KR20080084130A - Coupling structure of dek for slab execution - Google Patents

Coupling structure of dek for slab execution Download PDF

Info

Publication number
KR20080084130A
KR20080084130A KR1020070025400A KR20070025400A KR20080084130A KR 20080084130 A KR20080084130 A KR 20080084130A KR 1020070025400 A KR1020070025400 A KR 1020070025400A KR 20070025400 A KR20070025400 A KR 20070025400A KR 20080084130 A KR20080084130 A KR 20080084130A
Authority
KR
South Korea
Prior art keywords
deck
coupling
beams
panel
auxiliary
Prior art date
Application number
KR1020070025400A
Other languages
Korean (ko)
Inventor
김재준
손영진
노삼영
Original Assignee
(주) 콘스텍
한양대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 콘스텍, 한양대학교 산학협력단 filed Critical (주) 콘스텍
Priority to KR1020070025400A priority Critical patent/KR20080084130A/en
Publication of KR20080084130A publication Critical patent/KR20080084130A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/50Girders, beams, or the like as supporting members for forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A coupling structure of a deck for slab construction is provided to install a deck for slab construction easily, to heighten the utilization of a panel, and to apply to a small-sized building or an unfixed building. A coupling structure of a deck for slab construction is formed by arranging many primary beams(11) on one plane at regular intervals to make two ends of the primary beams supported by drop heads(14) placed on deck legs(13) arranged on the ground at regular intervals, coupling many auxiliary beams(12) between the primary beam and the primary beam at right angles to make two ends of the auxiliary beams provided with a retreated groove in the center of the upper part along the longitudinal direction and wood(20) inserted to the retreated groove to be coupled at right angles to the primary beams, and placing panels(15) on the top of the auxiliary beams and fixing the panel on the top of the auxiliary beams with a screw or a nail.

Description

슬라브 시공용 데크의 결합구조{Coupling structure of dek for slab execution}Coupling structure of dek for slab execution}

도1은 슬라브 시공을 위한 본 발명에 의한 데크의 결합구조를 보인 일부 분해 사시도이다.1 is a partially exploded perspective view showing a coupling structure of the deck according to the present invention for slab construction.

도2는 데크 결합을 위한 주 빔과 보조 빔의 구조를 보인 분해 사시도이다.Figure 2 is an exploded perspective view showing the structure of the main beam and the auxiliary beam for deck coupling.

도3은 보조 빔의 구조를 보인 단면도이다.3 is a cross-sectional view showing the structure of an auxiliary beam.

도4는 주 빔과 보조 빔과의 결합관계를 보인 단면도이다.4 is a cross-sectional view showing a coupling relationship between a main beam and an auxiliary beam.

- 도면의 주요 부분에 대한 부호의 설명-Explanation of symbols for the main parts of the drawings

11 : 주 빔 12 : 보조 프레임11: main beam 12: auxiliary frame

13 : 데크 랙 14 : 드롭 헤드 13: Deck Rack 14: Drop Head

15 : 판넬 16 : 결합구 15 Panel 16 Coupling Sphere

17 : 결합 편 18 : 결합돌기 17: coupling piece 18: coupling protrusion

19 : 요홈 20 : 목재19: groove 20: wood

21 : 걸이 22 : 고리 21: Hook 22: Hook

23 : 측면 24 : 지지면 23: side 24: support surface

25 : 이탈 방지돌기25: release prevention protrusion

본 발명은 슬라브 시공용 데크의 결합구조에 관한 것이다. 특히, 본 발명은 주 빔과 주 빔 사이에 주 빔과 직교되게 다수의 보조 빔을 일정간격을 두고 결합하고, 이 보조 빔 위에 통상의 판넬을 부착하여 슬라브 시공용 데크를 설치할 수 있도록 하는 슬라브 시공용 데크의 결합구조에 관한 것이다.The present invention relates to a coupling structure of the slab construction deck. Particularly, the present invention combines a plurality of auxiliary beams at regular intervals between the main beams and the main beams orthogonally to the main beams, and attaches a conventional panel on the auxiliary beams so that the slab construction deck can be installed. It relates to the coupling structure of the dragon deck.

일반적으로 콘크리트 벽체와 슬라브 시공용 거푸집은 콘크리트 철근구조의 다층 건축물의 기초가 된다. 즉, 콘크리트 철근구조의 다층 건축물은 내부공간이 벽체의 형상을 하는 주형과 같은 틀을 제작하고, 그 틀의 상단에 천정 슬라브 시공용 판재를 지면에 수평지게 설치한 후 상기 틀의 내부와 판재의 상면에 콘크리트를 채워 양생시키는 공정을 반복해서 짓는다.In general, the concrete wall and slab construction formwork is the basis of the multi-storey structure of the concrete reinforcement structure. In other words, in the multi-layered building of concrete reinforcing structure, a frame such as a mold having an interior space of a wall shape is manufactured, and a ceiling slab construction plate is installed horizontally on the ground at the top of the frame, and then Repeat the process of curing the concrete by filling the upper surface.

여기서, 콘크리트를 채워 벽체와 슬라브를 시공하기 위한 거푸집이라고 하는 틀과 판재는 다수의 사각 판 형상을 가지는 거푸집 판넬을 연결하여 제작한다.Here, the frame and the plate, called the formwork for constructing walls and slabs by filling the concrete is produced by connecting a formwork panel having a plurality of square plate shapes.

상기 벽체 시공용 거푸집은 각 벽체의 내측과 외측 두 면에 각각 밀착되는 두 부분으로 이루어지고 각 부분은 상단과 하단으로 구분할 수 있으며 각 상단과 하단은 다수의 단위 판넬로 분리되는데, 상기 각 단위 판넬은 거푸집 판넬, 다수의 거푸집 판넬들이 좌우로 결합되어 상단에 위치하는 것을 상단 거푸집, 하단에 위치하는 것을 하단 거푸집, 상단과 하단 거푸집을 구성하는 다수의 거푸집 판넬들의 전면들이 동일 평면상에 위치하도록 거푸집 판넬들이 각종 결합부재에 의해 결합되어 벽체의 일측 면 전체에 밀착되는 것을 내벽 거푸집이라고 일컫는다.The formwork for wall construction consists of two parts that are in close contact with each of the inner and outer surfaces of each wall, and each part may be divided into an upper part and a lower part, and each upper part and the lower part are separated into a plurality of unit panels. The formwork panel, a plurality of formwork panels are joined to the left and right to form a top formwork at the top, the bottom formwork at the bottom, the formwork panel of the plurality of formwork panels constituting the top and bottom formwork are located on the same plane Panels are coupled by various coupling members to be in close contact with one side of the wall is called an inner wall formwork.

상기 천정이 되는 슬라브용 거푸집은 다수의 거푸집 판넬들의 상면이 동일 평면을 이루고 상기 대향하는 두 내벽 거푸집 사이의 간격이 막히지 않도록 내면 거푸집의 상단부에 바닥과 평행하도록 배열된 상태에서, 벽체가 되는 두 내벽 거푸집 사이와 상기 슬라브용 거푸집의 상면에 콘크리트가 함께 타설되는데, 이는 벽체용 거푸집과 구분하기 위하여 상기 슬라브용 거푸집을 데크라고 한다. 또한, 데크를 구성하는 거푸집 판넬은 데크 판넬이라고 하고, 내벽 거푸집과 데크 모두를 일컬어 거푸집이라 한다.The ceiling slab formwork has two inner walls arranged in parallel with the floor at the upper end of the formwork so that the upper surface of the plurality of formwork panels forms the same plane and the gap between the two opposing inner wall formwork is not blocked. Concrete is poured together between the formwork and the upper surface of the slab formwork, which is called the deck formwork to distinguish it from the wall formwork. In addition, the formwork panel constituting the deck is called the deck panel, both the inner wall formwork and the deck is called the formwork.

거푸집의 기본 구성요소이며, 콘크리트에 밀착되는 판재와 판재를 지지하는 빔으로 구성된 거푸집 또는 데크 판넬의 재료로서 목재만이 주로 사용되고 있는데, 목재 판넬을 이용할 경우에는 판넬들 간의 연결조립이 못질 또는 와이어의 조임에 의해서 이루어지기 때문에 거푸집 설치작업에 많은 인력과 시간이 소요되고, 콘크리트 양생 후 거푸집의 철거작업에도 많은 시간과 인력이 소요된다.It is a basic component of formwork, and only wood is mainly used as a material of formwork or deck panel, which consists of a board that adheres to concrete and a beam supporting the board. When using a wood panel, assembling the connection between panels is not possible. Because it is made by tightening, a lot of manpower and time is required for the formwork installation work, and a lot of time and manpower is also required for the demolition work of the formwork after concrete curing.

또한 목재 판넬은 합판의 배면에 각형 목재 바가 보강되어 있기는 하나, 목재의 특성상 거푸집에 채워지는 콘크리트의 하중에 의한 압력으로 변형되기 쉬우며, 벽체의 규모가 클수록 그러한 경향은 더욱 증가하게 되고, 그 결과 벽체 외면이 평탄면을 이루지 못하게 되는 경우가 있다.In addition, the wooden panel is reinforced with a rectangular wooden bar on the back of the plywood, but due to the nature of the wood it is easy to be deformed by the pressure of the concrete filled in the formwork, the larger the wall size, the more the tendency increases As a result, the outer surface of the wall may not be flat.

위와 같은 목재 판넬의 변형을 방지하기 위해서는 거푸집을 만든 상태에서 콘크리트를 거푸집에 채우기 전에 별도의 보강재로 거푸집 판넬들을 보강해야 하고, 거푸집의 설치 및 철거과정에서 목재 판넬들이 변형되거나 파손되는 경우가 많아 목재 판넬의 반복사용에 제한을 받는다.In order to prevent the deformation of the wood panel as described above, the formwork panels must be reinforced with a separate reinforcement before filling the formwork with concrete, and the wood panels are often deformed or damaged during the installation and removal of the formwork. Restrictions on panel use are limited.

위와 같이 목재 판넬로 거푸집을 제작하는 경우 발생되는 문제점을 해결하기 위해 종래에는 철재나 알루미늄 재로 판넬을 제작하는 방법이 등장하였는데, 철재의 경우 콘크리트 타설과정에서 많은 물을 사용하기 때문에 판넬이 녹슬어 반복 사용에 한계가 있으며, 알루미늄 재의 경우 알루미늄 자체의 가격이 워낙 고가이므로 판넬의 가격이 높을뿐더러 도난의 우려도 많다.In order to solve the problems caused when manufacturing formwork with wood panels as described above, a method of manufacturing a panel made of iron or aluminum has conventionally appeared. In the case of steel, the panel is rusted and used repeatedly because a lot of water is used during concrete pouring. In the case of aluminum ash, the price of aluminum itself is so high that the price of the panel is high and there are many concerns about theft.

이에 종래에는 천정 슬라브용 데크의 경우, 다수의 주 빔이 데크 랙의 상부에 올려진 드롭 헤드에 주 빔의 상부가 평면을 이루도록 연결되는데, 이때 일렬로 배열된 주 빔들은 서로 일정간격을 유지한다. 그리고 작업자는 주 빔과 주 빔 사이에 공장이나 기타 제조업체에서 제작된 대형의 데크 판넬을 올려놓는 것으로 슬라브 시공용 데크의 결합을 완료한다.In the conventional slab for ceiling slabs, a plurality of main beams are connected to a drop head mounted on the top of the deck rack so that the upper part of the main beams form a plane, wherein the main beams arranged in a row maintain a constant distance from each other. . The operator completes the joining of the slab construction deck by placing a large deck panel made by a factory or other manufacturer between the main beam and the main beam.

상기한 바와 같이 주 빔과 주 빔 사이에 일정한 규격으로 공장 등에서 제작된 대형의 데크 판넬을 결합하면, 짧은 시간 내에 데크를 제작할 수 있다는 장점은 있으나, 데크 판넬의 크기가 워낙 크고 무거워서 데크 판넬을 설치하기 위해서는 중장비를 구비해야 한다. 또한 공장 등에서 대량으로 제작되는 대형의 데크 판넬이 다양한 형태의 건축물에 모두 맞지 않아 데크의 일부분만을 데크 판넬로 시공할 수 있다.As described above, when a large deck panel manufactured at a factory or the like is combined between the main beam and the main beam, the deck can be manufactured within a short time, but the deck panel is so large and heavy that the deck panel is installed. In order to do this, heavy equipment must be provided. In addition, large deck panels, which are produced in large quantities in factories, do not fit all the various types of buildings, so only a part of the deck can be constructed as deck panels.

특히, 건축물의 규모가 크지 않거나 건축물이 정형적으로 이루어지지 않은 경우 데크 판넬을 이용하여 시공할 수 있는 데크의 범위가 넓지 않아 하나의 데크를 시공하는데 여러 가지의 시공방법을 사용해야 한다.In particular, when the size of the building is not large or the building is not formed in a regular form, the deck can be constructed using the deck panel is not wide range of construction should be used for the construction of several decks.

상기한 바와 같이 슬라브 시공을 위한 데크를 설치하는 과정에서 발생하는 종래의 문제점을 해결하기 위한 본 발명은 슬라브 시공용 데크의 설치가 용이하고 판넬의 활용도를 높이며 규모가 적은 건축물이나 정형화되지 않은 건축물에도 적용 가능한 슬라브 시공용 데크의 결합구조를 제공하는데 그 목적이 있다.As described above, the present invention for solving the conventional problems arising in the process of installing the deck for slab construction is easy to install the deck for slab construction, increase the utilization of the panel, even in small buildings or unstructured buildings The purpose is to provide a joining structure of applicable slab construction decks.

상기한 바와 같은 목적을 달성하기 위한 본 발명에 의한 슬라브 시공용 데크의 결합구조는, 데크 랙(dek leg) 위에 놓여진 드롭 헤드(drop head)에 의해 다수개의 주 빔(primary beam)의 양단이 지지되어 상기 다수개의 주 빔이 일정간격을 두고 하나의 평면 상에 배열되고, 상부 중앙부분에 길이방향을 따라 요홈이 형성되고 상기 요홈에 목재가 내입된 보조 빔의 양단이 상기 일정간격을 두고 배열된 다수개의 주 빔 사이에 주 빔과 직교되게 일정간격을 두고 결합되며, 상기 보조 빔들의 상단에 판넬이 안착되고 나사나 못이 상기 판넬을 관통해서 목재에 고정되어 판넬이 보조 빔의 상부에 고정되는 것을 특징으로 한다.In the coupling structure of the slab construction deck according to the present invention for achieving the above object, both ends of the plurality of primary beams are supported by a drop head placed on the deck leg (dek leg) The plurality of main beams are arranged on a plane with a predetermined interval, the groove is formed along the longitudinal direction in the upper central portion and both ends of the auxiliary beam in which the wood is embedded in the groove is arranged at the predetermined interval A plurality of main beams are coupled at regular intervals to be orthogonal to the main beams, and a panel is seated on top of the auxiliary beams, and screws or nails are fixed to wood through the panel so that the panel is fixed on top of the auxiliary beams. It is characterized by.

또한 본 발명에 있어서, 상기 주 빔의 양측 면에는 주 빔의 길이방향을 따라 결합편이 수평지게 형성되고, 상기 보조 빔의 양단부에는 상기 주 빔의 결합편과의 분리 결합을 위한 결합돌기를 갖는 결합구가 결합되는 것이 바람직하다.In addition, in the present invention, the coupling piece is formed horizontally along the longitudinal direction of the main beam on both sides of the main beam, couplings having coupling protrusions for separate coupling with the coupling piece of the main beam at both ends of the auxiliary beam It is preferred that the spheres are bonded.

또한 본 발명에 있어서, 상기 요홈의 내측 면에는 상기 요홈에 결합된 목재의 이탈을 방지하기 위한 이탈 방지돌기가 형성되는 것이 바람직하다.In addition, in the present invention, it is preferable that the departure prevention projections for preventing the separation of the wood coupled to the groove on the inner surface of the groove is formed.

이하, 본 발명을 상세히 설명한다.Hereinafter, the present invention will be described in detail.

도1은 슬라브 시공을 위한 본 발명에 의한 데크의 결합구조를 보인 것으로 서, 지면에 일정간격을 두고 배열된 데크 랙(13)의 상부에 드롭 헤드(14)가 안착되어 있는데, 상기 데크 랙(13)은 슬라브 시공용 데크를 지지하기 위한 것이고, 드롭 헤드(14)는 데크의 해체가 용이하도록 하는 것이다.Figure 1 shows a coupling structure of the deck according to the present invention for the slab construction, the drop head 14 is seated on the deck rack 13 arranged at a predetermined interval on the ground, the deck rack ( 13) is for supporting the slab construction deck, the drop head 14 is to facilitate the dismantling of the deck.

상기 드롭 헤드(14)의 양측에는 주 빔(11)이 결합되는 데, 이를 위해 드롭 헤드(14)의 양측에는 상하로 이동 가능하도록 일체형으로 이루어진 걸이(21)가 결합되고, 주 빔(11)의 양측에는 걸이(21)와의 분리 결합을 위한 고리(22)가 결합되어 있다.Main beams 11 are coupled to both sides of the drop head 14. To this end, hooks 21 integrally formed to be movable up and down are coupled to both sides of the drop head 14, and the main beam 11 is coupled thereto. On both sides of the hook 21 is coupled to the ring 22 for separation and coupling.

상기 드롭 헤드(14)의 걸이(20)에 고리(22)가 결합되는 다수의 주 빔(11)은 상부가 평면을 이루고 일렬로 결합된 다수의 주 빔(11)은 일정간격을 두고 배열된다. 이때 주 빔(11)의 간격은 보조 빔(12)의 길이와 판넬(15)의 길이를 감안하여 결정한다.A plurality of main beams 11 having a ring 22 coupled to the hanger 20 of the drop head 14 may be arranged at a predetermined interval with a plurality of main beams 11 arranged in a plane. . In this case, the interval of the main beam 11 is determined in consideration of the length of the auxiliary beam 12 and the length of the panel 15.

위와 같이 일정간격을 두고 배열된 주 빔(11)과 주 빔(11) 사이에는 다수의 보조 빔(12)이 주 빔(11)과 직교되게 일정간격을 두고 결합되는데, 이를 위해 주 빔(11)의 양측 면에는 주 빔(11)과 일체형으로 결합 편(17)이 형성되고, 보조 빔(12)의 양단에는 결합편(17)의 분리 결합을 위한 결합 구(16)가 결합되어 있다.As described above, a plurality of auxiliary beams 12 are coupled at regular intervals orthogonally to the main beams 11 between the main beams 11 and the main beams 11 arranged at regular intervals. Coupling pieces 17 are integrally formed on both sides of the main beam 11, and both ends of the auxiliary beam 12 are coupled to the coupling sphere 16 for separate coupling of the coupling piece 17.

이렇게 데크 랙(13)과 드롭 헤드(14)의 상부에 배열된 주 빔(11)과 보조 빔(12)의 상부에는 시중에도 유통되고 있는 통상적인 크기의 목재 합판 등과 같은 판넬(15)이 못이나 나사 등에 의해 부착되게 된다.In the upper part of the main beam 11 and the auxiliary beam 12 arranged above the deck rack 13 and the drop head 14, a panel 15 such as a conventional sized wood plywood is not available on the market. Or by screws.

도2는 데크 결합을 위한 주 빔(11)과 보조 빔(12)의 구조를 보인 것으로서 데크 랙(13)과 드롭 헤드(14)가 지지하고 있는 주 빔(11)의 양 측면(23)에는 보조 빔(12)을 지지하기 위한 결합 편(17)이 일체형으로 형성되어 있는데, 이 결합 편(17)의 단부가 상향지게 절곡되어 있으므로 결합 편(17)에 결합된 보조 빔(12)이 쉽게 이탈되지 않는다.FIG. 2 shows the structure of the main beam 11 and the auxiliary beam 12 for deck coupling. Both sides 23 of the main beam 11 supported by the deck rack 13 and the drop head 14 are shown in FIG. A coupling piece 17 for supporting the auxiliary beam 12 is integrally formed. Since the end of the coupling piece 17 is bent upward, the auxiliary beam 12 coupled to the coupling piece 17 is easily formed. It does not break away.

또한 보조 빔(12)의 양측 단부에는 주 빔(11)의 결합 편(17)과의 분리 결합을 위한 결합구(16)가 결합되어 있는데, 이 결합구(16)는 보조 빔(12)의 양측 단부에 분리 결합 가능한 것으로서 하단부에 주 빔(11) 측면(23)의 결합 편(17)과의 분리 결합을 위한 결합 돌기(18)가 형성되고, 상단부에는 주 빔(11)의 결합 편(17)에 보조 빔(12)의 결합 돌기(18)가 결합되었을 때 주 빔(11)의 측면(23)에 닿게 되는 지지 면(24)이 형성되어 있다.In addition, both ends of the auxiliary beam 12 are coupled to the coupling member 16 for the separate coupling with the coupling piece 17 of the main beam 11, this coupling member 16 is As a separable coupling at both ends, a coupling protrusion 18 for separating coupling with the coupling piece 17 of the main beam 11 side 23 is formed at the lower end, and the coupling piece of the main beam 11 is formed at the upper end. A support surface 24 is formed which is brought into contact with the side 23 of the main beam 11 when the engaging projection 18 of the auxiliary beam 12 is coupled to 17.

즉, 주 빔(11)의 결합 편(17)에 보조 빔(12)의 결합 돌기(18)가 결합되었을 때 주 빔(11)의 측면(23)에 보조 빔(12)의 지지면(24)이 닿으면서 외부충격에도 불구하고 주 빔(11) 사이에 결합된 보조 빔(12)이 흔들리지 않는다.That is, when the engaging projection 18 of the auxiliary beam 12 is coupled to the engaging piece 17 of the main beam 11, the supporting surface 24 of the auxiliary beam 12 is connected to the side 23 of the main beam 11. ) And the auxiliary beam 12 coupled between the main beams 11 does not shake despite the external impact.

도3은 보조 빔(12)의 구조를 보인 것으로서 보조 빔(12)은 주 빔(11)과 주 빔(11) 사이에 주 빔(11)과 직교되게 일정간격을 두고 결합되는 것으로서 이 보조 빔(12)의 상부에는 보조 빔(12)의 길이방향을 따라 요홈(19)이 형성되어 있고, 이 요홈(19)에는 목재 합판 등과 같은 판넬(15)을 나사나 못 등과 같은 고정수단으로 고정하기 위한 목재(20)가 결합되어 있다.3 shows the structure of the auxiliary beam 12, wherein the auxiliary beam 12 is coupled between the main beam 11 and the main beam 11 at regular intervals to be orthogonal to the main beam 11, and this auxiliary beam 12 Grooves 19 are formed in the upper part of the auxiliary beam 12 along the longitudinal direction of the upper part 12, and the grooves 19 are fixed to the panel 15 such as wood plywood with fixing means such as screws or nails. Wood 20 is combined.

특히, 요홈(19)의 내측 면에는 요홈(19)의 아래를 향하는 이탈 방지돌기(25)가 형성되어 있는데, 이는 요홈(19)에 결합된 목재(20)가 외부로 이탈되지 않도록 잡아주는 역할을 한다.In particular, the inner surface of the groove 19 is formed with a departure prevention protrusion 25 facing the groove 19, which serves to hold the wood 20 coupled to the groove 19 so as not to escape to the outside. Do it.

도4는 주 빔(11)과 보조 빔(12)과의 결합관계를 보인 것으로서 작업자는 데크 랙(13)과 드롭 헤드(14)의 상부에 위치한 주 빔(11)들의 결합편(17)에 보조 빔(12)의 결합 돌기(18)를 결합하여, 주 빔(11)들 사이에 보조 빔(12)이 일정간격을 두고 배열한다.4 shows a coupling relationship between the main beam 11 and the auxiliary beam 12, in which the operator is connected to the engaging piece 17 of the main beams 11 located above the deck rack 13 and the drop head 14. By combining the engaging projections 18 of the auxiliary beam 12, the auxiliary beam 12 is arranged at regular intervals between the main beams (11).

그리고 작업자는 보조 빔(12)의 상부에 목재 합판 등과 같은 판넬(15)을 올려놓은 후 보조 빔(12)의 목재(20) 부위에 나사나 못을 박아 보조 빔(12)의 상부에 판넬(15)을 고정하게 된다.Then, the operator puts a panel 15 such as wood plywood on the upper part of the auxiliary beam 12, and then attaches a screw or a nail to a part of the wood 20 of the auxiliary beam 12 to place a panel (on the upper part of the auxiliary beam 12). 15) to be fixed.

따라서 본 발명에 의하면, 공장 등에서 제작된 대형의 데크 판넬을 이용하여 슬라브 시공을 위한 데크를 설치하는 경우 크고 무거운 데크 판넬의 이동이 자유롭지 못하고 규모가 크지 않은 건축물이나 아파트 등과는 달리 정형화되지 않은 건축물에는 설치하기 어려운 종래기술과는 달리 본 발명은 주 빔과 주 빔 사이에 주 빔과 직교되게 다수의 보조 빔을 일정간격을 두고 결합하고, 이 보조 빔 위에 통상의 판넬을 부착하여 슬라브 시공용 데크를 설치함으로써 슬라브 시공용 데크의 설치가 용이할 뿐더러 판넬의 활용도를 높일 수 있으며, 규모가 적은 건축물이나 정형화되지 않은 건축물에도 적용 가능하다.Therefore, according to the present invention, when installing a deck for slab construction using a large deck panel manufactured in factories, etc. unlike the buildings or apartments that are not standardized unlike buildings or apartments that are not free to move large and heavy deck panels Unlike the prior art, which is difficult to install, the present invention combines a plurality of auxiliary beams at regular intervals between the main beams and the main beams orthogonally to the main beams, and attaches a conventional panel on the auxiliary beams to form a slab construction deck. The installation makes it easy to install the deck for slab construction as well as increase the utilization of the panel, and can be applied to small buildings or unstructured buildings.

Claims (3)

데크 랙(dek leg) 위에 놓여진 드롭 헤드(drop head)에 의해 다수개의 주 빔(primary beam)의 양단이 지지되어 상기 다수개의 주 빔이 일정간격을 두고 하나의 평면 상에 배열되고, 상부 중앙부분에 길이방향을 따라 요홈이 형성되고 상기 요홈에 목재가 내입된 보조 빔의 양단이 상기 일정간격을 두고 배열된 다수개의 주 빔 사이에 주 빔과 직교되게 일정간격을 두고 결합되며, 상기 보조 빔들의 상단에 판넬이 안착되고 나사나 못이 상기 판넬을 관통해서 목재에 고정되어 판넬이 보조 빔의 상부에 고정되는 것을 특징으로 하는 슬라브 시공용 데크의 결합구조.Both ends of a plurality of primary beams are supported by drop heads placed on a deck leg so that the plurality of main beams are arranged on one plane at a predetermined interval, and the upper center portion Grooves are formed along the longitudinal direction and both ends of the auxiliary beams in which the wood is embedded in the grooves are coupled at regular intervals orthogonally to the main beams between the plurality of main beams arranged at the predetermined intervals. The panel is mounted on the top of the slab construction deck coupling structure, characterized in that the screws or nails are fixed to the wood through the panel is fixed to the top of the auxiliary beam. 제1항에 있어서,The method of claim 1, 상기 주 빔의 양측 면에는 주 빔의 길이방향을 따라 결합편이 수평지게 형성되고, 상기 보조 빔의 양단부에는 상기 주 빔의 결합편과의 분리 결합을 위한 결합돌기를 갖는 결합구가 결합되는 것을 특징으로 하는 슬라브 시공용 데크의 결합구조.Coupling pieces are formed horizontally along the longitudinal direction of the main beam on both sides of the main beam, the coupling portion having a coupling protrusion for separating coupling with the coupling piece of the main beam is coupled to both ends of the auxiliary beam. Coupling structure of slab construction deck. 제1항에 있어서,The method of claim 1, 상기 요홈의 내측 면에는 상기 요홈에 결합된 목재의 이탈을 방지하기 위한 이탈 방지돌기가 형성되는 것을 특징으로 하는 슬라브 시공용 데크의 결합구조.Coupling structure of the slab construction deck on the inner surface of the groove is characterized in that the separation prevention projections for preventing the separation of the wood coupled to the groove is formed.
KR1020070025400A 2007-03-15 2007-03-15 Coupling structure of dek for slab execution KR20080084130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070025400A KR20080084130A (en) 2007-03-15 2007-03-15 Coupling structure of dek for slab execution

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070025400A KR20080084130A (en) 2007-03-15 2007-03-15 Coupling structure of dek for slab execution

Publications (1)

Publication Number Publication Date
KR20080084130A true KR20080084130A (en) 2008-09-19

Family

ID=40024537

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070025400A KR20080084130A (en) 2007-03-15 2007-03-15 Coupling structure of dek for slab execution

Country Status (1)

Country Link
KR (1) KR20080084130A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200446209Y1 (en) * 2009-02-24 2009-10-08 김유신 Supporting frame structure for slab form
WO2011037304A1 (en) * 2009-09-22 2011-03-31 금강공업(주) Slab panel, construction system thereof, and method for assembling and disassembling slab panel
CN102409854A (en) * 2011-09-22 2012-04-11 深圳汇林达科技有限公司 Building construction method
CN105040547A (en) * 2015-08-05 2015-11-11 深圳市澳亚琞景景观设计有限公司 Movable wooden platform
CN109263801A (en) * 2018-09-30 2019-01-25 广船国际有限公司 A kind of method for arranging of shipborne equipment
WO2019194323A1 (en) * 2018-04-02 2019-10-10 (주) 혜성산업개발 Slab form system
US20210172182A1 (en) * 2019-12-07 2021-06-10 Peri Gmbh Filler beam assembly

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200446209Y1 (en) * 2009-02-24 2009-10-08 김유신 Supporting frame structure for slab form
WO2011037304A1 (en) * 2009-09-22 2011-03-31 금강공업(주) Slab panel, construction system thereof, and method for assembling and disassembling slab panel
CN102409854A (en) * 2011-09-22 2012-04-11 深圳汇林达科技有限公司 Building construction method
CN105040547A (en) * 2015-08-05 2015-11-11 深圳市澳亚琞景景观设计有限公司 Movable wooden platform
WO2019194323A1 (en) * 2018-04-02 2019-10-10 (주) 혜성산업개발 Slab form system
CN109263801A (en) * 2018-09-30 2019-01-25 广船国际有限公司 A kind of method for arranging of shipborne equipment
US20210172182A1 (en) * 2019-12-07 2021-06-10 Peri Gmbh Filler beam assembly
US11773607B2 (en) * 2019-12-07 2023-10-03 Peri Se Filler beam assembly

Similar Documents

Publication Publication Date Title
US8434280B2 (en) Modular building units
KR20080084130A (en) Coupling structure of dek for slab execution
KR100903212B1 (en) Connector of truss girder
KR100903211B1 (en) Deck plate with support member
KR101083698B1 (en) Deck-plate
KR101355926B1 (en) Reusable waffle type slab form assembly
KR101612088B1 (en) Aluminum molds provided Pin Lock
KR101018411B1 (en) Beam side form for deep deck and joint structure and construction method of reinforce concrete beam and slab for deep deck floor system thereof
KR100788742B1 (en) Coupling structure of dek in narrow space
KR101332929B1 (en) Connection device of concrete side a mold
KR100894808B1 (en) Connector of truss girder
KR20070027431A (en) A fastener for fixing a reinforcing bar assembly, a mold panel, and a ceiling panel by spot welding
KR20080001874U (en) A pillar mold
KR200414945Y1 (en) A slab panel for euro form of deck panel construct
KR102209501B1 (en) Stepped prevention plate and construction method for building deck plate
KR20180089808A (en) Framework for wall end
KR100812250B1 (en) Assembling vertical system form
KR101079781B1 (en) Spacer union structure of truss girder
KR100930003B1 (en) Slab mould and slab constructing method using this
KR100757030B1 (en) Contracting instrument for form and constructing method of using thereof
KR100597214B1 (en) Plural direction deck plate
KR100758627B1 (en) Assembling vertical system form
KR100547225B1 (en) Construction method of shear wall type structure using for plural direction deck plate
KR200400388Y1 (en) Pedestal member for water proof concrete mold
KR200226711Y1 (en) Device for connecting form panels

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E601 Decision to refuse application