KR20100035204A - Constructive method of dry grinding bottom close material of building - Google Patents

Constructive method of dry grinding bottom close material of building Download PDF

Info

Publication number
KR20100035204A
KR20100035204A KR1020080094414A KR20080094414A KR20100035204A KR 20100035204 A KR20100035204 A KR 20100035204A KR 1020080094414 A KR1020080094414 A KR 1020080094414A KR 20080094414 A KR20080094414 A KR 20080094414A KR 20100035204 A KR20100035204 A KR 20100035204A
Authority
KR
South Korea
Prior art keywords
layer
adhesive
mortar
building
floor
Prior art date
Application number
KR1020080094414A
Other languages
Korean (ko)
Inventor
권오석
Original Assignee
성안산업주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 성안산업주식회사 filed Critical 성안산업주식회사
Priority to KR1020080094414A priority Critical patent/KR20100035204A/en
Publication of KR20100035204A publication Critical patent/KR20100035204A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
    • E04F15/14Construction of joints, e.g. dividing strips

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

PURPOSE: A constructive method of a dry grinding bottom close material of a building is provided to reduce repair work costs and prevent the operation delay which is caused of broken stone chips. CONSTITUTION: An adhesive agent is spread on the upper side of a concrete layer(10) and a first adhesive layer(20). A metallic joiner(30) is arranged on the upper side of the adhesive layer and mortar is poured in order to form a mortar layer(40). The adhesive is spread on the upper side of the mortar layer and a second adhesive layer(50) is formed. A finishing member is poured in order to a finishing member layer(60).

Description

Constructive method of dry grinding bottom close material of building}

The present invention relates to a construction method of a floor finishing material for dry grind of a building, and more particularly, in performing dry grind to express an artificial stone texture of a floor finish of a building, the keystone included in the floor finishing material is used for high-speed rotation of a dry grind machine. The present invention relates to a construction method of a floor finishing material for dry grind of a building to prevent work from being separated, thereby improving work efficiency of dry grind.

In general, when finishing the floor of a building, a floor finishing material was used to express the texture of artificial stone on the surface of concrete for a long time, and a water grind method using water was used to finish the surface after curing. Dry mane construction method that does not use is widely practiced.

The dry grind construction method is to dry grind (polishing) by using a dedicated machine for dry grind after finishing the floor of a building, and when the grinding stone (not shown) interlocked with a dedicated machine (not shown) interlocks at a high speed, As the keystone included in the finishing material is separated from the floor, there is a problem that the labor delay, as well as the unnecessary human and material costs due to renovation work have to be paid.

Although the keystone included in the floor finishing material is constructed after patterning, when the part is separated, the uneven pattern is formed on the floor surface of the building. As a result of the separation of the keystone, only the mortar except the keystone remains on the bottom surface, which may cause a case in which luxury cannot be provided by maximizing the visual effect.

Accordingly, in the present invention, in order to solve the problems as described above in the finishing of the bottom surface by dry or water-drilling method to prevent the work delay and at the same time by avoiding the separation of the stones included in the floor finishing material by abrasive stones The purpose of the present invention is to provide a construction method of dry finishing floor finishing materials for buildings to prevent the occurrence of repair cost caused by the departure of the building.

Construction method of the dry finishing floor finishing material provided by the present invention,

Applying an adhesive to the upper surface of the concrete layer 10 to form the primary adhesive layer 20, and placing the joint 30 on the upper surface of the adhesive layer 20, and at the same time placing mortar Forming a mortar layer 40, forming a mortar layer 40 and applying an adhesive after 24 hours to form a secondary adhesive layer 50, and the secondary adhesive layer 50. At the same time, the bottom cement material is formed by stirring 40 kg of the cement 45 and 40 kg of the rock cement 62 and 40 kg of water to form the floor material layer 60, and after the formation of the floor material layer, during the grinding or dry grind. In the construction method of the floor finishing material is completed by performing a surface polishing operation using any one method,

The bottom finish material layer 60 is formed by adding 70-90 g of an adhesive to a mortar bottom finish material composed by stirring 40 kg of the back cement 61, 75 kg of the calcite 62, and 40 kg of water. However, at the same time as the mortar-like floor finishing material is sprayed on the upper surface is characterized in that the completed by spraying the adhesive liquid mixed with a ratio of 1: 1.

The construction method of the dry finishing floor finishing material of the building provided by the present invention can block the departure of the keystone to form a pattern on the floor surface of the building, so the delay of work due to the departure of the keystone and the human and physical resources required for repair Since the source can be sealed off, the floor can be effectively closed.

In order to achieve the above object, the present invention will be described in detail with reference to the accompanying drawings.

1 is a cross-sectional view of a building floor surface showing a preferred embodiment of the present invention will be described in more detail with respect to the construction method of the floor finishing material for dry grind provided by the present invention.

First, when the concrete layer 10 is completed, an adhesive is applied to the upper surface thereof to form a primary adhesive layer 20.

On the upper surface of the adhesive layer 20, the joint 30 is selected and placed at the same time as the mortar is poured to form a mortar layer 40. The joints do not need to be arranged as needed, and can be changed according to the working environment.

When about 24 hours have elapsed after the mortar layer is formed, a secondary adhesive layer 50 is formed by applying an adhesive to an upper surface of the mortar layer.

At the same time as the secondary adhesive layer 50 is formed, the bottom cement material is poured by adding 70-90 g of the adhesive to the mortar-type floor finishing material formed by stirring 40 kg of the back cement 61 and 40 kg of the stone 62 and 75 kg of water. The finish layer 60 is formed.

In addition, when the floor finishing material in the mortar state is poured with a trowel (not shown), the adhesive liquid mixed with water and the adhesive in a ratio of 1: 1 is sprayed on the upper surface thereof to provide a high strength floor finishing layer. I can receive it.

As described above, after the curing period of 3 to 4 days has elapsed after the floor finish layer is completed, the surface is polished by using a dry grinding machine.

Polishing the floor surface of the building is completed by roughing and finishing, but the surface of the building can be visually checked and the finishing process can be additionally carried out if necessary.

In addition, it is also possible to apply a water grind method which is a conventional surface polishing method on the surface of the floor finishing material layer constructed as described above.

After all, the core of the present invention is to ensure that strong cohesion between the keystone and the back cement is generated so that the keystone does not deviate from the back cement when polishing the surface, thereby providing a high quality floor surface, It cuts all the time and money spent.

1 is a cross-sectional configuration of the building floor showing a preferred embodiment of the present invention

◈ Explanation of symbols for the main parts of the drawing ◈

10: concrete layer 20: 1 adhesive layer

30: Joint 40: Mortar layer

50: 2 adhesive layer 60: floor finish layer

61: Keystone 62: Back cement

100: building

Claims (1)

The construction method of the floor finishing material for dry grind of the building, Applying an adhesive to an upper surface of the concrete layer 10 to form a primary adhesive layer 20; Selecting and arranging the joints 30 on the upper surface of the adhesive layer 20 and simultaneously pouring mortar to form a mortar layer 40; Forming a mortar layer 40 and applying an adhesive after 24 hours to form a secondary adhesive layer 50; Forming a bottom finish layer 60 by simultaneously stirring the bottom cement material 50 with 40 kg of back cement 61, 75 kg of feldspar 62, and 40 kg of water with the formation of the second adhesive layer 50; In the construction method of the floor finishing material is completed by performing a surface polishing operation using any method of water grind or dry grind after forming the floor finishing material layer, The bottom finish material layer 60 is formed by pouring 70 ~ 90 g of the adhesive into the mortar bottom finish material formed by stirring the 40 kg of the back cement 61 and the 75 kg of the stone 62 and 40 kg of water. The construction method of the floor finishing material for dry grind of a building, characterized in that it is completed by pouring a mortar floor coating material and at the same time by spraying an adhesive liquid mixed with water and an adhesive in a ratio of 1: 1.
KR1020080094414A 2008-09-26 2008-09-26 Constructive method of dry grinding bottom close material of building KR20100035204A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080094414A KR20100035204A (en) 2008-09-26 2008-09-26 Constructive method of dry grinding bottom close material of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080094414A KR20100035204A (en) 2008-09-26 2008-09-26 Constructive method of dry grinding bottom close material of building

Publications (1)

Publication Number Publication Date
KR20100035204A true KR20100035204A (en) 2010-04-05

Family

ID=42213113

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080094414A KR20100035204A (en) 2008-09-26 2008-09-26 Constructive method of dry grinding bottom close material of building

Country Status (1)

Country Link
KR (1) KR20100035204A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013068996A1 (en) 2011-11-11 2013-05-16 Vertequip - Equipamentos E Trabalhos Verticais, Lda. Equipment for moving people in height in non horizontal surfaces with vertical and horizontal translation
CN106917494A (en) * 2017-04-27 2017-07-04 福州皇家地坪有限公司 Prefabrication type grinding stone coiled material
CN107035103A (en) * 2017-06-20 2017-08-11 中国华西企业有限公司 A kind of cement floor construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013068996A1 (en) 2011-11-11 2013-05-16 Vertequip - Equipamentos E Trabalhos Verticais, Lda. Equipment for moving people in height in non horizontal surfaces with vertical and horizontal translation
CN106917494A (en) * 2017-04-27 2017-07-04 福州皇家地坪有限公司 Prefabrication type grinding stone coiled material
CN107035103A (en) * 2017-06-20 2017-08-11 中国华西企业有限公司 A kind of cement floor construction method

Similar Documents

Publication Publication Date Title
US20210254335A1 (en) Decorative concrete with uniform surface and method of forming the same
CN109826396A (en) A kind of construction method of A grades of fire prevention artistic floors
CN105386609A (en) Repairing technology for fair-faced concrete defects
CN102493626A (en) Method for manufacturing epoxy colored-stone terrace
CN108625618B (en) Quick repair method for water seepage caused by rupture of waterproof layer of bathroom without disassembling bricks
CN104108911A (en) Production formula and construction technology of ultra-wear-resistant ground
CN111608362A (en) Hollowing-proof and cracking-proof process for concrete terrace leveling layer
CN103174274A (en) Stone material seamless polishing construction method
CN109138354A (en) Inorganic grinding stone terrace
KR102363802B1 (en) The construction method of terrazzo
CN106121188A (en) Large area is seamless overall ground and construction method thereof
KR20100035204A (en) Constructive method of dry grinding bottom close material of building
CN113738082A (en) Epoxy terrazzo wet-paving process
CN105178562A (en) Inorganic crystal grindstone integrated terrace system and construction process thereof
CN103774696A (en) Construction process of cement-based permeable-crystallization type waterproof material
KR100858347B1 (en) Method for carrying out floor board of structure andfloor board of structure carried out by its method
CN108947464B (en) Ground surface layer based on phosphorus-magnesium material and construction process thereof
CN216921186U (en) Ground structure of golden millstone
CN107304632B (en) Stone gum construction method
US6669876B2 (en) Method of preparing smooth, watertight concrete surfaces on concrete pools
WO2001036762A1 (en) Terrazzo flooring system
KR100581701B1 (en) Method for carrying out floor board of structure and floor board of structure carried out by its method
CN110130615A (en) Indoor combined floor and its construction method based on phosphorus magnesium material and Self-leveling gypsum
CN113382822A (en) Dry-spreading type application method of concrete ground
CN109851300A (en) A kind of decorative concrete and preparation method and construction technology and its application

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application