KR20110120434A - Device for reinforcing head of pipe pile and connection between foundation and pipe pile thereof - Google Patents

Device for reinforcing head of pipe pile and connection between foundation and pipe pile thereof Download PDF

Info

Publication number
KR20110120434A
KR20110120434A KR1020100039847A KR20100039847A KR20110120434A KR 20110120434 A KR20110120434 A KR 20110120434A KR 1020100039847 A KR1020100039847 A KR 1020100039847A KR 20100039847 A KR20100039847 A KR 20100039847A KR 20110120434 A KR20110120434 A KR 20110120434A
Authority
KR
South Korea
Prior art keywords
hollow pile
hollow
head
pile
blocking plate
Prior art date
Application number
KR1020100039847A
Other languages
Korean (ko)
Other versions
KR101127994B1 (en
Inventor
박종배
천영수
심영종
정득재
Original Assignee
한국토지주택공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국토지주택공사 filed Critical 한국토지주택공사
Priority to KR1020100039847A priority Critical patent/KR101127994B1/en
Publication of KR20110120434A publication Critical patent/KR20110120434A/en
Application granted granted Critical
Publication of KR101127994B1 publication Critical patent/KR101127994B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Abstract

PURPOSE: A head reinforcing member for a hollow pile, and a structure for connecting the hollow pile to a base are provided to enable simple assembling and manufacturing by decreasing the number of parts and minimize interference with basic rebar due to a simple shape. CONSTITUTION: A head reinforcing member(100) for a hollow pile comprises a blocking plate, a central bar, a fixed head, and a holding frame. The blocking plate has a size to be inserted into the hollow of a hollow pile(10) and close the hollow. The central bar is fixed to stand on the central part of the blocking plate. The central bar is buried at basic concrete(20) and substantially reinforces the head of the hollow pile. The fixed head is formed to be more widely than the cross section of the central part on the upper part of the central bar. The fixed head reinforces the central bar to strengthen anchoring force to the basic concrete.

Description

중공말뚝의 머리보강재 및 이를 이용한 중공말뚝과 기초의 연결구조{Device for reinforcing head of pipe pile and connection between foundation and pipe pile thereof}Device for reinforcing head of pipe pile and connection between foundation and pipe pile

본 발명은 중공말뚝과 기초의 보강연결에 관한 것으로, 더욱 상세하게는 센터강봉을 중심으로 간편하게 조립가능하게 구성한 중공말뚝의 머리보강재와 이를 바람직하게 이용하여 말뚝과 기초의 접합부를 힌지접합 형태로 완성한 중공말뚝과 기초의 연결구조에 관한 것이다.
The present invention relates to a reinforcing connection between the hollow pile and the foundation, and more particularly, the head reinforcement of the hollow pile configured to be easily assembled around the center steel rod, and preferably using the same, a joint portion of the pile and the foundation is formed in a hinge joint form. It relates to the connection structure of the hollow pile and the foundation.

말뚝 기초를 갖는 건축물은 상부구조로부터 말뚝 기초까지 하중을 효과적으로 전달하기 위해 말뚝의 머리(두부)와 건축물의 기초를 적절한 보강을 통하여 접합한다. 도 1은 중공말뚝의 대표격인 PHC말뚝 머리를 보강한 종래 방식을 나타낸다. Buildings with pile foundations join the pile's head (head) and the foundation's foundation with adequate reinforcement to effectively transfer the load from the superstructure to the pile foundation. 1 shows a conventional method of reinforcing the PHC pile head which is a representative of the hollow pile.

도 1(a)는 PHC말뚝 몸체에 있는 PC강선을 30cm정도 노출시켜 이를 기초에 정착하여 보강한 방식인데, 이 방식은 PHC말뚝을 지표면 위 소요길이를 남겨두고 절단한 후 남은 부위를 해머, 파쇄기 등으로 파쇄시켜 강선의 노출을 유도한 다음 노출된 강선을 기초콘크리트에 매설하는 과정으로 진행한다. 그러나 이 방식은 절단, 파쇄 등의 시공과정이 복잡하고 사고 위험이 크다는 단점이 있다. 뿐만 아니라 파쇄작업 중에 PHC말뚝 본체에 무리한 힘이 가해지기 때문에 PHC말뚝에 균열과 파손 등의 발생 우려가 크다는 단점도 있다.Figure 1 (a) is a way to expose the PC steel wire in the PHC pile body about 30cm and settled on the foundation to reinforce it, this method is to leave the required length on the surface of the PHC pile after cutting the hammer, crusher It is crushed with a back to induce the exposure of the steel wire, and then proceeds to the process of embedding the exposed steel wire in the base concrete. However, this method has the disadvantage that the construction process such as cutting, shredding is complicated and the risk of accident is high. In addition, since the force is applied to the PHC pile body during the crushing operation, there is a disadvantage in that the PHC pile is more likely to be cracked and broken.

도 1(b)는 도 1(a) 방식에 따른 단점을 개선하기 위해 제안된 방식인데, 강선을 노출시키기 위한 과정을 없애고 절단기를 이용하여 한번에 PHC말뚝의 강선까지 깨끗하게 절단한 후 철근망을 PHC말뚝의 중공 내부에 삽입한 다음 철근망을 기초콘크리트에 매설하는 방식이다. 하지만 이 방식은 철근가공 및 용접 등에 의한 철근망 제작이 복잡하고 소요 철근량이 많아 경제적이지 못하며 기초철근과의 간섭문제가 발생하는 단점이 있다. 뿐만 아니라 철근망에 의한 과다 보강으로 PHC말뚝 머리에 과도한 인장력이 발생할 경우, 철근망의 인장파괴나 중공 내부의 콘크리트의 부착파괴 이전에 PHC말뚝의 할렬파괴가 선행될 가능성이 컸다.
Figure 1 (b) is a proposed method to improve the shortcomings according to the method of Figure 1 (a), eliminating the process for exposing the steel wire and cleanly cutting the steel wire of the PHC pile at a time using a cutter PHC rebar It is inserted into the hollow inside of the pile, and the reinforcing bar is embedded in the foundation concrete. However, this method is not economical because the rebar network fabrication by rebar processing and welding is complicated and the required amount of rebars, and there is a disadvantage of interference with the basic rebar. In addition, if excessive reinforcement occurs in the PHC pile head due to excessive reinforcement by the reinforcing bar network, the splitting of the PHC pile was likely to precede the tensile failure of the reinforcing bar network or the attachment failure of concrete in the hollow interior.

본 발명은 상기한 종래의 문제점들을 해결하고자 개발된 것으로서, 다음과 같은 기술적 과제를 갖는다. The present invention was developed to solve the above-mentioned problems, and has the following technical problem.

첫째, 부품수를 줄여 간단하게 조립 제작할 수 있으며 단순한 형상으로 기초철근과의 간섭을 최소화할 수 있는 중공말뚝의 머리보강재를 제공하고자 한다. First, to reduce the number of parts can be easily assembled and manufactured to provide a head reinforcement of the hollow pile that can minimize the interference with the basic reinforcement in a simple shape.

둘째, 중공말뚝의 머리보강재를 바람직하게 이용하여 말뚝과 기초의 접합부를 적절하게 보강하는 한편 힌지접합 구조로 완성한 중공말뚝과 기초의 연결구조를 제공하고자 한다.
Secondly, the head reinforcement of the hollow pile is preferably used to reinforce the joints of the pile and the foundation appropriately, while providing a connection structure of the hollow pile and the foundation completed by the hinge joint structure.

상기한 기술적 과제를 해결하기 위해 본 발명은 중공말뚝의 머리보강재와 이에 의한 중공말뚝과 기초의 연결구조를 제공한다.The present invention to solve the above technical problem provides a head reinforcement of the hollow pile and thereby the connection structure of the hollow pile and the foundation.

본 발명에 따른 중공말뚝의 머리보강재는 중공말뚝의 머리에 설치되는 부재로서, 중공말뚝의 중공에 삽입되어 중공을 폐쇄하는 크기의 차단판; 상기 차단판의 중심에 수직으로 서 있게 고정 장치된 센터봉강; 상기 센터봉강의 상부에서 센터봉강의 단면보다 넓게 마련된 정착헤드; 상기 차단판과 정착헤드 사이의 센터봉강에서 수평으로 여러 갈래로 뻗어나오게 마련된 부분으로 상기 차단판이 중공말뚝의 중공에 삽입되면 중공말뚝의 상단면에 거치될 수 있도록 마련된 거치살대;로 구성되는 것을 특징으로 한다.The head reinforcing material of the hollow pile according to the present invention is a member installed on the head of the hollow pile, the blocking plate of the size is inserted into the hollow of the hollow pile to close the hollow; A center bar fixed to stand perpendicular to the center of the blocking plate; A fixing head provided wider than a cross section of the center bar at an upper portion of the center bar; And a mounting rod provided to extend horizontally from the center bar between the blocking plate and the fixing head to the fork into the hollow of the hollow pile when the blocking plate is inserted into the hollow of the hollow pile. It is done.

본 발명에 따른 중공말뚝과 기초의 연결구조는, 중공말뚝; 차단판을 상기 중공말뚝의 중공에 삽입하고 거치살대를 중공말뚝의 상단면에 거치하면서 설치된 상기한 중공말뚝의 머리보강재; 상기 중공말뚝의 머리보강재가 설치된 중공말뚝의 중공을 포함하여 중공말뚝 위로 상기 중공말뚝의 머리보강재의 정착헤드를 매설하는 두께 이상으로 기초콘크리트를 타설하면서 시공된 기초;로 구성되는 것을 특징으로 한다.
Connection structure of the hollow pile and the foundation according to the present invention, hollow pile; Inserting the blocking plate into the hollow of the hollow pile and the reinforcing head of the hollow pile installed while mounting the mounting rod on the top surface of the hollow pile; Characterized in that the foundation was constructed while laying the foundation concrete to the thickness of embedding the fixing head of the head reinforcement of the hollow pile over the hollow pile including the hollow of the hollow pile is installed the head reinforcement of the hollow pile.

본 발명에 따르면 다음과 같은 효과를 기대할 수 있다.According to the present invention, the following effects can be expected.

첫째, 센터봉강을 중심으로 간단하게 구성하여 중공말뚝의 머리보강재를 완성하기 때문에 종래에 비해 부품수를 줄일 수 있으며, 이에 따라 저렴한 제작비로 간단하게 제작할 수 있는 중공말뚝의 머리보강재를 공급할 수 있다. 특히 본 발명에 따른 중공말뚝의 머리보강재는 센터봉강을 중심으로 전체적으로 단순한 형상을 가지기 때문에 기초철근과의 간섭을 최소화할 수 있어 유리하게 적용할 수 있다.First, since it is simply configured around the center bar to complete the head reinforcement of the hollow pile can reduce the number of parts compared to the conventional, thus can supply the head reinforcement of the hollow pile can be easily manufactured at a low production cost. In particular, since the head reinforcement of the hollow pile according to the present invention has a simple shape as a center around the center bar can be advantageously applied to minimize the interference with the reinforcing bar.

둘째, 중공말뚝의 머리보강재를 볼트 조립방식으로 간단하게 조립 제작할 수 있다. 또한 부품들을 다양한 규격으로 준비하면 현장여건에 탄력적으로 대응하면서 현장에서 적절한 규격의 중공말뚝의 머리보강재를 제작하여 공급할 수 있다.Second, the head reinforcement of the hollow pile can be easily assembled by bolt assembly method. In addition, if the parts are prepared in various specifications, it can flexibly respond to the site conditions and manufacture and supply the head reinforcement material of the appropriate size in the field.

셋째, 중공말뚝의 머리보강재를 단순히 중공말뚝에 거치하여 기초콘크리트에 매설하기 때문에 중공말뚝과 기초의 접합부를 센터봉강에 의한 힌지접합 형태로 완성할 수 있으며, 이에 따라 완성된 중공말뚝과 기초의 접합부는 압축, 인장, 전단력을 효과적으로 전달하는 한편 모멘트 저항으로 인한 파괴의 가능성을 배제할 수 있다.
Third, since the head reinforcement of the hollow pile is simply mounted on the hollow pile and embedded in the foundation concrete, the joint of the hollow pile and the foundation can be completed in the form of a hinge joint by the center bar, and thus the joint of the hollow pile and the foundation is completed. Can effectively transmit the compressive, tensile and shear forces while eliminating the possibility of fracture due to moment resistance.

도 1은 중공말뚝의 대표격인 PHC말뚝의 머리를 보강한 종래 방식을 나타낸다.
도 2와 도 3은 각각 본 발명에 따른 중공말뚝의 머리보강재에 대한 조립사시도와 분해사시도이다.
도 4는 본 발명에 따른 중공말뚝의 머리보강재에 대한 다른 실시예를 도시한다.
도 5는 도 2의 중공말뚝의 머리보강재가 중공말뚝의 머리에 설치된 상태를 도시한다.
도 6은 도 2의 중공말뚝의 머리보강재를 이용하여 완성한 중공말뚝 머리와 기초의 접합부를 도시한다.
1 shows a conventional method of reinforcing the head of the PHC pile, which is a representative example of the hollow pile.
2 and 3 are respectively assembled and exploded perspective view of the head reinforcement of the hollow pile according to the present invention.
Figure 4 shows another embodiment of the head reinforcement of the hollow pile according to the present invention.
Figure 5 shows a state in which the head reinforcement of the hollow pile of Figure 2 is installed on the head of the hollow pile.
Figure 6 shows the joint of the hollow pile head and the base completed using the head reinforcement of the hollow pile of Figure 2;

이하 첨부한 도면 및 바람직한 실시예에 따라 본 발명을 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and preferred embodiments.

도 2는 본 발명에 따른 중공말뚝의 머리보강재(100)에 대한 조립사시도이다. 본 발명에 따른 중공말뚝의 머리보강재(100)는 중공말뚝(10)의 머리에 설치되는 부재로, 차단판(110), 센터봉강(120), 정착헤드(130), 거치살대(140)를 기본 구성으로 포함한다. 중공말뚝의 머리보강재(100)가 설치되는 중공말뚝(10)은 강관말뚝, PHC말뚝 등이 있다.2 is an assembled perspective view of the head reinforcing material 100 of the hollow pile according to the present invention. The head reinforcement material 100 of the hollow pile according to the present invention is a member installed on the head of the hollow pile 10, the blocking plate 110, the center bar 120, the fixing head 130, the mounting rod 140 Included in default configuration. The hollow pile 10 in which the head reinforcing material 100 of the hollow pile is installed includes a steel pipe pile, a PHC pile, and the like.

차단판(110)은 중공말뚝의 중공(11)에 삽입되어 중공(11)을 폐쇄하는 크기를 가지는 판재로 마련되며, 중공말뚝(10) 위로 기초를 시공할 때 중공말뚝의 중공(11) 머리 부분에만 기초콘크리트(20)가 채워지도록 역할한다. 차단판(110)은 기초콘크리트(20) 타설하중을 견딜 수 있는 정도의 강성을 가지는 자재로 마련하도록 하며, 플라스틱, 철판 등으로 준비하면 적당하다. The blocking plate 110 is inserted into the hollow 11 of the hollow pile is provided with a plate having a size to close the hollow 11, the hollow 11 of the hollow pile when installing the foundation on the hollow pile 10 Only the portion serves to be filled with the base concrete 20. The blocking plate 110 is to be made of a material having a rigidity enough to withstand the foundation concrete 20 placing load, it is suitable to prepare with plastic, iron plate or the like.

센터봉강(120)은 차단판(110)의 중심에 수직으로 서 있게 고정 장치되는 부재로서, 기초콘크리트(20)에 매설되어 실질적으로 중공말뚝(10)의 머리를 보강하는 보강심재가 된다. 센터봉강(120)은 중공말뚝(10)의 머리 보강에서 요구하는 철근비로 마련되며, 이에 따라 본 발명에 따른 중공말뚝의 머리보강재(100)는 하나의 센터봉강(120)에 요구 철근비가 집중된 형태가 된다. 센터봉강(120)은 기초 시공과정에서 기초콘크리트(20)에 매설되어 기초콘크리트(20)와 일체화되는데, 기초콘크리트(20)와의 부착력 증대를 고려하면 이형철근 또는 전산볼트가 바람직하다. 특히 전산볼트는 도 3과 같은 조립구조에도 유리하다. The center bar 120 is a member fixed to stand vertically at the center of the blocking plate 110, and is embedded in the foundation concrete 20 to be a reinforcing core material substantially reinforcing the head of the hollow pile 10. Center bar 120 is provided in the reinforcement ratio required by the head reinforcement of the hollow pile 10, accordingly the head reinforcing material 100 of the hollow pile according to the present invention is a form where the required reinforcing ratio is concentrated in one center bar 120 Becomes Center bar 120 is embedded in the foundation concrete 20 during the foundation construction process is integrated with the foundation concrete 20, considering the increase in adhesion with the foundation concrete 20 is preferably a deformed reinforcement or computer bolts. In particular, the computer bolt is also advantageous to the assembly structure as shown in FIG.

정착헤드(130)는 센터봉강(120)의 상부에서 센터봉강(120)의 단면보다 넓게 마련된 부재로서, 센터봉강(120)을 보완하여 기초콘크리트(20)에의 정착력을 강화한다. 정착헤드(130)는 철판을 센터봉강(120)에 용접 내지 볼트 조립방식으로 고정 장치하면 적당하다. The fixing head 130 is a member provided wider than the cross section of the center bar 120 at the top of the center bar 120, and complements the center bar 120 to reinforce the fixing force to the foundation concrete 20. Fixing head 130 is suitable to fix the iron plate to the center bar 120 by welding to bolt assembly method.

거치살대(140)는 차단판(110)과 정착헤드(130) 사이의 센터봉강(120)에서 수평으로 여러 갈래로 뻗어나오게 마련됨과 동시에 차단판(110)이 중공말뚝의 중공(11)에 삽입되면 중공말뚝(10)의 상단면에 거치될 수 있도록 마련된 부재이다. 거치살대(140)에 의해 본 발명에 따른 중공말뚝의 머리보강재(100)는 별도의 고정장치 없이도 중공말뚝(10)의 머리에 안정적으로 설치되며, 아울러 여러 갈래로 갈라지는 거치살대(140) 본연의 형태에 의해 중공말뚝의 중공(11)이 개방되어 그 내부에 기초콘크리트(20)를 채울 수 있다. 거치살대(140)는 센터봉강(120)에서 수평으로 여러 갈래로 뻗어나오는 형태이면 강재, 플라스틱 등의 소재로 봉재, 판재 등을 다양하게 가공하여 마련할 수 있으며, 다만 어떠한 경우이든 중공말뚝의 중공(11) 내부에 차단판(110) 위로 타설되는 기초콘크리트(20) 타설하중을 지지할 수 있는 강성으로 센터봉강(120)에 장치되도록 마련해야 할 것이다.
Mounting rod 140 is provided in the center bar 120 between the blocking plate 110 and the fixing head 130 to extend horizontally to the fork and at the same time the blocking plate 110 is inserted into the hollow 11 of the hollow pile When the member is provided to be mounted on the top surface of the hollow pile (10). The head reinforcing material 100 of the hollow pile according to the present invention by the mounting rod 140 is stably installed on the head of the hollow pile 10 without a separate fixing device, and also the mounting rod 140 split into several branches. The hollow 11 of the hollow pile by the shape can be opened to fill the base concrete 20 therein. Mounting rod 140 may be provided by processing a variety of rods, plates, such as steel, plastic, etc., if the form extending out horizontally in the fork in the center bar 120, but in any case hollow of the hollow pile (11) It should be provided to be installed in the center bar 120 with a rigidity capable of supporting the foundation concrete 20 placed load over the blocking plate 110 therein.

도 3은 도 2의 중공말뚝의 머리보강재(100)를 분해한 도면인데, 보는 바와 같이 본 발명은 볼트조립 방식으로 간단하게 조립할 수 있는 중공말뚝의 머리보강재(100)를 제안한다. Figure 3 is an exploded view of the head reinforcing material 100 of the hollow pile of Figure 2, the present invention proposes a head reinforcing material 100 of the hollow pile that can be easily assembled by bolt assembly method.

보는 바와 같이 도 3에서는 센터봉강(120)을 상·하부에 수나사산(121, 122)이 형성되는 한편 중간에 접합너트(123)가 용접되도록 마련하고, 정착헤드(130)를 판재로 마련하고, 거치살대(140)를 일단부에 수나사산(143)이 형성된 봉강으로 마련하고 있다. 이에 따라 센터봉강(120)은 그 하부를 차단판(110) 중심에 관통 배치하여 와셔(151)와 체결너트(152a)를 체결하는 방식으로 차단판(110)과 조립하고, 그 상부를 정착헤드(130)에 관통 배치하여 한 쌍의 체결너트(152b)를 체결하는 방식으로 정착헤드(130)와 조립한다. 아울러 센터봉강 중간의 접합너트(123)에는 거치살대의 수나사산(143)을 체결하여 거치살대(140)를 조립한다. 이러한 조립식의 중공말뚝의 머리보강재(100)는 현장여건에 탄력적으로 대응하면서 적합한 규격의 중공말뚝의 머리보강재(100)를 제공할 수 있다. 즉, 센터봉강(120)의 규격, 차단판(120)의 크기, 거치살대(140)의 길이 등을 다양하게 준비하기만 하면 현장에서 중공말뚝(10)의 규모에 적합한 규격으로 간단하게 조립할 수 있다.
As shown in FIG. 3, the center bars 120 are provided with male threads 121 and 122 at the upper and lower portions thereof, while the joint nut 123 is welded in the middle, and the fixing head 130 is provided as a plate. , Mounting rod 140 is provided with a rod formed with a male thread 143 at one end. Accordingly, the center bar 120 is assembled with the blocking plate 110 in such a manner that the lower part penetrates through the center of the blocking plate 110 to fasten the washer 151 and the fastening nut 152a, and the upper part of the fixing head. It is assembled with the fixing head 130 in a manner to fasten the pair of fastening nuts (152b) by placing through the (130). In addition, the mounting nut 123 in the middle of the center bar is assembled to the mounting rod 140 by fastening the male thread mount 143 of the mounting rod. The prefabricated hollow head reinforcement material 100 may provide a reinforcement of the hollow pile head 100 of the appropriate standard while responsive to the site conditions. That is, simply preparing a variety of standards, such as the center bar 120, the size of the blocking plate 120, the length of the mounting rod 140 can be easily assembled to the standard suitable for the size of the hollow pile 10 in the field. have.

도 4는 조립식의 중공말뚝의 머리보강재에 대한 다른 실시예를 도시한다. 도 4(a)는 거치살대(140)를 십자형의 봉강으로 마련하여 교차점에서 센터봉강(120)을 용접 접합한 예이다. 도 4(b)는 센터봉강(120) 중간에 체결너트(152c)를 나사 체결하여 봉강으로 마련된 체결너트(152c)에 용접 접합한 예이다. Figure 4 shows another embodiment of the head reinforcement of the prefabricated hollow pile. 4 (a) is an example in which the mounting rod 140 is provided with a cross bar to weld the center bar 120 at an intersection point. 4 (b) shows an example in which the fastening nut 152c is screwed in the middle of the center bar 120 to be welded to the fastening nut 152c provided with the bar.

나아가 도 4(a)(b) 실시예에는 공통적으로 센터봉강(120)으로 전산볼트를 채용하고, 외곽테두리에 절개슬릿(111)이 형성된 차단판(110)을 채용한 것을 확인할 수 있다. 절개슬릿(111)이 형성된 차단판(110)은 중공말뚝의 중공에 삽입 설치하는데 유리한 형태가 된다. 왜냐하면 차단판(110)과 중공말뚝의 중공(11)이 완전히 일치하면 차단판(110)이 중공말뚝의 중공(11)에 맞물려 차단판(110)의 삽입 설치가 오히려 어려울 수 있는데, 이 경우 절개슬릿(111)에 의해 차단판(110)이 적절히 눌리거나 접히면서 삽입 설치가 용이해지기 때문이다. 특히 절개슬릿(111)이 형성된 차단판(110)은 내벽이 매끄럽지 못하게 제작되기 쉬운 콘크리트 중공말뚝(가령 PHC말뚝)에 유리하게 적용할 수 있을 것이다.
Furthermore, in the embodiment of FIG. 4 (a) and (b), it can be seen that a threaded plate 110 is commonly used as the center bar 120, and a blocking plate 110 in which an incision slit 111 is formed on the outer border is adopted. The blocking plate 110 in which the incision slit 111 is formed becomes an advantageous form to be inserted into the hollow of the hollow pile. Because the blocking plate 110 and the hollow 11 of the hollow pile is completely matched, the blocking plate 110 is engaged with the hollow 11 of the hollow pile, it may be rather difficult to install the insertion of the blocking plate 110, in this case incision This is because the blocking plate 110 is easily pressed or folded by the slit 111 to facilitate the insertion installation. In particular, the blocking plate 110 formed with the cutting slits 111 may be advantageously applied to concrete hollow piles (eg, PHC piles) that are easily manufactured to have an inner wall that is not smooth.

도 5는 도 2의 중공말뚝의 머리보강재(100)가 중공말뚝(10)의 머리에 설치된 상태를 보여준다. 보는 바와 같이 중공말뚝의 머리보강재(100)는 차단판(110)을 상기 중공말뚝의 중공(11)에 삽입하고 거치살대(140)를 중공말뚝(10)의 상단면에 거치하는 방식으로 중공말뚝(10)의 머리에 설치한다.
Figure 5 shows a state in which the head reinforcing material 100 of the hollow pile of Figure 2 is installed on the head of the hollow pile (10). As shown, the head reinforcing material 100 of the hollow pile is inserted into the hollow plate 11 of the hollow pile and the mounting plate 140, the hollow pile in such a way to mount the top surface of the hollow pile 10 Install in the head of (10).

도 6은 도 2의 중공말뚝의 머리보강재(100)를 이용하여 완성한 중공말뚝(10) 머리와 기초의 접합부를 도시한다. 중공말뚝(10)의 머리에 중공말뚝의 머리보강재(100)를 설치하고, 중공말뚝의 중공(11)을 포함하여 중공말뚝(10) 위로 중공말뚝의 머리보강재의 정착헤드(130)를 매설하는 두께 이상으로 기초콘크리트(20)를 타설하면서 기초를 시공한다. 이로써 중공말뚝(10)의 머리와 기초가 중공말뚝의 머리보강재(100)에 의해 보강되면서 일체화된다. FIG. 6 shows the joint of the hollow pile 10 head and the foundation completed using the head reinforcement 100 of the hollow pile of FIG. 2. Installing the head reinforcing material 100 of the hollow pile to the head of the hollow pile 10, and embedding the fixing head 130 of the head reinforcing material of the hollow pile over the hollow pile 10, including the hollow 11 of the hollow pile The foundation is constructed while placing the foundation concrete 20 above the thickness. As a result, the head and the foundation of the hollow pile 10 are integrated while being reinforced by the head reinforcing material 100 of the hollow pile.

특히 중공말뚝의 머리보강재(100)는 중공말뚝(10)에 직접적으로 고정되지 않은 채 단순히 중공말뚝(10)에 거치된 상태로 기초콘크리트(20)에 매설되기 때문에 중공말뚝(10)과 기초는 센터봉강에 의한 힌지접합 형태로 연결되며, 이에 따라 상부구조로부터 중공말뚝(10)까지 압축, 인장, 전단력을 효과적으로 전달하는 한편 모멘트는 전달하지 않는 구조로 완성된다. 이와 같은 중공말뚝(10)과 기초의 힌지접합은 중공말뚝(10)의 휨 등에 의해 발생 가능한 P-δ효과와 이로 인한 모멘트하중에 대하여 파괴를 방지하는데 유리한 구조가 된다. In particular, the head reinforcing material 100 of the hollow pile is not directly fixed to the hollow pile 10, the hollow pile 10 and the foundation because it is embedded in the foundation concrete 20 simply mounted on the hollow pile 10 It is connected in the form of a hinge joint by the center bar, thereby effectively transmitting the compression, tension, and shear force from the superstructure to the hollow pile 10, while completing the structure does not transmit the moment. The hinge joint of the hollow pile 10 and the foundation is advantageous in preventing the fracture against the P-δ effect and the moment load caused by the deflection of the hollow pile 10.

한편 센터봉강(120)과 차단판(110)을 와셔(151)와 체결너트(152a)로 조립한 중공말뚝의 머리보강재(100)가 설치된다면, 중공말뚝(10)에 전달되는 인장력에 대해서는 와셔(151)가 지압판으로 역할하면서 효과적으로 저항할 것으로 기대된다.
On the other hand, if the head reinforcing material 100 of the hollow pile assembled with the center bar 120 and the blocking plate 110 with the washer 151 and the fastening nut 152a is installed, the washer for the tensile force transmitted to the hollow pile 10 It is expected that 151 would act effectively as the pressure plate.

이상에서 본 발명은 구체적인 실시예를 참조하여 상세히 설명되었으나, 실시예는 본 발명을 예시하기 위한 것일 뿐이므로, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 치환, 부가 및 변형된 실시 형태들 역시 아래에 첨부한 특허청구범위에 의하여 정하여지는 본 발명의 보호범위에 속한다고 할 것이다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, the present invention is not limited to the above-described exemplary embodiments, and various modifications, additions and substitutions may be made without departing from the scope of the present invention. And the scope of the present invention is defined by the appended claims.

10: 중공말뚝
11: 중공
20: 기초
100: 중공말뚝의 머리보강재
110: 차단판
111: 절개슬릿
120: 센터봉강
121, 122: 수나사산
123: 접합너트
130: 정착헤드
140: 거치살대
143: 수나사산
151: 와셔
152a, 152b, 152c: 체결너트
10: hollow pile
11: hollow
20: Foundation
100: head reinforcement of the hollow pile
110: blocking plate
111: incision slit
120: center bar
121, 122: male thread
123: bonded nut
130: fixing head
140: holder
143: male thread
151: washer
152a, 152b, 152c: tightening nut

Claims (6)

중공말뚝(10)의 머리에 설치되는 부재로서,
중공말뚝의 중공(11)에 삽입되어 중공(11)을 폐쇄하는 크기의 차단판(110);
상기 차단판(110)의 중심에 수직으로 서 있게 고정 장치된 센터봉강(120);
상기 센터봉강(120)의 상부에서 센터봉강(120)의 단면보다 넓게 마련된 정착헤드(130);
상기 차단판(110)과 정착헤드(130) 사이의 센터봉강(120)에서 수평으로 여러 갈래로 뻗어나오게 마련된 부분으로, 상기 차단판(110)이 중공말뚝의 중공(11)에 삽입되면 중공말뚝(10)의 상단면에 거치될 수 있도록 마련된 거치살대(140);
로 구성되는 것을 특징으로 하는 중공말뚝의 머리보강재(100).
As a member installed on the head of the hollow pile 10,
A blocking plate 110 inserted into the hollow 11 of the hollow pile to close the hollow 11;
A center bar 120 fixed to stand perpendicular to the center of the blocking plate 110;
A fixing head 130 provided wider than a cross section of the center bar 120 at an upper portion of the center bar 120;
A portion provided to extend horizontally from the center bar 120 between the blocking plate 110 and the fixing head 130, the hollow plate when the blocking plate 110 is inserted into the hollow 11 of the hollow pile Mounting rod 140 provided to be mounted on the top surface of the (10);
Head reinforcement of the hollow pile, characterized in that consisting of (100).
제1항에서,
상기 센터봉강(120)은, 상·하부에 수나사산(121, 122)이 형성된 것으로, 하부가 상기 차단판(110) 중심에 관통 배치되어 와셔(151)와 체결너트(152a)의 조립 체결에 의해 차단판(110)에 고정 장치되는 한편, 상부가 판재로 마련된 상기 정착헤드(130)에 관통 배치되어 한 쌍의 체결너트(152b)의 조립 체결에 의해 정착헤드(130)에 고정 장치되는 것을 특징으로 중공말뚝의 머리보강재(100).
In claim 1,
The center bar 120 has male threads 121 and 122 formed at upper and lower portions thereof, and a lower portion thereof penetrates through the center of the blocking plate 110 so as to assemble and fasten the washer 151 and the fastening nut 152a. The fixing device is fixed to the blocking plate 110, while the upper part is fixed to the fixing head 130 by assembling and fastening the pair of fastening nuts 152b through the fixing head 130 is provided with a plate. Characterized by reinforcing head of the hollow pile (100).
제1항에서,
상기 거치살대(140)는, 일단부에 수나사산(143)이 형성된 봉강으로 마련되어 상기 센터봉강(120) 중간에 용접된 접합너트(123)에 조립 체결되거나, 봉강으로 마련되어 상기 센터봉강(120) 중간에 나사 체결된 체결너트(152c)에 용접 접합되는 것을 특징으로 하는 중공말뚝의 머리보강재(100).
In claim 1,
The mounting rod 140 is provided with a rod formed with a male thread 143 at one end thereof, and is assembled and fastened to a joint nut 123 welded to the center of the center bar 120, or provided as a bar and the center bar 120. Head reinforcing material 100 of the hollow pile, characterized in that welded to the fastening nut (152c) screwed in the middle.
제1항 내지 제3항 중 어느 한 항에서,
상기 센터봉강(120)은, 이형철근 또는 전산볼트인 것을 특징으로 하는 중공말뚝의 머리보강재(100).
4. The method according to any one of claims 1 to 3,
The center bar 120, the head reinforcing material 100 of the hollow pile, characterized in that the deformed rebar or computer bolt.
제1항 내지 제3항 중 어느 한 항에서,
상기 차단판(110)은, 외곽테두리에 절개슬릿(111)이 형성된 것임을 특징으로 하는 중공말뚝의 머리보강재(100).
4. The method according to any one of claims 1 to 3,
The blocking plate 110, the head reinforcing material 100 of the hollow pile, characterized in that the incision slit 111 is formed on the outer border.
중공말뚝(10);
차단판(110)을 상기 중공말뚝의 중공(11)에 삽입하고 거치살대(140)를 중공말뚝(10)의 상단면에 거치하면서 설치된 제1항 내지 제3항 중 어느 한 항에 따른 중공말뚝의 머리보강재(100);
상기 중공말뚝의 머리보강재(100)가 설치된 중공말뚝의 중공(11)을 포함하여 중공말뚝(10) 위로 상기 중공말뚝의 머리보강재의 정착헤드(130)를 매설하는 두께 이상으로 기초콘크리트(20)를 타설하면서 시공된 기초;
로 구성되는 것을 특징으로 하는 중공말뚝과 기초의 연결구조.
Hollow pile 10;
The hollow pile according to any one of claims 1 to 3 installed while inserting the blocking plate 110 into the hollow 11 of the hollow pile and mounting the mounting rod 140 on the top surface of the hollow pile 10. Hair reinforcement 100;
Including the hollow 11 of the hollow pile is installed the head reinforcing material 100 of the hollow pile, the foundation concrete 20 above the thickness of embedding the fixing head 130 of the head reinforcing material of the hollow pile 10 A foundation constructed while pouring;
Connection structure of the hollow pile and the foundation, characterized in that consisting of.
KR1020100039847A 2010-04-29 2010-04-29 Connection between foundation and pipe pile KR101127994B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100039847A KR101127994B1 (en) 2010-04-29 2010-04-29 Connection between foundation and pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100039847A KR101127994B1 (en) 2010-04-29 2010-04-29 Connection between foundation and pipe pile

Publications (2)

Publication Number Publication Date
KR20110120434A true KR20110120434A (en) 2011-11-04
KR101127994B1 KR101127994B1 (en) 2012-03-29

Family

ID=45391544

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100039847A KR101127994B1 (en) 2010-04-29 2010-04-29 Connection between foundation and pipe pile

Country Status (1)

Country Link
KR (1) KR101127994B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101442761B1 (en) * 2014-02-25 2014-09-23 (주) 포유엔지니어링 Apparatus for reinforcing PHC file head

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102488031B1 (en) * 2022-08-16 2023-01-12 주식회사 에스와이텍 Piled raft foundation application method using drawing apparatus and supporting apparatus, and assembly used to the same

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4693299B2 (en) * 2001-08-09 2011-06-01 旭化成建材株式会社 Column base connection structure
KR100771837B1 (en) * 2006-07-13 2007-10-30 현대엔지니어링 주식회사 Reinforcing apparatus for head of steel pipe pile
KR200446968Y1 (en) * 2009-02-27 2009-12-11 백호현 Rebar cap for reinforcement of concrete pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101442761B1 (en) * 2014-02-25 2014-09-23 (주) 포유엔지니어링 Apparatus for reinforcing PHC file head

Also Published As

Publication number Publication date
KR101127994B1 (en) 2012-03-29

Similar Documents

Publication Publication Date Title
KR100662811B1 (en) Non-synthetic complex steel pipe columm having tie ends for filling a steel soncrete and construction method thereof
KR100766661B1 (en) Tube girder filled with concrete
JP2010174474A (en) Prestressed concrete pile, method of manufacturing the same, and connection structure between pile and footing
KR102290747B1 (en) Connecting and Reinforcing Apparatus, Structure and Method for PHC Pile
KR101056027B1 (en) Combined structure of edge prestressed concrete composite pile with tension member and expansion foundation
JP2003055984A (en) Column base connecting structure
JP5236152B2 (en) Method of joining precast concrete column beams
KR101127994B1 (en) Connection between foundation and pipe pile
JP2009281066A (en) Building structure using composite structural beam having pc structure on its ends
JP3649717B2 (en) Joints and structures for joining steel pipe pile heads to concrete foundations
JP2973812B2 (en) Joint structure between steel members and concrete members
JP4107452B2 (en) Joint structure of pile and foundation concrete slab
JP2004003236A (en) Structure of joint between steel-concrete composite structure and reinforced concrete structure
KR100922121B1 (en) Construction Structure of Footing using Hybrid Pile having Various Cross-section
JP5028323B2 (en) Ground anchor method
JP2007291636A (en) Mixed-structure beam
JP2005139731A (en) Connection structure of pipe pile head, and method of constructing pipe pile head
KR100437260B1 (en) steel pipe pile connecting head reinforce ment structure
JP3681367B2 (en) Joint structure of steel column and foundation concrete
JP3290636B2 (en) Joint structure between steel column base and foundation concrete
KR20020066608A (en) Anchoring joint for steel pile head and concrete footing and thereof construction structure
KR100423934B1 (en) steel pipe pile head reinforcement structure
KR100442704B1 (en) Method and structure for reinforcement of ferroconcrete construction by using of exterior tension member
JP4865104B2 (en) Design method for composite structural beams
KR200245405Y1 (en) Couplers for Steel Pipe Piles

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150312

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160307

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170307

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180307

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190304

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20200106

Year of fee payment: 9