CN216921186U - Ground structure of golden millstone - Google Patents
Ground structure of golden millstone Download PDFInfo
- Publication number
- CN216921186U CN216921186U CN202220219404.XU CN202220219404U CN216921186U CN 216921186 U CN216921186 U CN 216921186U CN 202220219404 U CN202220219404 U CN 202220219404U CN 216921186 U CN216921186 U CN 216921186U
- Authority
- CN
- China
- Prior art keywords
- layer
- epoxy
- gold
- whetstone
- thickness
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004593 Epoxy Substances 0.000 claims abstract description 50
- 239000000463 material Substances 0.000 claims abstract description 19
- 238000007789 sealing Methods 0.000 claims abstract description 12
- 238000000227 grinding Methods 0.000 claims description 35
- 238000005336 cracking Methods 0.000 claims description 25
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 claims description 25
- 239000010931 gold Substances 0.000 claims description 25
- 229910052737 gold Inorganic materials 0.000 claims description 25
- 239000004570 mortar (masonry) Substances 0.000 claims description 15
- 239000003365 glass fiber Substances 0.000 claims description 12
- 238000005192 partition Methods 0.000 claims description 8
- 238000011049 filling Methods 0.000 claims description 7
- 229920005989 resin Polymers 0.000 claims description 6
- 239000011347 resin Substances 0.000 claims description 6
- 239000004575 stone Substances 0.000 claims description 5
- 239000000853 adhesive Substances 0.000 claims description 4
- 230000001070 adhesive effect Effects 0.000 claims description 4
- 230000002265 prevention Effects 0.000 claims 2
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000000926 separation method Methods 0.000 abstract description 23
- 239000011521 glass Substances 0.000 abstract description 10
- 230000000694 effects Effects 0.000 abstract description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 6
- 239000003513 alkali Substances 0.000 abstract description 3
- 239000000126 substance Substances 0.000 abstract description 3
- 239000010410 layer Substances 0.000 description 77
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 10
- 239000002585 base Substances 0.000 description 8
- 238000010276 construction Methods 0.000 description 6
- 239000010432 diamond Substances 0.000 description 6
- 229910003460 diamond Inorganic materials 0.000 description 6
- 238000005498 polishing Methods 0.000 description 6
- 239000011248 coating agent Substances 0.000 description 5
- 239000004568 cement Substances 0.000 description 4
- 238000000576 coating method Methods 0.000 description 4
- 239000004567 concrete Substances 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 4
- 239000011324 bead Substances 0.000 description 3
- 238000001035 drying Methods 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 230000003068 static effect Effects 0.000 description 3
- 238000011282 treatment Methods 0.000 description 3
- 239000000919 ceramic Substances 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000005056 compaction Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000011418 maintenance treatment Methods 0.000 description 2
- 239000004579 marble Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000003921 oil Substances 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 229920001296 polysiloxane Polymers 0.000 description 2
- 229920002635 polyurethane Polymers 0.000 description 2
- 239000004814 polyurethane Substances 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000000377 silicon dioxide Substances 0.000 description 2
- 238000003892 spreading Methods 0.000 description 2
- 230000007480 spreading Effects 0.000 description 2
- 239000000758 substrate Substances 0.000 description 2
- 230000001502 supplementing effect Effects 0.000 description 2
- 229920000049 Carbon (fiber) Polymers 0.000 description 1
- 239000006004 Quartz sand Substances 0.000 description 1
- XUIMIQQOPSSXEZ-UHFFFAOYSA-N Silicon Chemical compound [Si] XUIMIQQOPSSXEZ-UHFFFAOYSA-N 0.000 description 1
- 206010041662 Splinter Diseases 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 239000012615 aggregate Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004917 carbon fiber Substances 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000002537 cosmetic Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000004925 denaturation Methods 0.000 description 1
- 230000036425 denaturation Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000009499 grossing Methods 0.000 description 1
- 230000002401 inhibitory effect Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 229940127554 medical product Drugs 0.000 description 1
- 239000002923 metal particle Substances 0.000 description 1
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 239000002952 polymeric resin Substances 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
- 230000037452 priming Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000002829 reductive effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000005488 sandblasting Methods 0.000 description 1
- 238000007790 scraping Methods 0.000 description 1
- 229910052710 silicon Inorganic materials 0.000 description 1
- 239000010703 silicon Substances 0.000 description 1
- 235000012239 silicon dioxide Nutrition 0.000 description 1
- 229910052814 silicon oxide Inorganic materials 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000008399 tap water Substances 0.000 description 1
- 235000020679 tap water Nutrition 0.000 description 1
- 238000004018 waxing Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Floor Finish (AREA)
- Road Paving Structures (AREA)
Abstract
The utility model discloses a terrazzo ground structure which comprises a separation frame and an epoxy terrazzo terrace, wherein the separation frame is arranged in the epoxy terrazzo terrace, the separation frame separates the epoxy terrazzo terrace into a plurality of separation areas, and a glaze sealing layer is arranged on the surface of the epoxy terrazzo terrace; the present invention provides the glaze sealing layer to form a high quality effect such as a thin glass film on the surface of the floor material, and can maintain the effect for a long period of time, and is superior in water resistance, alkali resistance, oil resistance, chemical resistance, and the like.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to a golden millstone ground structure.
Background
The seamless artistic epoxy terrazzo is a high-decorative and integral seamless artistic floor capable of showing unique style of modern urban facilities. The terrace is formed by selecting various specially-made colorful glass particles, metal particles, shells or other suitable decorative aggregates and high polymer resin materials and performing site construction through special processes of grinding, polishing and the like.
The surface of the existing terrazzo terrace is generally protected by waxing or roll coating transparent polyurethane, but the terrazzo terrace which is waxed has poor wear resistance, and the roll coating transparent polyurethane has dark color and poor decoration.
In view of the above-mentioned drawbacks, the inventors of the present invention have finally obtained the present invention through a long period of research and practice.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical defects, the technical scheme adopted by the utility model is to provide a gold grindstone ground structure which comprises a separation frame and an epoxy gold grindstone terrace, wherein the separation frame is arranged in the epoxy gold grindstone terrace, the separation frame separates the epoxy gold grindstone terrace into a plurality of separation areas, and a glaze sealing layer is arranged on the surface of the epoxy gold grindstone terrace.
Preferably, the epoxy grindstone terrace is provided with a leveling mortar layer, an anti-cracking layer, a glass fiber net layer, an anti-cracking layer and an epoxy gold grindstone layer from bottom to top in sequence, the leveling mortar layer is arranged on a building floor slab, the separation frame comprises a plurality of separation strips, and the separation strips are arranged on the anti-cracking layer.
Preferably, the cross section of the separating strip is provided with an L shape, and the separating strip extends along a straight line or a curved line.
Preferably, the separation strip comprises a fixed plate and a separation plate, the fixed plate and the separation plate are vertically arranged, the fixed plate is attached to the anti-cracking layer, the thickness of the fixed plate is smaller than that of the separation plate, and the width of the fixed plate is larger than that of the separation plate.
Preferably, the partition strips are arranged in two areas corresponding to the expansion joint of the terrace, the partition strips are symmetrically arranged on two sides of the expansion joint, the fixed plate is far away from the expansion joint, and gaps between the two symmetrically arranged partition strips are filled with elastic joint filling materials.
Preferably, the elastic joint filling material is elastic resin.
Preferably, the fixing plate is provided with a plurality of mounting grooves which are equidistantly arranged along the extending direction of the fixing plate; the fixing plate is fixed on the anti-cracking layer in an adhesive mode.
Preferably, the thickness of the leveling mortar layer is set to be not less than 50mm, the thickness of the anti-cracking layer is set to be 1mm, the thickness of the glass fiber net layer is set to be 0.5mm, the thickness of the anti-cracking layer is set to be 0.5mm, and the thickness of the epoxy gold abrasive layer is set to be 12 mm.
Compared with the prior art, the utility model has the beneficial effects that: the present invention provides the glaze sealing layer to form a high quality effect such as a thin glass film on the surface of the floor material, and can maintain the effect for a long period of time, and is superior in water resistance, alkali resistance, oil resistance, chemical resistance, and the like.
Drawings
FIG. 1 is a schematic structural view of the ground structure of the diamond grinding stone;
fig. 2 is a structural view of the separator.
The figures in the drawings represent:
1-building a floor slab; 2-leveling a mortar layer; 3 an anti-cracking layer; 4-a glass fiber web layer; 5-a crack-resistant layer; 6-epoxy gold grinding stone layer; 7-sealing a glaze layer; 8-a dividing strip; 81-fixing plate; 82-a partition plate; and 83-mounting groove.
Detailed Description
The above and further features and advantages of the present invention are described in more detail below with reference to the accompanying drawings.
Example one
As shown in fig. 1, fig. 1 is a schematic structural diagram of the ground structure of the diamond.
The gold grindstone ground structure comprises a separation frame and an epoxy gold grindstone terrace, wherein the separation frame is arranged in the epoxy gold grindstone terrace, the separation frame separates the epoxy gold grindstone terrace into a plurality of separation areas, and the surface of the epoxy gold grindstone terrace is provided with a glaze sealing layer 7. The terraces of the epoxy gold grindstones in the separate areas can adopt different colors or patterns, and the separate areas can also be arranged in different shapes so as to form an integral pattern by combining the separate areas in different shapes.
The main component of the glaze seal layer 7 is composed of silicone (silicon oxide) used for medical products, cosmetics, and the like and silicon (silicon dioxide) as a main component of glass, and is an organic-inorganic hybrid material. This is a composite material having a special property which combines the gloss of silicone and the ability to follow up with denaturation under load with the high hardness of silica.
The glaze sealing layer 7 has a high quality effect as if a thin glass film is stuck to the surface of the floor material, and this state can be maintained for a long period of time. In addition, since the paint has excellent water resistance, alkali resistance, oil resistance, chemical resistance and the like, dirt can be easily removed, and a clean and bright state can be permanently maintained.
Epoxy rubble terrace is by supreme leveling mortar layer 2, crack control layer 3, glass fiber net layer 4, anti-crack layer 5, the golden rubble layer 6 of epoxy of having set gradually down, leveling mortar layer 2 sets up on building floor 1, it includes a plurality of parting bead 8 to separate the frame, parting bead 8 sets up anti-crack layer 5 is last.
The cross section of the separating strip 8 is arranged to be L-shaped, and the separating strip 8 extends along a straight line or a curved line to form the separating regions with different shapes.
As shown in fig. 2, fig. 2 is a structural view of the division bar; the dividing strip 8 comprises a fixing plate 81 and a dividing plate 82, the fixing plate 81 and the dividing plate 82 are vertically arranged, the fixing plate 81 is attached to the anti-cracking layer 5, the thickness of the fixing plate 81 is smaller than that of the dividing plate 82, and the width of the fixing plate 81 is larger than that of the dividing plate 82. By laying the epoxy diamond layer 6, the fixing plate 81 is arranged between the epoxy diamond layer 6 and the anti-crack layer 5, so that the stability of the division bar 8 can be ensured. The provision of a larger area of the fixing plate 81 also facilitates a smooth placement of the dividing strips 8 on the anti-splinter layer 5.
Typically, the dividing strip 8 is provided as a single strip. However, aiming at special areas such as a terrace expansion joint, the two separation strips 8 are symmetrically arranged on two sides of the expansion joint, the fixing plate 81 is far away from the expansion joint, and gaps between the two separation strips 8 are filled with elastic gap filling materials, so that the expansion joint is reduced while the transmission of the load of the terrace on two sides of the expansion joint is ensured. The elastomeric caulking material is typically an elastomeric resin.
Preferably, the fixing plate 81 is provided with a plurality of mounting grooves 83, and the mounting grooves 83 are equidistantly arranged along the extending direction of the fixing plate 81; the fixing plate 81 is fixed on the anti-crack layer 5 in an adhesive manner, and the installation groove 83 is arranged to increase the edge length of the fixing plate 81, so as to increase the adhesive area and further ensure the stability of the separation strip 8 on the anti-crack layer 5.
Generally, the thickness of the leveling mortar layer 2 is set to be not less than 50mm, the thickness of the anti-cracking layer 3 is set to be 1mm, the thickness of the glass fiber net layer 4 is set to be 0.5mm, the thickness of the anti-cracking layer 5 is set to be 0.5mm, and the thickness of the epoxy diamond layer 6 is set to be 12 mm.
Example two
The construction method of the terrazzo ground structure comprises the following steps:
s1, treating the base layer of the building floor slab 1;
grinding the base layer, processing the area with hollowness, weakness and unevenness of the original base layer ground, and detecting and processing various gaps
And grinding the base layer by using a grinder to remove the laitance on the surface of the base layer so that the base layer presents the firmest surface, and adopting a small dust-free grinder on the corners. Before paving the epoxy millstone surface layer, the on-site basic layer is required to be surveyed and comprehensively detected, a solution suitable for the on-site condition is made, and then the subsequent paving work of the epoxy millstone can be carried out.
Specifically, the state of the crack can be classified into motion, unstable, and stable states, i.e., dynamic crack and static crack.
In large-area seamless reinforced concrete ground, expansion joints, deformation joints and settlement joints which are necessary to be arranged during concrete construction, warehouse-dividing joints and construction joints which are convenient to construct and cracks caused by improper reinforcement arrangement are all in a motion or unstable state and can be classified as dynamic cracks.
Cracks which appear on the surface of the concrete during or after hardening, cracks which are generated when the concrete is not cured in place, and the cracks which are observed to be stable and not to be expanded and prolonged any more, namely, the cracks in a stable state can be classified as static cracks.
When the static cracks are processed, all the cracks are completely shown after sand blasting or vacuum polishing and dust absorption are carried out on the base layer, and only 45-degree V-shaped groove openings are formed in the cracks, and elastic resin is used for repairing and leveling the cracks.
The material for filling the cracks and the expansion joints of the base layer is selected from elastic gap filling materials. Precaution of the substrate (carbon fiber reinforcement when the substrate cracks are cracks created by structural forces).
S2, setting the leveling mortar layer 2;
s21, processing of the elevation and electromechanical pipelines:
re-measuring the elevation, checking the on-site elevation through infrared rays, and re-checking the thickness of the leveling mortar layer 2;
s22, pre-burying the electromechanical flat cable tube:
firstly snapping lines according to the electromechanical pipelines inserted in the ground, then slotting the structural floor, cleaning concrete sundries in the slots after slotting, and filling cement mortar after embedding the pipes.
And S23, paving an isolation film and paving the leveling mortar layer 2.
The leveling mortar layer 2 is generally set as a dry hard anti-cracking cushion layer, and the dry hard anti-cracking cushion layer is a floor material consisting of cement, sand, aggregate and other modified additives, and is stirred into a semi-dry state on site, paved and maintained to play a role in leveling and anti-cracking floor cushion layer. In the dry hard anti-cracking cushion layer, cement adopts cementing materials P042.5 cement and PC32.5 cement, sand adopts medium-coarse sand with the mud content of less than 1% and the fineness modulus of 2.3-3.0, and aggregate adopts fine stone with the mud content of less than 1% and the fineness modulus of 5 mm-15 mm.
S3, arranging an anti-cracking layer 3 on the leveling mortar layer 2; the anti-cracking layer 3 is generally an elastic inhibiting film.
S4, laying the glass fiber net layer 4 on the anti-cracking layer 3;
s41, priming: uniformly rolling a bottom coating agent on the anti-cracking layer 3 by using a roller or uniformly blade-coating the bottom coating on the anti-cracking layer 3 by using a knife board, and preprocessing the expansion joint of the base layer after drying;
and S42, paving the glass fiber net cut in advance on the deepened ground and pasting the glass fiber net.
S5, disposing the anti-crack layer 5 on the glass fiber net layer 4;
and uniformly scraping the prepared solvent-free epoxy primer on the laid glass fiber net layer 4. No. 4 quartz sand is selected for sand throwing treatment.
S6, mounting the division bar 8;
the division bar 8 is installed according to the drawing (flatness is adjusted by infrared rays), and the division bar is L-shaped.
Specifically, at elevator mouth position department, the elevator mouth adopts 5 mm's L type parting bead 8 to separate epoxy grindstone and elevator mouth baffle, and the effectual finished product baffle that prevents to bump bad elevator mouth when polishing epoxy grindstone corner like this.
The processing mode at the position of the glass curtain wall has two types of design node construction according to actual conditions and deepened designers.
Firstly, the glass curtain wall is isolated by an L-shaped separating strip 8 with the thickness of 5mm near the joint of the glass curtain wall and other materials.
Second, the parting strip 8 is aligned with the outer mouth of the glass channel prior to installation of the glass wall. The two modes can effectively prevent other materials from being damaged in the process of polishing the epoxy grindstone.
At evacuation pilot lamp position department, the evacuation pilot lamp has two kinds to be flat mouthful another kind is bellied, these two kinds of evacuation pilot lamps all need be the total package provide standard sample before spreading the epoxy grindstone, install subaerial while with the levelling rod adjustment levelness according to the equal size substitute of sample sculpture of evacuation pilot lamp, the evacuation pilot lamp that polishes like this of intercommunication substitute after the epoxy grindstone is pour is flushed with epoxy grindstone ground together, all take out then install original evacuation pilot lamp with the substitute of evacuation pilot lamp after the epoxy grindstone ground is completed.
At other material handing-over departments, all need to know its node in detail before the construction like handing-over departments such as marble, ceramic tile, baseboard, floodgate machine, marble, ceramic tile need adopt 5 mm's L type parting strip 8 to separate it, also need adopt 5 mm's L type parting strip 8 to put the floodgate machine after taking ground to do with its encircleing around the floodgate machine end opening, the baseboard treats that it accomplishes the face and installs and can guarantee the roughness and the aesthetic property of baseboard like this after ground is all ground to the completion.
S7, arranging the epoxy diamond layer 6;
s71, paving the epoxy gold grinding stone layer 6;
s711, mixing the epoxy millstone; the resin color paint component of the solvent-free epoxy millstone resin and the curing agent component B are mixed according to the specified proportion, fully stirred and mixed by a stirrer, and then poured into a special stirrer filled with various grades of aggregates for fully stirring.
S712, spreading, leveling and compacting the material; the mixed epoxy grindstone should be in time prevented cracking layer 3 above, pave thickness and use about 8 ~ 10 millimeters after the compaction as being suitable, because original basic unit roughness local probably reaches about 10 ~ 13 millimeters and lays simultaneously, should join in marriage infrared ray and detect the roughness, ensure that the roughness is in 2m/2 ~ 3mm, then carry out the compaction with the smoothing machine, make epoxy grindstone surface level, closely knit.
And S713, curing the epoxy millstone after paving.
S72, polishing the epoxy gold grindstone layer 6;
grinding and leveling (coarse grinding, middle grinding and fine grinding) grouting;
a hexagonal grinding head is assembled by a vacuum dust-free grinding machine for trial grinding, a ground dust-free limb grinding head is adhered to the grinding head, the maintenance period is indicated to be reached, grinding and leveling can be performed, grinding and leveling are performed according to the sequence of horizontal grinding and vertical grinding, the grinding rows are preferably jointed by one third, the grinding machine is swung left and right, the grinding speed of the grinding machine is uniformly controlled according to the grinding condition of the surface, the grinding speed cannot be stopped or changed randomly, and the phenomena of local depression, unevenness, grinding leakage and the like are avoided.
And (3) matching with a 2m guiding rule to detect the flatness of the ground to be polished, grinding a part with higher height until the flatness reaches the standard, grinding the texture of the aggregate, and detecting the ground thickness by 6mm or detecting the ground surface by infrared rays according to different standards.
And (2) carrying out middle grinding, namely adding a proper amount of water into a water tank by using a 12-head grinding machine, discharging a small amount of water during grinding, finding out a preliminary effect of the epoxy grindstone after grinding, cleaning and drying the slurry on the ground by using tap water after the middle grinding, and supplementing the slurry to repair the holes after the drying is finished.
And after the slurry supplementing operation is finished, closed maintenance treatment is carried out, so that other related professionals are prevented from entering a ground maintenance area when the ground is not completely solidified, pollution is avoided, and the ground impression effect after completion is influenced. The time for the closed curing treatment is generally more than 48 hours (determined according to the indoor temperature condition and the ground curing condition of the grindstone).
And after the sealing maintenance treatment is finished, final fine grinding is carried out, and the epoxy grindstone terrace is coated with a sealing glaze polishing agent to carry out sealing glaze treatment to form the sealing glaze layer 7.
The foregoing is illustrative of the preferred embodiments of the present invention, which is set forth only, and not to be taken as limiting the utility model. It will be understood by those skilled in the art that various changes, modifications and equivalents may be made therein without departing from the spirit and scope of the utility model as defined in the appended claims.
Claims (8)
1. The utility model provides a gold whetstone ground structure, its characterized in that, is including separating frame and epoxy gold whetstone terrace, it sets up to separate the frame in the epoxy gold whetstone terrace, it will to separate the frame a plurality of partition areas of formation are separated to epoxy gold whetstone terrace, epoxy gold whetstone terrace surface sets up the glaze sealing layer.
2. The gold whetstone floor structure of claim 1, wherein the epoxy gold whetstone floor level is sequentially provided with a leveling mortar layer, an anti-cracking layer, a glass fiber mesh layer, an anti-cracking layer, and an epoxy gold whetstone layer from bottom to top, the leveling mortar layer is provided on a building floor, the partition frame comprises a plurality of partition bars, and the partition bars are provided on the anti-cracking layer.
3. A terrazzo ground structure according to claim 2, characterized in that the division bar is provided in an L-shape in cross-section and that the division bar extends along a straight line or a curved line.
4. The terrazzo floor structure according to claim 2, characterized in that the dividing strips comprise fixing plates and dividing plates, which are arranged vertically, the fixing plates being arranged in a manner of being attached to the anti-crack layer, the thickness of the fixing plates being smaller than that of the dividing plates, and the width of the fixing plates being larger than that of the dividing plates.
5. The terrazzo ground structure according to claim 4, characterized in that two separating strips are provided corresponding to the floor expansion joint area, and the two separating strips are symmetrically provided at two sides of the expansion joint, the fixing plate is provided away from the expansion joint, and the gap between the two symmetrically provided separating strips is filled with elastic gap filling material.
6. The terrazzo floor structure according to claim 5, characterized in that the elastic caulking material is an elastic resin.
7. A golden grinding stone ground structure according to claim 4, wherein said fixing plate is provided with a plurality of mounting grooves which are provided at equal intervals in the extending direction of said fixing plate; the fixing plate is fixed on the anti-cracking layer in an adhesive mode.
8. The terrazzo floor structure according to claim 2, characterized in that the thickness of the leveling mortar layer is set to not less than 50mm, the thickness of the crack prevention layer is set to 1mm, the thickness of the glass fiber net layer is set to 0.5mm, the thickness of the crack prevention layer is set to 0.5mm, and the thickness of the gold epoxy grindstone layer is set to 12 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220219404.XU CN216921186U (en) | 2022-01-26 | 2022-01-26 | Ground structure of golden millstone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220219404.XU CN216921186U (en) | 2022-01-26 | 2022-01-26 | Ground structure of golden millstone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216921186U true CN216921186U (en) | 2022-07-08 |
Family
ID=82264276
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220219404.XU Expired - Fee Related CN216921186U (en) | 2022-01-26 | 2022-01-26 | Ground structure of golden millstone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216921186U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482461A (en) * | 2022-01-26 | 2022-05-13 | 中国建筑第五工程局有限公司 | Ground structure of golden millstone and construction method |
-
2022
- 2022-01-26 CN CN202220219404.XU patent/CN216921186U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482461A (en) * | 2022-01-26 | 2022-05-13 | 中国建筑第五工程局有限公司 | Ground structure of golden millstone and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111997303B (en) | Cast-in-place inorganic artificial terrazzo terrace and construction method thereof | |
CN110905162A (en) | Construction method of fiber-reinforced carborundum wear-resistant ground | |
US20090277127A1 (en) | Decorative aggregate concrete surface preparation process | |
CN106884536A (en) | A kind of construction method of compound terrace | |
CN105587102A (en) | Construction method of wet-on-wet paving type high abrasion resistance terrace | |
CN106121188A (en) | Large area is seamless overall ground and construction method thereof | |
CN102493626A (en) | Method for manufacturing epoxy colored-stone terrace | |
CN113738082A (en) | Epoxy terrazzo wet-paving process | |
CN216921186U (en) | Ground structure of golden millstone | |
CN111734085A (en) | Floating integral terrace and construction method thereof | |
CN111962349A (en) | Wear-resistant concrete ground construction process | |
CN105178562A (en) | Inorganic crystal grindstone integrated terrace system and construction process thereof | |
CN112030665A (en) | Construction method of vibration-compacted large-pore permeable concrete pavement | |
CN108947464B (en) | Ground surface layer based on phosphorus-magnesium material and construction process thereof | |
CN208776593U (en) | A kind of polishing concrete decoration terrace | |
KR100858347B1 (en) | Method for carrying out floor board of structure andfloor board of structure carried out by its method | |
CN111255191A (en) | Semi-pre-pasted ceramic tile and paving method thereof | |
CN114482461A (en) | Ground structure of golden millstone and construction method | |
KR200385757Y1 (en) | A new epoxy resin pavement system and porous solid tile using basaltic screenings | |
CN214169786U (en) | Terrazzo floor used in shopping center | |
CN114876155A (en) | Construction process for polishing ground by using non-ignition fine stone concrete | |
CN212836509U (en) | Floating integral terrace | |
CN112502436A (en) | Construction method of epoxy millstone indoor ground | |
KR100581701B1 (en) | Method for carrying out floor board of structure and floor board of structure carried out by its method | |
CN206016165U (en) | Large area is seamless overall ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220708 |
|
CF01 | Termination of patent right due to non-payment of annual fee |