KR20080112015A - Guide supporter having a tilt function - Google Patents
Guide supporter having a tilt function Download PDFInfo
- Publication number
- KR20080112015A KR20080112015A KR1020070060691A KR20070060691A KR20080112015A KR 20080112015 A KR20080112015 A KR 20080112015A KR 1020070060691 A KR1020070060691 A KR 1020070060691A KR 20070060691 A KR20070060691 A KR 20070060691A KR 20080112015 A KR20080112015 A KR 20080112015A
- Authority
- KR
- South Korea
- Prior art keywords
- girder
- bridge
- guide support
- support
- construction
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a guide support having a tilting function. In constructing a bridge by a precast method, the horizontal state of the girder is maintained in the horizontal continuous construction of the segment, in order to improve workability and precise connection after construction. By reducing the number of corrections to maintain the horizontal state according to the construction, there is an effect that the air of the bridge construction can be reduced by drastically reducing the continuous joint time of the top plate segment of the bridge proceeding as a precast method according to the construction of the bridge .
Description
1 is an example of installing a top plate of a bridge for explaining a general precast method;
Figure 2 is a perspective view showing a support for receiving and supporting the girder according to the present invention,
Figure 3 is a side view illustrating a step by step transfer state of the guide support according to the invention,
Figure 4 is a front view illustrating a tilt state of the girder using the guide support according to the present invention.
◎ Explanation of code for main part of drawing ◎
1:
1B: Rear Auxiliary Support 2: Lifting Means
3:
10B: rear guide support 11: lower body
12: Moving roller 13: Drive motor
a: pier b: guide rail
S: segment
The present invention relates to a girder guide support having a tilt function, and more particularly, in constructing a bridge by a precaster method, to improve the support for horizontally supporting the girder from the bottom of the girder installed on the pier and the pier. The present invention relates to a girder guide support for greatly improving bridge construction work by correcting the horizontal state of girder between bridge piers and piers.
In general, the precaster method lifts a segment, which is mounted on the upper part between the pier and the pier, and becomes the top plate of the bridge by lifting means from the girder, which is moved according to the top plate hypothesis of the bridge. The method of constructing bridges as a method of moving and constructing them continuously.
As shown in FIG. 1, the front
For reference, the rear auxiliary support (1B) is provided with a caster at the bottom, the guide rail is continuously installed on the upper plate of the bridge as the bridge top plate is continuously installed as a continuous construction of the segment is installed by the moving means is adjustable (b) is to allow the overall movement of the girder, the front auxiliary support is fixed to the front side of the girder, the lower part is fixed to the upper part of the pier between the piers (a) where the top plate of the bridge is installed Is installed in the structure.
On the other hand, in the girder, the guide support is installed on the upper portion of the segment that is the basis of the bridge top plate on the upper part of the pier corresponding to the end of the temporary construction section of the bridge and on the upper plate segment of the continuous bridge is installed to support the girder Consists of.
That is, the guide support is located between the front auxiliary support and the rear auxiliary support, and more precisely, is positioned above the reference segment seated on the bridge so as to be a hypothesis reference for the bridge top plate.
The guide support is divided into the front guide support (10A) and the rear guide support (10B) is named, the structure is installed on the
The guide guide is divided into the front guide support and the rear guide support as described above to support the lower part of the girder, to guide the cloud during the movement of the girder, and to move to the next pier point in the state where the bridge top plate of one section is continuously installed There was the same problem.
The girders, such as one large structure, are supported by auxiliary supports, but because of their relatively long lengths, the state of the girders supported by the supporting and guide supports cannot be maintained completely horizontal.
From the above point of view, as the upper plate of the bridge is installed as a continuous jointing method of lifting and transporting the segment through the girder, the fine adjustment time of the horizontal work of the segment becomes long, and the construction works out of problems such as out of the range. There was a problem in that the air of the overall bridge construction was extended because the correction work had to be performed several times.
The present invention has been invented for various problems as described above, in the construction of the bridge by the precaster method, by improving the support for horizontally supporting the girder from the bottom of the girder installed on the top of the piers and piers The aim is to significantly improve the construction of bridges by allowing the girder to be leveled between bridges.
According to the present invention for achieving the above object, the lower body and the lower body which is installed to be transportable between the auxiliary support with the auxiliary support provided on the lower front and back side of the girder mounted while being movable from the upper part of the piers by the precast method, The front guide support and the rear guide support provided with a moving roller for moving the cloud from the lower beam of the girder and a drive motor for driving the moving roller to support the lower part of the front and rear of the girder, the front guide It is characterized in that a plurality of hydraulic cylinders are installed in the lower body of the support and the rear guide support for tilting adjustment of the horizontal state of the girder.
Hereinafter, the present invention will be described in more detail with reference to FIGS. 2 to 4.
2 is a front view showing a support for receiving and supporting the girder according to the present invention, Figure 3 is a side view illustrating a transfer state of the guide support according to the present invention, Figure 4 using a guide support according to the present invention It is the front view which illustrated the tilt state of a girder.
The present invention is transferable between the auxiliary support (1A) (1B) with the auxiliary support (1A) (1B) installed on the lower front and back side of the girders (1) mounted while being movable from the top of the piers by the precast method The lower
Preferably, at least two
For reference, the
The
For reference, referring to the attached FIG. 1, the segment S to be installed as a
The
In the movement of the
When the movement of the
As described above, the girder readjusts the horizontal state before the hypothesis of the segment for forming the upper plate of the bridge in a state where both the
The horizontal state of the girder (1) is horizontally in accordance with the degree of protrusion of the operating rod of the hydraulic cylinder (14) installed on the
As described above, the present invention in the construction of the bridge by the precast method, the horizontal state of the girder in the continuous horizontal installation of the segment, in order to improve the workability and maintain the horizontal state according to the precise connection after construction work By reducing the number of corrections several times, it is possible to drastically reduce the continuous joint time of the top plate segment of the bridge proceeding as a precast method according to the construction of the bridge to reduce the air of the bridge construction.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070060691A KR20080112015A (en) | 2007-06-20 | 2007-06-20 | Guide supporter having a tilt function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070060691A KR20080112015A (en) | 2007-06-20 | 2007-06-20 | Guide supporter having a tilt function |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20080112015A true KR20080112015A (en) | 2008-12-24 |
Family
ID=40370048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070060691A KR20080112015A (en) | 2007-06-20 | 2007-06-20 | Guide supporter having a tilt function |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20080112015A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114922073A (en) * | 2022-05-19 | 2022-08-19 | 中电建路桥集团有限公司 | Device for rapidly disassembling distribution beam in Bailey disc buckle bracket system |
-
2007
- 2007-06-20 KR KR1020070060691A patent/KR20080112015A/en not_active Application Discontinuation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114922073A (en) * | 2022-05-19 | 2022-08-19 | 中电建路桥集团有限公司 | Device for rapidly disassembling distribution beam in Bailey disc buckle bracket system |
CN114922073B (en) * | 2022-05-19 | 2023-09-05 | 中电建路桥集团有限公司 | Device for rapidly disassembling distribution beam in Bei Leipan buckle bracket system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101654742B1 (en) | Movable scaffolding system mounted upper-structure of bridge and bridge construction method therewith | |
JP5179804B2 (en) | Mobile suspension support | |
KR101657994B1 (en) | Form traveler, and bridge construction method for using the same | |
CN109629441B (en) | PLC multipoint synchronous three-dimensional hydraulic bridge pushing system and pushing method | |
CN109629440B (en) | Steel box girder pushing construction method based on walking type three-dimensional hydraulic pushing equipment | |
KR101287455B1 (en) | System and method for launching upper structure of bridege | |
KR101582611B1 (en) | Slab gap adjustment apparatus with longitudinal moving and bridge construction method therewith | |
JP2018100564A (en) | Device and method of floor slab rebuilding | |
CN211772901U (en) | Space abnormal shape steel case arch rib installation device | |
EA009930B1 (en) | Machine for carrying out a track gauge correction | |
CN109989330B (en) | Continuous track and erection method thereof | |
KR102019014B1 (en) | Structure Transfer Device | |
CN110565983B (en) | Building jacking and shifting method | |
CN214787431U (en) | Two lining platform trucks of variable section | |
CN108708292A (en) | A kind of I-shaped steel reinforced concrete combination beam concrete folding constructing device and construction method | |
KR20100034097A (en) | Carriage system used for manufacturing u-typed channel brige | |
KR20080112015A (en) | Guide supporter having a tilt function | |
KR20120050945A (en) | Improved incremental launching method for the prestressed composite truss girder | |
CN114016424B (en) | Self-propelled platform and method suitable for small-angle oblique crossing bridge construction | |
KR20190122925A (en) | Bridges Construction Vents | |
CN211113199U (en) | Pre-assembly equipment for segmental beam | |
KR20040100083A (en) | Bridge construction method is by means of Incremental launching method using lateral launching apparatus | |
CN210664880U (en) | Adjusting pedestal for watertight test of concrete pouring guide pipe | |
JP2009024465A (en) | Delivery method | |
CN209836812U (en) | Rail-mounted movable shaping mould frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |