KR20130107436A - Bulkhead of bulk carrier and method for installing bulkhead - Google Patents
Bulkhead of bulk carrier and method for installing bulkhead Download PDFInfo
- Publication number
- KR20130107436A KR20130107436A KR1020120029196A KR20120029196A KR20130107436A KR 20130107436 A KR20130107436 A KR 20130107436A KR 1020120029196 A KR1020120029196 A KR 1020120029196A KR 20120029196 A KR20120029196 A KR 20120029196A KR 20130107436 A KR20130107436 A KR 20130107436A
- Authority
- KR
- South Korea
- Prior art keywords
- corrugated
- bulkhead
- shedding plate
- cargo hold
- plate
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 8
- 238000003466 welding Methods 0.000 claims abstract description 16
- 238000010276 construction Methods 0.000 claims abstract description 15
- 238000005192 partition Methods 0.000 claims description 39
- 230000008878 coupling Effects 0.000 claims description 30
- 238000010168 coupling process Methods 0.000 claims description 30
- 238000005859 coupling reaction Methods 0.000 claims description 30
- 238000009434 installation Methods 0.000 abstract description 8
- 230000008569 process Effects 0.000 description 4
- 239000000969 carrier Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B3/00—Hulls characterised by their structure or component parts
- B63B3/14—Hull parts
- B63B3/56—Bulkheads; Bulkhead reinforcements
- B63B3/60—Bulkheads; Bulkhead reinforcements with curved or corrugated plating
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B11/00—Interior subdivision of hulls
- B63B11/02—Arrangement of bulkheads, e.g. defining cargo spaces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
- B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
- B63B25/04—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods solid
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/40—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods
- B63B73/43—Welding, e.g. laser welding
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/388—Separate connecting elements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B2221/00—Methods and means for joining members or elements
- B63B2221/20—Joining substantially rigid elements together by means that allow one or more degrees of freedom, e.g. hinges, articulations, pivots, universal joints, telescoping joints, elastic expansion joints, not otherwise provided for in this class
Abstract
Description
본 발명은 벌크선의 화물창에 마련되는 격벽 및 이의 시공방법에 관한 것으로, 특히 쉐딩 플레이트를 파형 격벽에 힌지 결합시켜 쉐딩 플레이트의 설치작업을 보다 용이하게 실시할 수 있도록 한 화물창 격벽 및 이의 시공방법에 관한 것이다.The present invention relates to a bulkhead provided in the cargo hold of the bulk carrier and a construction method thereof, and more particularly, to a cargo hold bulkhead and a construction method thereof by hinge-bonding the shedding plate to the corrugated bulkhead to facilitate the installation of the shedding plate. will be.
일반적으로 벌크선이라 함은 곡물이나 광석과 같이 포장되지 않은 벌크화물의 운송에 사용되는 선박으로, 이러한 선박의 내부에는 벌크화물이 저장되는 화물창이 마련되어 있다.In general, bulk carriers are ships used for the transportation of unpacked bulk cargoes such as grains or ores. Inside these ships, cargo holds are provided for storing bulk cargoes.
한편 상기 벌크선에 마련되는 화물창은 격벽(bulkhead)에 의해 선체 내의 다른 구역과 구획되며, 이러한 구성은 일반적인 다른 선박과 동일하다. 그러나 벌크선의 경우 화물창에 저장되는 벌크화물의 특성을 고려하여 파형 격벽을 사용하고 있다.On the other hand, the cargo hold provided in the bulk carrier is partitioned from other areas in the hull by bulkheads, and this configuration is the same as other general ships. However, bulk carriers use corrugated bulkheads in consideration of the characteristics of bulk cargoes stored in cargo holds.
즉 플레이트와 보강제로 이루어진 일반적인 격벽을 이용하여 벌크선의 화물창을 구성할 경우, 벌크화물의 특성상 보강제가 손상될 확률이 높고 잔재물의 처리가 용이하지 못하므로, 벌크선의 경우 단면이 파형 구조로 형성된 파형 격벽을 이용하여 화물창을 구성하고 있다.In other words, when the bulk carrier is formed by using a general bulkhead composed of a plate and a reinforcement, the bulkhead has a high probability of damaging the reinforcement and is not easy to process the residue. The cargo hold is constructed using the.
한편 파형 격벽을 이용하여 화물창을 구성함에 있어서, 다수 개의 파형 격벽을 용접하여 상호 연결시킴으로써 요구되는 길이의 격벽을 구성하게 되며, 이러한 파형 격벽간의 연결작업시 파형 격벽간의 연결부에는 쉐딩 플레이트(Shedding plate)가 설치된다.Meanwhile, in forming a cargo hold using corrugated bulkheads, a plurality of corrugated bulkheads are welded and interconnected to form a bulkhead of a required length, and a connecting plate between the corrugated bulkheads in the connection work between the corrugated bulkheads is a shedding plate. Is installed.
도 1은 파형 격벽의 구조를 보인 사시도를, 도 2는 로어 스툴과 파형 격벽의 사이에 형성된 공간을 폐쇄하도록 쉐딩 플레이트가 설치된 상태를 보인 단면도를 도시하고 있다.1 is a perspective view showing the structure of the corrugated partition, Figure 2 is a cross-sectional view showing a state in which the shedding plate is installed to close the space formed between the lower stool and the corrugated partition.
상기 파형 격벽(10)은 돌출부(11)와 요입부(12)가 반복적으로 형성된 구조로 이루어지며, 이러한 구조를 갖는 다수 개의 파형 격벽(10)이 화물창에 마련된 로어 스툴(Lower stool,30)상에 안착되면서 상호 연결되어 화물창의 격벽을 구성하게 된다.The
상기와 같이 파형 격벽(10)들과 로어 스툴(30)의 사이에는 공간(S)이 형성되며, 이 공간(S)을 폐쇄하지 않고 그대로 둘 경우, 벌크화물이 상기 공간(S)에 쌓여 처리가 곤란한 문제가 발생하므로, 쉐딩 플레이트(20)를 이용하여 상기 공간(S)을 폐쇄함으로써 벌크화물이 파형 격벽(10)과 로어 스툴(30) 사이에 형성된 틈새 공간(S)에 쌓이지 않고 자연스럽게 화물창의 바닥으로 흘러내리도록 유도하게 된다.As described above, a space S is formed between the
이러한 쉐딩 플레이트(20)는 파형 격벽(10)의 제작 시 요입부(12) 마다 위치하도록 설치하고 있으나, 파형 격벽(10)의 끝단부, 즉 파형 격벽간의 연결부(10a)의 경우, 파형 격벽간의 연결을 위한 용접작업을 위해서 개방된 상태를 유지시켜야만 하므로, 다시 말해 파형 격벽(10)간의 연결부(10a)에 쉐딩 플레이트(20`)를 미리 설치한 경우 쉐딩 플레이트(20`)에 의해 커버된 부분(10b)은 파형 격벽간의 용접작업이 불가능하게 되므로, 파형 격벽(10)간의 연결부(10a)에 설치되는 쉐딩 플레이트(20`)는 파형 격벽간의 용접작업이 완료된 후, 별도의 작업을 통해 설치하고 있다.The
한편 종래에는 파형 격벽간의 연결부에 설치될 쉐딩 플레이트를 파형 격벽의 임의 위치에 가용접하여 고정시킨 상태에서 파형 격벽들의 연결작업을 실시한 후, 파형 격벽에 가용접된 쉐딩 플레이트를 분리하여 요구되는 위치에 설치하는 방식으로 작업을 실시하였다.On the other hand, conventionally, the shedding plate to be installed in the connection between the corrugated bulkheads is welded and fixed at an arbitrary position of the corrugated bulkheads, and the corrugated bulkheads are connected to each other. The work was carried out in a way.
그러나 상기 쉐딩 플레이트는 수백 kg에 달하는 중량물이므로, 취급이 용이하지 못하여 많은 인력과 장비 및 시간이 소요되는 문제점이 있다.However, since the shedding plate is a weight of several hundred kg, it is not easy to handle, which causes a lot of manpower, equipment, and time.
본 발명은 상기와 같은 문제점을 고려하여 이루어진 것으로, 본 발명의 목적은 파형 격벽간의 연결부에 설치되는 쉐딩 플레이트를 파형 격벽에 힌지 결합시켜 파형 격벽간의 연결을 위한 용접작업이 완료된 후, 쉐딩 플레이트를 회전시켜 요구되는 위치에 놓여질 수 있도록 함으로써 쉐딩 플레이트 설치작업의 편의성 및 안정성을 높일 수 있도록 화물창 격벽 및 이의 시공방법을 제공함에 있다.The present invention has been made in view of the above problems, and an object of the present invention is to hinge the shedding plate installed in the connection portion between the corrugated bulkheads to the corrugated partition wall, after the welding operation for the connection between the corrugated partition walls is completed, the shedding plate is rotated It is to provide a cargo hold bulkhead and its construction method to increase the convenience and stability of the shedding plate installation work by allowing it to be placed in the required position.
상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명의 화물창 격벽은 다수 개의 파형 격벽으로 이루어진 화물창 격벽에 있어서, 상기 다수 개의 파형 격벽 사이에 마련되는 적어도 하나의 연결부 및 적어도 하나의 연결부에 회동 가능하게 마련되는 쉐딩 플레이트를 포함하는 것을 특징으로 한다.Cargo hold bulkhead of the present invention to achieve the object as described above and to perform the problem to eliminate the conventional defects in the cargo hold bulkhead consisting of a plurality of corrugated bulkhead, at least one connection portion provided between the plurality of corrugated bulkhead and It characterized in that it comprises a shedding plate which is provided to be rotatable at least one connecting portion.
한편 상기 쉐딩 플레이트를 상기 파형 격벽에 연결하는 힌지 결합부가 더 포함될 수 있다.Meanwhile, a hinge coupler may be further included to connect the shedding plate to the corrugated partition wall.
또한 본 발명의 화물창 격벽의 시공방법은 다수 개의 파형 격벽을 이용하여 화물창 격벽을 구성함에 있어서, 상기 파형 격벽에 쉐딩 플레이트가 회전 가능하게 결합되는 힌지 결합부를 설치하되, 쉐딩 플레이트가 힌지 결합부를 중심으로 회전하여 취부선에 일치할 수 있도록 힌지 결합부를 취부선의 주변에 설치하는 단계(S100); 상기힌지 결합부에 쉐딩 플레이트를 결합시키되, 쉐딩 플레이트의 회전이 구속되도록 쉐딩 플레이트를 파형 격벽에 고정시키는 단계(S200); 상기쉐딩 플레이트가 설치된 파형 격벽을 선체로 이송하여 파형 격벽들을 상호 연결시킴으로써 격벽을 형성하는 단계(S300); 및 상기 파형 격벽간의 연결을 위한 용접작업이 완료된 후, 쉐딩 플레이트의 구속을 해제하고, 쉐딩 플레이트를 회전시켜 취부선에 일치되도록 한 다음 용접하여 쉐딩 플레이트를 고정시키는 단계(S400)로 구성된 것을 특징으로 한다.In addition, the construction method of the cargo hold bulkhead of the present invention in the configuration of the cargo hold bulkhead using a plurality of corrugated bulkheads, the hinged coupling portion to which the shedding plate is rotatably coupled to the corrugated bulkhead, but the shedding plate is centered on the hinge coupling Installing a hinge coupler around the mounting line to rotate to match the mounting line (S100); Coupling a shedding plate to the hinge coupling unit and fixing the shedding plate to the corrugated partition wall so that rotation of the shedding plate is restricted (S200); Transferring the corrugated partition wall in which the shedding plate is installed to the hull to interconnect the corrugated partition walls to form a partition wall (S300); And after the welding operation for the connection between the corrugated bulkheads is completed, releasing the restraint of the shedding plate, rotating the shedding plate to match the mounting line, and then welding and fixing the shedding plate (S400). do.
한편 상기 S200 단계는 쉐딩 플레이트와 파형 격벽의 부분적인 가용접을 통해 회전을 구속할 수 있다.On the other hand, the step S200 may restrict the rotation through the partial welding of the shedding plate and the corrugated partition.
한편 상기 S100 단계는 파형 격벽의 연결부에 가장 근접한 곳에 위치한 돌출부의 측면에 힌지 결합부를 설치하는 것이 바람직하다.Meanwhile, in the step S100, it is preferable to install the hinge coupler on the side surface of the protrusion located closest to the connection portion of the corrugated bulkhead.
상기와 같은 특징을 갖는 본 발명에 의하면, 파형 격벽에 힌지 결합된 쉐딩 플레이트를 회전시킴으로써 요구되는 취부 위치에 쉐딩 플레이트를 정확히 배치할 수 있으므로, 쉐딩 플레이트 설치작업의 편의성과 효율성을 높일 수 있고, 더불어 작업의 안전성 또한 높일 수 있는 효과가 있다.According to the present invention having the above characteristics, since the shedding plate can be accurately positioned at the required mounting position by rotating the shedding plate hinged to the corrugated bulkhead, the convenience and efficiency of the shedding plate installation can be increased, and The safety of the work can also be increased.
도 1 은 파형 격벽의 구조를 보인 사시도,
도 2 는 로어 스툴과 파형 격벽의 사이에 형성된 공간을 폐쇄하도록 쉐딩 플레이트가 설치된 상태를 보인 단면도,
도 3 은 쉐딩 플레이트가 파형 격벽에 힌지 결합된 상태를 보인 예시도,
도 4 는 본 발명의 바람직한 실시예에 따른 화물창 격벽 시공방법의 공정도.1 is a perspective view showing the structure of the corrugated bulkhead,
2 is a cross-sectional view showing a state in which the shedding plate is installed to close the space formed between the lower stool and the corrugated partition wall;
3 is an exemplary view showing a state in which the shedding plate is hinged to the corrugated partition wall,
Figure 4 is a process diagram of the cargo hold bulkhead construction method according to a preferred embodiment of the present invention.
이하, 본 발명의 바람직한 실시예를 첨부된 도면과 연계하여 상세히 설명하면 다음과 같다. 본 발명의 실시예를 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the embodiments of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.
도 3은 쉐딩 플레이트가 파형 격벽에 힌지 결합된 상태를 보인 예시도를, 도 4는 본 발명의 바람직한 실시예에 따른 화물창 격벽 시공방법의 공정도를 도시하고 있다.3 is an exemplary view showing a state in which the shedding plate is hinged to the corrugated bulkhead, Figure 4 is a process diagram of the cargo hold bulkhead construction method according to a preferred embodiment of the present invention.
본 발명은 벌크선의 화물창 격벽을 구성하는 파형 격벽(10)들의 연결부와 로어 스툴(30) 사이에 형성된 틈새 공간(S)을 폐쇄하는 쉐딩 플레이트(20)를 보다 용이하게 안전하게 설치할 수 있도록 한 화물창 격벽 및 이의 시공방법에 관한 것이다.The present invention provides a cargo hold bulkhead that enables easier and safer installation of the
한편 본 발명에 따른 화물창 격벽은 다수 개의 파형 격벽(10)으로 구성되고, 이때 다수 개의 파형 격벽(10) 사이에는 적어도 하나의 연결부(10a)가 마련되며, 파형 격벽 사이에 마련된 연결부 중 적어도 하나의 연결부에는 쉐딩 플레이트(20)가 회동 가능한 구조로 마련되어 있다.Meanwhile, the cargo hold bulkhead according to the present invention includes a plurality of
이와 같이 회동 가능한 구조를 갖는 쉐딩 플레이트(20)를 연결부(10a)에 마련하기 위하여 파형 격벽(10)에는 힌지 결합부(40)가 구비되며, 상기 힌지 결합부(40)에 쉐딩 플레이트(20)가 결합되어 회동 가능한 구조를 갖게 된다.In order to provide the
상기와 같은 구조를 갖는 화물창 격벽의 시공을 위한 본 발명에 따른 시공방법은 파형 격벽(10)에 쉐딩 플레이트(20)가 회전 가능하게 결합되는 힌지 결합부(40)를 설치하되, 쉐딩 플레이트(20)가 힌지 결합부(40)를 중심으로 회전하여 취부선(L)에 일치하도록 힌지 결합부(40)를 취부선(L)의 주변에 설치하는 단계(S100); 상기 힌지 결합부(40)에 쉐딩 플레이트(20)를 결합시키되, 쉐딩 플레이트(20)의 회전이 구속되도록 쉐딩 플레이트(20)를 파형 격벽(10)에 고정시키는 단계(S200); 상기 쉐딩 플레이트(20)가 설치된 파형 격벽(10)을 선체로 이송하여 파형 격벽(10)들을 상호 연결시킴으로써 격벽을 형성하는 단계(S300); 및 상기 파형 격벽(10)간의 연결을 위한 용접작업이 완료된 후, 쉐딩 플레이트(20)의 구속을 해제하고, 쉐딩 플레이트(20)를 회전시켜 취부선(L)에 일치되도록 한 다음 용접하여 쉐딩 플레이트(20)를 고정시키는 단계(S400)로 구성되어 있다.The construction method according to the present invention for the construction of the cargo hold bulkhead having the structure as described above is provided with a
상기 S100 단계는 쉐딩 플레이트(20)를 회동 가능하게 지지하기 위한 힌지 결합부(40)를 파형 격벽(10)의 연결부(10a) 주변에 설치하는 단계이다.The step S100 is a step of installing a
이러한 S100 단계는 파형 격벽(10)을 제작하는 과정에서 요구되는 위치에 힌지 결합부(40)를 설치하거나, 또는 제작이 완료된 파형 격벽(10)에 힌지 결합부(40)를 추가적으로 설치하는 것으로 이루어질 수 있다.This step S100 consists of installing the
한편 상기 힌지 결합부(40)는 쉐딩 플레이트(20)가 힌지 결합부(40)를 중심으로 회전하였을 때, 쉐딩 플레이트(20)가 취부선(L)에 정확히 일치될 수 있도록 하기 위하여 취부선(L)의 주변에 설치되며, 보다 구체적으로 힌지 결합부(40)에 의한 쉐딩 플레이트(20)의 회전 반경을 고려하여 취부선(L)으로부터 이격됨과 더불어 취부선(L)과 평행한 힌지축(H)을 갖도록 설치된다.Meanwhile, when the
이와 같은 힌지 결합부(40)는 쉐딩 플레이트(20)가 파형 격벽(10)에 밀착되게 회전하였을 때, 파형 격벽(10)의 바깥쪽으로 돌출되는 부분이 최소화될 수 있도록 하는 것이 바람직하며, 이를 위하여 상기 힌지 결합부(40)는 파형 격벽(10)의 연결부(10a)에 가장 근접한 돌출부(11)의 측면에 설치된다.When the
상기 S200 단계는 파형 격벽(10)에 설치된 힌지 결합부(40)에 쉐딩 플레이트(20)를 결합하여 쉐딩 플레이트(20)를 파형 격벽(10)에 설치하는 단계이다.The step S200 is a step of installing the
한편 상기 힌지 결합부(40)와 쉐딩 플레이트(20)의 결합은 쉐딩 플레이트(20)를 힌지 결합부(40)에 용접함으로써 이루어질 수 있으며, 쉐딩 플레이트(20)와 힌지 결합부(40)의 결합이 완료된 후, 쉐딩 플레이트(20)가 파형 격벽(10)에 밀착되도록 회전시킨 상태에서 쉐딩 플레이트(20)를 부분적으로 파형 격벽(10)에 용접하는 가용접(W)을 실시함으로써, 쉐딩 플레이트(20)의 회전을 억제한 상태로 파형 격벽(10)에 고정시키게 된다.Meanwhile, the
상기 S300 단계는 쉐딩 플레이트(20)의 설치 및 고정이 완료된 파형 격벽(10)을 선체로 이송시켜 요구되는 위치에 배치한 후, 파형 격벽(10)간의 용접작업을 실시하는 단계이다.The step S300 is a step of transferring the
상기 S400 단계는 가용접에 의해 파형 격벽(10)에 구속된 쉐딩 플레이트(20)의 구속을 해제시킨 후, 힌지 결합부(40)를 중심으로 쉐딩 플레이트(20)를 회전시킴으로써 쉐딩 플레이트(20)가 취부선(L)에 일치되도록 위치시킨 다음 쉐딩 플레이트(20)의 둘레를 따라 용접을 실시함으로써 쉐딩 플레이트(20)의 설치작업을 완료하게 된다.
In the step S400, after releasing the restraint of the
상술한 바와 같이 본 발명에 따른 화물창 격벽 및 이의 시공방법은 쉐딩 플레이트(20)를 미리 파형 격벽(10)에 힌지 결합시킴으로써, 중량물인 쉐딩 플레이트(20)의 설치작업을 신속하고 정확하며 안전하게 실시할 수 있는 이점이 있다.
As described above, the cargo hold bulkhead and the construction method thereof according to the present invention are hinged to the
본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.
<도면의 주요 부분에 대한 부호의 설명>
(10) : 파형 격벽 (11) : 돌출부
(20) : 요입부
(20) : 쉐딩 플레이트 (30) : 로어 스툴
(40) : 힌지 결합부Description of the Related Art
(10): corrugated bulkhead (11): protrusion
20. recessed part
20: shedding plate 30: lower stool
40: hinge coupling
Claims (5)
상기 다수 개의 파형 격벽 사이에 마련되는 적어도 하나의 연결부 및
적어도 하나의 연결부에 회동 가능하게 마련되는 쉐딩 플레이트를 포함하는 것을 특징으로 하는 화물창 격벽.In the cargo hold bulkhead consisting of a plurality of corrugated bulkheads,
At least one connection part provided between the plurality of waveform partition walls;
A cargo hold bulkhead, comprising: a shedding plate rotatably provided at least one connection part.
상기 쉐딩 플레이트를 상기 파형 격벽에 연결하는 힌지 결합부를 더 포함하는 것을 특징으로 하는 화물창 격벽.The method according to claim 1,
A cargo hold bulkhead further comprises a hinge coupling portion connecting the shed plate to the corrugated bulkhead.
상기 파형 격벽에 쉐딩 플레이트가 회전 가능하게 결합되는 힌지 결합부를 설치하되, 쉐딩 플레이트가 힌지 결합부를 중심으로 회전하여 취부선에 일치할 수 있도록 힌지 결합부를 취부선의 주변에 설치하는 단계(S100);
상기 힌지 결합부에 쉐딩 플레이트를 결합시키되, 쉐딩 플레이트의 회전이 구속되도록 쉐딩 플레이트를 파형 격벽에 고정시키는 단계(S200);
상기 쉐딩 플레이트가 설치된 파형 격벽을 선체로 이송하여 파형 격벽들을 상호 연결시킴으로써 격벽을 형성하는 단계(S300); 및
상기 파형 격벽간의 연결을 위한 용접작업이 완료된 후, 쉐딩 플레이트의 구속을 해제하고, 쉐딩 플레이트를 회전시켜 취부선에 일치되도록 한 다음 용접하여 쉐딩 플레이트를 고정시키는 단계(S400)로 구성된 것을 특징으로 하는 화물창 격벽의 시공방법In constructing the cargo hold bulkhead using a plurality of corrugated bulkheads,
Installing a hinge coupling part to which the shedding plate is rotatably coupled to the corrugated partition wall, and installing the hinge coupling part around the mounting line such that the shedding plate rotates around the hinge coupling part to match the mounting line (S100);
Coupling a shedding plate to the hinge coupling unit and fixing the shedding plate to the corrugated partition wall so that rotation of the shedding plate is constrained (S200);
Transferring the corrugated partition wall in which the shedding plate is installed to the hull to interconnect the corrugated partition walls to form a partition wall (S300); And
After the welding operation for the connection between the corrugated bulkheads is completed, the restraint of the shedding plate, rotating the shedding plate to match the mounting line and then welding to fix the shedding plate (S400) Construction method of cargo hold bulkhead
상기 S200 단계는 쉐딩 플레이트와 파형 격벽의 부분적인 가용접을 통해 회전을 구속하는 것을 특징으로 하는 화물창 격벽의 시공방법.The method according to claim 3,
The step S200 is a cargo hold bulkhead construction method characterized in that the restraint of rotation through the partial welding of the shedding plate and the corrugated bulkhead.
상기 S100 단계는 파형 격벽의 연결부에 가장 근접한 곳에 위치한 돌출부의 측면에 힌지 결합부를 설치하는 것을 특징으로 하는 화물창 격벽의 시공방법.
The method according to claim 3,
In the step S100, the cargo hold bulkhead construction method, characterized in that the hinge coupling portion is installed on the side of the protrusion located closest to the connection portion of the corrugated bulkhead.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120029196A KR20130107436A (en) | 2012-03-22 | 2012-03-22 | Bulkhead of bulk carrier and method for installing bulkhead |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120029196A KR20130107436A (en) | 2012-03-22 | 2012-03-22 | Bulkhead of bulk carrier and method for installing bulkhead |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20130107436A true KR20130107436A (en) | 2013-10-02 |
Family
ID=49630739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120029196A KR20130107436A (en) | 2012-03-22 | 2012-03-22 | Bulkhead of bulk carrier and method for installing bulkhead |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20130107436A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103910027A (en) * | 2014-03-18 | 2014-07-09 | 谢合清 | Bottom structure of vertical corrugated bulkhead of ship |
CN106514081A (en) * | 2016-12-22 | 2017-03-22 | 浙江精功科技股份有限公司 | Welding track control method for horizontal-type corrugated plate H-section steel based on laser ranging |
CN110371238A (en) * | 2019-07-31 | 2019-10-25 | 广船国际有限公司 | Corrugated bulkhead and ship |
CN110466683A (en) * | 2019-08-22 | 2019-11-19 | 中船黄埔文冲船舶有限公司 | A kind of joining method splicing corrugated bulkhead positioning tool and corrugated bulkhead |
CN112550607A (en) * | 2020-12-01 | 2021-03-26 | 沪东中华造船(集团)有限公司 | Manufacturing method of duplex stainless steel trough bulkhead |
CN113371126A (en) * | 2021-07-29 | 2021-09-10 | 广船国际有限公司 | Groove type bulkhead discharge plate structure |
-
2012
- 2012-03-22 KR KR1020120029196A patent/KR20130107436A/en not_active Application Discontinuation
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103910027A (en) * | 2014-03-18 | 2014-07-09 | 谢合清 | Bottom structure of vertical corrugated bulkhead of ship |
CN106514081A (en) * | 2016-12-22 | 2017-03-22 | 浙江精功科技股份有限公司 | Welding track control method for horizontal-type corrugated plate H-section steel based on laser ranging |
CN110371238A (en) * | 2019-07-31 | 2019-10-25 | 广船国际有限公司 | Corrugated bulkhead and ship |
CN110466683A (en) * | 2019-08-22 | 2019-11-19 | 中船黄埔文冲船舶有限公司 | A kind of joining method splicing corrugated bulkhead positioning tool and corrugated bulkhead |
CN110466683B (en) * | 2019-08-22 | 2021-08-20 | 中船黄埔文冲船舶有限公司 | Positioning tool for splicing groove-shaped bulkhead and splicing method of groove-shaped bulkhead |
CN112550607A (en) * | 2020-12-01 | 2021-03-26 | 沪东中华造船(集团)有限公司 | Manufacturing method of duplex stainless steel trough bulkhead |
CN113371126A (en) * | 2021-07-29 | 2021-09-10 | 广船国际有限公司 | Groove type bulkhead discharge plate structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20130107436A (en) | Bulkhead of bulk carrier and method for installing bulkhead | |
AU2011365089B2 (en) | Folding-type container | |
US8942059B2 (en) | Container system for seismic cable and stations | |
RU2637257C2 (en) | Multifunctional pipe-laying vessel | |
JP6838795B2 (en) | A hull used as the outer shell of a floating hydrocarbon storage plant and / or a floating hydrocarbon processing plant, a method for manufacturing the hull, a ship equipped with the hull, and a method for manufacturing the ship having the hull. | |
ITMI20101739A1 (en) | CARGO VESSEL TO REFORM TUBES WITH A VESSEL FOR LAYING UNDERWATER PIPES, METHOD AND TRANSFER TUBE KITS FROM A CARGO VESSEL TO A VESSEL TO INSTALL UNDERWATER PIPES | |
JP2009149200A (en) | Container ship and container loading method for container ship | |
US20160339999A1 (en) | Method for conversion of a vessel for use as floating liquefied natural gas facility | |
KR101627663B1 (en) | Hatch cover | |
US20050186033A1 (en) | Apparatus and method | |
JP5917147B2 (en) | Transport system for nuclear fuel assembly containers | |
CN105667560B (en) | A kind of portable waste liquid transport vehicle | |
KR101962159B1 (en) | Main body of carrying box | |
CN106935294B (en) | A kind of underwater capacity reducing device of spentnuclear fuel associated component suitable for odevity unit | |
ES2411354T3 (en) | Apparatus for transporting construction equipment in a closed container inside the hold of a ship | |
KR101344140B1 (en) | Structure and method for mounting shedding plate of bulk carrier | |
Nakahira et al. | Design progress of the ITER blanket remote handling equipment | |
EA039688B1 (en) | Collapsible intermodal container and collapsible intermodal container assembly | |
KR20160001689U (en) | Handrail for ship | |
KR101873442B1 (en) | Remodeling method of container ship | |
KR101168032B1 (en) | Protector for cable reel of amp system | |
US7843163B1 (en) | Portable weather resistant enclosure | |
KR101783765B1 (en) | foldable marine loadimg arm | |
CN218316422U (en) | SUV communication command car | |
CN203743615U (en) | Limiting and locking structure of rigid arm of underwater structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WITN | Application deemed withdrawn, e.g. because no request for examination was filed or no examination fee was paid |