KR20090077433A - 냉간 압연강의 연속 제조방법 - Google Patents
냉간 압연강의 연속 제조방법 Download PDFInfo
- Publication number
- KR20090077433A KR20090077433A KR1020080003399A KR20080003399A KR20090077433A KR 20090077433 A KR20090077433 A KR 20090077433A KR 1020080003399 A KR1020080003399 A KR 1020080003399A KR 20080003399 A KR20080003399 A KR 20080003399A KR 20090077433 A KR20090077433 A KR 20090077433A
- Authority
- KR
- South Korea
- Prior art keywords
- cold rolled
- rolled steel
- steel
- cold
- annealing
- Prior art date
Links
Images
Classifications
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47H—FURNISHINGS FOR WINDOWS OR DOORS
- A47H5/00—Devices for drawing draperies, curtains, or the like
- A47H5/02—Devices for opening and closing curtains
Landscapes
- Metal Rolling (AREA)
Abstract
Description
Claims (8)
- 냉간 압연강의 연속 제조방법에 있어서,주강(cast steel)을 어닐링(annealing) 및 피클링(pickling)한 후에 주강을 열간 압연하는 것에 의해서 제조되는 백색 강(white steel)(400)의 코일(100)을 제공하는 단계;백색 강(400)의 코일(100)을 언코일링-용접 설비(21)에서 풀고 용접하되, 백색 강(400)의 코일(100)을 언코일링 장치(uncoiling device)(211)에서 평탄하게 하고 용접 장치(212)에서 용접하는 단계;평탄화되고 용접된 백색 강(400)을 제1 스트립 축적기(22)에 제공된 한 세트의 텐션 롤러(221)에 통과시키는 단계;백색 강(400)을 제1 스트립 축적기(22)로부터, 냉간 압연강을 소정의 두께로 만들도록 백색 강(400)을 냉간 압연하는 냉간 압연장치(23)쪽으로 이동시키는 단계;냉간 압연강을 냉간 압연장치(23)로부터, 냉간 압연 백색강에서 그리스를 제거하기 위한 탈지 장치(24)쪽으로 이동시키는 단계;냉간 압연강을 탈지 장치(24)로부터 한 세트의 텐션 롤러(251)를 갖는 제2 스트립 축적기(25)쪽으로 이동시키는 단계;냉간 압연강을 제2 스트립 축적기(25)로부터, 냉간 압연강을 어닐링하고 어닐링 후에 냉간 압연강을 전기분해 및 산 세척하여 냉간 압연강에서 스케일을 제거 하기 위한 어닐링-피클링 설비(26)쪽으로 이동시키는 단계;냉간 압연강을 어닐링 피클링 설비(26)로부터 한 세트의 텐션 롤러(271)를 갖는 제3 스트립 축적기(27)쪽으로 이동시키는 단계;냉간 압연강을 제3 스트립 축적기(27)로부터 냉간 압연강에 광택을 내기 위한 조질 압연장치(temper rolling device)(28)쪽으로 이동시키는 단계;냉간 압연강을 조질 압연장치(28)로부터 냉간 압연강을 레벨링하기 위한 텐션 레벨링 장치(tension leveling device)(29)쪽으로 이동시키는 단계;냉간 압연강을 텐션 레벨링 장치(29)로부터 한 세트의 텐션 롤러(311)를 갖는 제4 스트립 축적기(31)쪽으로 이동시키는 단계; 및냉간 압연강을 제4 스트립 축적기(31)로부터 냉간 압연강을 트리밍 및 리코일링 하기 위한 트리밍-리코일링 설비(trimming-recoiling installation)(32)쪽으로 이동시키는 단계를 포함하는냉간 압연강의 연속 제조방법.
- 제 1 항에 있어서,백색 강(400)은 50 내지 70% 범위의 압연비에서 약 0.3㎜의 두께로 냉간 압연되는냉간 압연강의 연속 제조방법.
- 제 1 항에 있어서,상기 탈지 장치(24)는 냉간 압연강에 기저 용액을 분무하는 기저 용액 분무 영역(241)과, 물을 사용하여 냉간 압연강을 세척하는 수세 영역(242)과, 수세 후에 냉간 압연강을 건조시키는 건조 영역(243)을 포함하는냉간 압연강의 연속 제조방법.
- 제 1 항에 있어서,상기 어닐링-피클링 설비(26)는 어닐링 장치(261)를 포함하고, 상기 어닐링 장치는, 1000℃ 내지 1200℃ 범위의 온도에서 작동하는 가열 영역(263)과, 상기 가열 영역(263)의 상류에 배치되고 상기 가열 영역(263)에 의해 발생된 복사열에 의해 냉간 압연강을 예열하는 예열 영역(264)과, 상기 가열 영역(264)의 하류에 배치되고 냉간 압연강을 80℃이하의 온도로 냉각하는 냉각 영역(265)을 포함하는냉간 압연강의 연속 제조방법.
- 제 1 항에 있어서,상기 언코일링 장치(211)는 2개의 오버행 맨드렐(overhang-mandrel) 형 언코일러(uncoiler)를 포함하는냉간 압연강의 연속 제조방법.
- 제 1 항에 있어서,상기 용접 장치(212)는, 1.5㎜ 이상의 두께를 갖는 강 스트립을 용접하는 제 1 아크 용접기와, 1.5㎜ 미만의 두께를 갖는 강 스트립을 용접하는 제2 아크 용접기를 포함하는냉간 압연강의 연속 제조방법.
- 제 1 항에 있어서,상기 어닐링-피클링 설비(26)는 피클링 장치(262)를 포함하며, 상기 피클링 장치는, 냉간 압연강으로부터 산화철 스케일을 제거하기 위한 황산나트륨을 수용하는 전기분해 탱크(266)와, 냉간 압연강으로부터 Fe-Cr-Ni 산화물 스케일을 제거하기 위한 질산 및 플루오르화수소산을 수용하는 산 세척 탱크(267)와, 냉간 압연강을 세척하는 수세 영역(268)을 구비하는냉간 압연강의 연속 제조방법.
- 제 1 항에 있어서,상기 텐션 레벨링 장치(29)는, 레벨링 후에 냉간 압연강을 세척 및 건조시키는 세척 건조장치(292)를 포함하는냉간 압연강의 연속 제조방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080003399A KR100983762B1 (ko) | 2008-01-11 | 2008-01-11 | 냉간 압연강의 연속 제조방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080003399A KR100983762B1 (ko) | 2008-01-11 | 2008-01-11 | 냉간 압연강의 연속 제조방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090077433A true KR20090077433A (ko) | 2009-07-15 |
KR100983762B1 KR100983762B1 (ko) | 2010-09-24 |
Family
ID=41335931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080003399A KR100983762B1 (ko) | 2008-01-11 | 2008-01-11 | 냉간 압연강의 연속 제조방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100983762B1 (ko) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101323300B1 (ko) * | 2012-04-05 | 2013-10-30 | 주식회사 포스코 | 시편 가공 장치 및 그 가공 방법 |
KR101480505B1 (ko) * | 2012-12-20 | 2015-01-09 | 주식회사 포스코 | 냉연 강판 형상 교정 장치 및 교정 방법 |
KR20200006371A (ko) * | 2018-07-10 | 2020-01-20 | 주식회사 삼우에코 | 강판 연속열처리로 실험장비 |
CN114101384A (zh) * | 2020-08-31 | 2022-03-01 | 宝山钢铁股份有限公司 | 板带焊缝过平整机和张紧辊时的张紧力控制方法 |
KR102388492B1 (ko) * | 2022-01-28 | 2022-04-20 | 강재성 | 압입롤과 용접롤을 이용하여 코일을 연속으로 공급하는 코일공급용 자동 용접기 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5772719A (en) | 1980-10-24 | 1982-05-07 | Kawasaki Steel Corp | Manufacture of cold rolled steel strip |
WO1994016838A1 (en) * | 1993-01-28 | 1994-08-04 | Nippon Steel Corporation | Continuous hot rolling method and rolled material joining apparatus |
FR2775205B1 (fr) * | 1998-02-25 | 2000-03-24 | Usinor | Installation de fabrication de bandes d'acier inoxydable laminees a froid |
ATE419930T1 (de) * | 1998-12-18 | 2009-01-15 | Outokumpu Oy | Verfahren zur herstellung von edelstahlbändern |
-
2008
- 2008-01-11 KR KR1020080003399A patent/KR100983762B1/ko active IP Right Grant
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101323300B1 (ko) * | 2012-04-05 | 2013-10-30 | 주식회사 포스코 | 시편 가공 장치 및 그 가공 방법 |
KR101480505B1 (ko) * | 2012-12-20 | 2015-01-09 | 주식회사 포스코 | 냉연 강판 형상 교정 장치 및 교정 방법 |
KR20200006371A (ko) * | 2018-07-10 | 2020-01-20 | 주식회사 삼우에코 | 강판 연속열처리로 실험장비 |
CN114101384A (zh) * | 2020-08-31 | 2022-03-01 | 宝山钢铁股份有限公司 | 板带焊缝过平整机和张紧辊时的张紧力控制方法 |
CN114101384B (zh) * | 2020-08-31 | 2024-01-09 | 宝山钢铁股份有限公司 | 板带焊缝过平整机和张紧辊时的张紧力控制方法 |
KR102388492B1 (ko) * | 2022-01-28 | 2022-04-20 | 강재성 | 압입롤과 용접롤을 이용하여 코일을 연속으로 공급하는 코일공급용 자동 용접기 |
Also Published As
Publication number | Publication date |
---|---|
KR100983762B1 (ko) | 2010-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2746876C1 (ru) | Система и способ непрерывного производства холоднокатаных листов нержавеющей стали | |
CA2613975C (en) | Method and production line for manufacturing metal strips made of copper or copper alloys | |
AU2006224727B2 (en) | Method and device for descaling a metal strip | |
EP2067541B1 (en) | Method for continuously manufacturing cold-rolled steel | |
CN102310314A (zh) | 一种钛及钛合金带卷加工方法 | |
CN108906888A (zh) | 不锈钢冷轧带钢生产设备 | |
CN114173957B (zh) | 在铸轧复合设备中可深冲的钢带的制造 | |
CN106244967B (zh) | 钢板冷轧涂镀一体化生产机组及其生产工艺 | |
KR100983762B1 (ko) | 냉간 압연강의 연속 제조방법 | |
RU2571987C2 (ru) | Способ прокатки полосового металла и соответствующий прокатный стан | |
US6453709B2 (en) | Cold rolling method and installation | |
US20220177989A1 (en) | Method for manufacturing of stainless steel strips | |
KR100207835B1 (ko) | 스테인레스강 원주형품의 제조방법 및 플랜트 | |
WO2000003816A1 (fr) | Equipement et procede destines au placage en continu d'une feuille d'acier | |
KR100990865B1 (ko) | 금속 스트립의 연속 제조 방법 및 장치 | |
US20110315280A1 (en) | Method and Device for Annealing and Descaling Strips of Stainless Steel | |
CN113846291A (zh) | 一种镀锌钢板/卷的清洗涂镀联合机组及其生产方法 | |
JP2003064461A (ja) | 連続亜鉛メッキ処理設備および連続亜鉛メッキ処理方法 | |
RU2736468C1 (ru) | Способ производства рулонного проката из низколегированной стали | |
CN113302006B (zh) | 用于制造不锈钢带材的方法 | |
RU2679159C1 (ru) | Способ производства особо тонких горячекатаных полос на широкополосном стане литейно-прокатного комплекса | |
JP2003080301A (ja) | ステンレス板の連続焼鈍・酸洗設備および連続焼鈍・酸洗処理方法 | |
JPH0824904A (ja) | 金属帯の製造方法 | |
CN114130815A (zh) | 一种小批量轧制纯钛卷板的工艺方法 | |
CN116237376A (zh) | 带钢的冷轧方法以及780Mpa级冷轧双相钢 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
AMND | Amendment | ||
E601 | Decision to refuse application | ||
AMND | Amendment | ||
J201 | Request for trial against refusal decision | ||
B701 | Decision to grant | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130806 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140820 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20150820 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20160620 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20170522 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20190715 Year of fee payment: 10 |