밍부(40)로 콘크리트를 계속적으로 공급하고, 철근 사이로 콘크리트가 포설된 상태에서 콘크리트 수납실내에 설치되는 바이브레이터(e)에 의해 진동과 압력을 가할 수 있도록 하는 기능을 갖는다.A first concrete storage chamber 14 for storing concrete is formed under the first input hole 12, and the first concrete storage chamber 14 continuously supplies concrete to the first forming part 40. , And has a function of applying vibration and pressure by vibrator (e) installed in the concrete storage chamber in the state where the concrete is installed between the reinforcing bars.

본 발명에 따른 본체(10)에 두 개의 투입구(12,13)가 형성되는 이유는 상기 터널 공동구(102)와 리드 헌치부(103) 및 공동구(120)를 형성하기 위한 콘크리트와, 상기 뚜껑 지지 콘크리트벽체(121)를 형성하기 위한 콘크리트의 슬럼프 값이 다르기 때문이며, 이때 슬럼프라 함은 현장타설되는 콘크리트의 유동성 또는 작업성을 나타내는 척도로써, 일반적으로 상기 공동구와 리드 헌치부를 형성하기 위한 콘크리트는 슬럼프 4이고, 상기 공동구의 뚜껑을 지지하기 위한 뚜껑 지지 콘크리트벽체를 형성하는 콘크리트의 슬럼프는 6~7이므로 서로 다른 투입구를 통해 콘크리트를 투입하여 타설작업을 진행하는 것이 바람직하다.The reason why the two openings 12 and 13 are formed in the main body 10 according to the present invention is concrete for forming the tunnel cavity hole 102, the lead hauling part 103 and the cavity hole 120, and the lid support. This is because the slump value of the concrete for forming the concrete wall 121 is different, and the slump frame is a measure indicating the fluidity or workability of the concrete being cast in the field. In general, the concrete for forming the cavity and the lead haunting part is Slump 4, the slump of concrete to form a lid support concrete wall for supporting the lid of the cavity is 6 to 7 it is preferable to proceed with the pouring operation by putting the concrete through different inlets.

또한, 본 발명에 따른 상기 본체는 상기 콘크리트휘니셔(a)를 따라 이동할 때 철근이 관통될 수 있도록 전방으로부터 후방을 관통하여 철근 관통홈(16)이 형성된다.In addition, the main body according to the present invention is formed with reinforcing through grooves 16 penetrating from the front to the rear so that the reinforcing bars can pass through when the concrete body moves along the concrete finishing machine (a).

상기 콘크리트휘니셔(a)가 이동하기 전 철근을 상기 철근 관통홈(16)과 대응되는 각도로 구부린 다음 상기 철근 관통홈을 따라 철근이 통과하게 된다.Before the concrete finishing machine (a) moves, the reinforcing bar is bent at an angle corresponding to the reinforcing steel through groove 16, and the reinforcing bars pass through the reinforcing steel through groove.

상기 콘크리트휘니셔의 부착구(20)는 상기한 타설장치를 콘크리트휘니셔에 장착하기 위한 부착구로서 실시예는 본체 측부에 부착구를 형성한 구조를 도시한 것이며, 상기 부착구는 콘크리트휘니셔의 수평 붐(f)에 부착 고정된다.The concrete attachment 20 of the concrete finishing machine is an attachment for mounting the above-mentioned pouring device to a concrete finishing machine. In this embodiment, an attachment hole is formed on the side of the body, And fixed to the horizontal boom (f).

상기 바이브레이터 부착구(30)는 본체 내의 콘크리트 수납실(14,15)에 막대를 돌출 형성한 구조이며, 상기 바이브레이터 부착구(30)에는 콘크리트휘니셔의 구동 유압에 의해 동작되는 바이브레이터(e)가 설치되어 타설시 콘크리트가 충분히 다져지도록 하는 작용을 한다.The vibrator attachment hole 30 has a structure in which a bar is protruded from the concrete storage chambers 14 and 15 in the main body, and the vibrator attachment hole 30 includes a vibrator e operated by the driving hydraulic pressure of the concrete finisher. Installed so that the concrete is sufficiently compacted when pouring.

상기 제1포밍부(40)는 터널 내에 형성되는 터널 공동구(102)와 리드 헌치부(103) 및 공동구(120)의 형상을 성형하는 이동 거푸집이며, 상기 제2포밍부(50)는 상기 공동구의 외벽에 상측으로 돌출형성되는 뚜껑 지지 콘크리트벽체(121)를 성형하는 이동 거푸집이다.The first forming unit 40 is a moving mold for forming the shapes of the tunnel cavity 102, the lead spike part 103 and the cavity 120 formed in the tunnel, And a lid-supporting concrete wall body 121 protruding upward from the outer wall of the lid.

먼저, 상기 제1포밍부(40)는 상기 본체(10)의 전후방에 각각 형성되는 제1스크리드(screed)(41)로 이루어진 구성을 특징으로 하며, 상기 제2포밍부(50)는 상기 본체의 후방에 형성된 제1스크리드(41) 측면에 형성되는 제2스크리드(51)로 구성된다.The first forming unit 40 may include a first screed 41 formed on the front and rear sides of the main body 10, And a second screed 51 formed on a side surface of the first screed 41 formed at the rear of the main body.

상기 제1스크리드(41)는 터널 공동구(102)와 리드 헌치부(103) 및 공동구(120)의 표면을 매끈하게 형성하기 위한 미장판으로써, 상기 본체(10)의 전,후방 측벽으로부터 내측으로 수평방향으로 형성되며, 각 스크리드가 콘크리트의 타설압을 견딜 수 있도록 각 스크리드 상부에 박스 구조의 보강 프레임이 형성될 수 있다.The first screed 41 is an unsprung plate for smoothly forming the surface of the tunnel cavity 102, the lead spikes 103 and the cavity 120. The first scree 41 is formed on the inner side of the front and rear side walls of the main body 10 And a reinforcing frame of a box structure may be formed on each of the screeds so that the screed can withstand the installation pressure of the concrete.

도 3은 상기 제1스크리드(41)가 상기 본체(10)의 후방에 형성된 것을 도시하였으며, 도면에는 도시되지 않았으나 상기 본체(10)의 전방에도 상기 제1스크리드(41)가 형성되어 있다.3 shows that the first screed 41 is formed on the rear side of the main body 10 and the first screed 41 is formed on the front side of the main body 10 .

상기 제2스크리드(51)는 상기 공동구의 외벽에 상측으로 돌출형성되는 뚜껑 지지 콘크리트벽체(121)를 형성하기 위한 미장판으로써, 상기 본체의 후방에 형성된 제1스크리드(41)의 측면에 형성된다.The second screed (51) is an unfinished plate for forming a lid-supported concrete wall body (121) protruding upward from an outer wall of the cavity. The second screed (51) is formed on the side of the first screed (41) .

상기 뚜껑 지지 콘크리트벽체(121)는 공동구(120)를 덮는 뚜껑을 지지하는 역할을 한다.The lid-supported concrete wall 121 serves to support a lid covering the cavity 120.

한편, 본 발명은 도 8에 도시된 바와 같이 하나 이상의 제2스크리드(51)를 형성하여 뚜껑 지지 콘크리트벽체(121)를 복수개로 형성할 수도 있으며, 상기 콘크리트휘니셔(a))가 이동하는 동안 상기 제1스크리드(41)에 의해 터널 공동구(102)와 리드 헌치부(103) 및 공동구(120)가 형성되고, 상기 본체의 후방에 형성된 제2스크리드(51)가 상기 제1스크리드(41)에 의해 형성된 공동구(120) 위를 지나가면서 외벽 상단에 공동구를 덮기 위한 뚜껑을 지지하는 뚜껑 지지 콘크리트벽체(121)를 형성하게 된다.8, a plurality of lid-supported concrete walls 121 may be formed by forming at least one second screed 51, and the concrete finer (a) The second screed 51 formed on the rear side of the main body is separated from the first screed 41 by the first screed 41 and the lead spirally wound portion 103 and the cavity 120 by the first screed 41, A lid-supporting concrete wall body 121 for supporting a lid for covering a cavity is formed at the upper end of the outer wall while passing over the cavity 120 formed by the lid 41. [

또한, 본 발명에 따른 타설장치는 상기 리드 헌치부(103)의 상단에 "

Figure pat00002
" 형상의 수팽창지수제 투입홈(104)을 형성할 수 있도록 이와 대응되는 형상의 누름판(60)이 상기 본체(10)와 결합된다.In addition, the pouring apparatus according to the present invention is characterized in that the lead-
Figure pat00002
The pressure plate 60 having a shape corresponding to that of the water inflating index injecting groove 104 is formed in the body 10. [

수팽창지수재라 함은 물과 접촉하면 팽창하여 구조체 접촉면에 밀착되어 밀폐압력을 유지하여 누수를 방지하는 특징이 있으며, 콘크리트 구조물이나 맨홀 또는 수로 등에 널리 사용되는 것으로 자세한 설명은 생략하도록 한다.The water expansion index material is characterized in that it is expanded when it comes into contact with water and is in close contact with the structure contact surface to maintain the sealing pressure to prevent leakage, and is widely used in concrete structures, manholes, and waterways.

상기 누름판(60)은 상기 본체(10)의 후방에 제1스크리드(41)의 일측 저면에 결합되며, 상기 수팽창지수제 투입홈과 대응되는 "

Figure pat00003
" 형상으로 이루어진다.The push plate 60 is coupled to a bottom surface of the first screed 41 on the rear side of the main body 10,
Figure pat00003
"Made of shape.

상기 리드헌치부(103)는 상단이 평평하게 형성되며, 굳기 전 상태이므로 상기 누름판(60)이 수팽창지수제 투입홈(104)을 형성하고자 하는 위치를 지나가면서 누르게 되면 상기 리드 헌치부의 상단에 상기 누름판의 외형과 동일한 형상의 수팽창지수제 삽입홈(104)이 형성된다.Since the upper end of the lead wedge portion 103 is flat and is not hardened, when the pressure plate 60 is pressed while passing through the position for forming the water expansition index injection groove 104, the upper end of the lead wedge portion 103 A water expansion index insertion groove 104 having the same shape as the outer shape of the pressure plate is formed.

이후, 상기 콘크리트휘니셔(a)가 전진하게 되면 상기 누름판(60)이 진행방향을 따라 리드헌치부의 상단에 수팽창지수제 투입홈을 형성한다.Thereafter, when the concrete finishing machine (a) advances, the press plate 60 forms a water expansition index injection groove at the upper end of the lead dent portion along the proceeding direction.

상기한 타설장치는 다이크, L형 측구, 교량 방호벽 등의 연속타설을 위해 종래 사용되어온 콘크리트휘니셔의 수평 붐에 부착한 상태에서 간편하게 사용할 수 있다.
The above-mentioned pouring apparatus can be easily used in a state where it is attached to a horizontal boom of a concrete finishing machine which has been conventionally used for continuous casting of a dike, an L-shaped viewport, a bridge wall,

다음으로, 본 발명의 실시예와 관련된 터널 내에 형성되는 공동구의 시공방법에 대하여 보다 상세하게 설명하도록 한다.Next, a method of constructing a cavity formed in a tunnel according to an embodiment of the present invention will be described in more detail.

본 발명은 터널 내에 형성되는 공동구 및 리드헌치부의 시공방법에 있어서, 터널 내부에 형성된 기초지반 위에 터널 공동구(102)와 리드헌치부(103) 및 공동구(120)를 형성할 위치를 정하고 철근을 배근하는 철근 배근단계와; 상기 터널 공동구와 리드헌치부 및 공동구의 표면 형성을 위해 그와 대응되는 형상으로 이루어지는 제1스크리드(41)와, 상기 공동구의 외벽에 상측으로 돌출되는 뚜껑 지지 콘크리트벽체(121)를 형성하기 위한 제2스크리드(51)가 구비되는 타설장치가 장치된 콘크리트휘니셔(a)를 사용하여 상기 타설장치를 배근부에 세팅하는 콘크리트 휘니셔 세팅단계와; 상기 타설장치로 콘크리트를 공급하면서 콘크리트휘니셔를 진행시켜 콘크리트를 연속적으로 타설하는 단계로써, 상기 제1스크리드(41)를 통해 터널 공동구(102)와 리드헌치부(103) 및 공동구(120)의 표면을 형성하는 제1포밍부(40) 형성단계 및 상기 제2스크리드(51)를 통해 상기 공동구(120)의 일측 외벽에 뚜껑 지지 콘크리트벽체(121)를 형성하는 제2포밍부(50) 형성단계로 이루어지는 콘크리트 타설단계;로 이루어지는 것을 특징으로 한다.According to the present invention, in the construction method of the hollow ball and the lead hunting part formed in the tunnel, the position where the tunnel hollow ball 102, the lead hunting part 103 and the hollow ball 120 are to be formed on the foundation ground formed inside the tunnel, Reinforcing bar reinforcement step; The first screed 41 having a shape corresponding thereto for forming the surface of the tunnel cavity, the lead hunting portion and the cavity, and a lid support concrete wall 121 protruding upward from the outer wall of the cavity A concrete finisher setting step of setting the placing apparatus to the reinforcement part using a concrete finisher (a) equipped with a pouring apparatus provided with a second screed 51; Continuously pouring concrete by advancing a concrete finisher while supplying concrete to the pouring device, through the first screed 41, the tunnel hollow hole 102, the lead hunting unit 103, and the hollow hole 120. The second forming unit 50 forming the lid support concrete wall 121 on the outer wall of one side of the cavity 120 through the first forming unit 40 forming step and the second screed 51 to form a surface of the Characterized in that consisting of ;;

먼저, 본 발명에서 철근 배근단계는 공동구의 설계강도를 확보하기 위하여 철근을 배근하는 단계로 표준시방서에 기재된 바대로 좌우대칭을 이루도록 횡방향 철근과 이를 엮어 일체로 묶어주기 위해 철근을 배근하는 단계이다.In the present invention, the reinforcing steel reinforcing step is a step of reinforcing the reinforcing bars to secure the design strength of the borehole. The reinforcing steel reinforcing bars are formed by weaving the transverse reinforcing bars together with the reinforcing bars so as to form symmetry as described in the standard specification .

콘크리트 휘니셔 세팅단계는 콘크리트 휘니셔의 주행 경로를 정지(整地)하고, 타설장치를 철근 상에 위치하도록 조정하며, 설계 구배로 진행할 수 있도록 안내센서등을 설치하고, 콘크리트 공급을 위한 컨베이어 등을 타설 가능한 상태로 조정하는 단계이다.In the concrete finishing step, the traveling path of the concrete finishing machine is grounded, the pouring device is placed on the reinforcing bar, a guide sensor is installed so as to advance to the design gradient, and a conveyor And adjusting it to a state in which it can be placed.

상기에서 타설장치는 콘크리트 휘니셔에 장착되어 공동구의 기본 형상을 연속적으로 성형 형성하기 위한 장치로서, 공동구의 단면 형상과 동형의 포밍부(또는 이동 거푸집)가 포함된 구조를 갖는다. 상기한 타설장치는 공동구의 표면 형성을 위한 제1스크리드(41)와, 상기 공동구의 외벽에 상측으로 돌출형성되는 측벽을 형성하기 위한 제2스크리드(51)가 구비되고, 콘크리트 타설시 적정 다짐압을 가할 수 있도록 바이브레이터(e) 등이 구비된 구조가 사용된다.The pouring apparatus is a device for continuously forming a basic shape of a cavity by being mounted on a concrete finishing machine and has a structure including a forming section (or a moving die) having the same shape as the sectional shape of the cavity. The pouring apparatus includes a first screed 41 for forming a surface of a hollow and a second screed 51 for forming a side wall protruding upward from the outer wall of the hollow, A structure including a vibrator e and the like is used so that the compaction pressure can be applied.

콘크리트 타설단계는 타설장치에 콘크리트를 공급하고 콘크리트 휘니셔(a)를 진행시켜 콘크리트를 연속적으로 타설하는 단계이다.The concrete pouring step is a step of continuously pouring concrete by supplying concrete to the pouring device and advancing the concrete finishing machine (a).

콘크리트의 연속 타설공정은 타설장치에 콘크리트를 채워 상기 제1,2포밍부(40,50)로 투입되도록 한 상태에서 단지 콘크리트휘니셔(a)를 전진시키는 과정으로 이루어지며, 이에 의해 철근을 감싸는 타설장치의 제1,2포밍부(40,50)로 콘크리트가 공급되어 터널 공동구(102)와 리드헌치부(103)와 공동구(120) 및 뚜껑 지지 콘크리트벽체(121)의 형상이 연속성형된다. The concrete continuous casting process is a process of advancing the concrete finishing machine (a) in a state in which the casting machine is filled with concrete and put into the first and second forming units 40 and 50, The concrete is supplied to the first and second forming sections 40 and 50 of the pouring apparatus so that the shapes of the tunnel hole 102 and the lead pouring section 103 and the cavity 120 and the lid supporting concrete wall 121 are continuously formed .

사용되는 콘크리트 휘니셔는 다이크, L형 측구, 교량 방호벽 등의 연속타설을 위해 종래 사용되어온 콘크리트 휘니셔를 그대로 적용할 수 있다.The concrete finishing used can be applied as it is for the continuous casting of dies, L-type gauges, bridge barriers and the like.

상기한 타설단계는 터널의 라이닝, 라이닝 배면 배수구가 완성되고, 콘크리트휘니셔의 주행로가 정지(整地)되고, 공동구 및 리드헌치부 형성을 위한 철근이 설치된 상태에서 믹서트럭으로 부터의 콘크리트가 콘크리트 휘니셔의 컨베이어 공급되고, 컨베이어에 이송된 콘크리트가 타설장치에 채워진 상태에서 주행하면 타설장치 내부에 채워진 콘크리트가 철근 사이에 충전된다.In the above-mentioned casting step, the lining of the tunnel and the lining back drainage are completed, the running path of the concrete finishing machine is stopped, and the concrete from the mixer truck is filled with concrete, When the concrete supplied to the conveyor of the finishing machine is conveyed while being filled in the pouring apparatus, the concrete filled in the pouring apparatus is filled between the reinforcing bars.

이때, 상기 컨베이어를 통해 공급되는 콘크리트는 상기 제1투입구와 제2투입구에 각각 공급되며, 상기 제1투입구를 통해 투입된 콘크리트는 상기 제1포밍부로 공급되어 상기 제1스크리드에 의해 터널 공동구와 리드헌치부 및 공동구의 표면을 매끄럽게 형성한다.At this time, the concrete supplied through the conveyor is supplied to the first inlet and the second inlet, respectively, the concrete introduced through the first inlet is supplied to the first forming unit is the tunnel cavity and lead by the first screed Smooth the surface of the haunches and cavity.

또한, 상기 제2투입구에 투입된 콘크리트는 상기 제2포밍부로 공급되어 상기 제2스크리드에 의해 뚜껑 지지 콘크리트벽체를 형성하게 된다.In addition, the concrete introduced into the second inlet is supplied to the second forming unit to form a lid support concrete wall by the second screed.

a : 콘크리트휘니셔 b : 타설장치
c : 컨베이어 d : 믹서트럭
e : 바이브레이터 f : 수평 붐
10 : 본체 11 : 분리벽
12 : 제1투입구 13 : 제2투입구
14 : 제1콘크리트 수납실 15 : 제2콘크리트 수납실
16 : 철근 관통홈 20 : 부착구
30 : 바이브레이터 부착구
40 : 제1포밍부 41 : 제1스크리드
50 : 제2포밍부 51 : 제2스크리드
60: 누름판 101 : 기초지반
102 : 터널 공동구 103 : 리드 헌치부
110 : 라이닝 배면 배수구 120 : 공동구
121 : 뚜껑 지지 콘크리트벽체
130 : 주행로 140 : 배수로
a: concrete finishing b: pouring device
c: Conveyor d: Mixer truck
e: vibrator f: horizontal boom
10: main body 11: separating wall
12: first inlet 13: second inlet
14: 1st concrete storage room 15: 2nd concrete storage room
16: Reinforcing groove 20: Attachment hole
30: Vibrator attachment hole
40: first forming part 41: first screed
50: second forming portion 51: second screed
60: press plate 101: foundation foundation
102: Tunnel constructions 103: Lead constructions
110: lining back drainage port 120:
121: Concrete wall with lid
130: Driving route 140: Drainage

Claims (3)

터널 내에서 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드헌치부의 콘크리트 기계타설 장치에 있어서,
내부에 콘크리트를 수납할 수 있도록 몰드 중앙 및 상부에 투입구가 형성되되 중앙에 형성된 분리벽(11)을 통해 제1투입구(12)와 제2투입구(13)가 형성되는 본체(10)와;
상기 본체(10)의 전·후방에 형성되는 것으로, 상기 제1투입구(12)로부터 콘크리트를 공급받아 터널 내에 형성된 기초지반 또는 기초콘크리트 위에 터널 공동구(102)와 리드헌치부(103) 및 공동구(120)를 형성할 수 있도록 상기 터널 공동구와 리드헌치부 및 공동구와 대응되는 형상으로 이루어지는 제1포밍부(40)가 형성되는 제1스크리드(41)와;
상기 본체(10)의 후방에 형성된 제1스크리드(41)의 측면에 형성되는 것으로, 상기 제2투입구(13)로부터 콘크리트를 공급받아 상기 공동구(120)의 외벽에 공동구를 덮는 뚜껑을 지지하기 위한 뚜껑 지지 콘크리트벽체(121)를 형성하기 위한 제2포밍부(50)가 형성되는 제2스크리드(51)와;
상기 본체(10)의 일측면에 결합되는 콘크리트휘니셔 부착구(20); 및
상기 본체 내의 콘크리트 수납공간에 설치되는 바이브레이터 부착구(30);
를 포함하여 이루어지는 것을 특징으로 하는 터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드헌치부의 콘크리트 기계타설 장치.
A concrete pouring apparatus for a concrete pouring section and a lining concrete pouring section in a tunnel,
A main body 10 having a charging port formed at the center and an upper portion of the mold so that concrete can be received therein, and a first charging port 12 and a second charging port 13 are formed through a separation wall 11 formed at the center;
The tunnel 10 is formed on the front and rear sides of the main body 10 and receives the concrete from the first input port 12 to receive the tunnel hole 102, the lead hook portion 103, A first screed 41 formed with a first forming portion 40 having a shape corresponding to the tunnel hole, the lead spike portion, and the cavity so as to form the tunnel forming portion 120;
And is formed on the side of the first screed 41 formed on the rear side of the main body 10 so as to receive a concrete from the second charging port 13 and support a cap covering the cavity on the outer wall of the cavity 120 A second screed 51 formed with a second forming portion 50 for forming a lid-supporting concrete wall 121 for the lid-supporting concrete wall 121;
A concrete finishing attachment 20 coupled to one side of the main body 10; And
A vibrator attachment 30 installed in a concrete receiving space in the main body;
The concrete pouring apparatus of the present invention is characterized in that the concrete pouring apparatus is installed in a tunnel.
제1항에 있어서, 상기 본체(10)의 후방에는 상기 리드 헌치부(103)의 상단에 "
Figure pat00004
" 형상의 수팽창지수제 투입홈(104)을 형성할 수 있도록 이와 대응되는 형상으로 이루어지는 누름판(60)이 결합되는 것을 특징으로 하는 터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드헌치부의 콘크리트 기계타설 장치.
[2] The apparatus according to claim 1, wherein a rear portion of the main body (10)
Figure pat00004
And a pressure plate (60) having a shape corresponding to the pressure plate (60) is formed so as to form the water expansition index injection groove (104) of the shape of the concrete pouring lining concrete. Pouring device.
터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드헌치부의 시공방법에 있어서,
상기 공동구 및 리드헌치부를 형성할 위치를 정하고 철근을 배근하는 철근 배근단계와;
상기 공동구와 리드 헌치부의 표면 형성을 위해 그와 대응되는 형상으로 이루어지는 제1스크리드와, 상기 공동구의 외벽에 상측으로 돌출되는 뚜껑 지지 콘크리트벽체(121)를 형성하기 위한 제2스크리드가 구비되는 타설장치가 장치된 콘크리트휘니셔를 사용하여 상기 타설장치를 배근부에 세팅하는 콘크리트 휘니셔 세팅단계와;
상기 타설장치로 콘크리트를 공급하면서 콘크리트휘니셔를 진행시켜 콘크리트를 연속적으로 타설하는 단계로써, 상기 제1스크리드를 통해 공동구와 리드헌치부의 표면을 형성하는 제1포밍부 형성단계 및 상기 제2스크리드를 통해 상기 공동구의 일측 외벽에 뚜껑 지지 콘크리트벽체를 형성하는 제2포밍부 형성단계로 이루어지는 콘크리트 타설단계;
를 포함하여 이루어지는 것을 특징으로 하는 터널 내에 형성되는 콘크리트 공동구 및 라이닝콘크리트의 리드헌치부의 시공방법.
In the construction method of the concrete hollow ball and the lining concrete lead haunch formed in the tunnel,
A reinforcing bar laying step of setting a position to form the hollow and the lead hanging part and arranging a reinforcing bar;
A first screed having a shape corresponding to the surface of the cavity and the lead haunting portion, and a second screed for forming a lid support concrete wall 121 protruding upward on the outer wall of the cavity A concrete finisher setting step of setting the placing apparatus using the concrete finisher equipped with a placing apparatus, wherein the placing apparatus is placed in the back muscle;
Continuously pouring concrete by advancing a concrete finisher while supplying concrete to the pouring device, a first forming part forming step of forming a surface of a cavity and a lead hunting part through the first screed and the second A concrete pouring step of forming a second forming part for forming a lid support concrete wall on one side wall of the cavity through a screed;
The method according to any one of claims 1 to 3, further comprising the steps of:
KR1020120064401A 2012-06-15 2012-06-15 Concrete placing apparatus for utility-pipe conduit KR101436132B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120064401A KR101436132B1 (en) 2012-06-15 2012-06-15 Concrete placing apparatus for utility-pipe conduit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120064401A KR101436132B1 (en) 2012-06-15 2012-06-15 Concrete placing apparatus for utility-pipe conduit

Publications (2)

Publication Number Publication Date
KR20130141186A true KR20130141186A (en) 2013-12-26
KR101436132B1 KR101436132B1 (en) 2014-09-01

Family

ID=49985385

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120064401A KR101436132B1 (en) 2012-06-15 2012-06-15 Concrete placing apparatus for utility-pipe conduit

Country Status (1)

Country Link
KR (1) KR101436132B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101867595B1 (en) * 2017-10-17 2018-06-14 남용학 Utility-Pipe Conduit Construction Equipment of Tunnel
CN110454198A (en) * 2019-08-26 2019-11-15 洛阳兴坤隧道工程机械有限公司 A kind of trolley concrete running gate system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100683558B1 (en) * 2005-02-04 2007-02-15 태갑성 Drainage way construction method at tunnel site and it's device
KR200394648Y1 (en) 2005-06-23 2005-09-02 이장운 Apparatus for constructing the concrete-wall shaped with embossed carving
KR101083272B1 (en) 2010-01-22 2011-11-15 오봉조 Sliding form system for constructing drainage canal and construction method of drainage canal using the system
KR101044745B1 (en) 2010-11-12 2011-06-27 유재홍 Boundary stone constructing apparatus and method enabling leveling and hardening

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101867595B1 (en) * 2017-10-17 2018-06-14 남용학 Utility-Pipe Conduit Construction Equipment of Tunnel
CN110454198A (en) * 2019-08-26 2019-11-15 洛阳兴坤隧道工程机械有限公司 A kind of trolley concrete running gate system
CN110454198B (en) * 2019-08-26 2021-01-26 洛阳兴坤隧道工程机械有限公司 Trolley concrete pouring system

Also Published As

Publication number Publication date
KR101436132B1 (en) 2014-09-01

Similar Documents

Publication Publication Date Title
CN104533456B (en) Super-large section chamber reinforced concrete modelling construction method
KR101954428B1 (en) Pre assemble pc composite mold and method for consructing concrete structure using this same
US8920068B1 (en) Process for slip forming reinforced bridge coping with exposed rebars
US9435085B1 (en) System and method for slip forming monolithic reinforced composite concrete structures having multiple functionally discrete components
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN106988339B (en) Sandy gravel stratum piping lane construction technology
CN109972638B (en) Construction method of prefabricated thin-wall formwork lattice beam ecological slope protection
KR101436132B1 (en) Concrete placing apparatus for utility-pipe conduit
JP4715571B2 (en) Construction method inside tunnel
KR101563713B1 (en) U Method for constructing Utype roadside drain and sliding form
CN105155474B (en) Chute construction shaper and the construction method of chute
JP2019120115A (en) Method of constructing tunnel lining structure
CN110593902A (en) Construction method for filling inverted arch and integrally pouring
JP2002327600A (en) Retaining wall structure of tunnel watchman's passage and member for forming retaining wall
CN210768793U (en) Two-lining construction system at intersection of main tunnel and double-layer construction transverse channel
CN114645721A (en) Combined assembly process for highway tunnel and inverted arch structure and assembly device thereof
KR102202598B1 (en) Double wall structure for top-down construction and top-down structure construction method therewith
KR101563710B1 (en) J Method for constrJcting Jtype roadside drain and sliding form
JP6740064B2 (en) Construction method of concrete frame
JP6986803B1 (en) Retaining wall structure and how to build a retaining wall
US20130118103A1 (en) Precast wall section and method of building a wall
CN214741342U (en) Full-prefabricated internal structure of shield tunnel
KR101645511B1 (en) Precast type integral imbutment bridge and construction methode thereof
CN110904998B (en) Template lining trolley applied to pipe gallery and construction method thereof
CN212578849U (en) Bipartition type prefabricated pipe joint combined template

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
FPAY Annual fee payment

Payment date: 20170825

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180827

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190708

Year of fee payment: 6