JP4847805B2 - Cable laying method - Google Patents

Cable laying method Download PDF

Info

Publication number
JP4847805B2
JP4847805B2 JP2006178019A JP2006178019A JP4847805B2 JP 4847805 B2 JP4847805 B2 JP 4847805B2 JP 2006178019 A JP2006178019 A JP 2006178019A JP 2006178019 A JP2006178019 A JP 2006178019A JP 4847805 B2 JP4847805 B2 JP 4847805B2
Authority
JP
Japan
Prior art keywords
cable
strand
strands
shaping jig
temporary shaping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006178019A
Other languages
Japanese (ja)
Other versions
JP2008007998A (en
Inventor
渡 大橋
洋 木部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SE Corp
Original Assignee
SE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SE Corp filed Critical SE Corp
Priority to JP2006178019A priority Critical patent/JP4847805B2/en
Publication of JP2008007998A publication Critical patent/JP2008007998A/en
Application granted granted Critical
Publication of JP4847805B2 publication Critical patent/JP4847805B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、例えば、斜張橋ケーブル等において、主桁と主塔との定着部間に架設される緊張材を、効率的な作業で束ねる斜張ケーブルの架設方法に関するものである。   The present invention relates to a cable laying method for bundling tension members laid between fixing portions between a main girder and a main tower in an efficient work, for example, in a cable-stayed bridge cable.

従来、斜張橋や吊り橋等におけるケーブル21は、図6乃至図7(A)に示すように、主桁3と主塔7との定着部8,9間にガイドワイヤーなどで先導させてポリエチレン(PE)被覆されたストランド4をアンカーヘッド18の円錐型貫通孔20に挿通させクサビ19で止めて架設し、その後、定着部にセットしたジャッキで前記ストランド4を緊張させ前記クサビ19で締め込み、これを複数本のストランド4に各々施工し均一な張力にした後に、前記複数本のストランド4全部を纏めてジャッキで緊張させて定着させていたものが知られている。   Conventionally, as shown in FIGS. 6 to 7A, the cable 21 in a cable-stayed bridge, a suspension bridge, or the like is guided by a guide wire or the like between the fixing portions 8 and 9 of the main girder 3 and the main tower 7, and is made of polyethylene. (PE) The coated strand 4 is inserted into the conical through hole 20 of the anchor head 18 and fixed with a wedge 19, and then the strand 4 is tensioned with a jack set on the fixing portion and tightened with the wedge 19. In addition, it is known that each of the plurality of strands 4 is applied to a uniform tension, and then all the plurality of strands 4 are gathered and fixed with a jack.

前記ケーブル21は、前記アンカーヘッド18の円錐型貫通孔が所要間隙をおいて同心円状に配設されていることから、間隙をおいて平行に架設されたストランドをそのまま外套保護管でカバーすると、この外套保護管10aの直径が大きくなる。すると、風雨の影響でケーブル21が振動することがあり、定着具の損傷につながる。そこで、このケーブル21に高減衰ゴム等のダンパーを設けて振動を吸収する対策があり、ケーブル21を束ねるクランプと主桁に一端が固定された前記ダンパーとを接続する方法がある。   In the cable 21, since the conical through-holes of the anchor head 18 are arranged concentrically with a required gap, if the strands laid in parallel with a gap are directly covered with a mantle protective tube, The diameter of the mantle protective tube 10a is increased. Then, the cable 21 may vibrate under the influence of wind and rain, leading to damage to the fixing tool. Therefore, there is a countermeasure for absorbing vibration by providing a damper such as a high damping rubber on the cable 21, and there is a method of connecting a clamp for bundling the cable 21 and the damper having one end fixed to the main girder.

また、前記振動対策として、前記ケーブル21の振動の発生それ自体を抑えるために、可能な限り当該ケーブル21の直径を小さくする方法がある。そこで、図7(B)に示すように、前記複数本のストランド4をクランプ材22で一本に束ねることによって、外套保護管10bの直径を可能な限り小さくするものである。   As a countermeasure against the vibration, there is a method of reducing the diameter of the cable 21 as much as possible in order to suppress the occurrence of the vibration of the cable 21 itself. Therefore, as shown in FIG. 7B, the diameter of the outer tube 10b is made as small as possible by bundling the plurality of strands 4 together with the clamp material 22.

それには、従来、前記主塔と主桁との両定着部間に適宜間隔を有して平行状態に架設・緊張された複数本のストランドを、一対の仮クランプにより複数本のストランドを例えば六角形状に整形して束ね、その後、本設クランプで束ねて一本のケーブルにする、ケーブルの架設方法が知られている(特許文献1、特許文献2参照)。
特開平08−27725号公報 特開2000−282409号公報
For this purpose, conventionally, a plurality of strands constructed and tensioned in parallel with an appropriate interval between the fixing portions of the main tower and the main girder, and a plurality of strands, for example, hexagons by a pair of temporary clamps. A cable erection method is known that is shaped and bundled into a shape and then bundled with a permanent clamp to form a single cable (see Patent Document 1 and Patent Document 2).
Japanese Patent Laid-Open No. 08-27725 JP 2000-282409 A

しかし、従来の斜張ケーブルの架設方法では、保護管にストランドを挿通させて定着部間に平行に緊張して架設したストランドに、一対の仮クランプをボルトでケーブルの半径方向に締め込む工法、若しくは、階段状のクランプで位置規制して束ねる工法なので、保護管の径を小さくすると、パイロットケーブルでストランドを引き上げて保護管に挿通させる作業において、挿通させたストランドの数が増えるに従って、挿通済みのストランドが絡み合うようになって邪魔になり、次第にストランドを挿通させることが困難となる。ストランドを保護管に挿通させる作業能率を良くして、作業工数の低減と工期短縮が要望される。本発明に係る斜張ケーブルの架設方法は、このような課題を解決するために提案されたものである。   However, in the conventional cable laying method, a pair of temporary clamps are tightened in the radial direction of the cable with bolts on the strands that are laid in parallel with the fixing tube by inserting the strands through the protective tube, Or, it is a method of bundling by regulating the position with a stepped clamp, so if you reduce the diameter of the protective tube, in the work of pulling up the strand with the pilot cable and inserting it into the protective tube, it is already inserted as the number of inserted strands increases The strands become intertwined and get in the way, and it becomes difficult to gradually insert the strands. There is a demand for a reduction in work man-hours and a shortened work period by improving the work efficiency of inserting the strands into the protective tube. The cable laying method according to the present invention has been proposed in order to solve such a problem.

本発明に係る斜張ケーブルの架設方法の上記課題を解決して目的を達成するための要旨は、複数本のストランドを保護管に挿通させてその端部を主塔側と主桁側とにおける両定着部間に架設するに際し、前記複数本のストランドの内、一つに整形して束ねた場合の上側の一部のストランドを前記両定着部間に架設して緊張させ、前記定着部のシース管における自由端開口部に、前記架設した上側の一部のストランドを当該ストランドの架設位置よりも下げた位置に仮固定する仮設整形治具を取り付けて仮固定し、その後、残りのストランドを前記保護管に挿通させ前記両定着部間に架設して緊張し、前記複数本のストランドを本設のクランプ部材で纏めて束ね、その後、前記仮設整形治具を前記シース管の 自由端開口部から撤去することである。   The gist for solving the above-mentioned problems of the cable laying method according to the present invention to achieve the object is to insert a plurality of strands into a protective tube and to connect the ends thereof on the main tower side and the main girder side. When laying between both fixing portions, among the plurality of strands, a part of the upper strand when the strands are shaped and bundled is laid between the fixing portions to be tensioned, and the fixing portion At the free end opening of the sheath tube, a temporary shaping jig for temporarily fixing a part of the above-constructed upper strand at a position lower than the installation position of the strand is temporarily fixed, and then the remaining strands are fixed. Passing through the protective tube, laying between the fixing portions and tensioning them, and bundling the plurality of strands together with a permanent clamp member, and then attaching the temporary shaping jig to the free end opening of the sheath tube Is to remove from The

前記仮設整形治具には、ストランドを当該仮設整形治具の内側に押さえるガイド部材が設けられていること、;
前記ガイド部材は、仮設整形治具に着脱自在であると共に、ストランドを内側に押さえる角度が可変できるものであること、;
を含むものである。
The temporary shaping jig is provided with a guide member for holding the strand inside the temporary shaping jig;
The guide member is detachable from the temporary shaping jig and can change the angle at which the strand is pressed inside;
Is included.

本発明の斜張ケーブルの架設方法によれば、複数本のストランドの内、上側の一部を定着部間に架設した後に、仮設整形治具により整形されて、その後、架設されるストランドは、束ねた場合のケーブル全体の断面においてその上側部分のストランドが密集した状態になる。ストランドを両定着部間に全部架設した後に、本設のクランプ部材で前記ストランドを束ねる際に、前記ケーブル全体の上側部分が整形された密集状態になっているので、2分割体の前記クランプで挟んで束ねる作業が行いやすくなり、作業能率が向上する。
また、前記仮設整形治具には、ガイド部材が設けられていて、ケーブル全体の下部のストランドが両定着部間に架設される際に、当該治具の内側に押さえるように規制する。よって、2分割体の本設のクランプで前記ストランドを束ねるときに、前記ガイド部材でストランドが収束されて、ストランドを束ねる作業が容易となる。
更に、前記ガイド部材が仮設整形治具に着脱自在であると共に、ストランドを内側に押さえる角度が可変できるものであれば、架設するストランドの本数に対応してガイド部材の長さを太さを変えたり、ストランドガイド用の角度を適宜に変更することが可能となり、より便宜な治具になる。
According to the cable laying method of the present invention, after a part of the upper side of the plurality of strands is laid between the fixing portions, the strand is shaped by a temporary shaping jig, and then the laid strand is In the cross section of the entire cable when bundled, the strands in the upper part thereof are in a dense state. After the strands are completely installed between the fixing portions, when the strands are bundled with the permanent clamp member, the upper part of the entire cable is in a compacted state. The work of pinching and bundling becomes easier and the work efficiency is improved.
Further, the temporary shaping jig is provided with a guide member, and when the lower strand of the entire cable is installed between the fixing portions, the temporary shaping jig is regulated so as to be pressed inside the jig. Therefore, when the strands are bundled by the two-piece permanent clamp, the strands are converged by the guide member, and the operation of bundling the strands becomes easy.
Further, if the guide member can be attached to and detached from the temporary shaping jig and the angle at which the strand is pressed inward is variable, the length of the guide member is changed according to the number of strands to be installed. Or the strand guide angle can be changed as appropriate, which makes the jig more convenient.

本発明に係る斜張ケーブルの架設方法は、図1に示すように、まず、斜張橋における主桁側と主塔側とにおける定着部のシース管1において、その 自由端開口部1aのフランジ1bにボルト・ナットて固定する仮設整形治具2を形成する。   As shown in FIG. 1, the cable laying method according to the present invention is as follows. First, in the sheath tube 1 of the fixing portion on the main girder side and the main tower side of the cable-stayed bridge, the flange of the free end opening 1a is provided. A temporary shaping jig 2 to be fixed to 1b with bolts and nuts is formed.

前記仮設整形治具2は、前記筒体であるシース管1のフランジ1bの形状の半割りに対応した形状で所要板厚の金属製基板2aと、該基板2aの下位置で両側に溶接等で固着された金属製ネジ基台ブロック2b,2dと、同じく上部に溶接等で固着された金属製ネジ基台2cと、該ネジ基台2b,2dとネジ基台2cとに進退自在に螺合されるネジ棒2e,2g,2fと、該ネジ棒2e,2g,2fによって押圧される半六角型整形用ブロック2hと、該整形用ブロック2hに八状に固着された一対のガイド部材2iとで、構成されている。   The temporary shaping jig 2 has a shape corresponding to a half of the shape of the flange 1b of the sheath tube 1 which is the cylindrical body, a metal substrate 2a having a required plate thickness, and welding on both sides at a position below the substrate 2a. The metal screw base blocks 2b and 2d fixed in the above, the metal screw base 2c fixed to the upper part by welding or the like, and the screw bases 2b and 2d and the screw base 2c are screwed so as to be able to advance and retreat. Screw rods 2e, 2g, 2f to be combined, a semi-hexagonal shaping block 2h pressed by the screw rods 2e, 2g, 2f, and a pair of guide members 2i fixed to the shaping block 2h in eight shapes And is composed of.

前記基板2aは、ボルト・ナットにより取付孔に挿通させてフランジ1bに、着脱自在に固定される。前記ネジ棒2e,2g,2fの先端部の当て板2jは、前記整形用ブロック2hを押圧する盤体である。   The board 2a is detachably fixed to the flange 1b by being inserted into the mounting hole with bolts and nuts. The contact plate 2j at the tip of the screw rods 2e, 2g, and 2f is a disc body that presses the shaping block 2h.

前記整形用ブロック2hは、ストランドを整列させるものであり、六角形状の半分の形状になっている。この幅は任意であるが、上部のストランド列を押さえるので該ストランドのポリエチレン(PE)被覆を傷つけないような幅にする。また、前記ガイド部材2iは、金属棒であって下に八の字形にして、半六角形状の傾斜した辺に沿って溶接等の手段で固定されている。このガイド部材2iの長さは、シース管1にほぼ届く長さにする。   The shaping block 2h aligns the strands and has a half shape of a hexagon. This width is arbitrary, but the width is set so as not to damage the polyethylene (PE) coating of the strand because the upper strand row is pressed. Further, the guide member 2i is a metal bar having an octagonal shape at the bottom, and is fixed by means such as welding along the inclined side of the semi-hexagon. The length of the guide member 2i is set so as to reach the sheath tube 1 almost.

次に、上記仮設整形治具2を使用して施工する、本発明に係るケーブルの架設方法について説明する。図2に示すように、斜張橋において、主桁3側の定着部にシース管1が設けられ、アンカーヘッド3aが定着ナット3bで定着されている。主桁3の上に露出して主塔側に向いた 自由端開口部1aには、端部にフランジ1bが設けられている。   Next, a cable laying method according to the present invention that is constructed using the temporary shaping jig 2 will be described. As shown in FIG. 2, in the cable-stayed bridge, the sheath tube 1 is provided at the fixing portion on the main girder 3 side, and the anchor head 3a is fixed by the fixing nut 3b. A flange 1b is provided at the end of the free end opening 1a exposed on the main beam 3 and facing the main tower.

主桁3側から、PE被覆されたストランド4をPE製の保護管5に挿通させて主塔側に送り込むために、ドラム等から引き出した前記ストランド4を、例えば、プッシングマシン6で押し上げたり、距離的に長い場合には予め保護管5に挿通させ降下させたパイロットケーブルをストランド4の端部に繋着させて該パイロットケーブルによって引き上げたりする。そして、主塔側の定着のシース管の定着部と主桁側のシース管1の定着部とに、ストランドの端部を処理してアンカーヘッドの円錐孔にウエッジで止めて前記最初のストランド4を架設する。このストランド4を架設後に、ジャッキで緊張させるが、前記保護管5の重みで下に垂れ下がる状態になる。   From the main girder 3 side, in order to insert the PE-coated strand 4 through the PE protective tube 5 and send it to the main tower side, the strand 4 drawn out from the drum or the like is pushed up by, for example, a pushing machine 6, If the distance is long, the pilot cable inserted and lowered in advance through the protective tube 5 is connected to the end of the strand 4 and pulled up by the pilot cable. Then, the ends of the strands are processed into the fixing portion of the fixing sheath tube on the main tower side and the fixing portion of the sheath tube 1 on the main girder side, and are fastened to the conical hole of the anchor head with a wedge, and the first strand 4 Is installed. After the strand 4 is installed, it is tensioned with a jack, but the strand 4 hangs down by the weight of the protective tube 5.

図3に示すように、複数本のストランド4の内、例えば、六角形状で一つに整形して束ねた場合の、上側の一部のストランド4を前記両定着部間に架設して緊張させる。例えば、ストランド4が全部で19本の場合には、上側の一列が3本、または、24本の場合には上側の一列が4本、となる。   As shown in FIG. 3, among the plurality of strands 4, for example, in a case where the strands 4 are shaped into a hexagonal shape and bundled, the upper part of the strands 4 is laid between the fixing portions and is tensioned. . For example, when the number of strands 4 is 19 in total, there are three upper rows, or in the case of 24 strands, there are four upper rows.

次に、主桁3側若しくは主塔側における前記定着部のシース管1におけ 自由端開口部1aに、図4に示すように、前記架設した上側の一部のストランド4,4…を当該ストランド4,4…の架設位置よりも下げた位置に仮固定する、仮設整形治具2をボルト・ナットで取り付けて仮固定する。これには、ネジ基台ブロック2b,2c,2dを有する基板2aをフランジ1bに、ボルト・ネットをボルト孔に挿通させ締結して定する。   Next, as shown in FIG. 4, a part of the upper strands 4, 4,... Laid on the upper end of the sheath pipe 1 of the fixing portion on the main girder 3 side or the main tower side, as shown in FIG. A temporary shaping jig 2 that is temporarily fixed at a position lower than the installation position of the strands 4, 4. For this, the base plate 2a having the screw base blocks 2b, 2c, 2d is inserted into the flange 1b, and the bolt / net is inserted into the bolt hole and fastened.

そして、上側の一部のストランド4に整形用ブロック2hを上から載せて載置し、前記ストランド4を架設位置よりも下げた位置になるように、ネジ棒2e,2f,2gを締め込んで当て板2jで位置決めする。これにより、前記上側の一部のストランド4,4…が、仮設整形治具2の整形用ブロック2hにより整列されて押さえられ、密集する。   Then, the shaping block 2h is placed on the upper part of the strand 4 from above, and the screw rods 2e, 2f, and 2g are tightened so that the strand 4 is positioned lower than the installation position. Positioning is performed with the contact plate 2j. As a result, the upper strands 4, 4,... Are aligned and pressed by the shaping block 2 h of the temporary shaping jig 2 to be dense.

前記上側一部のストランド4,4…は、両定着部間で緊張されているので保護管5の上部に密集することになり、この保護管5における前記ストランド4下の空間5aが広く確保される。その後、図5に示すように、残りのストランド4を前記保護管5の前記空間5aに挿通させ、前記両定着部間に架設して緊張する。   Since the upper part of the strands 4, 4... Are tensioned between the two fixing portions, the upper strands 4 and 4... Are concentrated in the upper part of the protective tube 5, and a space 5a below the strand 4 in the protective tube 5 is secured widely. The Thereafter, as shown in FIG. 5, the remaining strand 4 is inserted into the space 5 a of the protective tube 5, and is stretched between the fixing portions to be tensioned.

前記保護管5に挿通させる残りのストランド4を、前記上側一部のストランド4,4…が保護管5の上部に密集した状態になった後に挿通させるので、上側から順番に挿通させるようにすれば、後発のストランド4が保護管5の上側に次々に集まって密集し、後のストランド4の挿通作業が容易となる。そして、保護管5の中央部から下のストランド4は、前記仮設整形治具2の成型用ブロック2hによる拘束がないので、ガイド部材2i,2iの内側において自由に架設位置で点在する。   The remaining strands 4 to be inserted into the protective tube 5 are inserted after the upper part of the strands 4, 4... Are densely arranged on the upper portion of the protective tube 5, so that they are inserted in order from the upper side. For example, the subsequent strands 4 gather one after the other on the upper side of the protective tube 5 and are densely packed, and the subsequent strand 4 can be easily inserted. And since the strand 4 below from the center part of the protective tube 5 is not restrained by the molding block 2h of the temporary shaping jig 2, it is freely scattered in the installation position inside the guide members 2i and 2i.

その後に、前記複数本のストランド4を本設のクランプ部材(図示せず)で纏めて束ねる。この本設のクランプは、例えば、六角形状が上下に2分割された状態のクランプ材である。ストランド4全体の半分の上側は整形用ブロック2hで六角形状の半分の形状に密集されているので、上側のクランプ材は、前記ストランド4の上から被せやすく容易に設置できる。そして、下側の半分のクランプ材は、点在するストランド4を下から上に押し上げていくと、ガイド部材2i,2iにより当該下側のストランド4が集約されて、前記上側のクランプ材と容易に合体させる事ができる。   Thereafter, the plurality of strands 4 are bundled together with a permanent clamp member (not shown). This permanent clamp is, for example, a clamp material in a state in which a hexagonal shape is divided into two vertically. Since the upper half of the entire strand 4 is densely packed in a hexagonal half shape by the shaping block 2h, the upper clamp member can be easily placed on the strand 4 and easily installed. Then, when the lower half clamp material pushes up the scattered strands 4 from the bottom to the top, the lower strands 4 are gathered by the guide members 2i and 2i so that the lower clamp material can be easily combined with the upper clamp material. Can be combined.

前記本設のクランプ材により、複数のストランド4が1本のケーブルに纏められる。その後、前記仮設整形治具2を前記シース管1の 自由端開口部1aから撤去する。   The plurality of strands 4 are combined into one cable by the permanent clamp member. Thereafter, the temporary shaping jig 2 is removed from the free end opening 1 a of the sheath tube 1.

本発明に係るケーブルの架設方法の他の実施例は、前記仮設整形治具2において、前記ガイド部材2i,2iを仮設整形治具2に対して着脱自在にすることであり、ボルトやクランプで取り外し自在にするものである。ガイド部材2iの長さや太さの異なるものに交換するときに便宜である。また、このガイド部材2iのストランド4を内側に押さえる角度が可変できるものであることとすれば、ストランド4の点在の具合により、任意に八の字の角度を拡開させたりすることができて便宜である。このようにするには、例えば、整形用ブロック2hの取付面に、複数種類の角度毎の取付孔を予め用意しておいて、ネジ付きクリップやボルト等でガイド部材2iを固定するようにすることで可能となる。   Another embodiment of the cable laying method according to the present invention is to make the guide members 2i, 2i detachable from the temporary shaping jig 2 in the temporary shaping jig 2, using bolts or clamps. It is intended to be removable. This is convenient when the guide member 2i is replaced with one having a different length or thickness. Further, if the angle at which the strand 4 of the guide member 2i is pressed inward is variable, the angle of the figure eight can be arbitrarily expanded depending on the condition of the strand 4 being scattered. It is convenient. In order to do this, for example, a plurality of types of mounting holes for each angle are prepared in advance on the mounting surface of the shaping block 2h, and the guide member 2i is fixed with a clip with screws, bolts, or the like. This is possible.

本発明に係る斜張ケーブルの架設方法における、仮設整形治具2の使用状態を示す斜視図である。It is a perspective view which shows the use condition of the temporary shaping jig | tool 2 in the construction method of the cable-stayed cable which concerns on this invention. 同本発明の斜張ケーブルの架設方法を説明する説明図である。It is explanatory drawing explaining the construction method of the cable-stayed cable of the same invention. 同本発明の斜張ケーブルの架設方法を説明する説明図である。It is explanatory drawing explaining the construction method of the cable-stayed cable of the same invention. 同本発明の斜張ケーブルの架設方法で、シース管1に仮設整形治具2を取り付けた状態の説明図である。It is explanatory drawing of the state which attached the temporary shaping jig | tool 2 to the sheath pipe | tube 1 by the construction method of the cable-stayed cable of this invention. 同本発明の斜張ケーブルの架設方法で、ストランド4を全部仮設した状態の説明図である。It is explanatory drawing of the state which installed all the strands 4 by the construction method of the cable-stretched cable of the same invention. 従来例に係る斜材ケーブルの架設方法を示す説明図である。It is explanatory drawing which shows the construction method of the diagonal cable which concerns on a prior art example. 同ストランド4をアンカーヘッド18に定着させる様子を示す断面図(A)と、ストランド4をクランプ材22で束ねた様子を示す斜視図(B)とである。They are a sectional view (A) showing how the strand 4 is fixed to the anchor head 18 and a perspective view (B) showing how the strand 4 is bundled with the clamp material 22.

符号の説明Explanation of symbols

1 斜張ケーブルの架設方法、 1a 自由端開口部、
1b フランジ、
2 仮設整形治具、 2a 基板、
2b,2c,2d ネジ基台ブロック、
2e,2f,2g ネジ棒、
2h 整形用ブロック、
2i ガイド部材、
2j 当て板、
3 主桁、 3a アンカーヘッド、
3b 定着ナット、
4 ストランド、
5 保護管、 5a 空間、
6 プッシングマシン。



1 Cable-laying cable installation method, 1a Free end opening,
1b flange,
2 Temporary shaping jig, 2a substrate,
2b, 2c, 2d screw base block,
2e, 2f, 2g screw rod,
2h Block for shaping,
2i guide member,
2j
3 main girder, 3a anchor head,
3b fixing nut,
4 strands,
5 protection tube, 5a space,
6 Pushing machine.



Claims (3)

複数本のストランドを保護管に挿通させてその端部を主塔側と主桁側とにおける両定着部間に架設するに際し、
前記複数本のストランドの内、一つに整形して束ねた場合の上側の一部のストランドを前記両定着部間に架設して緊張させ、
前記定着部のシース管における自由端開口部に、前記架設した上側の一部のストランドを当該ストランドの架設位置よりも下げた位置に仮固定する仮設整形治具を取り付けて仮固定し、
その後、残りのストランドを前記保護管に挿通させ前記両定着部間に架設して緊張し、
前記複数本のストランドを本設のクランプ部材で纏めて束ね、
その後、前記仮設整形治具を前記シース管の自由端開口部から撤去すること、
を特徴とする斜張ケーブルの架設方法。
When inserting a plurality of strands through a protective tube and laying the ends between the fixing portions on the main tower side and the main girder side,
Among the plurality of strands, the upper part of the strand when shaped and bundled is stretched between the fixing portions and is tensioned.
Temporarily fixing a temporary shaping jig for temporarily fixing the part of the laid upper strand at a position lower than the erected position of the strand to the free end opening of the sheath tube of the fixing unit,
After that, the remaining strand is inserted through the protective tube and is laid between the fixing parts and is tensioned.
The plurality of strands are bundled together with a permanent clamp member,
Then, removing the temporary shaping jig from the free end opening of the sheath tube,
A cable-laying method characterized by the above.
仮設整形治具には、ストランドを当該仮設整形治具の内側に押さえるガイド部材が設けられていること、
を特徴とする請求項1に記載の斜張ケーブルの架設方法。
The temporary shaping jig is provided with a guide member that holds the strand inside the temporary shaping jig,
2. A cable laying method according to claim 1, wherein the cable is laid.
ガイド部材は、仮設整形治具に着脱自在であると共に、ストランドを内側に押さえる角度が可変できるものであること、
を特徴とする請求項2に記載の斜張ケーブルの仮設方法。
The guide member is detachable from the temporary shaping jig and can change the angle at which the strand is pressed inward.
The temporary installation method of the cable-stayed cable of Claim 2 characterized by these.
JP2006178019A 2006-06-28 2006-06-28 Cable laying method Active JP4847805B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006178019A JP4847805B2 (en) 2006-06-28 2006-06-28 Cable laying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006178019A JP4847805B2 (en) 2006-06-28 2006-06-28 Cable laying method

Publications (2)

Publication Number Publication Date
JP2008007998A JP2008007998A (en) 2008-01-17
JP4847805B2 true JP4847805B2 (en) 2011-12-28

Family

ID=39066445

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006178019A Active JP4847805B2 (en) 2006-06-28 2006-06-28 Cable laying method

Country Status (1)

Country Link
JP (1) JP4847805B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264588B (en) * 2014-09-23 2016-06-29 中交第二航务工程局有限公司 Cable guide pipe positioner
CN106192759B (en) * 2016-07-19 2017-11-21 中交一公局第三工程有限公司 A kind of big pipe sleeve tubule installation method of Cable stayed Bridge Main Tower cable guide pipe
CN108491635B (en) * 2018-03-26 2022-04-12 东南大学 Method for jointly calculating boom force and main cable line shape of suspension bridge
CN109208477B (en) * 2018-10-17 2023-11-28 中铁大桥局集团第五工程有限公司 Adjustable positioning device for positioning center of orifice of cable duct and use method
CN112609576B (en) * 2020-11-19 2022-05-31 中铁二局集团有限公司 Method and device for positioning and installing spatial attitude of stay cable guide pipe
CN114436116B (en) * 2022-02-10 2023-11-24 中铁广州工程局集团有限公司 Method for hanging stay cable of super-long and super-heavy steel strand

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH076169B2 (en) * 1990-05-11 1995-01-30 住友建設株式会社 How to install and tension cable-stayed cables
JP2958241B2 (en) * 1994-07-12 1999-10-06 株式会社エスイー Tensioning material erection method and erection drawing device
JP3529057B2 (en) * 1994-09-06 2004-05-24 株式会社エスイー Cable fixing method and device
JP2000282409A (en) * 1999-03-30 2000-10-10 Se Corp Method and device for bundling tendon
FR2849070B1 (en) * 2002-12-18 2005-03-04 Freyssinet Int Stup METHOD FOR MOUNTING A HAUBAN

Also Published As

Publication number Publication date
JP2008007998A (en) 2008-01-17

Similar Documents

Publication Publication Date Title
JP4847789B2 (en) Cable laying method
JP4847805B2 (en) Cable laying method
KR100876074B1 (en) Main towers of cable stayed girder bridge and the construction method
JP3917369B2 (en) Method and apparatus for attaching load transmitting member to cable, and suspension bridge provided with the apparatus
JP5405889B2 (en) Tension material tensioning method
KR101974516B1 (en) Cable fixing apparatus using ball joint cardan and wedge fixing part, and construction method for the same
JP4336401B2 (en) How to install an oblique cable
KR101482388B1 (en) Prestressed girder
JP3957680B2 (en) Assembling method of cable-stayed cable
JP2007192011A (en) Cable anchoring structure of structural body and cable tension adjusting method in cable anchoring structure
JP5597443B2 (en) Construction method of PC structure
JP2000282409A (en) Method and device for bundling tendon
JP4592609B2 (en) Communication cable fixture
JP5427657B2 (en) Tensile force release device and tension release method
JPH08170306A (en) Saddle structure for main-tower side diagonal cable of cable stayed bridge
CN113235441A (en) Strand penetrating device and method for prestressed steel strand
KR101305917B1 (en) Bulk head for precast box girder mould
JP5828315B2 (en) Wire rope tensioning method in slope stabilization method
JP7341761B2 (en) Roof unit and roof structure construction method
CN214543535U (en) Street code for protecting outer sheath of wire
KR100739879B1 (en) Device
KR200494644Y1 (en) Dummy structure for clamping steel strand
KR20190002947U (en) Dummy structure for clamping steel strand
CN114941288B (en) Construction method for suspension bridge loose cable sleeve
CN219690292U (en) Steel strand fixing device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090612

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101022

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110920

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111014

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141021

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4847805

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250