KR20120004379A - Apparatus for sticking adhesive to mount secondary barrier of lng storage tank and method of the same - Google Patents

Apparatus for sticking adhesive to mount secondary barrier of lng storage tank and method of the same Download PDF

Info

Publication number
KR20120004379A
KR20120004379A KR1020110136775A KR20110136775A KR20120004379A KR 20120004379 A KR20120004379 A KR 20120004379A KR 1020110136775 A KR1020110136775 A KR 1020110136775A KR 20110136775 A KR20110136775 A KR 20110136775A KR 20120004379 A KR20120004379 A KR 20120004379A
Authority
KR
South Korea
Prior art keywords
secondary barrier
storage tank
adhesive
frame
lng storage
Prior art date
Application number
KR1020110136775A
Other languages
Korean (ko)
Other versions
KR101325697B1 (en
Inventor
한성종
김민홍
김종호
Original Assignee
삼성중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성중공업 주식회사 filed Critical 삼성중공업 주식회사
Priority to KR1020110136775A priority Critical patent/KR101325697B1/en
Publication of KR20120004379A publication Critical patent/KR20120004379A/en
Application granted granted Critical
Publication of KR101325697B1 publication Critical patent/KR101325697B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B1/00Hand tools
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/01Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
    • F17C2225/0146Two-phase
    • F17C2225/0153Liquefied gas, e.g. LPG, GPL
    • F17C2225/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

PURPOSE: An apparatus for applying adhesives for installing a secondary barrier of an LNG(liquefied natural gas) storage tank and a method thereof are provided to apply effective pressure on an adhesive film by multiple pressing plates despite height difference of an exposed part, recessed or protruded structure, and stepped section of the exposed part. CONSTITUTION: An apparatus(100) for applying adhesives for installing a secondary barrier of an LNG(liquefied natural gas) storage tank comprises a frame(10), a drive unit(20), a heating unit(30), a supply unit(40), and a pressing unit(50). The drive unit is mounted in the frame. A lower heat insulation board, a main secondary barrier, an upper heat insulation board are successively stacked on between an inner hull and a primary barrier of an LNG storage tank. The drive unit transfers the frame corresponding to the exposed part of the main secondary barrier exposed between upper heat insulation boards which are adjacent to each other. The heating unit, the supply unit, and the pressing unit are installed in the frame, respectively. The heating unit heats the exposed part of the main secondary barrier. The supply unit supplies an adhesive film to the heated exposed part. The pressing unit presses the adhesive film and attaches the adhesive film on the exposed part.

Description

액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치 및 그 방법 {APPARATUS FOR STICKING ADHESIVE TO MOUNT SECONDARY BARRIER OF LNG STORAGE TANK AND METHOD OF THE SAME}Adhesive construction device for secondary barrier installation of LNG storage tank and method thereof {APPARATUS FOR STICKING ADHESIVE TO MOUNT SECONDARY BARRIER OF LNG STORAGE TANK AND METHOD OF THE SAME}

본 발명은 필름 형상의 접착제를 시공하는 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치 및 그 방법에 관한 것이다.The present invention relates to an adhesive construction device for secondary barrier installation of a liquefied natural gas storage tank for constructing a film adhesive and a method thereof.

일반적으로, 액화천연가스(LNG)는 메탄(methane)을 주성분으로 하는 천연가스를 섭씨 -163도로 냉각하여 부피를 1/600로 줄인 무색 투명한 액체 상태이다.In general, liquefied natural gas (LNG) is a colorless transparent liquid state in which a volume of 1/600 is reduced by cooling a natural gas containing methane as a main component at -163 degrees Celsius.

액화천연가스를 수송하는 액화천연가스 운반선 또는 액화천연가스를 생산하여 저장하는 부유식 해상구조물은 초저온 상태로 액화된 액화천연가스를 저장할 수 있는 저장 탱크를 구비한다. 액화천연가스 저장 탱크는 내부에 단열 및 불투과 구조를 가진다.A liquefied natural gas carrier for transporting liquefied natural gas or a floating offshore structure for producing and storing liquefied natural gas includes a storage tank capable of storing liquefied natural gas at cryogenic conditions. LNG storage tanks have an insulating and impermeable structure therein.

예를 들면, 액화천연가스 저장 탱크는 내부에 저장되는 액화천연가스에 직접 접촉되는 1차 방벽, 1차 방벽을 단열 지지하는 상부 단열 보드, 1차 방벽에서 누액된(leaked) 액화천연가스에 접촉되는 2차 방벽, 및 2차 방벽을 단열 지지하는 하부 단열 보드를 구비한다.For example, a liquefied natural gas storage tank may have a primary barrier in direct contact with the liquefied natural gas stored therein, an upper insulation board for thermally supporting the primary barrier, and a liquid natural gas leaked from the primary barrier. And a lower insulating board for insulating and supporting the secondary barrier.

하부 단열 보드는 단위 면적을 가지고 복수로 선체 내벽에 배치되므로 인접하는 하부 단열 보드 사이에 간격을 형성한다. 이로 인하여, 2차 방벽은 복수의 하부 단열 보드 상의 주 2차 방벽과, 이웃하는 주 2차 방벽을 연결하는 보조 2차 방벽으로 구성된다.The lower insulation boards have a unit area and are arranged in the hull inner wall in a plurality, thereby forming a gap between adjacent lower insulation boards. For this reason, the secondary barrier is composed of a primary secondary barrier on the plurality of lower insulating boards and an auxiliary secondary barrier connecting neighboring primary secondary barriers.

상부 단열 보드는 주 2차 방벽들 각각에 하부 단열 보드의 면적보다 작은 면적으로 구비되므로 주 2차 방벽에 노출부를 형성한다. 이 노출부에 접착제를 도포하여 보조 2차 방벽을 부착함으로써 2차 방벽이 완성된다.The upper insulation board is provided with an area smaller than the area of the lower insulation board in each of the primary secondary barriers to form an exposed portion in the primary secondary barrier. The secondary barrier is completed by applying an adhesive to the exposed portion and attaching the secondary secondary barrier.

이를 위하여, 2차 방벽의 노출부에 접착제를 도포하고, 접착제 상에 스트립을 가압하여 스트립을 접합하는 스트립 접합 장치 및 스트립 접합 방법이 개시되어 있다.To this end, a strip bonding apparatus and a strip bonding method are disclosed in which an adhesive is applied to an exposed portion of a secondary barrier and a strip is pressed by pressing a strip on the adhesive.

본 발명의 목적은 구조를 단순하게 하여, 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치 및 이를 이용한 시공 방법을 제공하는 것이다.An object of the present invention is to simplify the structure, to provide an adhesive construction device for installing the secondary barrier of the LNG storage tank and a construction method using the same.

본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치는, 프레임, 상기 프레임에 장착되어 액화천연가스 저장 탱크의 선체 내벽과 1차 방벽 사이에 순차적으로 적층 설치되는 하부 단열 보드, 주 2차 방벽 및 상부 단열 보드 중 이웃하는 상기 상부 단열 보드 사이로 노출되어 서로 이격되는 상기 주 2차 방벽의 노출부에 대응하여 상기 프레임을 주행시키는 구동부, 상기 프레임에 장착되어 상기 주 2차 방벽의 노출부를 가열하는 가열부, 상기 프레임에 장착되어 접착제 필름을 가열된 상기 노출부로 공급하는 공급부, 및 상기 프레임에 장착되어 공급되는 상기 접착제 필름을 상기 노출부에 가압하여 부착하는 가압부를 포함한다.Adhesive construction apparatus for installing a secondary barrier of a liquefied natural gas storage tank according to an embodiment of the present invention, the frame, the lower portion is mounted to the frame and sequentially stacked between the hull inner wall and the primary barrier of the liquefied natural gas storage tank A drive unit for driving the frame in response to an exposed portion of the main secondary barrier which is exposed between the adjacent upper insulating boards and spaced apart from each other among the insulation board, the main secondary barrier and the upper insulation board; A heating part for heating the exposed part of the car barrier, a supply part mounted on the frame to supply an adhesive film to the heated exposure part, and a press part for pressing and applying the adhesive film mounted on the frame to the exposed part. do.

상기 가열부는, 상기 프레임의 진행 방향에서 전방에 배치되고, 상기 공급부는, 상기 프레임의 진행 방향에서 상기 가열부의 후방에 배치될 수 있다.The heating unit may be disposed at the front in the advancing direction of the frame, and the supply unit may be disposed at the rear of the heating unit in the advancing direction of the frame.

상기 가열부는, 상기 노출부에 대응하는 플레이트 히터, 및 상기 플레이트 히터에 연결되어 신축 작용하는 실린더를 포함할 수 있다.The heating unit may include a plate heater corresponding to the exposed part, and a cylinder connected to the plate heater to extend and contract.

상기 공급부는, 상기 접착제 필름을 감은 공급롤에 삽입되어 상기 프레임에 설치되는 장착 바, 상기 장착 바에서 직경 방향으로 이동되어 상기 공급롤의 내면을 가압하는 가동부재, 및 상기 장착 바에서 상기 가동부재를 탄성적으로 지지하는 탄성부재를 포함할 수 있다.The supply part is inserted into the supply roll wound the adhesive film is installed in the frame bar, a movable member for moving in the radial direction from the mounting bar to press the inner surface of the supply roll, and the movable member in the mounting bar It may include an elastic member for elastically supporting the.

상기 가동부재는, 상기 장착 바의 직경 방향의 양측에 배치되는 쌍으로 이루어질 수 있다.The movable member may be formed in a pair disposed on both sides of the mounting bar in the radial direction.

상기 공급부는, 상기 공급롤의 하방에 설치되어 상기 접착제 필름을 상기 공급롤에서 상기 노출부로 안내하는 가이드를 더 포함할 수 있다.The supply unit may further include a guide installed below the supply roll to guide the adhesive film from the supply roll to the exposed part.

상기 가압부는, 상기 접착제 필름에 닿아 상기 접착제 필름을 가압하는 가압 플레이트, 및 상기 가압 플레이트에 볼 조인트로 연결되어 신축 작용하도록 상기 프레임에 장착되는 실린더를 포함할 수 있다.The pressing unit may include a pressure plate that contacts the adhesive film to press the adhesive film, and a cylinder mounted to the frame to be elastically connected to the pressure plate by a ball joint.

상기 프레임은, 상기 프레임의 진행 방향을 따라 배치되는 제1 방향 부재들, 상기 진행 방향에 교차하는 제2 방향을 따라 배치되어 상기 제1 방향 부재들을 연결하는 제2 방향 부재들을 포함하며, 상기 제2 방향 부재는 상기 구동부를 상기 제2 방향으로 안내하는 가이드 홈을 형성할 수 있다.The frame may include first direction members disposed along a travel direction of the frame, second direction members disposed along a second direction crossing the travel direction and connecting the first direction members. The bidirectional member may form a guide groove for guiding the driving part in the second direction.

상기 구동부는, 상기 상부 단열 보드의 측면에 구름 마찰로 밀착되어 구동되는 복수의 구동롤, 상기 구동롤을 구동하는 모터, 상기 구동롤을 상기 제1 방향으로 이동시키는 폭 조절부, 및 상기 프레임에 장착되어 상기 상부 단열 보드 상에서 구름 작동되는 지지롤을 포함할 수 있다.The driving unit includes a plurality of driving rolls which are driven in close contact with the side surface of the upper insulating board by rolling friction, a motor for driving the driving rolls, a width adjusting unit for moving the driving rolls in the first direction, and the frame. It may be mounted to include a support roll rolling on the upper insulation board.

상기 폭 조절부는, 상기 가이드 홈에 가이드 돌기로 결합되고, 상기 제1 방향 부재와 나란하게 1쌍으로 배치되어 상기 제2 방향으로 이동되는 폭 조절 부재, 상기 폭 조절 부재에 나사 결합되고 서로 반대 방향의 나사로 형성되는 리드 스크류, 및 상기 리드 스크류를 구동하는 모터를 포함할 수 있다.The width adjusting part may be coupled to the guide groove with a guide protrusion, and disposed in pairs in parallel with the first direction member and moved in the second direction, and screwed to the width adjusting member and opposite directions. The lead screw is formed of a screw, and may include a motor for driving the lead screw.

본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 방법은, 액화천연가스 저장 탱크의 선체 내벽과 1차 방벽 사이에 순차적으로 적층 설치되는 하부 단열 보드, 주 2차 방벽, 및 상부 단열 보드 중 상기 상부 단열 보드 사이로 노출되어 서로 이격되는 상기 주 2차 방벽의 노출부를 가열하는 가열 단계, 접착제와 보호 필름으로 구성되는 접착제 필름을 공급하여 가열된 상기 노출부에 가압하여 부착하는 가압 단계, 및 부착된 상기 접착제 필름에서 보호 필름을 제거하는 제거 단계를 포함한다.According to an embodiment of the present invention, a method for installing a secondary barrier adhesive for a liquefied natural gas storage tank includes a lower insulation board and a main secondary barrier sequentially stacked between an inner wall and a primary barrier of a liquefied natural gas storage tank. And a heating step of heating the exposed portions of the main secondary barrier exposed between the upper insulating boards and spaced apart from each other, and supplying an adhesive film composed of an adhesive and a protective film to press and attach the heated portions to the exposed heat. And a removing step of removing the protective film from the adhesive film attached thereto.

상기 가열 단계는 상기 노출부에 부착되는 접착제의 멜팅 범위 내에서 상기 노출부를 가열할 수 있다.The heating step may heat the exposed portion within the melting range of the adhesive attached to the exposed portion.

이와 같이 본 발명의 일 실시예에 따르면, 주 2차 방벽의 노출부를 가열하고, 접착제와 보호 필름으로 구성되는 접착제 필름을 공급하여, 노출부에 접착제 필름을 가압하여 부착함으로써 보조 2차 방벽 설치를 위한 접착제를 시공하는 장치의 구성을 단순하게 하는 효과가 있다.Thus, according to one embodiment of the present invention, by heating the exposed portion of the primary secondary barrier, supplying an adhesive film composed of an adhesive and a protective film, by pressing the adhesive film to the exposed portion to install the secondary secondary barrier There is an effect of simplifying the configuration of the device for constructing the adhesive for.

도 1 및 도 2는 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치의 사시도이다.
도 3은 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 방법의 순서도이다.
도 4는 도 1 및 도 2의 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치로 접착제를 시공하는 상태의 평면도이다.
도 5는 도 4의 시공 상태에서 Ⅴ-Ⅴ선을 따라 자른 단면도이다.
도 6은 도 1의 우측면도이다.
도 7은 도 1의 평면도이다.
도 8는 도 1의 정면도이다.
도 9는 도 1의 배면도이다.
도 10은 접착제 필름을 공급하는 공급부의 사시도이다.
도 11은 도 10의 Ⅹ-Ⅹ선을 따라 자른 단면도이다.
1 and 2 is a perspective view of the adhesive construction device for the secondary barrier installation of the LNG storage tank according to an embodiment of the present invention.
Figure 3 is a flow chart of the adhesive construction method for the secondary barrier installation of the liquefied natural gas storage tank according to an embodiment of the present invention.
4 is a plan view of a state in which the adhesive is constructed by the adhesive construction device for secondary barrier installation of the LNG storage tank of FIGS.
5 is a cross-sectional view taken along the line VV of the construction state of FIG. 4.
6 is a right side view of FIG. 1.
7 is a plan view of FIG. 1.
8 is a front view of FIG. 1.
9 is a rear view of FIG. 1.
10 is a perspective view of a supply unit for supplying an adhesive film.
FIG. 11 is a cross-sectional view taken along the line VII-VII of FIG. 10.

이하 도면을 참조하여 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치 및 이를 이용한 접착제 시공 방법에 대하여 설명한다.Hereinafter, an adhesive construction device for installing a secondary barrier of a liquefied natural gas storage tank according to an embodiment of the present invention, and an adhesive construction method using the same will be described.

도 1 및 도 2는 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치(편의상, 이하에서 "접착제 시공 장치"라 한다)(100)의 사시도이다.1 and 2 are perspective views of an adhesive construction device (hereinafter, referred to as "glue construction device") 100 for installing a secondary barrier of a liquefied natural gas storage tank according to an embodiment of the present invention.

도 1 및 도 2를 참조하면, 일 실시예의 접착제 시공 장치(100)는 주 2차 방벽의 노출부에 접착제를 부착할 수 있도록 프레임(10), 구동부(20), 가열부(30), 공급부(40) 및 가압부(50)를 포함한다.1 and 2, the adhesive construction device 100 according to an embodiment may include a frame 10, a driving unit 20, a heating unit 30, and a supply unit to attach an adhesive to an exposed portion of a main secondary barrier. 40 and the pressurizing part 50 are included.

도 3은 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 방법(편의상, 이하에서 "접착제 시공 방법"이라 한다)의 순서도이다.Figure 3 is a flow chart of the adhesive construction method for the secondary barrier installation of the liquefied natural gas storage tank according to an embodiment of the present invention (hereinafter referred to as "glue construction method" for convenience).

도 3을 참조하면, 일 실시예에 따른 접착제 시공 방법은 도 1 및 도 2의 접착제 시공 장치(100)를 이용하여, 주 2차 방벽의 노출부에 접착제를 부착할 수 있도록 도 3의 순서도와 같은 단계들을 포함한다.Referring to Figure 3, the adhesive construction method according to an embodiment using the adhesive construction device 100 of Figures 1 and 2, the flow chart of Figure 3 to attach the adhesive to the exposed portion of the primary secondary barrier The same steps are included.

예를 들면, 일 실시예의 접착제 시공 방법은 가열부(30)로 주 2차 방벽의 노출부를 가열하는 가열 단계(ST1), 공급부(40)로 공급되는 접착제 필름(F)을 가압부(50)로 가압하여 주 2차 방벽의 노출부에 부착하는 가압 단계(ST2), 및 접착제 필름(F)에서 접착제(L1)를 남기고 보호 필름(L2)(도 6 참조)을 분리하여 제거하는 제거 단계(ST3)를 포함한다.For example, the adhesive construction method of the embodiment is a heating step (ST1) for heating the exposed portion of the main secondary barrier with the heating unit 30, the adhesive film (F) supplied to the supply unit 40, the pressing unit 50 Pressing step (ST2) to attach to the exposed portion of the main secondary barrier by pressing with pressure, and removing step of separating and removing the protective film (L2) (see Fig. 6) leaving the adhesive (L1) in the adhesive film (F) ( ST3).

도 4는 도 1 및 도 2의 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치(100)로 접착제를 시공하는 상태의 평면도이고, 도 5는 도 4의 시공 상태에서 Ⅴ-Ⅴ선을 따라 자른 단면도이다(편의상, 도 6의 가이드(44)를 제거하여 도시함).FIG. 4 is a plan view of a state in which adhesive is applied by the adhesive construction device 100 for installing a secondary barrier of the LNG storage tank of FIGS. 1 and 2, and FIG. 5 is along the line V-V in the construction state of FIG. 4. It is sectional drawing cut out (for convenience, the guide 44 of FIG. 6 is removed and shown).

일 실시예에 따른 접착제 시공 장치(100) 및 접착제 시공 방법의 이해를 돕기 위하여, 도 4 및 도 5를 참조하여, 액화천연가스 저장 탱크에 구비되는 단열 및 불투과 단면 구조에 대하여 설명한다.In order to help understand the adhesive construction device 100 and the adhesive construction method according to an embodiment, with reference to Figures 4 and 5, the thermal insulation and impermeable cross-sectional structure provided in the LNG storage tank will be described.

도 5를 참조하면, 액화천연가스 저장 탱크는 선체 내벽(60)에 순차적으로 적층 설치되는 하부 단열 보드(64), 주 2차 방벽(62), 상부 단열 보드(63) 및 1차 방벽(61)을 포함한다.Referring to FIG. 5, the LNG storage tank includes a lower insulation board 64, a primary secondary barrier 62, an upper insulation board 63, and a primary barrier 61 that are sequentially stacked on the hull inner wall 60. ).

하부 단열 보드(64)는 주 2차 방벽(62)과 선체 내벽(60) 사이에 위치하는 단열 보드로써, 고정부재(미도시)에 의하여 선체 내벽(60)에 고정 장착되는 하부 단열 부재 보호판(641)과 하부 단열 부재 보호판(641)에 부착되는 하부 단열 부재(642)를 포함한다.The lower insulation board 64 is an insulation board positioned between the main secondary barrier 62 and the hull inner wall 60, and the lower insulation member protective plate fixedly mounted to the hull inner wall 60 by a fixing member (not shown) ( 641 and a lower heat insulating member 642 attached to the lower heat insulating member protection plate 641.

상부 단열 보드(63)는 1차 방벽(61)과 주 2차 방벽(62) 사이에 위치하는 단열 보드로써, 주 2차 방벽(62)에 부착되는 상부 단열 부재(632)와 상부 단열 부재(632)에 부착되는 상부 단열 부재 보호판(631)을 포함한다.The upper insulation board 63 is an insulation board positioned between the primary barrier 61 and the main secondary barrier 62, and the upper insulation member 632 and the upper insulation member attached to the primary secondary barrier 62. An upper heat insulating member protection plate 631 attached to the 632.

예를 들면, 하, 상부 단열 부재(642, 632)는 폴리우레탄 폼으로 형성되어 선체 내벽(60)과 액화천연가스 사이에 단열성을 부여하고, 하, 상부 단열 부재 보호판(641, 631)은 플라이우드로 형성되어 하, 상부 단열 부재(642, 632)의 기계적 강성을 부여한다.For example, the lower and upper insulating members 642 and 632 are formed of polyurethane foam to impart thermal insulation between the hull inner wall 60 and the liquefied natural gas, and the lower and upper insulating member protective plates 641 and 631 are plyed. It is formed of wood to impart the mechanical rigidity of the lower insulation members 642 and 632.

또한 주 2차 방벽(62)은 금속 복합 재료층(metal composite laminate)로 형성되어 불투과 구조를 형성하고, 1차 방벽(61)은 스테인레스 스틸 재질의 맴브레인으로 형성되어 불투과 구조를 형성한다. 실질적으로, 1차 방벽(61)은 접착제 시공 장치를 사용하는 단계에서는 설치되어 있지 않지만 저장 탱크의 구조를 설명하기 위하여 도시된다.In addition, the main secondary barrier 62 is formed of a metal composite laminate to form an opaque structure, and the primary barrier 61 is formed of a stainless steel membrane to form an opaque structure. Substantially, the primary barrier 61 is shown to explain the structure of the storage tank although it is not installed in the step of using the adhesive construction device.

도 4를 참조하면, 하부 단열 보드(64)는 설정된 면적을 가지고 선체 내벽(60)에서 x, y축 방향으로 설정된 제2 간격(G2)으로 이격되어 배치된다. 제2 간격(G2)의 범위는 하부 단열 보드(64)의 수축 및 팽창을 흡수하는 범위 내에서 설정된다. 주 2차 방벽(62)은 하부 단열 보드(64)의 상면에 부착되어 보조 2차 방벽(미도시)과 함께 2차 방벽을 형성하여, 1차 방벽(61)에서 누액된 액화천연가스에 대하여 2차 안전 장치로써, 2차 불투과 구조를 형성한다.Referring to FIG. 4, the lower insulation board 64 has a set area and is spaced apart from the inner hull inner wall 60 at a second interval G2 set in the x and y-axis directions. The range of the second interval G2 is set within the range of absorbing the contraction and expansion of the lower insulation board 64. The primary secondary barrier 62 is attached to the upper surface of the lower insulation board 64 to form a secondary barrier together with an auxiliary secondary barrier (not shown), to the liquid natural gas leaked from the primary barrier 61. As a secondary safety device, it forms a secondary impermeable structure.

상부 단열 보드(63)는 하부 단열 보드(64) 및 주 2차 방벽(62) 면적보다 좁은 면적으로 설정되어 제1 간격(G1)으로 이격되어 주 2차 방벽(62)의 상부 표면에 부착된다. 따라서 주 2차 방벽(62)은 제2 간격(G2)으로 이격된 부근에서 상부 단열 보드(63)의 외곽을 따라 가면서 노출되는 표면(이하, "노출부(621)"라 한다)을 형성한다. 1차 방벽(61)은 상부 단열 보드(63)의 상면에 부착되어 저장된 액화천연가스에 직접 접촉되고, 1차 불투과 구조를 형성한다.The upper insulation board 63 is set to a smaller area than the lower insulation board 64 and the main secondary barrier 62, and is spaced at a first interval G1 and attached to the upper surface of the main secondary barrier 62. . Accordingly, the main secondary barrier 62 forms a surface (hereinafter referred to as an “exposure portion 621”) exposed along the outer periphery of the upper insulation board 63 in the vicinity spaced at the second interval G2. . The primary barrier 61 is attached to the upper surface of the upper insulation board 63 to directly contact the stored liquefied natural gas, and forms a primary impermeable structure.

상부 단열 보드(63)의 제1 간격(G1)이 주 2차 방벽(62)의 제2 간격(G2)보다 더 넓게 형성되므로 주 2차 방벽(62)의 노출부(621)는 제1, 제2 간격(G1, G2)의 차이에 상응하는 면적으로 설정된다.Since the first gap G1 of the upper insulation board 63 is formed to be wider than the second gap G2 of the main secondary barrier 62, the exposed portion 621 of the main secondary barrier 62 is formed of a first, The area corresponding to the difference between the second intervals G1 and G2 is set.

일 실시예의 접착제 시공 장치(100)는 주 2차 방벽(62)의 노출부(621)에 접착제(L1)를 시공하도록 구성되며, 접착제 시공 방법은 노출부(621)에 접착제(L1)를 부착하도록 이루어진다.The adhesive construction apparatus 100 of one embodiment is configured to apply the adhesive L1 to the exposed portion 621 of the primary secondary barrier 62, and the adhesive construction method attaches the adhesive L1 to the exposed portion 621. To be done.

다시 도 1 및 도 2를 참조하면, 접착제 시공 장치(100)에서 프레임(10)은 구동부(20), 가열부(30), 공급부(40) 및 가압부(50)를 장착할 수 있도록 구성된다. 구동부(20)는 제2 간격(G2)으로 이격되는 주 2차 방벽(62)의 노출부(621)에 대응하여, 프레임(10)을 주행시킬 수 있도록 구성된다.1 and 2, in the adhesive construction apparatus 100, the frame 10 is configured to mount the driving unit 20, the heating unit 30, the supply unit 40, and the pressing unit 50. . The driver 20 is configured to drive the frame 10 in response to the exposed portion 621 of the main secondary barrier 62 spaced apart from the second interval G2.

가열부(30)는 주 2차 방벽(62)의 노출부(621)를 가열할 수 있도록 구성된다. 공급부(40)는 접착제 필름(F)을 노출부(621)로 공급할 수 있도록 구성된다(도 4, 도 5 참조). 가압부(50)는 공급되는 접착제 필름(F)을 노출부(621)에 가압하여 부착한다(도 6 참조).The heating portion 30 is configured to heat the exposed portion 621 of the main secondary barrier 62. The supply part 40 is comprised so that the adhesive film F may be supplied to the exposed part 621 (refer FIG. 4, FIG. 5). The pressing part 50 presses the adhesive film F supplied to the exposed part 621, and attaches it (refer FIG. 6).

부착된 접착제 필름(F)으로부터 보호 필름(L2)을 수동으로 제거할 수도 있다.The protective film L2 can also be removed manually from the adhesive film F attached.

도 3을 참조하면, 접착제 시공 장치(100)를 이용하는 접착제 시공 방법에서, 가열 단계(ST1)는 구동부(20)에 의하여 주행하는 프레임(10)에 구비되는 가열부(30)로 주 2차 방벽(62)의 노출부(621)를 가열한다.Referring to FIG. 3, in the adhesive construction method using the adhesive construction apparatus 100, the heating step ST1 is a main secondary barrier to the heating unit 30 provided in the frame 10 driven by the driving unit 20. The exposed portion 621 of 62 is heated.

가압 단계(ST2)는 공급부(40)로 공급되는 접착제 필름(F)을 가압부(50)로 가압하여, 가열된 주 2차 방벽(62)의 노출부(621)에 부착한다. 이때, 노출부(621)의 가열은 부착되는 접착제(L1)의 멜팅 범위 내에서 진행될 수 있다.In the pressing step ST2, the adhesive film F supplied to the supply part 40 is pressed by the pressing part 50 and attached to the exposed part 621 of the heated primary secondary barrier 62. At this time, the heating of the exposed portion 621 is the melting of the adhesive (L1) to be attached It can proceed within the range.

제거 단계(ST3)는 보호 필름(L2)을 부착된 접착제 필름(F)으로부터 수동으로 제거할 수 있다.The removal step ST3 can remove the protective film L2 manually from the adhesive film F attached.

즉 가열, 가압 단계(ST1, ST2)에 의하여 노출부(621)에 부착된 접착제(L1)는 경화되지 않고 노출부(621)에 보조 2차 방벽(미도시)을 부착한 후에 보조 2차 방벽을 통하여 전달되는 열에 의하여 경화될 수 있다.That is, the adhesive L1 attached to the exposed portion 621 by the heating and pressing steps ST1 and ST2 is not cured, but after the auxiliary secondary barrier (not shown) is attached to the exposed portion 621, the secondary secondary barrier is applied. It may be cured by heat transferred through.

보조 2차 방벽 부착 단계(ST4)는 일 실시예의 접착제 시공 장치(100) 및 그 시공 방법 이후에 별도의 장치로 진행될 수 있다. 노출부에 보조 2차 방벽을 부착함으로써, 2차 방벽의 불투과 구조가 완성된다.The secondary secondary barrier attachment step ST4 may be performed as a separate device after the adhesive construction device 100 and the construction method of one embodiment. By attaching the secondary secondary barrier to the exposed portion, the impermeable structure of the secondary barrier is completed.

이상에서 일 실시예에 따른 접착제 시공 장치(100) 및 그 시공 방법에 대하여 개략적으로 설명하였고, 이하에서 접착제 시공 방법을 구현하는 접착제 시공 장치(100)를 더 구체적으로 설명한다. 중복 기재를 피하기 위하여, 접착제 시공 장치(100)를 설명하면서 관련되는 접착제 시공 방법을 함께 설명한다.The adhesive construction apparatus 100 and a construction method thereof according to an embodiment have been described above, and the adhesive construction apparatus 100 implementing the adhesive construction method will be described in more detail below. In order to avoid overlapping base materials, the adhesive construction method concerned is demonstrated together, demonstrating the adhesive construction apparatus 100. FIG.

도 5는 도 4의 시공 상태에서 Ⅴ-Ⅴ선을 따라 자른 단면도이고, 도 6은 도 1의 우측면도이며, 도 7은 도 1의 평면도이고, 도 8는 도 1의 정면도이며, 도 9는 도 1의 배면도이다.5 is a cross-sectional view taken along the line VV in the construction state of FIG. 4, FIG. 6 is a right side view of FIG. 1, FIG. 7 is a plan view of FIG. 1, FIG. 8 is a front view of FIG. 1, and FIG. 9 is 1 is a rear view.

도 1, 도 2, 도 5 내지 도 9를 참조하면, 프레임(10)은 접착제 시공 장치(100)의 진행 방향(x축 방향)을 따라 배치되는 제1 방향 부재들(11)과, 진행 방향에 교차하는 제2 방향(y축 방향)을 따라 배치되어 제1 방향 부재들(11)을 연결하는 제2 방향 부재들(12)을 포함한다.1, 2, and 5 to 9, the frame 10 includes first direction members 11 disposed along a travel direction (x-axis direction) of the adhesive construction device 100, and a travel direction. The second direction members 12 are disposed in a second direction (y-axis direction) intersecting the second direction members 12 to connect the first direction members 11.

제1, 제2 방향 부재들(11, 12)은 선체 내벽(60), 1, 2차 방벽(61, 62), 상, 하부 단열 보드(63, 64), 및 제1, 제2 간격(G1, G2)의 크기에 따라 적절한 개수로 이루어질 수 있다. 제2 방향 부재(12)는 구동부(20)를 제2 방향으로 안내하는 가이드 홈(121)을 포함한다.The first and second directional members 11 and 12 may include the hull inner wall 60, the primary and secondary barriers 61 and 62, the upper and lower insulating boards 63 and 64, and the first and second spacings ( According to the size of G1, G2) it can be made an appropriate number. The second direction member 12 includes a guide groove 121 for guiding the driving unit 20 in the second direction.

일 실시예에서와 같이 제1 방향 부재들(11)이 높이 방향(z축 방향)으로 이격되어 복수로 배치되는 경우, 프레임(10)은 제1 방향 부재들(11)을 연결하는 제3 방향 부재(13)를 더 포함할 수도 있다.When the first direction members 11 are arranged in plurality in a height direction (z-axis direction) as in an exemplary embodiment, the frame 10 may have a third direction connecting the first direction members 11. It may further comprise a member (13).

구동부(20)는 상부 단열 보드(63)의 측면에 구름 마찰로 밀착되어 구동되는 복수의 구동롤(21), 구동롤(21)을 구동하는 모터(23), 구동롤(21)을 제2 방향(y축 방향)으로 이동시키는 폭 조절부(22), 및 프레임(10)에 장착되어 상부 단열 보드(63) 상에서 구름 작동되는 지지롤(24)(편의상, 도 4에만 도시)을 포함한다.The driving unit 20 includes a plurality of driving rolls 21, a motor 23 driving the driving rolls 21, and a driving roll 21 driven in close contact with the side surfaces of the upper insulation board 63 by rolling friction. Width 22 for moving in the direction (y-axis direction), and supporting rolls 24 (for convenience, shown only in FIG. 4) mounted to the frame 10 and rolling on the upper insulation board 63. .

도 5에 도시된 바와 같이, 구동롤(21)은 상부 단열 보드(63)의 상부 단열 부재 보호판(631)의 측면에 구름 마찰로 밀착되어 구동된다. 폭 조절부(22)는 폭 조절 부재(221)와 리드 스크류(222) 및 모터(223)를 포함하여, 제1 간격(G1)에 따라 조절된다.As shown in FIG. 5, the driving roll 21 is driven in close contact with the rolling friction on the side surface of the upper insulating member protection plate 631 of the upper insulating board 63. The width adjusting part 22 includes the width adjusting member 221, the lead screw 222, and the motor 223, and is adjusted according to the first interval G1.

폭 조절 부재(221)는 제1 방향 부재(11)와 나란하게 1쌍으로 배치되어 제2 방향(y축 방향)으로 이동되도록 제2 방향 부재(12)의 가이드 홈(121)에 가이드 돌기(122, 도 6 참조)로 결합된다.The width adjusting members 221 are arranged in pairs in parallel with the first direction member 11 to guide the grooves in the guide groove 121 of the second direction member 12 so as to move in the second direction (y-axis direction). 122, see FIG. 6).

리드 스크류(222)는 폭 조절 부재(221)에 나사 결합되어 폭 조절 부재(221)를 y축 방향으로 이동시킨다. 이때, 나란히 배치되는 1쌍의 폭 조절 부재(221)가 y축 방향에서 서로 반대 방향으로 이동하도록 서로 반대 방향의 나사로 형성될 수 있다.The lead screw 222 is screwed to the width adjusting member 221 to move the width adjusting member 221 in the y-axis direction. In this case, the pair of width adjusting members 221 disposed side by side may be formed of screws in opposite directions to move in opposite directions in the y-axis direction.

모터(223)는 프레임(10)에 고정되고, 리드 스크류(222)에 동력 전달 가능하게 연결된다. 예를 들면, 모터(223)와 리드 스크류(222)는 벨트와 풀리로 연결될 수 있다.The motor 223 is fixed to the frame 10 and is connected to the lead screw 222 so as to transmit power. For example, the motor 223 and the lead screw 222 may be connected to the belt and the pulley.

모터(23)는 폭 조절 부재(221)의 하방에 설치되고 구동롤(21)에 연결되어 구동롤(21)을 구동한다. 구동롤(21)이 상부 단열 부재 보호판(631)의 측면에 일치되어 구동력을 제공할 때, 지지롤(24)은 상부 단열 부재 보호판(631) 상에서 접착제 시공 장치(100)의 하중을 지지하면서 구름 작용으로 프레임(10)을 이동시킨다.The motor 23 is installed below the width adjusting member 221 and is connected to the driving roll 21 to drive the driving roll 21. When the driving roll 21 is aligned with the side surface of the upper insulation member protection plate 631 to provide driving force, the support roll 24 supports the load of the adhesive construction device 100 on the upper insulation member protection plate 631. Move the frame 10.

가열부(30)는 접착제 시공 장치(100)의 진행 방향(x축 방향)에서 전방에 배치되어 노출부(621)를 가열한다. 가열부(30)는 노출부(621)에 대응하는 플레이트 히터(31), 및 플레이트 히터(31)에 연결되어 신축 작용하는 실린더(32)를 포함한다. The heating part 30 is disposed in front in the advancing direction (x-axis direction) of the adhesive construction device 100 to heat the exposed part 621. The heating part 30 includes a plate heater 31 corresponding to the exposed part 621, and a cylinder 32 connected to the plate heater 31 to extend and contract.

플레이트 히터(31)는 복사, 대류 또는 전도의 방법으로 노출부(621)의 평면을 균일하게 가열할 수 있다. 실린더(32)는 프레임(10)의 전방으로 더 연장되는 연장부(14)에 z축 방향으로 설치되어 신축 작용하여, 플레이트 히터(31)와 노출부(621)의 간격을 조절할 수 있다.The plate heater 31 may uniformly heat the plane of the exposed portion 621 by radiation, convection or conduction. The cylinder 32 is installed in the z-axis direction in the extension portion 14 extending further to the front of the frame 10 to extend and contract, thereby adjusting the distance between the plate heater 31 and the exposed portion 621.

플레이트 히터(31)의 작동으로 주 2차 방벽(62)의 노출부(621)가 가열되고, 가열 후, 노출부(621)의 잠열에 의하여 노출부(621)와 접촉한 접착제 필름(F)의 접착제(L1)는 멜팅 범위 내에서 가열되고, 노출부(621) 측이 경화되므로 노출부(621)에 부착된 상태를 유지한다.By the operation of the plate heater 31, the exposed portion 621 of the main secondary barrier 62 is heated, and after heating, the adhesive film F which contacts the exposed portion 621 by the latent heat of the exposed portion 621. The adhesive L1 is heated within the melting range, and the exposed portion 621 is cured so that it remains attached to the exposed portion 621.

공급부(40)는 접착제 시공 장치(100)의 진행 방향(x축 방향)에서 가열부(30)의 후방에 배치되어, 가열된 노출부(621)에 접착제 필름(F)을 공급한다. The supply part 40 is arrange | positioned behind the heating part 30 in the advancing direction (x-axis direction) of the adhesive construction apparatus 100, and supplies the adhesive film F to the heated exposure part 621. FIG.

도 10은 접착제 필름(F)을 공급하는 공급부(40)의 사시도이고, 도 11은 도 10의 Ⅹ-Ⅹ선을 따라 자른 단면도이다. 공급부(40)는 장착 바(41), 가동부재(42) 및 탄성부재(43)를 포함한다.FIG. 10: is a perspective view of the supply part 40 which supplies the adhesive film F, and FIG. 11 is sectional drawing cut along the XX 'line | wire of FIG. The supply part 40 includes a mounting bar 41, a movable member 42 and an elastic member 43.

장착 바(41)는 프레임(10)에 회전 가능하게 설치되어, 접착제 필름(F)을 감은 공급롤(R1)에 삽입되어 공급롤(R1)을 장착한다. 장착 바(41)는 프레임(10)과의 장착 마찰에 의하여, 접착제 필름(F)에 설정된 장력을 유지하면서 접착제 필름(F)을 풀어서 공급한다. 접착제 필름(F)의 설정된 장력 유지는 노출부(621)에 접착되는 접착제(L1)의 두께를 균일하게 한다.The mounting bar 41 is rotatably installed in the frame 10 and is inserted into the supply roll R1 wound around the adhesive film F to mount the supply roll R1. The mounting bar 41 releases and supplies the adhesive film F, maintaining the tension set to the adhesive film F by the mounting friction with the frame 10. The set tension maintenance of the adhesive film F makes the thickness of the adhesive L1 adhered to the exposed portion 621 uniform.

가동부재(42)는 장착 바(41)에서 직경 방향으로 이동되어 공급롤(R1)의 내면을 가압함으로써 공급롤(R1)과 장착 바(41)의 일체 회전을 가능하게 한다. 탄성부재(43)는 장착 바(41)에서 가동부재(42)를 탄성적으로 지지한다.The movable member 42 is moved in the radial direction from the mounting bar 41 to press the inner surface of the supply roll R1 to enable integral rotation of the supply roll R1 and the mounting bar 41. The elastic member 43 elastically supports the movable member 42 at the mounting bar 41.

가동부재(42)는 장착 바(41)의 직경 방향의 양측에 배치되는 쌍으로 이루어져, 공급롤(R1)의 중심에 장착 바(41)를 배치하여 장착 바(41) 및 공급롤(R1)의 원활한 회전을 가능하게 한다.The movable member 42 is composed of a pair disposed on both sides of the mounting bar 41 in the radial direction, by placing the mounting bar 41 in the center of the supply roll (R1), the mounting bar 41 and the supply roll (R1) Enables smooth rotation of

다시 도 1, 도 2 및 도 5 내지 도 9를 참조하면, 공급부(40)는 공급롤(R1)의 하방에 설치되어 접착제 필름(F)을 공급롤(R1)에서 주 2차 방벽(62)의 노출부(621)로 안내하는 가이드(44)를 더 포함할 수 있다.Referring back to FIGS. 1, 2 and 5 to 9, the supply part 40 is installed below the supply roll R1 to supply the adhesive film F to the main secondary barrier 62 on the supply roll R1. It may further include a guide 44 to guide the exposed portion 621 of the.

가이드(44)는 접착제 시공 장치(100)의 진행 방향을 향하여 볼록한 곡면으로 형성되어 접착제 필름(F)을 안정적으로 유도하며, 접착제 필름(F)의 보호 필름(L2)과 접촉되면서 안내한다. 이때, 접착제(L1)는 노출부(621)를 향하여 부착 가능한 상태를 유지한다(도 6 참조).The guide 44 is formed in a convex curved surface toward the advancing direction of the adhesive construction device 100 to stably guide the adhesive film F, and guides it in contact with the protective film L2 of the adhesive film F. At this time, the adhesive L1 maintains the attachable state toward the exposed portion 621 (see FIG. 6).

가압부(50)는 접착제 필름(F)에 닿아 접착제 필름(F)을 가압하는 가압 플레이트(51), 및 가압 플레이트(51)에 볼 조인트(52)로 연결되어 신축 작용하도록 프레임(10)에 장착되는 실린더(53)를 포함한다.The pressing unit 50 contacts the adhesive film F to the pressing plate 51 for pressing the adhesive film F, and is connected to the pressing plate 51 by the ball joint 52 so as to stretch and act on the frame 10. And a cylinder 53 to be mounted.

가압 플레이트(51)는 넓은 면적으로 형성되어 보호 필름(L2)에 닿아서 가압하여 접착제 필름(F)을 주 2차 방벽(62)의 노출부(621)에 부착한다. 가압 플레이트(51)의 가압에 의하여 접착제(L1)는 노출부(621) 상에서 더욱 균일한 두께를 형성하게 된다.The pressing plate 51 is formed in a large area and touches the protective film L2 to press the adhesive film F to attach the adhesive film F to the exposed portion 621 of the main secondary barrier 62. By pressing the pressing plate 51, the adhesive L1 forms a more uniform thickness on the exposed portion 621.

실린더(53)는 신장되어 가압 플레이트(51)를 가압한다. 볼 조인트(52)는 실린더(53) 하강 작동에도 가압 플레이트(51)가 노출부(621)의 요철에 대응할 수 있게 한다.The cylinder 53 is extended to pressurize the pressure plate 51. The ball joint 52 allows the pressure plate 51 to respond to the unevenness of the exposed portion 621 even when the cylinder 53 is lowered.

또한 가압 플레이트(51)는 접착제 필름(F)의 폭 방향으로 복수로 구비되어 노출부(621)의 높이 차이, 오목 또는 볼록 구조 및 제2 간격(G2)에 의한 노출부(621)의 단차 영역에서도 접착제 필름(F)을 효과적으로 가압할 수 있다.In addition, the pressing plate 51 is provided in plural in the width direction of the adhesive film F, so that the height difference of the exposed portion 621, the concave or convex structure, and the stepped region of the exposed portion 621 due to the second gap G2. Even in the adhesive film F can be effectively pressed.

보호 필름(L2)은 부착된 접착제 필름(F)으로부터 수동으로 제거될 수 있다.The protective film L2 can be manually removed from the adhesive film F attached.

이상에서 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치 및 이를 이용한 접착제 시공 방법에 대하여 설명하였으나, 본 발명의 사상은 본 명세서에 제시되는 실시예에 제한되지 아니하며, 본 발명의 사상을 이해하는 당업자는 동일한 사상의 범위 내에서, 구성요소의 부가, 변경, 삭제, 추가 등에 의해서 다른 실시 예를 용이하게 제안할 수 있을 것이나, 이 또한 본 발명의 사상범위 내에 든다고 할 것이다.The adhesive construction device and the adhesive construction method for installing the secondary barrier of the LNG storage tank according to an embodiment of the present invention has been described above, but the spirit of the present invention is not limited to the embodiments presented herein. However, one of ordinary skill in the art who understands the spirit of the present invention can easily suggest another embodiment within the scope of the same spirit by adding, changing, deleting, and adding components, but this is also within the spirit of the present invention. something to do.

10 : 프레임 11, 12, 13 : 제1, 제2, 제3 방향 부재
20 : 구동부 21 : 구동롤
22 : 폭 조절부 23, 223 : 모터
24 : 지지롤 30 : 가열부
31 : 플레이트 히터 32, 53 : 실린더
40 : 공급부 41 : 장착 바
42 : 가동부재 43 : 탄성부재
44 : 가이드 R1 : 공급롤
50 : 가압부 51 : 가압 플레이트
52 : 볼 조인트 60 : 선체 내벽
61 : 1차 방벽 62 : 주 2차 방벽
63, 64 : 상, 하부 단열 보드 100 : 접착제 시공 장치
121 : 가이드 홈 122 : 가이드 돌기
221 : 폭 조절 부재 222 : 리드 스크류
621 : 노출부 631, 641 : 상, 하부 단열 부재 보호판
632, 642 : 상, 하부 단열 부재 F : 접착제 필름
G1, G2 : 제1, 제2 간격 L1 : 접착제
L2 : 보호 필름
10 Frame 11, 12, 13: First, Second, Third Directional Members
20: drive unit 21: drive roll
22: width adjustment unit 23, 223: motor
24: support roll 30: heating part
31: plate heater 32, 53: cylinder
40: supply part 41: mounting bar
42: movable member 43: elastic member
44: guide R1: feed roll
50 pressurizing unit 51 pressurizing plate
52: ball joint 60: hull inner wall
61: primary barrier 62: primary secondary barrier
63, 64: upper and lower insulation board 100: adhesive construction device
121: guide groove 122: guide protrusion
221: width adjusting member 222: lead screw
621: exposed part 631, 641: upper and lower insulation member protective plate
632, 642: upper and lower insulation member F: adhesive film
G1, G2: first and second gap L1: adhesive
L2: Protective Film

Claims (12)

프레임;
상기 프레임에 장착되어, 액화천연가스 저장 탱크의 선체 내벽과 1차 방벽 사이에 순차적으로 적층 설치되는 하부 단열 보드, 주 2차 방벽 및 상부 단열 보드 중 이웃하는 상기 상부 단열 보드 사이로 노출되어 서로 이격되는 상기 주 2차 방벽의 노출부에 대응하여 상기 프레임을 주행시키는 구동부;
상기 프레임에 장착되어, 상기 주 2차 방벽의 노출부를 가열하는 가열부;
상기 프레임에 장착되어, 접착제 필름을 가열된 상기 노출부로 공급하는 공급부; 및
상기 프레임에 장착되어, 공급되는 상기 접착제 필름을 상기 노출부에 가압하여 부착하는 가압부
를 포함하는 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치.
frame;
Mounted on the frame, the lower insulation board, which is sequentially stacked between the hull inner wall and the primary barrier of the liquefied natural gas storage tank is exposed between the adjacent upper insulation board of the primary secondary barrier and the upper insulation board spaced apart from each other A driving unit for driving the frame corresponding to the exposed portion of the main secondary barrier;
A heating unit mounted to the frame to heat an exposed portion of the main secondary barrier;
A supply unit mounted to the frame to supply an adhesive film to the heated exposure unit; And
A pressing unit attached to the frame to press the adhesive film supplied to the exposed unit by pressing
Adhesive construction device for the secondary barrier installation of the LNG storage tank comprising a.
제1항에 있어서,
상기 가열부는,
상기 프레임의 진행 방향에서 전방에 배치되고,
상기 공급부는,
상기 프레임의 진행 방향에서 상기 가열부의 후방에 배치되는
액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치.
The method of claim 1,
The heating unit includes:
Disposed in the forward direction of the frame,
Wherein the supply unit includes:
It is arranged behind the heating unit in the advancing direction of the frame
Adhesive construction device for secondary barrier installation of LNG storage tank.
제2항에 있어서,
상기 가열부는,
상기 노출부에 대응하는 플레이트 히터, 및
상기 플레이트 히터에 연결되어 신축 작용하는 실린더
를 포함하는 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치.
The method of claim 2,
The heating unit includes:
A plate heater corresponding to the exposed portion, and
A cylinder connected to the plate heater and stretched
Adhesive construction device for the secondary barrier installation of the LNG storage tank comprising a.
제1항에 있어서,
상기 공급부는,
상기 접착제 필름을 감은 공급롤에 삽입되어 상기 프레임에 설치되는 장착 바,
상기 장착 바에서 직경 방향으로 이동되어 상기 공급롤의 내면을 가압하는 가동부재, 및
상기 장착 바에서 상기 가동부재를 탄성적으로 지지하는 탄성부재
를 포함하는 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치.
The method of claim 1,
Wherein the supply unit includes:
A mounting bar inserted into a supply roll wound around the adhesive film and installed on the frame;
A movable member which is moved in the radial direction from the mounting bar to press the inner surface of the supply roll, and
An elastic member for elastically supporting the movable member in the mounting bar
Adhesive construction device for the secondary barrier installation of the LNG storage tank comprising a.
제4항에 있어서,
상기 가동부재는,
상기 장착 바의 직경 방향의 양측에 배치되는 쌍으로 이루어지는
액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치.
The method of claim 4, wherein
The movable member,
Consists of a pair disposed on both sides in the radial direction of the mounting bar
Adhesive construction device for secondary barrier installation of LNG storage tank.
제4항에 있어서,
상기 공급부는,
상기 공급롤의 하방에 설치되어 상기 접착제 필름을 상기 공급롤에서 상기 노출부로 안내하는 가이드
를 더 포함하는 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치.
The method of claim 4, wherein
Wherein the supply unit includes:
A guide installed below the supply roll to guide the adhesive film from the supply roll to the exposed portion;
Adhesive construction device for the secondary barrier installation of the LNG storage tank further comprising.
제1항에 있어서,
상기 가압부는,
상기 접착제 필름에 닿아 상기 접착제 필름을 가압하는 가압 플레이트, 및
상기 가압 플레이트에 볼 조인트로 연결되어 신축 작용하도록 상기 프레임에 장착되는 실린더
를 포함하는 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치.
The method of claim 1,
The pressing portion
A pressure plate which contacts the adhesive film to press the adhesive film;
A cylinder mounted to the frame to be elastically actuated by being connected to a ball joint to the pressing plate
Adhesive construction device for the secondary barrier installation of the LNG storage tank comprising a.
제1항에 있어서,
상기 프레임은,
상기 프레임의 진행 방향을 따라 배치되는 제1 방향 부재들,
상기 진행 방향에 교차하는 제2 방향을 따라 배치되어 상기 제1 방향 부재들을 연결하는 제2 방향 부재들을 포함하며,
상기 제2 방향 부재는
상기 구동부를 상기 제2 방향으로 안내하는 가이드 홈을 형성하는
액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치.
The method of claim 1,
The frame includes:
First directional members disposed along a traveling direction of the frame,
A second direction member disposed along a second direction crossing the traveling direction and connecting the first direction members,
The second direction member is
Forming a guide groove for guiding the driving part in the second direction
Adhesive construction device for secondary barrier installation of LNG storage tank.
제8항에 있어서,
상기 구동부는,
상기 상부 단열 보드의 측면에 구름 마찰로 밀착되어 구동되는 복수의 구동롤,
상기 구동롤을 구동하는 모터,
상기 구동롤을 상기 제1 방향으로 이동시키는 폭 조절부, 및
상기 프레임에 장착되어 상기 상부 단열 보드 상에서 구름 작동되는 지지롤
을 포함하는 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치.
The method of claim 8,
The driving unit,
A plurality of drive rolls are driven in close contact with the surface friction of the upper insulation board,
A motor for driving the driving roll;
A width adjusting part for moving the driving roll in the first direction, and
Roll mounted support roll mounted on the frame on the upper insulation board
Adhesive construction device for the secondary barrier installation of the LNG storage tank comprising a.
제9항에 있어서,
상기 폭 조절부는,
상기 가이드 홈에 가이드 돌기로 결합되고, 상기 제1 방향 부재와 나란하게 1쌍으로 배치되어 상기 제2 방향으로 이동되는 폭 조절 부재,
상기 폭 조절 부재에 나사 결합되고 서로 반대 방향의 나사로 형성되는 리드 스크류, 및
상기 리드 스크류를 구동하는 모터
를 포함하는 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 장치.
10. The method of claim 9,
The width adjusting unit,
A width adjusting member coupled to the guide groove with a guide protrusion and arranged in pairs in parallel with the first direction member to move in the second direction,
A lead screw screwed to the width adjusting member and formed of a screw in opposite directions;
A motor for driving the lead screw
Adhesive construction device for the secondary barrier installation of the LNG storage tank comprising a.
액화천연가스 저장 탱크의 선체 내벽과 1차 방벽 사이에 순차적으로 적층 설치되는 하부 단열 보드, 주 2차 방벽, 및 상부 단열 보드 중 이웃하는 상기 상부 단열 보드 사이로 노출되어 서로 이격되는 상기 주 2차 방벽의 노출부를 가열하는 가열 단계;
접착제와 보호 필름으로 구성되는 접착제 필름을 공급하여 가열된 상기 노출부에 가압하여 부착하는 가압 단계; 및
부착된 상기 접착제 필름에서 보호 필름을 제거하는 제거 단계
를 포함하는 액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 방법.
The main secondary barrier is exposed between the lower insulation board, the main secondary barrier, and the upper insulation board neighboring one of the upper insulation board and sequentially spaced apart between the hull inner wall and the primary barrier of the LNG storage tank. A heating step of heating the exposed portion of the;
A pressurizing step of supplying an adhesive film composed of an adhesive and a protective film to press and attach the heated portion to the exposed portion; And
A removal step of removing the protective film from the adhesive film attached
Adhesive construction method for the secondary barrier installation of the LNG storage tank comprising a.
제11항에 있어서,
상기 가열 단계는
상기 노출부에 부착되는 접착제의 멜팅 범위 내에서 상기 노출부를 가열하는
액화천연가스 저장 탱크의 2차 방벽 설치용 접착제 시공 방법.
The method of claim 11,
The heating step
Heating the exposed portion within the melting range of the adhesive attached to the exposed portion
Adhesive construction method for installation of secondary barrier in LNG storage tank.
KR1020110136775A 2011-12-16 2011-12-16 Apparatus for sticking adhesive to mount secondary barrier of lng storage tank and method of the same KR101325697B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110136775A KR101325697B1 (en) 2011-12-16 2011-12-16 Apparatus for sticking adhesive to mount secondary barrier of lng storage tank and method of the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110136775A KR101325697B1 (en) 2011-12-16 2011-12-16 Apparatus for sticking adhesive to mount secondary barrier of lng storage tank and method of the same

Publications (2)

Publication Number Publication Date
KR20120004379A true KR20120004379A (en) 2012-01-12
KR101325697B1 KR101325697B1 (en) 2013-11-05

Family

ID=45610983

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110136775A KR101325697B1 (en) 2011-12-16 2011-12-16 Apparatus for sticking adhesive to mount secondary barrier of lng storage tank and method of the same

Country Status (1)

Country Link
KR (1) KR101325697B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101444390B1 (en) * 2013-06-12 2014-09-29 삼성중공업 주식회사 Supple triplex peeler
KR101475402B1 (en) * 2013-09-06 2014-12-22 삼성중공업 주식회사 Jig for alignment of sheet

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101701775B1 (en) 2014-11-28 2017-02-02 삼성중공업 주식회사 A film attaching apparatus for ship
KR101690969B1 (en) 2014-12-12 2016-12-29 삼성중공업 주식회사 A film attaching apparatus for ship

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100781562B1 (en) 2006-11-27 2007-12-03 삼성중공업 주식회사 Apparatus for attaching sheet
KR100928316B1 (en) * 2007-07-06 2009-11-25 삼성중공업 주식회사 Automatic bonding device
KR100973636B1 (en) 2008-03-19 2010-08-02 현대중공업 주식회사 Automatic triplex bonding apparatus with inclined bonding prevent function
KR101253425B1 (en) * 2011-03-24 2013-04-11 현대중공업 주식회사 Automatic Triplex Bonding Apparatus for LNG Carrier

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101444390B1 (en) * 2013-06-12 2014-09-29 삼성중공업 주식회사 Supple triplex peeler
KR101475402B1 (en) * 2013-09-06 2014-12-22 삼성중공업 주식회사 Jig for alignment of sheet

Also Published As

Publication number Publication date
KR101325697B1 (en) 2013-11-05

Similar Documents

Publication Publication Date Title
KR101325697B1 (en) Apparatus for sticking adhesive to mount secondary barrier of lng storage tank and method of the same
KR101411938B1 (en) Apparatus for bonding
KR101325709B1 (en) Apparatus for coating adhesive for mounting secondary barrier of lng storage tank
KR101325699B1 (en) Device and method for bonding of auxiliary secondary barrier for lng storage tank
KR101505539B1 (en) Device and method for bonding of auxiliary secondary barrier for lng storage tank
KR101327814B1 (en) Apparatus for sticking secondary barrier of lng storage tank and method of the same
JP6225020B2 (en) Laminator
KR101279333B1 (en) Automatic triplex bonding apparatus with far infrared ray heater
KR20130116113A (en) Apparatus for bonding
KR20130132120A (en) Apparatus for bonding
KR101580788B1 (en) Auto bonding apparatus
KR101774918B1 (en) Apparatus for moving
KR20130134836A (en) Apparatus and method for bonding
KR101600289B1 (en) Auto bonding apparatus
KR101325708B1 (en) Apparatus for coating adhesive for mounting secondary barrier of lng storage tank and method of the same
KR101634999B1 (en) Auto bonding apparatus
KR20130092308A (en) Device for bonding of auxiliary secondary barrier for lng storage tank and liquefied natural gas reservior tank
KR20240107294A (en) Automatic Bonding Apparatus
KR102027286B1 (en) Apparatus for bonding barrier of lng storage tank
CN117460176B (en) Flexible circuit board film pressing machine
KR20160072880A (en) Bonding apparatus
KR101744633B1 (en) Apparatus for moving
KR200484440Y1 (en) Adhesive patch of panel connection part of cargo in LNG ship
KR20120004375A (en) Heating apparatus and heating system
KR101467878B1 (en) Apparatus for bonding

Legal Events

Date Code Title Description
A201 Request for examination
G15R Request for early opening
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20191001

Year of fee payment: 7