KR20120045092A - Temporary roof system for reactor containment building of nuclear power plant - Google Patents
Temporary roof system for reactor containment building of nuclear power plant Download PDFInfo
- Publication number
- KR20120045092A KR20120045092A KR1020100106414A KR20100106414A KR20120045092A KR 20120045092 A KR20120045092 A KR 20120045092A KR 1020100106414 A KR1020100106414 A KR 1020100106414A KR 20100106414 A KR20100106414 A KR 20100106414A KR 20120045092 A KR20120045092 A KR 20120045092A
- Authority
- KR
- South Korea
- Prior art keywords
- truss
- nuclear power
- power plant
- roof system
- post
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/242—Safety or protective measures preventing damage to building parts or finishing work during construction for temporarily covering the whole worksite, e.g. building, trench
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/28—Safety or protective measures preventing damage to building parts or finishing work during construction against unfavourable weather influence
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/16—Roof structures with movable roof parts
- E04B7/166—Roof structures with movable roof parts characterised by a translation movement of the movable roof part, with or without additional movements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/18—Special structures in or on roofs, e.g. dormer windows
Abstract
Description
본 발명은 원자력 발전소의 격납건물 구간용 가설지붕 시스템에 관한 것으로서, 상세하게는 원자력 발전소 시공시 격납건물 CLP의 내측면에서 타워 크레인에 설치되어 타워 크레인과 함께 상승되고, 격납건물 CLP의 내측면에 고정되도록 하는 원자력 발전소의 격납건물 구간용 가설지붕 시스템에 관한 것이다.The present invention relates to a temporary roof system for a containment section of a nuclear power plant, and more particularly, is installed on a tower crane at an inner side of a containment building CLP during nuclear power plant construction, and is elevated together with a tower crane, and is provided on an inner side of a containment building CLP. A temporary roof system for a containment section of a nuclear power plant to be fixed.
세계적으로 에너지 관련 사항은 항상 중요한 이슈로 대두되고 있다. 중국을 위시한 개발도상국 및 모든 산업국가에서 이를 해결하기 위해 꾸준히 노력하고 있다. 특히 지구온난화의 주범으로 지목되는 탄소배출을 줄이기 위해 기존의 화력발전을 대체하는 연구개발을 하고 있으나, 그 중에서도 가능성이 있는 대체 에너지 자원으로는 원자력, 풍력, 태양광/태양열, 지열, 조력, 수소에너지 등을 꼽을 수 있다. 그러나 현재 경제성 및 현실성의 관점에서 원자력에너지 개발이 가장 선두에 있으며, 각 나라마다 원자력발전소의 건설에 박차를 가하고 있는 실정이다.Globally, energy-related issues are always an important issue. Developing countries, including China, and all industrial countries are constantly working to resolve them. In particular, we are conducting research and development to replace existing thermal power plants to reduce carbon emissions, which are considered as the main culprit of global warming. Among them, potential alternative energy sources are nuclear, wind, solar / solar, geothermal, tidal, and hydrogen Energy, etc. However, in terms of economics and practicality, nuclear energy development is at the forefront, and each country is accelerating the construction of nuclear power plants.
세계적으로 원자력발전소 건설을 추진하고 있는 국가를 살펴보면 다음과 같다. 중국의 경우 2020년까지 32기, 2050년까지 150기를 건설할 예정이고, 미국도 2020년까지 10기를 건설할 계획이다. 또한 한국에서 현재 가동중인 원전 20기 이외에 신고리 3, 4호기, 신월성 1, 2호기와, 신울진 1, 2호기가 건설 중이며, 계속해서 신고리 5, 6호기가 건설 준비 중에 있다. 특히 고리 한 지역에서만 향후 기존의 4호기를 포함해 1, 2호기가 건설되는 세계적으로 유래 없는 원자력발전소 타운이 생기게 되는 것이다. 국제원자력기구(IAEA)에서는 앞으로 25년 이내에 300기 정도의 새로운 원자력발전소를 기대한다고 한다.The countries that are promoting the construction of nuclear power plants in the world are as follows. China plans to build 32 units by 2020 and 150 units by 2050, while the United States plans to build 10 units by 2020. In addition to the 20 nuclear power plants currently in operation in Korea, Shingori Units 3 and 4, Shinwolseong
가히 원자력 르네상스가 도래하고 있다고 말할 수 있겠다. 세계에서 가장 많은 원자력발전소를 보유하고 있는 미국에서도 최근 수십 년 동안 원자력발전소 건설을 한 사례가 없는 반면에 한국에서는 계속해서 원전건설을 추진하고 있었다. 더구나 국내의 경우는 미국, 프랑스(Framatome) 및 캐나다(CANDU) 시스템의 다양한 원전이 건설 및 운영되고 있어 세계적으로 주목받고 있는 실정이다.I can say that the nuclear renaissance is coming. In the United States, which has the largest number of nuclear power plants in the world, no nuclear power plants have been built in recent decades, while South Korea has continued to build nuclear power plants. Moreover, in the case of Korea, various nuclear power plants of the US, France, and Canada (CANDU) systems are being constructed and operated.
국내의 원자력발전소는 초기에 고리원전을 시작해 다양한 원전형태의 건설 및 운영 경험으로 인해 많은 기술이 축적되어 있으며, 최근에 이러한 기술이 세계적으로 인정되어 UAE에 한국형 원자력발전소가 진출하게 되는 쾌거를 이룩하게 되었다.Nuclear power plants in Korea started with Kori Nuclear Power Plant in the early stages, and many technologies have been accumulated due to various construction and operation experiences of various types of nuclear power plants. Recently, these technologies have been recognized globally, and the Korean nuclear power plant has entered the UAE. It became.
원자력발전소 건설은 안전을 최우선으로 확보하기 위한 설계 및 운전이 필수적인 과제이다. 체르노빌 및 TMI 사고 이후, 특히 원자로가 들어가는 격납건물(RCB?Reactor Containment Building)의 중요성이 한층 주목받고 있는 상황이다. 원자력발전소의 격납건물은 압력유지 및 방사성물질의 유출을 방지하는 마지막 보루이다. 원전의 격납건물 건설에 있어서 안전성뿐만 아니라 경제성을 고려하지 않을 수 없다. 특히 원전 수출 및 국내 건설에 있어서 가장 중요한 건설 공기 단축 원자력발전소의 구조건전성 및 안전성을 확보하는데 있어서 격납건물의 중요한 목적은 방사성물질의 유출을 방지하는 최후의 보루 역할을 한다는 것이다.Nuclear power plant construction is an essential task to design and operate to ensure safety first. After the Chernobyl and TMI accidents, in particular, the importance of the reactor containment building (RCB) is drawing attention. The containment building of a nuclear power plant is the last bulwark to maintain pressure and prevent the release of radioactive material. In the construction of containment of nuclear power plants, not only safety but also economics must be considered. In particular, the most important purpose of the containment building in securing structural integrity and safety of nuclear power plants, which is the most important for nuclear power plant export and domestic construction, is to act as a last resort to prevent the leakage of radioactive materials.
또한 원전의 격납건물 건설에 있어서 고려해야 될 가장 중요한 인자는 안전성과 경제성이다. 이러한 목표를 달성하기 위해, CLP(Containment Liner Plate) 공법이 개발되어 적용되었다. 이 공법은 건설기간 단축, 비용 절감 및 구조건전성을 확보하는 계기가 되었다. 그리고 이러한 공법을 바탕으로 국내건설 뿐만 아니라 원전 수출에 커다란 기여를 하게 되었다.In addition, the most important factors to be considered in the construction of containment of nuclear power plants are safety and economics. To achieve this goal, a CLP (Containment Liner Plate) method was developed and applied. This construction method has helped to shorten the construction period, reduce costs and ensure structural health. Based on this construction method, it contributed not only to domestic construction but also to nuclear power plant exports.
그러나, 최근에 발주되는 원자력 구조물은 촉박한 공기로 발주되고 있는 데, 우리나라 기후가 아열대 기후로 변환되면서, 우천일수가 증가되고, 우천일수 증가가 공기지연의 큰 원인이 되고 있는 문제점이 있다.However, the recently ordered nuclear structure is being ordered by the tight air, there is a problem that the number of rainy days, the increase in the number of rainy days is a major cause of air delay as the climate of Korea is converted to subtropical climate.
본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 원자력 발전소 시공시 격납건물 CLP의 내측면에서 타워 크레인에 설치되어 타워 크레인과 함께 상승되고, 격납건물 CLP의 내측면에 고정시킴으로써 강우시에도 작업이 가능하도록 하여 공기를 단축시킬 수 있도록 하는 원자력 발전소의 격납건물 구간용 가설지붕 시스템을 제공하는데 그 목적이 있다.The present invention is to solve the above problems, installed in the tower crane on the inner surface of the containment building CLP during the construction of the nuclear power plant is elevated together with the tower crane, the work is carried out during rain by fixing to the inner surface of the containment building CLP It is an object of the present invention to provide a temporary roof system for containment sections of a nuclear power plant that can shorten the air by making it possible.
상기와 같은 목적을 달성하기 위한 본 발명의 특징은,Features of the present invention for achieving the above object,
원자력 발전소의 격납건물을 형성하기 위한 CLP 및 타워 크레인에 설치되는 가설지붕 시스템에 있어서, 상기 타워 크레인의 상부에 조립되고, 상단에 고정링 트러스가 돌출 형성되는 포스트 트러스와; 상기 포스트 트러스의 외측에 설치되는 아웃링 트러스와; 상기 포스트 트러스의 고정링 트러스와 상기 아웃링 트러스를 상호 연결시키는 케이블; 및 상기 포스트 트러스의 상면과 아웃링 트러스의 상면에 설치되는 지붕막으로 이루어지는 것을 특징으로 한다.A temporary roof system installed on a CLP and a tower crane for forming a containment building of a nuclear power plant, comprising: a post truss assembled to an upper portion of the tower crane and having a fixed ring truss protruded from an upper end thereof; An outring truss mounted outside the post truss; A cable interconnecting the fixed ring truss of the post truss and the outring truss; And a roof film provided on an upper surface of the post truss and an upper surface of the outring truss.
여기에서, 상기 고정링 트러스는 상기 포스트 트러스에서 회전되도록 이의 하단에 회전판이 구비된다.Here, the fixing ring truss is provided with a rotating plate at the bottom thereof so as to rotate in the post truss.
여기에서, 상기 케이블은 상기 포스트 트러스의 고정링 트러스와 상기 아웃링 트러스를 상호 연결시키되, 상기 지붕막의 상면에 위치하는 상부 케이블과; 상기 포스트 트러스의 고정링 트러스와 상기 아웃링 트러스를 상호 연결시키되, 상기 지붕막의 저면에 위치하는 하부 케이블로 이루어진다.Here, the cable is connected to the fixed ring truss of the post truss and the outer ring truss, the upper cable located on the upper surface of the roof film; The fixed ring truss of the post truss and the outer ring truss are interconnected, and the lower cable is formed on the bottom surface of the roof film.
여기에서 또한, 상기 상부 케이블은 상기 아웃링 트러스에 고정 후 연장되어 상기 CLP의 내측면의 러그에 고정 설치된다.Here, the upper cable is fixed to the lug of the inner surface of the CLP is extended after fixing to the outring truss.
여기에서 또, 상기 원자력 발전소의 격납건물 구간용 가설지붕 시스템은 상기 타워 크레인의 상승에 따라 상승된다.Here, the temporary roof system for the containment building section of the nuclear power plant is raised as the tower crane rises.
상기와 같이 구성되는 본 발명인 원자력 발전소의 격납건물 구간용 가설지붕 시스템에 따르면, 원자력 발전소 시공시 격납건물 CLP의 내측면에서 타워 크레인에 설치되어 타워 크레인과 함께 상승되고, 격납건물 CLP의 내측면에 고정시킴으로써 강우시에도 작업이 가능하도록 하여 공기를 단축시킬 수 있다.According to the temporary roof system for the containment building section of the nuclear power plant of the present invention configured as described above, is installed on the tower crane in the inner surface of the containment building CLP during the construction of the nuclear power plant is elevated together with the tower crane, the inner surface of the containment building CLP By fixing it, it is possible to shorten the air by allowing work even during rainfall.
도 1은 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템의 구성을 나타낸 측단면도이다.
도 2는 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템의 구성을 나타낸 평면도이다.
도 3은 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템의 구성을 나타낸 사시도이다.
도 4 및 도 5는 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템의 설치 과정을 나타낸 설명도이다.1 is a side cross-sectional view showing the configuration of a temporary roof system for the containment building section of the nuclear power plant according to the present invention.
2 is a plan view showing the configuration of a temporary roof system for the containment building section of the nuclear power plant according to the present invention.
Figure 3 is a perspective view showing the configuration of a temporary roof system for the containment building section of the nuclear power plant according to the present invention.
4 and 5 are explanatory views showing the installation process of the temporary roof system for the containment building section of the nuclear power plant according to the present invention.
이하, 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템의 구성을 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, the configuration of the temporary roof system for the containment building section of the nuclear power plant according to the present invention will be described in detail.
하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략할 것이다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.In the following description of the present invention, if it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted. The following terms are defined in consideration of the functions of the present invention, and may be changed according to the intentions or customs of the user, the operator, and the like. Therefore, the definition should be based on the contents throughout this specification.
도 1은 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템의 구성을 나타낸 측단면도이고, 도 2는 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템의 구성을 나타낸 평면도이며, 도 3은 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템의 구성을 나타낸 사시도이다.1 is a side cross-sectional view showing the construction of a temporary roof system for a containment building section of a nuclear power plant according to the present invention, Figure 2 is a plan view showing the configuration of a temporary roof system for a containment building section of a nuclear power plant according to the present invention, 3 is a perspective view showing the configuration of the temporary roof system for the containment building section of the nuclear power plant according to the present invention.
도 1 내지 도 3을 참조하면, 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템(1)은, 포스트 트러스(10)와, 아웃링 트러스(20)와, 케이블(30)과, 지붕막(40)으로 구성된다.1 to 3, the
먼저, 포스트 트러스(10)는 통상의 직육면체 형태의 트러스 구조로서 타워 크레인(50)의 상부에 조립된다. 여기에서, 포스트 트러스(10)는 상단에 고정링 트러스(11)가 돌출 형성된다. 이때, 고정링 트러스(11)에는 하기에서 설명할 케이블(30)이 설치되는 고리(미도시)가 형성되는 것이 바람직하다. 여기에서 또한, 고정링 트러스(11)는 이의 하단에 회전판(13)이 구비되어 포스트 트러스(10)에서 회전 가능하도록 형성되며, 포스트 트러스(10)의 회전시에도 하기에서 설명할 케이블(30)에 의해 지붕막(40)을 고정하도록 한다.
First, the
또한, 아웃링 트러스(20)는 포스트 트러스(10)의 외측에 설치된다. 여기에서, 아웃링 트러스(20)는 CLP(60)의 내경보다 작은 외경을 갖도록 형성되어 간섭을 피하는 것이 바람직하다. 이때, 아웃링 트러스(20)에는 케이블(30)이 설치되는 고리(미도시)가 형성되는 것이 바람직하다.
In addition, the
또, 케이블(30)은 포스트 트러스(10)의 고정링 트러스(11)와 아웃링 트러스(20)를 상호 연결시킨다. 여기에서, 케이블(30)은 포스트 트러스(10)의 고정링 트러스(11)와 아웃링 트러스(20)를 상호 연결시키되, 하기에서 설명할 지붕막(40)의 상면에 위치하는 상부 케이블(31)과, 포스트 트러스(10)의 고정링 트러스(11)와 아웃링 트러스(20)를 상호 연결시키되, 지붕막(40)의 저면에 위치하는 하부 케이블(33)로 이루어진다. 이때, 상부 케이블(31)은 아웃링 트러스(20)에 고정 후 연장되어 CLP(60)의 내측면의 러그(61)에 고정 설치된다.
In addition, the
한편, 지붕막(40)은 포스트 트러스(10)의 상면과 아웃링 트러스(20)의 상면에 설치된다. 여기에서, 지붕막(40)은 빛을 투과하는 막 재질로 8각 형태로 형성되고, 일측에 자재투입구(41)가 형성되고, 중앙부에 포스트 트러스(10)의 고정링 트러스(11)가 돌출되도록 관통홀(43)이 형성된다.
On the other hand, the
이하, 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템의 설치 과정을 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, the installation process of the temporary roof system for the containment building section of the nuclear power plant according to the present invention will be described in detail with reference to the accompanying drawings.
도 4 및 도 5는 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템의 설치 과정을 나타낸 설명도이다.4 and 5 are explanatory views showing the installation process of the temporary roof system for the containment building section of the nuclear power plant according to the present invention.
먼저, 도 4에 도시된 바와 같이 지상에서 포스트 트러스(10)의 고정링 트러스(11)와 아웃링 트러스(20)를 하부 케이블(33)을 통해 상호 연결시킨다.First, as shown in FIG. 4, the
그런 다음, 지붕막(40)을 설치 후 포스트 트러스(10)의 고정링 트러스(11)와 아웃링 트러스(20)를 상부 케이블(31)을 통해 상호 연결시킨다. 이때, 지붕막(40)은 고정링 트러스(11)와 아웃링 트러스(20)와 상부 케이블(31) 및 하부 케이블(33)에 별도의 연결 수단을 통해 연결되는 것이 바람직하다.Then, after the
이러한 상태에서, 인양 장비를 통해 타워 크레인(50)의 상부에 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템(1)을 결합시킨다. 이때, 포스트 트러스(10)를 타워 크레인(50)의 최상부에 결합시킨다. 또한, 타워 크레인(50)은 포스트 트러스(10)와의 간섭을 피하기 위하여 탑리스(TOPLESS) 타입이 적용되는 것이 바람직하다.In this state, the
결합이 완료되면, 상부 케이블(31)의 끝단을 CLP(60)의 내측면의 러그(61)에 고정시켜 유동을 방지한다.When the coupling is completed, the end of the
한편, 원자력 발전소의 격납건물의 높이 변화에 따라 본 발명에 따른 원자력 발전소의 격납건물 구간용 가설지붕 시스템(1)을 상승시키는 데, 타워 크레인(50)이 자체 상승되기 때문에 상부 케이블(31)만을 CLP(60)의 러그(61)에서 분리 후 타워 크레인(50)의 상승 완료후 재결합시키면 된다.On the other hand, in accordance with the change in the height of the containment building of the nuclear power plant to raise the temporary roof system (1) for the containment building section of the nuclear power plant according to the present invention, because the
또한, 가설지붕 시스템(1)의 무게로 인해 타워 크레인(50)의 상승이 불가능한 경우 포스트 트러스(10)를 타워 크레인(50)에서 해체하고, 상부 케이블(31)만을 CLP(60)의 러그(61)에서 분리 후 별도의 인양 장비를 통해 인양한 다음, 타워 크레인(50)의 상승 완료후 재결합시키면 된다.In addition, when the
그리고, 건설 자재의 투입이 필요한 경우 별도의 인양 장비를 통해 건설 자재를 지붕막(40)의 자재투입구(41)를 통해 투입시킨다.And, if the input of the construction material is necessary to input the construction material through the
본 발명은 다양하게 변형될 수 있고 여러 가지 형태를 취할 수 있으며 상기 발명의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다. 하지만 본 발명은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 이해되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments. It is to be understood, however, that the present invention is not limited to the specific forms referred to in the description, but rather includes all modifications, equivalents, and substitutions within the spirit and scope of the invention as defined by the appended claims. Should be.
10 : 포스트 트러스 20 : 아웃링 트러스
30 : 케이블 40 : 지붕막10: Post Truss 20: Outring Truss
30
Claims (5)
상기 타워 크레인의 상부에 조립되고, 상단에 고정링 트러스가 돌출 형성되는 포스트 트러스와;
상기 포스트 트러스의 외측에 설치되는 아웃링 트러스와;
상기 포스트 트러스의 고정링 트러스와 상기 아웃링 트러스를 상호 연결시키는 케이블; 및
상기 포스트 트러스의 상면과 아웃링 트러스의 상면에 설치되는 지붕막으로 이루어지는 것을 특징으로 하는 원자력 발전소의 격납건물 구간용 가설지붕 시스템.In the temporary roof system installed in the CLP and tower crane for forming the containment building of the nuclear power plant,
A post truss assembled to an upper portion of the tower crane and having a fixed ring truss protruding from the top;
An outring truss mounted outside the post truss;
A cable interconnecting the fixed ring truss of the post truss and the outring truss; And
Temporary roof system for the containment building section of the nuclear power plant, characterized in that consisting of a roof film is installed on the upper surface of the post truss and the upper surface of the outer ring truss.
상기 고정링 트러스는,
상기 포스트 트러스에서 회전되도록 이의 하단에 회전판이 구비되는 것을 특징으로 하는 원자력 발전소의 격납건물 구간용 가설지붕 시스템.The method of claim 1,
The fixing ring truss,
Temporary roof system for a containment building section of the nuclear power plant, characterized in that the rotating plate is provided at its lower end to rotate in the post truss.
상기 케이블은,
상기 포스트 트러스의 고정링 트러스와 상기 아웃링 트러스를 상호 연결시키되, 상기 지붕막의 상면에 위치하는 상부 케이블과;
상기 포스트 트러스의 고정링 트러스와 상기 아웃링 트러스를 상호 연결시키되, 상기 지붕막의 저면에 위치하는 하부 케이블로 이루어지는 것을 특징으로 하는 원자력 발전소의 격납건물 구간용 가설지붕 시스템.The method of claim 1,
The cable,
An upper cable interconnecting the fixed ring truss of the post truss and the outring truss, the upper cable being located on an upper surface of the roof film;
Temporary roof system for the containment building section of the nuclear power plant, characterized in that the interconnection between the fixed ring truss and the outer ring truss of the post truss, the lower cable located on the bottom of the roof film.
상기 상부 케이블은,
상기 아웃링 트러스에 고정 후 연장되어 상기 CLP의 내측면의 러그에 고정 설치되는 것을 특징으로 하는 원자력 발전소의 격납건물 구간용 가설지붕 시스템.The method of claim 3, wherein
The upper cable is,
Temporary roof system for the containment building section of the nuclear power plant, characterized in that the extension is fixed to the outer ring and then installed in the lug of the inner surface of the CLP.
상기 원자력 발전소의 격납건물 구간용 가설지붕 시스템은,
상기 타워 크레인의 상승에 따라 상승되는 것을 특징으로 하는 원자력 발전소의 격납건물 구간용 가설지붕 시스템.The method of claim 1,
Temporary roof system for the containment section of the nuclear power plant,
Temporary roof system for the containment building section of the nuclear power plant, characterized in that the rising as the tower crane rises.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100106414A KR101216595B1 (en) | 2010-10-29 | 2010-10-29 | Temporary roof system for reactor containment building of nuclear power plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100106414A KR101216595B1 (en) | 2010-10-29 | 2010-10-29 | Temporary roof system for reactor containment building of nuclear power plant |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20120045092A true KR20120045092A (en) | 2012-05-09 |
KR101216595B1 KR101216595B1 (en) | 2012-12-31 |
Family
ID=46264610
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100106414A KR101216595B1 (en) | 2010-10-29 | 2010-10-29 | Temporary roof system for reactor containment building of nuclear power plant |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101216595B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102855947A (en) * | 2012-09-21 | 2013-01-02 | 国核工程有限公司 | Temporary roof cover of nuclear island safety shell |
CN106927375A (en) * | 2017-04-19 | 2017-07-07 | 中建四局第三建筑工程有限公司 | A kind of tower crane rain-proof shelter and preparation method thereof |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7026477B2 (en) | 2016-10-20 | 2022-02-28 | 株式会社桂精機製作所 | Integrated environmental control system for horticultural house and house heating method |
-
2010
- 2010-10-29 KR KR1020100106414A patent/KR101216595B1/en active IP Right Grant
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102855947A (en) * | 2012-09-21 | 2013-01-02 | 国核工程有限公司 | Temporary roof cover of nuclear island safety shell |
CN102855947B (en) * | 2012-09-21 | 2015-03-11 | 国核工程有限公司 | Temporary roof cover of nuclear island safety shell |
CN106927375A (en) * | 2017-04-19 | 2017-07-07 | 中建四局第三建筑工程有限公司 | A kind of tower crane rain-proof shelter and preparation method thereof |
Also Published As
Publication number | Publication date |
---|---|
KR101216595B1 (en) | 2012-12-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9546642B2 (en) | Energy-storing and power-generating system and method for a vertical-axis wind generator | |
CN201763508U (en) | Wind and rain hydroelectric generator | |
KR101216595B1 (en) | Temporary roof system for reactor containment building of nuclear power plant | |
CN204804053U (en) | Spherical node of assembled concrete frame with from reset function | |
CN109537621A (en) | A kind of combined type sea windward electricity bucket foundation | |
CN201786579U (en) | Tower of wind power generating unit | |
KR101221072B1 (en) | Opening and closing roof system for all-weather construction in main control room block of nuclear power plant | |
CN201695514U (en) | Ecological multifunctional prefabricated balcony | |
CN105952600B (en) | A kind of highway generating apparatus | |
CN204385874U (en) | A kind of rainwater memory module | |
CN206091496U (en) | Dry coal canopy with solar energy power generation function | |
KR101229095B1 (en) | Inner roof system for reactor containment building of nuclear power plant | |
CN204613759U (en) | A kind of disc type photovoltaic tracking device | |
CN110761954B (en) | Precast concrete fan tower barrel with spiral line connecting seam and connecting method | |
CN203960902U (en) | A kind of glass fiber reinforced plastics manhole | |
CN205954669U (en) | Well minitype aerogenerator modularization ground | |
CN201915822U (en) | External staircase of wind power generator tower | |
CN205445024U (en) | Integrated main plant layout structure for domestic garbage incineration power generation | |
CN205779450U (en) | A kind of layering wave energy collection and conversion device | |
CN205955168U (en) | Scaffold puts up reinforcing apparatus for building engineering | |
CN204385907U (en) | A kind of assembly concrete framework composition node with the band steel pipe of Self-resetting function | |
Te | Design of AP/CAP Construction Cover Module | |
CN204385909U (en) | A kind of assembly concrete framework composition node with Self-resetting function | |
CN214999790U (en) | Power station installation and debugging device | |
CN209653198U (en) | A kind of nuclear power plant reactor construction of hydropower top cover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20151216 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20171220 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20181128 Year of fee payment: 7 |