KR20110006804A - Deadweight/lightweight measurement at launching stage - Google Patents
Deadweight/lightweight measurement at launching stage Download PDFInfo
- Publication number
- KR20110006804A KR20110006804A KR1020090064360A KR20090064360A KR20110006804A KR 20110006804 A KR20110006804 A KR 20110006804A KR 1020090064360 A KR1020090064360 A KR 1020090064360A KR 20090064360 A KR20090064360 A KR 20090064360A KR 20110006804 A KR20110006804 A KR 20110006804A
- Authority
- KR
- South Korea
- Prior art keywords
- ship
- launching
- dock
- dwt
- measuring
- Prior art date
Links
- 238000005259 measurement Methods 0.000 title claims description 43
- 238000000034 method Methods 0.000 claims abstract description 12
- 239000013535 sea water Substances 0.000 claims abstract description 11
- 238000003466 welding Methods 0.000 claims abstract description 4
- 238000001035 drying Methods 0.000 claims description 22
- 238000010276 construction Methods 0.000 claims description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 16
- 238000012360 testing method Methods 0.000 claims description 7
- 238000010586 diagram Methods 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 235000013361 beverage Nutrition 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 238000002789 length control Methods 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B13/00—Conduits for emptying or ballasting; Self-bailing equipment; Scuppers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B19/00—Arrangements or adaptations of ports, doors, windows, port-holes, or other openings or covers
- B63B19/12—Hatches; Hatchways
- B63B19/14—Hatch covers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B43/00—Improving safety of vessels, e.g. damage control, not otherwise provided for
- B63B43/02—Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking
- B63B43/04—Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving stability
- B63B43/06—Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving stability using ballast tanks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B79/00—Monitoring properties or operating parameters of vessels in operation
- B63B79/30—Monitoring properties or operating parameters of vessels in operation for diagnosing, testing or predicting the integrity or performance of vessels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C1/00—Dry-docking of vessels or flying-boats
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C3/00—Launching or hauling-out by landborne slipways; Slipways
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B2207/00—Buoyancy or ballast means
- B63B2207/02—Variable ballast or buoyancy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T70/00—Maritime or waterways transport
- Y02T70/10—Measures concerning design or construction of watercraft hulls
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
Abstract
Description
본 발명은 진수시 데드웨이트를 측정하는 선박건조공법에 관한 것으로, 선박의 진수시 데드웨이트를 측정하여 안벽공기를 단축할 수 있는 진수시 데드웨이트를 측정하는 선박건조공법에 관한 것이다. The present invention relates to a ship drying method for measuring deadweight at launch, and to a ship drying method for measuring deadweight at launch that can shorten the quay air by measuring deadweight at launch.
일반적으로 DWT(DEADWEIGHT)는 재화중량톤수라고도 하고, 해운에서 말하는 데드웨이트는 선박 및 설비, 기타 항해에 필요한 연료 ㅇ식료품 ㅇ음료수 등 장비를 제외한 적재화물의 중량을 말하며, 단위는 영국톤인 2,240lbs이며 의 산출기준이 된다. In general, DWT (DEADWEIGHT) is also referred to as tonnage of the weight of goods, and deadweight refers to the weight of cargo, excluding fuel, food, beverages, and other equipment necessary for ships, equipment, and other navigation. And are the basis for calculating.
즉, 상기와 같은 데드웨이트는 선박에 있어서 화물을 실을 수 있는 톤수를 의미하고 있으며, 선박건조시 선주의 승인에 의해 측정되어지고 있다. In other words, the dead weight as described above means tonnage that can carry cargo in the ship, and is measured by the owner's approval when the ship is built.
종래에 있어서의 데드웨이트(이하 'DWT'라 칭합니다.)측정은 안벽공사선박의 안벽공사 완료후 선박의 시운전 이전에 실시하고 있었다. 즉, 종래에는 도크내에서의 선박블록 조립, 진수, 안벽공사, DWT, 시운전, 선주인도의 순서로 선박건조가 진행되고 있었다. In the related art, dead weight (hereinafter referred to as 'DWT') measurement was performed before the trial operation of the vessel after the completion of the quay wall construction of the quay wall construction vessel. That is, in the prior art, ship building has been proceeding in the order of ship block assembly, launching, quay wall construction, DWT, commissioning, and owner delivery.
또한, 종래의 선박건조는 진수시 도 3의 (a)와 같이 진수 컨디션에 맞게 선창(HOLD)를 사용하여 진수하므로, 차후에 선창(HOLD)배수 및 청소를 필요로 하므로, 작업시간이 더욱 소요되는 문제점이 있었다. In addition, the conventional ship drying is launched by using the hold (HOLD) to fit the launch condition as shown in Figure 3 (a) when launching, it is necessary to drain and clean the dock (HOLD) in the future, it takes more time There was a problem.
또한, 종래의 선박은 진수시, 도크 공기 부족 등에 의하여 선박의 주동력원을 작동시키지 못하는 상태에서 진수를 수행하므로, 별도의 펌프 등을 이용하여 선창에 주수해야 하는 문제점이 있었다. In addition, the conventional ships perform launching in a state in which the main power source of the ship cannot be operated due to lack of dock air at launching, and thus, there is a problem that water is to be poured into the dock using a separate pump or the like.
그러나, 건조량 증가로 인하여 안벽이 부족한 현실에서 상기와 같은 종래 DWT 측정방법은 0.5일 정도의 안벽공기가 필요하고, 진수 이후 DWT 컨디션을 맞추기 위하여 주수 및 배수에 추가적인 안벽공기가 소요되어 안벽의 부족현상이 더욱 증대되는 문제점이 있었다. However, in the reality that the lack of a quay due to the increase in drying amount, the conventional DWT measurement method requires about 0.5 days of quay air, and additional quay air is required for drainage and drainage to meet the DWT condition after launching. There was a problem that is further increased.
또한, DWT 측정을 하는 호선은 안벽에 복선 계류가 곤란하므로, DWT 측정을 위하여 불필요한 호선의 이동현상이 빈번하게 발생되고, 이러한 호선의 이동으로 인하여 다른 호선의 건조공정에 영향을 줄 뿐 만 아니라, 안벽 효율성이 저하되는 여러 가지 문제점이 있었다. In addition, since ships for DWT measurement are difficult to moor on double walls in the inner wall, unnecessary movement of ships occurs frequently for DWT measurement, and the movement of these ships not only affects the drying process of other ships. There have been various problems in which the quay wall efficiency is lowered.
본 발명은 상기와 같은 문제점을 해소하기 위한 것으로, 그 목적은 선박의 진수시 DWT 측정을 함께 진행하여, 안벽공기 및 전체 선박건조공기를 단축하고, 안 벽을 효율적으로 활용할 수 있는 진수시 데드웨이트를 측정하는 선박건조공법을 제공하는 것이다. The present invention is to solve the above problems, its purpose is to proceed with the DWT measurement at the time of launch of the ship, shortening the air and the entire ship drying air, launching deadweight can efficiently utilize the inner wall It is to provide a ship drying method for measuring the.
본 발명의 또다른 목적은 선박 진수시 본선펌프에 의해 발라스트 수를 주입/배수하여, 진수 및 DWT 측정을 신속하게 수행할 수 있는 진수시 데드웨이트를 측정하는 선박건조공법을 제공하는 것이다. Still another object of the present invention is to provide a ship drying method for measuring dead weight during launching which can perform launching and DWT measurements quickly by injecting / draining ballast water by a ship's main pump at launch.
본 발명은 도크내에서 블록을 탑재 용접하여 선박을 조립하는 조립단계; 도크내로 바닷물을 유입하여 선박을 진수하고 선박의 DWT 측정을 수행하는 진수 및 DWT 측정단계; 진수 및 DWT 측정이 완료된 선박을 도크에서 안벽으로 이동시켜 계류시킨 후 안벽공사를 수행하는 안벽공사단계; 안벽공사가 완료된 선박을 시운전하는 시운전단계를 포함하여, 선박 진수시 DWT 측정을 수행하도록 되어 있다. The present invention provides an assembly step of assembling a ship by welding the block mounted in the dock; Launching and DWT measurement step of launching the vessel by introducing seawater into the dock and performing the DWT measurement of the vessel; A quay wall construction step of carrying out the quay wall construction after moving the ship from which the launch and DWT measurement is completed to the quay wall in the dock; Including the commissioning step of commissioning the vessel after the quay wall construction is completed, DWT measurement is to be performed when the vessel is launched.
이와 같이 본 발명은 도크내에서의 선박진수시 DWT 측정을 하도록 되어 있어, 0.5일 이상의 안벽공기 및 선박건조공기를 단축시킬 수 있으며, 안벽의 효율적 이용을 가능하게 한다. Thus, the present invention is to measure the DWT when launching the ship in the dock, it is possible to shorten the sea wall air and the ship drying air of 0.5 days or more, and to enable the efficient use of the quay wall.
또한, 본 발명은 본선펌프 및 발라스트 탱크에 의해 선박 진수 및 DWT 측정이 이루어질 수 있어, 종래 선박진수에 따른 선창의 배수 및 청소작업을 생략할 수 있으며, 신속하고 정확한 진수 및 DWT 측정이 가능하다.In addition, the present invention can be carried out by the ship's main pump and ballast tank ship and DWT measurement, it is possible to omit the drainage and cleaning of the dock according to the conventional ship launching, it is possible to quickly and accurately launch and DWT measurement.
또한, 본 발명은 선박 진수전에 주수탱크를 선도장하여 DWT 컨디션을 맞춤으로써, 선박 진수 컨디션과 DWT 컨디션을 일치시킬 수 있으며, DWT 측정을 맞추기 위한 별도의 주수 및 배수를 생략할 수 있다. In addition, the present invention can lead the water tank to the ship before launching to match the DWT condition, can match the ship launch condition and the DWT condition, it is possible to omit the separate water and drain to fit the DWT measurement.
또한, 본 발명은 선박 주수탱크가 선도장되어 있어, 별도의 진공펌프 설치 없이도 본선펌프의 작동에 의해 발라스트 탱크로 발라스트수를 주수 및 배수할 수 있으며, 이를 통해 진수작업을 신속하게 수행할 수 있다. In addition, the present invention is the ship water tank is leading, it is possible to pour and drain the ballast water to the ballast tank by the operation of the main pump without installing a separate vacuum pump, it is possible to perform the launching operation quickly. .
또한, 종래기술에 따라 선박을 건조시 진수condition → DWT 측정 condition → strength test condition → 시운전 speed condition으로 가는 과정이 복잡하였지만, 본 발명은 진수시 DWT를 실시함으로써 진수condition이 바로 DWT측정 condition이 되었고, 최근 tanker선의 경우는 cargo tank를 이용한 동일한 진수 및 DWT condition을 만들어 향후 strength test 및 시운전 speed condition까지 이용할 수 가 있는 효과가 있다.In addition, according to the prior art, the process of going to the launch condition → DWT measurement condition → strength test condition → commissioning speed condition when the ship is constructed is complicated, but the present invention is a DWT measurement condition by carrying out DWT at launch, Recent tanker ships have the same launch and DWT conditions using cargo tanks, which can be used for future strength tests and speed tests.
또한, 본 발명은 도크내에서 DWT 측정을 수행하도록 되어 있어, 외부영향을 많이 받는 안벽에서의 DWT 측정에 비해 정확한 측정이 가능하고, DWT 측정작업을 안전하게 수행할 수 있는 등 많은 효과가 있다. In addition, the present invention is to perform the DWT measurement in the dock, it is possible to measure accurately compared to the DWT measurement on the quay wall affected by a lot of external influences, and there are many effects such as safe to perform the DWT measurement work.
본 발명은 도크내에서 선박을 조립한 후 안벽으로 이동시켜 안벽공사를 수행하는 선박건조공법에 있어서, 도크내로 바닷물을 유입하고, 선박의 본선펌프에 의해 발라스트 탱크 또는 선창내로 물을 주수하여 진수한 후, 선박의 DWT 측정을 수 행한 다음, 선박을 도크내에서 안벽으로 이동시키도록 되어 있다. The present invention is a ship drying method for assembling a vessel in the dock and then moved to the inner wall to perform a quay wall construction, the sea water is introduced into the dock, water is injected into the ballast tank or the dock by the ship's main ship pump to launch Thereafter, after the ship's DWT measurement is performed, the ship is moved to the quay wall in the dock.
이하, 본 발명을 첨부된 도면에 의해 상세히 설명하면 다음과 같다. Hereinafter, described in detail by the accompanying drawings of the present invention.
도 1 은 본 발명에 따른 건조공법을 보인 블록예시도를, 도 2 는 본 발명에 따른 선박 진수과정을 보인 예시도를 도시한 것으로, 본 발명은 도크내에서 블록을 탑재 용접하여 선박을 조립하는 조립단계와, 도크내로 바닷물을 유입하여 선박을 진수하고 선박의 DWT 측정을 수행하는 진수 및 DWT 측정단계와, 진수 및 DWT 측정이 완료된 선박을 도크에서 안벽으로 이동시켜 계류시킨 후 안벽공사를 수행하는 안벽공사단계와, 안벽공사가 완료된 선박을 시운전하는 시운전단계를 포함하도록 되어 있다. 1 is an exemplary block diagram showing a drying method according to the present invention, Figure 2 shows an exemplary view showing a ship launching process according to the present invention, the present invention is to mount the welding in the dock to assemble the ship The launching and DWT measurement step of launching the ship by introducing seawater into the dock and conducting the DWT measurement of the ship, and the mooring after carrying out the mooring by moving the ship from the dock to the quay. The quarrying step and the commissioning step of commissioning the vessel completed the quay wall construction.
상기 조립단계는 도크내에서 첫번째 블록을 배치하는 기공(KEEL-LAYING)을 포함하여 다수개의 블록을 조립 및 탑재하여 선박을 조립한다. The assembling step assembles the ship by assembling and mounting a plurality of blocks including a keel-laying to arrange the first block in the dock.
상기 진수 및 DWT 측정단계는 도크내로 바닷물을 유입하여 선박을 진수시키고, 도크내에 진수된 선박의 눈금(드라프트)을 읽어 DWT 측정을 수행한다. The launching and DWT measurement step injects seawater into the dock to launch the ship, and reads the scale (draft) of the ship launched in the dock to perform DWT measurement.
즉, 상기 진수 및 DWT 측정단계는 선박의 탑재물건과 비탑재물건을 파악하여 필요 탑재물건 이외의 물건은 하역시키는 탑재물건 확인단계와, 도크내로 바닷물을 유입하고, 도 3 의 (b)에 도시된 바와 같이 선박의 발라스트 탱크 또는 선창(HOLD)내로 물을 주수하여 선박을 진수시키는 진수단계와, 선박의 눈금(드라프트)을 통해 DWT 측정하는 DWT 측정단계;를 포함한다. That is, the launching and DWT measuring step is to check the payload and the non-loading goods of the ship, and to check the loading goods unloading goods other than the necessary payload, and to introduce the seawater into the dock, shown in Figure 3 (b) And a launching step of launching the ship by pouring water into a ballast tank or a dock (HOLD) of the ship, and a DWT measurement step of measuring DWT through a scale (draft) of the ship.
이때, 상기 진수 및 DWT 측정단계는 발라스트 탱크를 선도장하는 선도장단계를 더 포함한다. 즉, 본 발명은 도 3 에 도시된 바와 같이, hold를 이용한 진수(도3(a))에서 ballast tank를 이용하여 진수(도3(b))할 수 있게 도장을 완료하였다. 도 3(b)는 진수condition을 tank top level에서 보여준 도면이다. 이때, 빗금친 부분은 물이 주수된 부분을 표현한 것이다.At this time, the launching and DWT measuring step further includes a leading length step leading the ballast tank. That is, the present invention, as shown in FIG. 3, the painting is completed so that the launch (Fig. 3 (b)) using the ballast tank in the launch (Fig. 3 (a)) using the hold. Figure 3 (b) is a view showing the launch condition at the tank top level. At this time, the hatched portion represents the portion where water is poured.
상기 탑재물건 확인단계는 안벽 작업시 꼭 필요한 장비에 번호표를 부착하여 탑재하고, 그 외의 장비는 하역시키며, 번호표가 부착된 장비는 누락없이 비탑재물 리스트에 등재한다. 이때, 상기 비탑재물 리스트에 등재된 장비들은 DWT 측정결과에 반영하여 정확한 DWT 측정을 수행하도록 되어 있다. The loading check step is attached to the equipment attached to the equipment necessary for the quay wall work, the other equipment is unloaded, the equipment with the number tag is listed on the non-loading list without omission. In this case, the equipment listed in the non-loading list is reflected in the DWT measurement result to perform accurate DWT measurement.
상기 진수단계는 선박의 본선펌프를 이용하여 발라스트 탱크 또는 선창(HOLD)에 물을 주수 및 배수한다. 즉, 선박내로 기름을 공급하여 발전기를 가동시키고, 발전기의 가동에 의해 본선펌프를 작동시켜 발라스트 탱크 또는 선창(HOLD)내로 물을 주수 및 배수한다. The launching step is to feed and drain the water to the ballast tank or the hold (HOLD) using the ship's main pump. That is, the generator is operated by supplying oil into the vessel, and the main pump is operated by the operation of the generator to feed and drain the water into the ballast tank or the hold (HOLD).
즉, 상기 진수단계는 진수 컨디션과 DWT 컨디션을 일치시켜 진수와 DWT 측정이 가능하도록 되어 있다. That is, in the launching step, launching and DWT measurement are made possible by matching launching condition and DWT condition.
아울러, 상기 진수컨디션은 dock 내에서의 선박건조가 완료된 후 선박을 최초로 수면위에 띄우는 작업을 진수라고 하는데, 이때 선박을 안전하게 진수시키기 위하여 필요한 ballast condition을 의미하고, In addition, the launching condition is called launching a ship that floats on the surface of the ship for the first time after the completion of ship construction in the dock, this time means a ballast condition necessary to safely launch the ship,
상기 DWT 측정컨디션은 계약상의 재화중랑(deadweight) 만족여부를 확인하기 위해 공선상태의 중량(lightweight)을 측정한 후 만재배수량에서 lightweight 를 빼서 deadweight를 계산한다. 이때, DWT를 측정하기 위하여 선주 / 선급에 승인받은 ballast condition을 의미한다. The DWT measurement condition calculates the deadweight by measuring the weight of the collinear state in order to confirm whether the contract deadweight is satisfied. At this time, it means the ballast condition approved by the owner / class to measure the DWT.
또한, 상기와 같은 본선펌프의 가동은 종래 진공펌프에 의한 물의 주수 및 배수에 비해 공기를 단축시킬 수 있을 뿐 만 아니라, 발라스트 탱크의 경우 배수효율을 더욱 향상시킬 수 있다. In addition, the operation of the main ship pump as described above can not only shorten the air compared to the main water and drainage of water by the conventional vacuum pump, but also can further improve the drainage efficiency in the case of a ballast tank.
또한, 상기 진수단계는 도크와 선박의 간격을 조절하여 눈금(드라프트)측정을 위한 보트의 이동공간 및 승선박스의 승하강공간을 확보하도록 되어 있다. 이때, 도크(200)와 선박(100)의 간격(L1,L2)은 도 2 에 도시된 바와 같이, 선박(100)에 연결된 케이블(300)의 길이조절을 통해 선박의 진수시 도크(200)와 선박(100)간의 간격이 자동조절된다. In addition, the launching step is to adjust the distance between the dock and the ship to ensure the moving space of the boat for the scale (draft) measurement and the lifting space of the boarding box. At this time, the interval between the
또한, 상기 진수단계는 트림(TRIM) 60~100㎝가 되도록 조절한다. 이는 선박에 ballasting 량을 최소화 하여 dock 공기를 줄이기 위한 것이다.In addition, the launching step is adjusted so that the trim (TRIM) 60 ~ 100cm. This is to reduce dock air by minimizing the amount of ballasting on the ship.
또한, 상기 진수 및 DWT 측정단계는 선박내 일측에 해치커버를 겹쳐서 탑재하는 해치커버 탑재단계를 더 포함한다. In addition, the launching and DWT measurement step further includes a hatch cover mounting step of mounting the hatch cover on one side in the ship.
상기 해치커버 탑재단계는 해치커버를 다수개씩 겹쳐서 선박 일측에 탑재 및 테크 하우징(DECK HOUSE)을 탑재하며, 이와 같은 해치커버의 탑재는 차후 선창(hold) 작업을 용이하게 하면서, 선박의 진수 및 DWT 측정을 위한 것이다. 또한, 이와 같은 해치커버의 탑재는 안벽에서의 해치커버 적재장소를 확보할 필요가 없어 안벽적치장소 부족현상을 제거할 수 있다. 또한, 이와 같은 해치커버의 적재시험은 사전에 완료하는 것이 바람직하다.In the hatch cover mounting step, the hatch cover is mounted on the ship side by stacking a plurality of hatch covers, and the deck housing is mounted on the side of the ship, and the mounting of the hatch cover facilitates hold work in the future, while launching the ship and DWT. It is for measurement. In addition, since the hatch cover is not installed, it is not necessary to secure a place for loading the hatch cover on the quay wall, thereby eliminating the shortage of the quay wall place. In addition, it is preferable to complete such a loading test of the hatch cover in advance.
상기 DWT 측정단계는 도크내에 진수된 상태에서 선박에 형성된 눈금(드라프트)를 측정하여 DWT 측정을 수행한다. In the DWT measurement step, a DWT measurement is performed by measuring a scale (draft) formed on a ship in a state launched in a dock.
이와 같이 본 발명은 본선pump작동 및 진수시 DWT측정이 가능하도록 dock 공기를 향상시키기 위하여, 부분진수시 main engine 탑재를 가능하게 하기 위한 swash BHD를 부분진수 후 그 opening을 시공하도록 되어 있다. In this way, the present invention is to construct the opening after the swash BHD to enable the main engine mounted in the partial launch, in order to improve the dock air to enable the main pump operation and DWT measurement during launch.
상기 안벽공사단계는 진수 및 DWT 측정후 안벽으로 이동된 선박에 대하여 마무리 의장공사를 수행한다. 이와 같은 안벽공사는 선박건조에 있어서 일반적인 공사단계이므로, 이에 대한 상세한 설명은 생략한다. The quay wall construction step is to perform a finish design for the ship moved to the quay after the launch and DWT measurement. Such a quay wall construction is a general construction stage in ship construction, so a detailed description thereof will be omitted.
상기 시운전단계는 선박의 기계류, 전장류에 대한 시운전을 수행하고, 외항에 나가 선박의 운항 종합 시운전을 거쳐 이상유무를 확인한다. 이와 같은 시운전 후에는 선주에게 선박이 인도된다. The commissioning step is to perform a test run on the machinery, electrical equipment of the ship, and go to the outer port to check whether there is any abnormality through the comprehensive test operation of the ship. After such commissioning, the ship is delivered to the owner.
본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위내에 있게 된다. The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.
도 1 은 본 발명에 따른 건조공법을 보인 블록예시도1 is an exemplary block diagram showing a drying method according to the present invention
도 2 는 본 발명에 따른 선박 진수과정을 보인 예시도2 is an exemplary view showing a ship launching process according to the present invention
도 3 은 선박의 진수 컨디션을 보인 예시도3 is an exemplary view showing the launch condition of the ship
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
(100) : 선박 (200) : 도크100: Ship 200: Dock
(300) : 케이블300: cable
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090064360A KR101095113B1 (en) | 2009-07-15 | 2009-07-15 | Deadweight/Lightweight Measurement at Launching Stage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090064360A KR101095113B1 (en) | 2009-07-15 | 2009-07-15 | Deadweight/Lightweight Measurement at Launching Stage |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20110006804A true KR20110006804A (en) | 2011-01-21 |
KR101095113B1 KR101095113B1 (en) | 2011-12-16 |
Family
ID=43613501
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090064360A KR101095113B1 (en) | 2009-07-15 | 2009-07-15 | Deadweight/Lightweight Measurement at Launching Stage |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101095113B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115556898A (en) * | 2022-10-25 | 2023-01-03 | 沪东中华造船(集团)有限公司 | Rapid carrying and linear control method for titanium alloy air guide sleeve for shipbuilding on inclined slipway |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100335215B1 (en) * | 2000-06-12 | 2002-05-04 | 김형벽ㅂ | Draught measuring devices |
-
2009
- 2009-07-15 KR KR1020090064360A patent/KR101095113B1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115556898A (en) * | 2022-10-25 | 2023-01-03 | 沪东中华造船(集团)有限公司 | Rapid carrying and linear control method for titanium alloy air guide sleeve for shipbuilding on inclined slipway |
CN115556898B (en) * | 2022-10-25 | 2024-06-11 | 沪东中华造船(集团)有限公司 | Quick carrying and linear control method for titanium alloy guide cover for shipbuilding by inclined slipway |
Also Published As
Publication number | Publication date |
---|---|
KR101095113B1 (en) | 2011-12-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100796410B1 (en) | Inundation method using tandem construction method | |
WO2010059059A1 (en) | Device for floating production of lng and method for converting a lng-carrier to such a device | |
KR100687812B1 (en) | Method of constructing ship on the sea and the ground | |
CN105813938A (en) | Ship-shaped structure | |
US4084529A (en) | Floating dry dock with lifting pontoons | |
KR100914350B1 (en) | Tank hydro test method a period of dock stage using buoyancy of half diving state | |
CN110371270B (en) | Method for safely floating and refuting product ship in water | |
KR101095113B1 (en) | Deadweight/Lightweight Measurement at Launching Stage | |
KR101302037B1 (en) | Floating dock | |
CN102092458A (en) | In-dock super-large ship floating secondary positioning process | |
KR101115121B1 (en) | Method for Performing Light Weight in a Dockon the ground Before Launching a Ship | |
KR20110136395A (en) | Ship construction method using wooden support allowance | |
JP2009517290A (en) | Inundation method applied to tandem construction method | |
CN206766292U (en) | Middle-size and small-size submarine handling torpedo new exclusive landing stage | |
KR20160148762A (en) | Quay using decrepit ship and method for fabricating the same | |
CN109080792A (en) | The stowage method of half ship not floating in a kind of dock | |
KR20130141163A (en) | Ship for transportation and installation | |
KR200451278Y1 (en) | An engine test barge | |
KR100953487B1 (en) | Inundation method using lashing in tandem construction method | |
KR101159029B1 (en) | Ship building method by sliding launching of megablock | |
RU2403168C1 (en) | Pontoon-type floating vessel | |
KR101183740B1 (en) | Tandem construction method using magnetic device | |
Rashkovskyi et al. | Innovative technologies in composite floating docks construction | |
KR20160059217A (en) | Inclining test system for semi-submergible rig, semi-submergible rig with the same and inclining test method using the system | |
Rajewski | Impact of dock tanks pumping plan on structural loads of a dock and a ship |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20141202 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20161128 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20171129 Year of fee payment: 7 |
|
LAPS | Lapse due to unpaid annual fee |