KR20130001459A - Bulk head for precast box girder mould - Google Patents

Bulk head for precast box girder mould Download PDF

Info

Publication number
KR20130001459A
KR20130001459A KR1020110062220A KR20110062220A KR20130001459A KR 20130001459 A KR20130001459 A KR 20130001459A KR 1020110062220 A KR1020110062220 A KR 1020110062220A KR 20110062220 A KR20110062220 A KR 20110062220A KR 20130001459 A KR20130001459 A KR 20130001459A
Authority
KR
South Korea
Prior art keywords
box girder
bulk head
guide roll
bulkhead
precast box
Prior art date
Application number
KR1020110062220A
Other languages
Korean (ko)
Other versions
KR101305917B1 (en
Inventor
정선희
Original Assignee
동도산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 동도산업 주식회사 filed Critical 동도산업 주식회사
Priority to KR1020110062220A priority Critical patent/KR101305917B1/en
Publication of KR20130001459A publication Critical patent/KR20130001459A/en
Application granted granted Critical
Publication of KR101305917B1 publication Critical patent/KR101305917B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

PURPOSE: A bulk head for a precast box girder form is provided to reduce the use of strands for manufacturing a precast box girder and to reduce the manufacturing time of the precast box girder. CONSTITUTION: A bulk head(10) for a precast box girder form comprises a bulk head(10) and a guide roll device(20). A pair of protective walls is attached to the outer surfaces of the top ends of side plates of the bulk head. Hinges for suspending the guide roll device are installed on the top ends of the protective walls. The guide roll device is installed on the top ends of the side plates of the bulk head, and the top end thereof is suspended in the hinges.

Description

프리캐스트 박스 거더 거푸집용 벌크 헤드{BULK HEAD FOR PRECAST BOX GIRDER MOULD} Bulk head for precast box girder formwork {BULK HEAD FOR PRECAST BOX GIRDER MOULD}

본 발명은 프리캐스트 박스 거더를 제작하는 거푸집의 양단에 조립하여 박스 거더의 단부를 성형하는 벌크 헤드에 관한 것이며, 특히 강연선의 절감과 박스 거더의 제작공기 단축에 역점을 프리캐스트 박스 거더 거푸집용 벌크 헤드에 관한 것이다. The present invention relates to a bulkhead for forming an end of a box girder by assembling it at both ends of a formwork for manufacturing a precast box girder, and in particular, a bulk for precast box girder formwork focusing on reducing the stranded wire and shortening the manufacturing air of the box girder. It's about the head.

종래에는 도 1에 예시한 바와 같이 프리캐스트 박스 거더 제작장에서는 거푸집(1)의 양단에 벌크 헤드(2)가 조립되고, 이 상태에서 거푸집(1)에 장전된 철근망에 복수의 강연선(3)를 배치한 다음 각 강연선(3)의 양단부를 거푸집(1)의 양단에 장착된 벌크 헤드(2)를 관통시키고, 각 강연선(3)의 양단부가 홀딩업장치(4)를 경유하도록 걸친 후에 홀딩업장치(4)의 외측으로 노출된 모든 강연선(3)의 단부를 반력대(5)의 웨지에 물리고 설계치에 상당하도록 긴장하여 프리스트레스를 부여한 후 콘크리트를 타설, 양생하여 박스 거더를 제작한 다음에 홀딩업장치(4)와 반력대(5) 사이에 놓인 강연선 부분 중에서 되도록 홀딩업장치(4)에 가까운 부분(6)을 가스 절단기 따위로 절단하는 순으로 제작한다.Conventionally, as illustrated in FIG. 1, in the precast box girder manufacturing site, the bulk heads 2 are assembled at both ends of the formwork 1, and in this state, a plurality of stranded wires 3 are mounted on the reinforcing bar network loaded on the formwork 1. ), And then both ends of each of the strands (3) through the bulk head (2) mounted on both ends of the formwork (1), and both ends of each of the strands (3) to pass through the holding up device (4) After the end of all strands 3 exposed to the outside of the holding-up device 4 is bitten by the wedge of the reaction table 5, and tensioned to correspond to the design value, prestress is applied, concrete is poured and cured to manufacture box girders. In the portion of the stranded wire placed between the holding-up device 4 and the reaction table 5, the portion 6 close to the holding-up device 4 is cut in such a manner as to cut the gas cutting machine.

벌크 헤드의 양측부는 좌우 대칭형이며, 벌크 헤드의 좌우 측판 상부에는 강연성이 통과할 강연선공이 천공되어 있다. 강연선공은 강연선과 동수이며, 모든 강연선공의 안팎 언저리는 모가 나 있다. 이렇게 모가 난 강연선공을 관통한 강연선을 수평으로 인장하면 강연선공의 외측 언저리에서 강연선에 꺾임현상이 발생한다. 강연선의 꺾임현상을 방치하면 강연선공의 편마모는 물론 강연선공 주변 벌크 헤드의 측판에 변형이 초래되고, 강연선공에 접촉된 강연성의 소선이 손상되기도 한다.Both sides of the bulk head are symmetrical in shape, and a line of holes for passing ductility is drilled in the upper left and right side plates of the bulk head. Lecturers are the same number as the Lecturers, and all of them are in and out. When the strand that penetrates the raised strand hole is stretched horizontally, bending occurs in the strand at the outer edge of the strand strand. The neglecting of the stranded ships causes deformation of the bulkhead of the stranded ships as well as the side plates of the bulkheads around the stranded ships, and damages the stranded wires in contact with the stranded ships.

홀딩업장치는 벌크 헤드의 강연선공으로 빠져나온 강연선의 단부를 걸쳐서 긴장시킬 때 강연선과 강연선공과의 마찰을 최소화하면서 반력대로 향하는 강연선의 단부가 예리한 각도로 꺾이지 않고 곡선형의 부드러운 꺾이도록 유도하여 강연선의 꺾임부를 보호하는 동시에 반력대와의 사이에서 강연선의 단부가 수평을 이루도록 반력대에 정착시켜 강연선이 보다 효과적으로 긴장되도록 돕고, 개개의 강연선이 일정한 간격으로 반력대에 웨지물림되도록 돕는 강연선 단부용 스페이서 역할을 하는 것이다. The holding-up device minimizes the friction between the strands and the strands when the tension lines are pulled out through the strands of the bulkhead, while inducing the ends of the strands facing the reaction zone to be curved smoothly without bending at sharp angles. Spacer end spacers to protect the bends of the strands and to allow the strands to be tensioned more effectively by settingtle on the reaction zones so that the ends of the strands are horizontal with the reaction zones, and to allow individual strands to wedge into the reaction zones at regular intervals. It is to play a role.

그러나 프리캐스트 박스 거더 거푸집에서 벌크 헤드와 반력대 사이에 홀딩업장치를 설치하여 박스 거더를 제작하면 벌크 헤드의 외측으로 노출된 강연선 부분이 필요 이상 길어진다. 이는 곧 강연선의 과잉 사용을 의미하며, 강연선의 과다 사용은 박스 거더의 제작원가 상승으로 이어져 박스 거더당 제작원가부담을 가중시키고 홀딩업장치의 설치와 홀딩업장에 강연선을 걸치는 작업은 박스 거더의 제작공기 지연을 초래하여 박스 거더의 제작능률을 떨어뜨리기도 한다.However, in the precast box girder formwork, if the holding girders are installed between the bulkhead and the reaction zone, the box girders are made longer than necessary to expose the strands to the outside of the bulkhead. This means that the use of stranded wire is excessive, and the excessive use of the stranded wire leads to an increase in the manufacturing cost of the box girder, which increases the production cost per box girder, and the installation of the holding up device and the hanging of the stranded wire at the holding place is the manufacture of the box girder. It can also cause air delays and reduce the manufacturing efficiency of the box girders.

본 발명의 목적은 프리캐스트 박스 거더 제작용 강연선의 절감과 박스 거더 제작공기의 단축에 따른 제작능률제고에 기여할 수 있는 프리캐스트 박스 거더 거푸집용 벌크 헤드를 제공하는 것이다.
It is an object of the present invention to provide a bulkhead for precast box girder formwork which can contribute to the reduction of the strand for producing precast box girder and the improvement of manufacturing efficiency according to the shortening of the box girder manufacturing air.

이들 과제는 양쪽 측판의 상단부에 복수의 강연선공이 천공된 채로 프리캐스트 박스 거더 거푸집의 양단에 조립되는 통상의 벌크 헤드를 전제로 하되, 상기 강연선공의 외측에 위치하여 강연선공을 관통해 나온 강연선의 단부가 곡선형으로 꺾여 반력대로 향하도록 유도하는 강연선용 안내롤장치를 설치하여 홀딩업장치의 기능을 대행하도록 한 프리캐스트 박스 거더 거푸집용 벌크 헤드로 달성할 수 있다.
These tasks are based on the assumption that a conventional bulkhead is assembled at both ends of the precast box girder formwork with a plurality of stranded holes drilled at the upper ends of both side plates, and the stranded vessels are located outside the stranded vessels and penetrate the stranded vessels. A bulkhead for precast box girder formwork can be achieved by installing a guide roll device for a stranded ship that guides the end portion of the end portion to be curved and directed toward the reaction force.

종래의 홀딩업장치를 대체한 안내롤장치가 벌크 헤드에 수용됨에 따라 벌크 헤드와 반력대간의 거리가 단축된다. 이는 곧 강연선의 길이단축을 의미한다. 프리캐스트 박스 거더당 수 십 가닥의 강연선이 소요되는 점을 고려하면 강연선의 절감량은 실로 막대하다. 이에 따라 프리캐스트 박스 거더의 제작원가도 크게 낮아진다.As the guide roll device replacing the conventional holding up device is accommodated in the bulk head, the distance between the bulk head and the reaction force band is shortened. This means shortening of the strand. Given the tens of strands per precast box girder, the savings in the strands are enormous. As a result, the manufacturing cost of the precast box girder is greatly reduced.

또, 홀딩업장치를 별도로 설치하고 여기에 다수의 강연선을 걸치는 작업은 많은 시간을 요하지만, 본 발명의 벌크 헤드를 활용하면 그 측판에 천공된 강연선공으로 강연선의 단부가 관통하는대로 안내롤장치의 각 롤 위에 걸쳐지게 되므로 강연선의 단부를 반력대에 고정하기 위한 작업이 수월해 그에 상응하는 만큼 프리캐스트 박스 거더의 제작기간도 단축된다.
In addition, it is necessary to install a separate holding-up device and apply a large number of stranded wires to it, but using the bulk head of the present invention, the guide roll device as the end of the stranded wires passes through the stranded wire drilled in the side plate. Since it is spread over each roll of the roll, it is easy to fix the end of the strand to the reaction zone, and correspondingly, the manufacturing time of the precast box girder is shortened.

도 1은 종래 프리캐스트 박스 거더 제작장치의 개념도
도 2는 본 발명에 의한 벌크 헤드의 정면도
도 3은 안내롤장치가 안장될 벌크 헤드의 보호벽부 사시도
도 4는 안내롤장치의 사시도
도 5는 본 발명의 벌크 헤드가 적용된 박스 거더 제작장치의 개념도
도 6은 도 5에서 보호벽측 종단측면도
도 7은 벌크 헤드의 강선공을 관통한 강연선이 안내롤장치의 롤에 걸쳐진 부분의 예시도
1 is a conceptual diagram of a conventional precast box girder manufacturing apparatus
2 is a front view of the bulk head according to the present invention;
3 is a perspective view of a protective wall of the bulkhead to which the guide roll device is to be seated;
4 is a perspective view of the guide roll device
5 is a conceptual diagram of a box girder manufacturing apparatus applied a bulk head of the present invention
6 is a longitudinal cross-sectional side view of the protective wall in FIG.
Figure 7 is an illustration of a portion of the strand extending through the steel wire hole of the bulk head over the roll of the guide roll device;

도 2에서, 본 발명에서 제안하는 프리캐스트 박스 거더 거푸집용 벌크 헤드(10)는 측판(11)의 상단부에 안내롤장치(20)가 설치되어 있다. 즉, 강연선공이 위치한 벌크 헤드(10)의 양쪽 측판(11) 상단부에 거푸집쪽에서 강연선공으로 관통한 강연선의 단부를 걸쳐서 반력대로 향하게 유도하는 안내롤장치(20)가 설치된 것이다. In Figure 2, the bulkhead 10 for precast box girder formwork proposed in the present invention is provided with a guide roll device 20 in the upper end of the side plate (11). That is, the guide roll device 20 is guided to the reaction force over the end portions of the stranded line penetrating into the stranded line hole from the die side to the upper end of both side plates 11 of the bulkhead 10 where the stranded line is located.

도 3과 함께 살펴보면, 벌크 헤드(10)의 양쪽 측판(11) 상단부에는 안내롤장치(20)가 벌크 헤드(10)의 옆방향으로 유동하지 못하게 가두는 한 쌍의 보호벽(12)이 나란히 부착되어 있고, 이들 보호벽(12)의 위쪽에는 힌지방식으로 안내롤장치(20)를 설치하기 위한 돌쩌귀(13)가 설치되어 있으며, 돌쩌귀(13)에는 힌지축(14)이 꽂힌다.Referring to FIG. 3, a pair of protective walls 12 are attached to the upper end portions of both side plates 11 of the bulk head 10 to prevent the guide roll device 20 from flowing sideways of the bulk head 10. The top 13 of these protective walls 12 is provided with a hinge 13 for installing the guide roll device 20 in a hinged manner, the hinge shaft 14 is inserted into the hinge 13.

프리캐스트 박스 거더에 프리스트레스를 부여하려고 반력대쪽에서 강연선을 긴장할 때에 벌크 헤드(10)의 강연선공과 반력대측 강연선 긴장구간에 측방향으로 미세한 편차가 발생할 수 있다. 이 편차는 반력대의 웨지와 벌크 헤드측 강연선공 사이에 위치한 안내롤장치(20)의 안내롤이 강연선공과 웨지를 직선으로 잇는 선상에 정위치하지 않을 때 주로 발생한다. 이 때 만약 반력대쪽에서 강연선을 긴장할 때 안내롤장치(20)가 그 편차에 상응하는 움직임을 보이지 않는다면 힌지축(14)과 돌쩌귀(13)는 물론 안내롤장치(20)의 현수봉(26)에까지 무리가 가해져 변형되거나 안내롤장치(20)의 자세가 불안정해지고 이로 인하여 강연선 안내기능에 지장을 초래할 우려가 있다.When tensioning the strand on the reaction force side to impart prestress to the precast box girder, minor deviations in the lateral direction may occur between the strand of the bulkhead 10 and the tension of the reaction force side strand. This deviation mainly occurs when the guide roll of the guide roll device 20 located between the wedge of the reaction zone and the bulkhead side strand ball is not positioned on the line connecting the strand ball and the wedge in a straight line. At this time, if the guide roll device 20 does not show the movement corresponding to the deviation when the tension line is tensioned from the reaction force side, the hinge rod 14 and the handle 13 as well as the suspension rod 26 of the guide roll device 20. There is a fear that the force is applied to deform or deform or the position of the guide roll device 20 becomes unstable, thereby causing a problem in the guide line function.

돌쩌귀(13)는 안내롤장치(20)의 상단에 부착된 현수봉(26)이 힌지식으로 설치되어 보호벽(12)에 갇힘에 따라 안내롤장치(20)가 측방향으로 유동제한을 받긴하지만 보호벽(12)의 내면과 안내롤장치(20)의 롤대(21)의 외측면 사이에 주어진 공차 범위 내에서 측방향으로 제자리 선회할 수 있는 여유를 부여하기 위해 필요한 안내롤장치용 지지수단이다. 돌쩌귀(13)는 벌크 헤드(10)의 폭방향과 평행하게 부착된다.The handle 13 has a suspension rod 26 attached to the top of the guide roll device 20 hingedly installed and trapped in the protective wall 12, although the guide roll device 20 receives a flow restriction in the lateral direction. It is a supporting means for the guide roll device necessary to give a clearance for turning in the lateral direction within a given tolerance range between the inner surface of the protective wall 12 and the outer surface of the roll base 21 of the guide roll device 20. The handle 13 is attached in parallel with the width direction of the bulk head 10.

도 4에서, 안내롤장치(20)는 횡방향으로 일정한 간격을 두고 배열된 빗살형 롤대(21)에 가로 및 세로방향으로 정연하게 회전형 롤(22)이 롤대(21)를 가로지르게 꿴 롤축(23) 상에서 공회전 가능하게 설치되고, 롤대(21)는 그 상단부를 벌크 헤드(10)의 폭방향으로 관통한 횡핀(25)에 의해 롤대 지지판(24)과의 결합상태가 유지된다.In Fig. 4, the guide roll device 20 is a roll shaft in which the rotatable roll 22 traverses the roll stand 21 in a horizontal and vertical direction to the comb-shaped roll stand 21 arranged at regular intervals in the transverse direction. The roll stand 21 is installed so as to be idling on the 23, and the roll stand 21 is held in engagement with the roll stand support plate 24 by a horizontal pin 25 that penetrates the upper end portion in the width direction of the bulk head 10.

롤대 지지판(24)의 중앙에는 현수봉(26)이 부착되어 있다. 이 현수봉(26)은 상기 돌쩌귀(13)의 힌지축(14)에 안내롤장치(20)를 매다는데 필요한 요소로서, 종형 봉이며, 그 상단에는 돌쩌귀(13)와 나란하며 힌지축(14)에 설치하기 위한 힌지축공이 천공된 돌쩌귀형 현수판(27)이 부착되어 있다. A suspension rod 26 is attached to the center of the roll base support plate 24. The suspension rod 26 is an element necessary for attaching the guide roll device 20 to the hinge shaft 14 of the handle 13, which is a vertical rod, and the hinge shaft 14 is parallel to the handle 13 at the upper end thereof. A hinge-shaped suspension plate 27 having a perforated hinge shaft hole for installation is attached thereto.

도 5는 안내롤장치(20)가 설치된 벌크 헤드(10)를 통상대로 박스 거더 거푸집의 양단에 장착하고, 박스 거더 거푸집 내에 배치된 모든 강연선(3)의 단부를 벌크 헤드(10)의 각 강연선공으로 빼내서 안내롤장치(20)의 각 롤(22)에 개별적으로 걸친 다음 반력대(5)에 물린 상태를 예시한 것이다. FIG. 5 shows that the bulk head 10 provided with the guide roll device 20 is normally mounted at both ends of the box girder formwork, and the ends of all the strands 3 arranged in the box girder formwork are each lectured in the bulk head 10. The state of being removed by the piercing and then biting by the reaction table 5 separately covering each roll 22 of the guide roll apparatus 20 is illustrated.

홀딩업장치가 배제되느니만치 반력대(5)를 벌크 헤드(10)에 보다 가까이 배치할 수 있다. 이에 따라 강연선의 기장을 종전 보다 짧게 설계할 수 있어서 강연선이 절감되는 것이다. 통상 박스 거더에는 수 십 가닥의 강연선이 설치되는 점을 감안하면 강연선의 절감효과가 아주 크다. 그리고 박스 거더가 완성된 후에 강연선 단부의 절단위치는 반력대(5)와 안내롤장치(20) 사이에 걸쳐진 강연선부분 중에서 안내롤장치(20)에 근접한 부분이다. As long as the holding up device is excluded, the reaction table 5 can be placed closer to the bulk head 10. Accordingly, the length of the strand can be designed shorter than before, thereby reducing the strand. Considering that tens of strands of strands are usually installed in the box girders, the reduction of the strands is very large. And after the box girder is completed, the cutting position of the end of the strand line is a portion close to the guide roll apparatus 20 among the portions of the strand line spanned between the reaction table 5 and the guide roll apparatus 20.

도 6에서, 벌크 헤드(10)의 보호벽(12) 사이에 안내롤장치(20)가 안장되고 돌쩌귀(13)의 축공에 현수판(27)의 축공을 일치시킨 다음에 힌지축(14)을 꽂아 고정하면 간단하게 벌크 헤드(10)에 안내롤장치(20)를 설치할 수 있다. 각 롤(22)은 벌크 헤드(10)의 측판 상단부에 위치한 강선공(15)의 외측에 정렬된다. In FIG. 6, the guide roll device 20 is seated between the protective walls 12 of the bulk head 10 and the shaft hole of the suspension plate 27 is aligned with the shaft hole of the hinge 13 and then the hinge shaft 14 is moved. When plugged in and fixed, the guide roll device 20 can be easily installed in the bulk head 10. Each roll 22 is aligned to the outside of the steel ball 15 located in the upper end of the side plate of the bulk head 10.

도 7에서, 거푸집(40) 쪽에서 벌크 헤드(10)의 강연선공(15)을 관통해 나온 강연선(30)의 단부는 롤(22)에 걸쳐진 후 반력대에 물려 고정하게 되는 데, 롤(22)의 정점 부분에 걸쳐지는 강연선(30)에 있어서 벌크 헤드(10)측 강연선공 영역 부분은 강연선부는 강연선공(15)의 내주면과 그 언저리에 접촉되지 않아야 강연선공 영역의 강연선부와 강연선공(15)의 보호에 이롭다. 안내롤장치(20)는 이 점을 의식하여 설치하는 것을 원칙으로 한다.
In FIG. 7, the ends of the strands 30 penetrating through the strand wire holes 15 of the bulk head 10 on the formwork 40 are caught by the reaction zone and fixed by the reaction zone. In the strand 30 extending over the apex portion of the bulkhead 10, the portion of the strand area of the bulkhead 10 side should not be in contact with the inner circumferential surface of the strand line 15 and the edge thereof. 15) beneficial to the protection. In principle, the guide roll device 20 is installed in consideration of this point.

10: 벌크 헤드
11: 측벽
12: 보호벽
13: 돌쩌귀
20: 안내롤장치
21: 롤대
22: 롤
27: 현수판
10: bulkhead
11: sidewall
12: protective wall
13: stone
20: guide roll device
21: roll stand
22: roll
27: placard

Claims (2)

강연선공이 위치한 벌크 헤드(10)의 양쪽 측판(11) 상단부 외면에 한 쌍의 보호벽(12)이 나란히 부착되고, 보호벽(12)의 상단에 안내롤장치 현수용 돌쩌귀(13)가 설치된 벌크 헤드(10)와, 상기 보호벽(12) 내에 안장된 채로 상기 돌쩌귀(13)에 상단을 힌지식으로 매단 강연선용 안내롤장치(20)로 이루어진 것을 특징으로 하는 프리캐스트 박스 거더 거푸집용 벌크 헤드. A pair of protective walls 12 are side by side attached to the outer surface of the upper end of both side plates 11 of the bulkhead 10 in which the stranded ship is located, and the bulkhead is provided with a guide roll device suspension 13 on the top of the protective wall 12. And a bulkhead for precast box girder formwork, comprising a guide roll device for hanging strands hinged to the top 13 with a saddle in the protective wall 12. 제1항에 있어서,
안내롤장치(20)는 횡방향으로 일정한 간격을 두고 배열된 빗살형 롤대(21)에 가로 및 세로방향으로 정연하게 회전형 롤(22)이 롤대(21)를 가로지르게 꿴 롤축(23) 상에서 공회전 가능하게 설치되고, 롤대(21)는 그 상단부를 벌크 헤드(10)의 폭방향으로 관통한 횡핀(25)에 의해 롤대 지지판(24)과의 결합상태가 유지되며, 롤대 지지판(24)의 중앙에는 상단에 돌쩌귀형 현수판(27)이 부착된 현수봉(26)이 부착된 프리캐스트 박스 거더 거푸집용 벌크 헤드.
The method of claim 1,
The guide roll device 20 is formed on the roll shaft 23 in which the rotatable roll 22 crosses the roll stand 21 in a horizontal and vertical direction to the comb-shaped roll stand 21 arranged at regular intervals in the transverse direction. The roll stand 21 is installed to be idle, and the state of engagement with the roll stand support plate 24 is maintained by the horizontal pin 25 penetrating its upper end portion in the width direction of the bulk head 10. Bulkhead for precast box girder formwork with a suspension rod 26 attached to the top with a dowel-type suspension plate 27 at the center.
KR1020110062220A 2011-06-27 2011-06-27 Bulk head for precast box girder mould KR101305917B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110062220A KR101305917B1 (en) 2011-06-27 2011-06-27 Bulk head for precast box girder mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110062220A KR101305917B1 (en) 2011-06-27 2011-06-27 Bulk head for precast box girder mould

Publications (2)

Publication Number Publication Date
KR20130001459A true KR20130001459A (en) 2013-01-04
KR101305917B1 KR101305917B1 (en) 2013-09-09

Family

ID=47834493

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110062220A KR101305917B1 (en) 2011-06-27 2011-06-27 Bulk head for precast box girder mould

Country Status (1)

Country Link
KR (1) KR101305917B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108103937A (en) * 2017-11-24 2018-06-01 中国建筑第八工程局有限公司 Utilize the cast-in-place box beam construction method of native loose tool substitution falsework
CN108951423A (en) * 2018-07-09 2018-12-07 云南春鹏钢绞线有限公司 A kind of steel strand penetrating device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100966313B1 (en) * 2009-09-21 2010-06-28 동방엔지니어링 주식회사 Mold for bridge floor having steel wire guide structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108103937A (en) * 2017-11-24 2018-06-01 中国建筑第八工程局有限公司 Utilize the cast-in-place box beam construction method of native loose tool substitution falsework
CN108951423A (en) * 2018-07-09 2018-12-07 云南春鹏钢绞线有限公司 A kind of steel strand penetrating device

Also Published As

Publication number Publication date
KR101305917B1 (en) 2013-09-09

Similar Documents

Publication Publication Date Title
JP4252982B2 (en) Bridge and bridge construction method
JP5164004B2 (en) Manufacturing method of pretension PC member
JP5894039B2 (en) Anchor cable fixing structure
US10017942B2 (en) Rebar wall set-up bar
CN104278637A (en) No-catwalk cableway erecting method for main cable strands of suspension bridge
JP5252397B2 (en) Column head construction method for PC bridge
KR20130131866A (en) Rebar structure of void concrete slab
KR101305917B1 (en) Bulk head for precast box girder mould
JP2018112024A (en) Reinforcement cage relocation device
KR100960508B1 (en) Apparatus for supporting steel-concrete composite girder and method of manufacturing steel composite girder using thereof
JP4847805B2 (en) Cable laying method
CN106012834B (en) A kind of spatial warping curve abnormal shape antisymmetry steel king-tower inner support and tensioning system
KR102594890B1 (en) Apparatus for manufacturing prestressed precast hollow core slab
JP5693869B2 (en) Bridge girder construction method
KR101807234B1 (en) Apparatus for introducing compressive force in slab of a bridge and method for constructing a bridge having the same
KR101389044B1 (en) Steel girders for bridges and its production method
JP5427657B2 (en) Tensile force release device and tension release method
CN208266661U (en) Cable-stayed bridge wide cut beam lattice main beam structure and combinations thereof template system
JP6713419B2 (en) Suspension method and suspension structure
CN110948676A (en) Prefab steel tensioning device
CN205934723U (en) Support and a push -pull system in spatial warping curve abnormal shape antisymmetry steel king -tower
JP4276731B2 (en) Cable wiring method and wiring device
KR20100133653A (en) Tension frame for manufactyring prestressed concrete beam girder of pretension type, and method for installing tendons using tension frame
CN214163463U (en) Prestressed concrete steel bar truss prefabricated plate production facility
KR20190111591A (en) An up-down guide apparatus for slab form

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160829

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170904

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180911

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20191021

Year of fee payment: 7