KR100757030B1 - Contracting instrument for form and constructing method of using thereof - Google Patents
Contracting instrument for form and constructing method of using thereof Download PDFInfo
- Publication number
- KR100757030B1 KR100757030B1 KR1020070036434A KR20070036434A KR100757030B1 KR 100757030 B1 KR100757030 B1 KR 100757030B1 KR 1020070036434 A KR1020070036434 A KR 1020070036434A KR 20070036434 A KR20070036434 A KR 20070036434A KR 100757030 B1 KR100757030 B1 KR 100757030B1
- Authority
- KR
- South Korea
- Prior art keywords
- formwork
- fastening
- coupling
- wall
- fastener
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/14—Bracing or strutting arrangements for formwalls; Devices for aligning forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/001—Corner fastening or connecting means for forming or stiffening elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/16—Members, e.g. consoles, for attachment to the wall to support girders, beams, or the like carrying forms or moulds for floors, lintels, or transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
도 1은 종래기술에 따른 거푸집 상부거푸집 설치구조를 나타내는 사시도.1 is a perspective view showing a formwork upper mold installation structure according to the prior art.
도 2는 종래기술에 따른 거푸집 상부거푸집 설치구조를 나타내는 단면도.Figure 2 is a cross-sectional view showing a formwork upper mold installation structure according to the prior art.
도 3은 본 발명에 따른 거푸집 상부체결구를 나타내는 사시도.Figure 3 is a perspective view showing a formwork upper fastener according to the present invention.
도 4는 본 발명에 따른 거푸집 상부체결구의 보강편을 설치한 상태를 나타내는 사시도.Figure 4 is a perspective view showing a state in which the reinforcing piece of the upper fastening form according to the present invention is installed.
도 5는 본 발명에 따른 거푸집 상부체결구를 결합한 상태를 나타내는 사용상태도.Figure 5 is a use state showing a state in which the formwork fasteners coupled to the present invention.
도 6은 본 발명에 따른 거푸집 상부체결구를 이용하여 보강천정부를 시공하는 상태를 나타내는 사용상태도.6 is a use state diagram showing a state of constructing the reinforcement ceiling using the formwork upper fastener according to the present invention.
도 7은 본 발명에 따른 거푸집 상부체결구를 이용한 시공방법을 나타내는 공정도.7 is a process chart showing a construction method using the formwork upper fastener according to the present invention.
*도면의 주요부분에 대한 부호의 설명* * Description of the symbols for the main parts of the drawings *
100 : 상부체결구 110 : 체결부100: fastening hole 110: fastening portion
111 : 체결몸체 112 : 체결공간111: fastening body 112: fastening space
113 : 체결지지구 114 : 측부체결구113: fastening support 114: side fastening
115 : 보강편 120 : 결합부115: reinforcing piece 120: coupling portion
121 : 결합몸체 122 : 결합공간121: coupling body 122: coupling space
123 : 결합지지구 124 : 측부결합구123: coupling support 124: side coupling
125 : 결합목재 126 : 보강거푸집125: bonded wood 126: reinforcement formwork
본 발명은 거푸집 상부체결구 및 이를 이용한 시공방법에 관한 것이다.The present invention relates to a formwork upper fastener and a construction method using the same.
일반적으로, 거푸집(form)이라 함은 각종 건축물을 시공함에 있어, 기둥, 바닥, 벽 등 콘크리트를 부어 만들 모양의 틀을 짠 후 콘크리트를 부어 넣고 굳은 뒤 이 틀을 떼어내는 것을 말한다.In general, the form (form) refers to the construction of a variety of buildings, such as pillars, floors, walls, etc. to squeeze the shape of the shape made by pouring concrete, pour concrete, and then harden the mold.
이러한, 거푸집은 별도의 고정수단을 이용하여 건물의 벽체나 옹벽 등을 시공하고자 하는 위치에 다수개의 패널을 연결하여 설치하게 되며, 상기 패널은 일정한 크기로 규격화되어 사용되고 있다.Such a formwork is installed by connecting a plurality of panels to a position where a wall or retaining wall of a building is to be constructed using a separate fixing means, and the panels are standardized to a certain size and used.
상기와 같은 거푸집을 이용하여 형성된 건축물의 벽체는, 벽체의 두께만큼 이격된 상태에서 각 전면이 서로 대향하도록 설치되는 두 벽체거푸집 사이의 공간에 채워지는 콘크리트에 의해서 만들어진다.The wall of the building formed using the formwork as described above is made of concrete filled in the space between the two wall formwork installed so that each front surface facing each other in the state separated by the thickness of the wall.
그리고, 다층 구조의 층간이나 천정을 형성하는 상부 거푸집은 다수의 거푸 집판넬들의 상면이 동일 수평면을 이루고 상기 대향하는 두 벽체 거푸집 사이의 공간이 막히지 않도록 각 벽체거푸집의 상단부에 바닥과 평행하도록 결합되고, 두 벽체 거푸집 사이와 상부 거푸집의 상면에 콘크리트가 함께 타설되어 사용되고 있다.And, the upper formwork forming the interlayer or ceiling of the multi-layer structure is coupled so that the upper surface of the plurality of formwork panels form the same horizontal plane and parallel to the bottom of the upper end of each wall formwork so that the space between the two opposing wall formwork is not blocked. In addition, concrete is used between two wall formwork and the upper surface of upper formwork.
이러한, 거푸집은 콘크리트와의 부착성이 낮은 재료인 종래에는 목재만이 주로 사용되어 왔으나, 목재 판넬을 이용할 경우에는 판넬들간의 연결조립이 못질 또는 와이어의 조임에 의해서 이루어지기 때문에, 거푸집 설치 작업에 많은 인력과 시간이 필요로 되며, 또한 콘크리트 양생 후 거푸집의 철거 작업에도 많은 시간과 인력이 소요된다.In the past, the formwork is a material having low adhesion to concrete, but only wood has been mainly used. However, in the case of using a wood panel, connection between panels is made by nailing or tightening of wires. It requires a lot of manpower and time, and also takes a lot of time and manpower to demolish the formwork after concrete curing.
따라서, 근래에는 철재나 알루미늄과 같은 금속 프레임의 전면에 목재 코팅판 등의 판재가 결합된 목재와 금속 판넬이 개발되어 각종 건축물 시공현장에서 사용되고 있으며, 그 사용 범위 및 규모가 급속히 증가되고 있는 추세에 있다.Therefore, recently, wood and metal panels in which plate materials such as wood coated plates are combined on the front of metal frames such as steel or aluminum have been developed and used in various construction sites, and the range and scale of their use are increasing rapidly. .
그러나, 벽체거푸집과 달리 슬라브 시공용 데크의 경우에는 금속제 데크판넬의 중량과 핸들링 상의 어려움 등으로 특히, 소규모 건축물의 경우 여전히 합판과 같은 목재가 널리 사용되고 있는 바, 합판이 사용된 종래의 거푸집 구조를 도시한 도 1 및 도 2에 의거하여 살펴보면 다음과 같다.However, unlike wall formwork, slab construction decks have heavy weights and handling difficulties due to the weight of metal deck panels, and in the case of small buildings, wood such as plywood is still widely used. Referring to Figures 1 and 2 shown as follows.
벽체(W)를 시공하기 위해서 하부에 바닥(A)에 고정되는 기초부(12)의 상부에 천정이 구비되는 양측으로 벽체가 형성되도록 설치한 벽체 거푸집과,A wall formwork installed to form walls on both sides of which a ceiling is provided on an upper portion of the
상기 벽체거푸집(11)의 상부에 천장을 시공하도록 대향되는 두 벽체거푸집(11)의 각 상단부를 결합하여 바닥과 평행되는 천장을 형성하는 상부거푸집(13)을 포함하여 구성한다.It comprises a
상기 상부거푸집(13)은 목재 합판으로 사용되고 천정이 타설되는 콘크리트를 지탱하도록 합판으로 이루어진 상부거푸집(13)의 저면에 다수의 가로바(14)(장선,長線)들이 평행한 상태로 밀착되도록 형성하고, 상기 가로바(14)들의 저면에는 직교하도록 평행한 다수의 세로바(15)(멍에)들이 밀착된 후 각 세로바(15)들의 저면을 따라 다수의 지지대(S3)들이 바닥(A)까지 직립하여 상기 상부거푸집(13)을 지지하게 되는 구조이며, 벽체거푸집 배면 상단부를 따라 상기 가로바(14)와 평행한 각목(T)이 결합되어 데크(13)와 벽체거푸집(11)을 연결하게 된다.The
이때, 평탄한 전면이 벽체(W)의 두께만큼 이격된 상태로 대향하는 두 벽체거푸집(11)은 벽체를 두께 방향으로 가로지르게 되는 다수의 연결편(C)으로 결합되며, 벽체 시공 완료 후 상기 각 연결편(C)의 양단부를 절단하여 벽체거푸집을 해체하게되고, 각 연결편(C)의 중간부는 벽체 콘크리트속에 매몰된 상태가 된다.At this time, the two
그리고, 상기 벽체거푸집(11)의 각 배면에는, 벽체(W) 시공용으로 타설되는 콘크리트의 하중에 의한 압력으로 각 벽체거푸집(11)을 이루는 거푸집판넬들이 처음의 조립 위치에서 이탈되는 것을 방지하기 위하여 다수의 수직지지대(S1)들과 수평지지대(S2)들이 결합되며, 합판으로 이루어진 상부거푸집(13)는 벽체거푸집(11) 배면 상단부를 따라 고정 결합된 각목(T)에 못질되어 고정 결합되는 구조이다.And, on each rear surface of the
상기와 같은 종래기술의 상부거푸집 설치구조는 각목에 의해 못질되어 상부거푸집을 고정하는 구조로 형성함에 따라 상부거푸집 고정 시에 자유단으로 고정되는 각목의 고정이 어렵고, 고정 시에 망치에 의한 타격으로 발생된 충격에 의한 유동으로 거푸집이 틀어지거나 빈틈이 발생하여 양생 시에 콘크리트가 유출되거나 정 확한 형태로 천정이 형성되지 않아 건축물의 수명을 축소시키는 문제점이 있었다.As the upper formwork installation structure of the prior art as described above is formed into a structure for fixing the upper formwork by nailing by the wood, it is difficult to fix the wood to be fixed to the free end when fixing the upper formwork, by hitting with a hammer during fixing Due to the flow caused by the impact generated, the formwork is distorted, or the gap is generated, so that concrete does not flow out during curing or the ceiling is not formed in an accurate shape, which has a problem of reducing the life of the building.
또한, 종래기술의 상부거푸집 설치구조는 목재로 형성된 거푸집을 고정하는 구조를 제시한 것으로 최근에 사용되는 철재나 알루미늄과 같은 금속 프레임의 전면에 목재 코팅판 등의 판재가 결합된 목재와 금속 판넬을 사용하기 어려운 문제점이 있었다.In addition, the upper formwork installation structure of the prior art has proposed a structure for fixing the formwork formed of wood, using wood and metal panels combined with a plate such as a wood coating plate on the front of a metal frame such as iron or aluminum recently used There was a problem that was difficult to do.
그리고, 종래기술의 상부거푸집 설치구조는 가로바와 세로바로 지지된 상부거푸집을 벽체거푸집에 각목으로 결합시킴에 따라 콘크리트 양생 시에 못으로 고정된 각목으로 하중이 집중되면 거푸집의 결합력의 저하로 인하여 틈이 발생하는 문제점이 있었다.In addition, the upper formwork installation structure of the prior art combines the upper formwork supported by the horizontal bar and the vertical bar to the wall formwork as a timber, so that when the load is concentrated to the timber fixed by nails during concrete curing, the gap due to the deterioration of the cohesion of the formwork There was a problem that occurred.
아울러, 종래기술의 상부거푸집 설치구조는 내력이 작용하는 벽체와 천장의 결합부분으로 보강되는 보강천정부를 형성하기 위해서는 각목으로 벽체와 천정을 연결하는 연결부분에 거푸집을 설치하여 사용하는 것으로 각목으로 결합된 결합부분에 보강을 위한 다른 거푸집을 설치함과 동시에 천정거푸집의 연결구조를 확보하여야 함에 따라 설치와 연결에 따른 비용이 증대되는 문제점이 있었다.In addition, the upper formwork installation structure of the prior art is used to install the formwork at the connecting portion connecting the wall and the ceiling to the timber to form a reinforcement ceiling to be reinforced by the coupling portion of the wall and the ceiling to which the load-bearing force acts. In addition to the installation of other formwork for reinforcement at the same joint portion to secure the connection structure of the ceiling formwork, there was a problem that the cost of installation and connection is increased.
이와 같은, 문제점을 해결하고자 안출된 본 발명의 주목적은 벽체를 형성하는 벽체거푸집을 연결하면서 층간의 천장을 구비하는 상부거푸집을 설치하도록 벽체거푸집의 상부에 체결공간에 삽입되어 체결되는 체결부를 형성하고, 체결부의 대향되는 벽체거푸집 측으로 상부거푸집에 결합되는 결합목재를 결합몸체의 결합공간 에 형성하여 상부거푸집의 고정력을 향상시키고, 벽체거푸집에 상부 삽입체결됨에 따라 시공과 해체가 용이하여 시공효율성을 증대시킨다.The main object of the present invention devised to solve the problems as described above is to form a fastening portion inserted into the fastening space to the upper part of the wall formwork to install the upper formwork having a ceiling between the floors while connecting the wall formwork to form a wall, In order to improve the fixing force of the upper formwork by forming the joining wood coupled to the upper formwork on the side of the wall formwork facing the fastening body in the joining space of the joining body, and to insert the upper formwork to the wall formwork, it is easy to construct and dismantle. Let's do it.
이와 같은, 목적을 달성하고자 안출된 본 발명의 거푸집 상부체결구를 이용한 시공방법은 바닥의 기초부 상부에 벽체를 형성하도록 복수의 벽체거푸집을 형성하고, 대향되는 벽체거푸집의 상부에 천정을 형성하도록 가로바와 세로바로 지지대에 지지된 상부거푸집을 체결하는 상부체결구에 있어서, 상기 상부체결구는 벽체거푸집의 상부에 삽입되는 체결지지구의 하부에 체결공간을 형성하도록 양측 하부로 측부체결구를 구비한 체결몸체를 형성한 체결부와, 상기 체결부의 대향되는 벽체거푸집방향 일측의 측부체결구를 절곡하여 결합지지구를 형성하고, 결합지지구의 상부로 상부거푸집을 고정시키는 결합목재를 안치하는 결합공간을 구비되도록 일측 상부에 측부결합구를 구비한 결합몸체를 형성하여 체결부와 일체로 결합목재를 안치하도록 형성한 결합부를 포함하여 구성하는 것을 특징으로 한다.Such a construction method using the formwork upper fastener of the present invention devised to achieve the object is to form a plurality of wall formwork to form a wall on the upper portion of the base of the floor, and to form a ceiling on the upper side of the wall formwork facing In the upper fastener for fastening the upper formwork supported on the support by the horizontal bar and the vertical bar, the upper fastener is fastened with side fasteners on both sides to form a fastening space in the lower portion of the fastening support inserted into the top of the wall formwork. It has a coupling portion for forming a body and a coupling space for bending the side fasteners on one side of the wall forming die facing the fastening portion to form a coupling support, and set up a coupling wood for fixing the upper formwork to the upper portion of the coupling support. Forming a coupling body having a side coupling sphere on one side so as to settle the coupling wood integrally with the fastening portion That generated combination characterized in that it comprises part.
또한, 상기 체결부는 측부체결구의 일측으로 결합몸체가 형성되는 부분에 보강편을 형성하여 상부거푸집의 고정으로 전달되는 하중을 보강편으로 분산하여 체결된 벽체거푸집으로 전달되는 것을 방지하도록 구성하는 것을 특징으로 한다.In addition, the fastening portion is formed to form a reinforcing piece in a portion in which the coupling body is formed to one side of the side fasteners to distribute the load transmitted to the fixing of the upper formwork to the reinforcing piece to prevent delivery to the fastened wall formwork. It is done.
그리고, 상기 결합부는 결합목재의 상부에 천정의 보강부분이 구비되는 보강천정부 타설공간을 형성하도록 보강거푸집을 고정 설치하여 천정 타설 시에 보강되는 보강천정부가 형성되도록 결합목재에 보강거푸집을 설치하도록 구성하는 것을 특징으로 한다.And, the coupling portion is fixed to install the reinforcement formwork to form a reinforcement ceiling to form a reinforcement ceiling pouring space is provided with a reinforcement part of the ceiling on the upper part of the joining wood is configured to install the reinforcement formwork to the reinforcement wood to form a reinforcement ceiling to be reinforced at the time of ceiling Characterized in that.
또한, 거푸집 상부체결구를 이용한 시공방법은 벽체가 설치되는 위치의 바닥에 형성된 기초부 상부에 형성된 벽체거푸집을 설치하는 벽체거푸집 설치단계와, 상기 벽체거푸집 설치단계에서 설치된 벽체거푸집의 상부에 삽입 설치되도록 체결지지구의 하부로 측부체결구를 형성하여 체결공간을 구비한 체결몸체의 측부체결구 일측으로 연장부분에 보강편을 형성한 체결부를 구비하고, 체결부의 일측으로 측부체결구가 연장되어 측부로 절곡한 결합지지구의 일측 상부로 측부결합구를 형성하여 결합공간을 구비한 결합몸체를 형성한 결합부의 결합공간 내부에 결합목재를 수납 형성하는 상부체결구 형성단계와, 상기 상부체결구 형성단계에서 형성된 상부체결구를 대향되는 벽체거푸집의 상부에 결합부가 대향되는 측으로 마주보게 설치되도록 체결부의 체결공간에 벽체거푸집의 상부를 삽입 설치하는 상부체결구 설치단계와, 상기 상부체결구 설치단계에서 천정을 구비하도록 대향되는 벽체거푸집의 상부에 상부체결구를 설치한 상태로 결합부의 결합목재에 상부거푸집을 고정시키는 상부거푸집 고정단계와, 상기 상부거푸집 고정단계에서 상부체결구에 상부거푸집을 고정한 상태로 상부거푸집의 하부에 세로바와 가로바를 지지대로 지지하도록 설치하여 상부거푸집을 지지하여 상부거푸집의 시공을 마치는 상부거푸집 시공완성단계를 포함하여 구성한다.In addition, the construction method using the formwork upper fastener is a wall formwork installation step of installing the wall formwork formed on the upper portion of the base formed on the bottom of the position where the wall is installed, and the wall formwork installed in the upper part of the wall formwork installed in the wall formwork installation step A side fastener is formed at the bottom of the fastening support so as to have a fastening portion formed with a reinforcing piece extending to one side of the fastening body having a fastening space, and the side fastener is extended to one side of the fastening part. In the upper fastener forming step of forming a side joining sphere to the upper side of the bent coupling support to form a joining wood in the coupling space of the coupling portion forming a coupling body having a coupling space, and in the upper fastener formation step Fasten the formed upper fasteners so that the coupling parts face each other on the opposite side of the wall formwork. The upper fastener installation step of inserting and installing the upper part of the wall formwork in the fastening space of the part, and the upper fastener is installed on the upper part of the wall formwork facing the ceiling form in the upper fastener installation step in the joining wood The upper formwork fixing step for fixing the upper formwork, and the upper formwork is fixed to the upper fastener in the upper formwork fixing step to install the upper formwork to support the vertical bar and the horizontal bar in the lower part of the upper formwork to support the upper formwork It comprises the upper formwork construction completion step of finishing the construction.
아울러, 상부거푸집 고정단계는 천정의 하부 측으로 콘크리트 타설부분을 확대하여 보강하는 보강천정부를 구비하도록 상부체결구의 결합목재 상부에 보강천정 타설공간을 확보하도록 단부에 보강거푸집을 설치하고, 대향되는 벽체에 형성된 보 강거푸집의 상부로 상부체결구의 체결부를 체결한 상태로 결합목재로 상부거푸집을 고정시켜 보강천정부가 타설되도록 구성하는 것을 특징으로 한다.In addition, the upper formwork fixing step is to install a reinforcement formwork at the end to secure the reinforcement ceiling placing space on the upper part of the joining wood of the upper fastener so as to have a reinforcement ceiling to expand and reinforce the concrete placing portion to the lower side of the ceiling, and to the opposite wall It characterized in that the reinforcement ceiling is poured by fixing the upper formwork with a joining wood in the state of fastening the fastening portion of the upper fastener to the upper portion of the formed formwork.
이와 같이, 구성된 본 발명의 거푸집 상부체결구를 이용한 시공방법에 바람직한 실시예를 도면을 참조하면서 살펴보면 다음과 같다. Thus, looking at the preferred embodiment of the construction method using the formwork upper fastener of the present invention with reference to the drawings as follows.
우선, 도면들 중, 동일한 구성요소 또는 부품들은 가능한 동일한 참조부호로 나타내고 있음에 유의하여야 한다. 본 발명을 설명함에 있어, 관련된 공지기능 혹은 구성에 대한 구체적인 설명은 본 발명의 요지를 모호하지 않기 위하여 생략한다.First, in the drawings, the same components or parts are to be noted that the same reference numerals as possible. In describing the present invention, detailed descriptions of related well-known functions or configurations are omitted in order not to obscure the subject matter of the present invention.
도 3은 본 발명에 따른 거푸집 상부체결구를 나타내는 사시도이고, 도 4는 본 발명에 따른 거푸집 상부체결구를 결합한 상태를 나타내는 사용상태도이며, 도 5는 본 발명에 따른 거푸집 상부체결구의 보강편을 설치한 상태를 나타내는 사시도이고, 도 6은 본 발명에 따른 거푸집 상부체결구를 이용하여 보강천정부를 시공하는 상태를 나타내는 사용상태도이며, 도 7은 본 발명에 따른 거푸집 상부체결구를 이용한 시공방법을 나타내는 공정도이다.Figure 3 is a perspective view showing a formwork upper fastener according to the present invention, Figure 4 is a state diagram showing a state of combining the formwork upper fastener according to the present invention, Figure 5 is a reinforcing piece of the formwork upper fastener according to the present invention. Figure 6 is a perspective view showing the installed state, Figure 6 is a state diagram showing the state of constructing the reinforcement ceiling using the formwork upper fastener according to the present invention, Figure 7 is a construction method using the formwork upper fastener according to the present invention It is process chart to show.
도 3 내지 도 7에서 도시한 바와 같이, 본 발명의 거푸집 상부체결구(100)는 바닥(A)의 기초부(12) 상부에 벽체(W)를 형성하도록 복수의 벽체거푸집(11)을 형성하고, 대향되는 벽체거푸집(11)의 상부에 천정(C)을 형성하도록 가로바(14)와 세로바(15)로 지지대(S3)에 지지된 상부거푸집(13)을 체결하도록 체결부(110)와 결합부(120)를 구비한 상부체결구(100)를 형성하도록 구성한다.As shown in Figure 3 to Figure 7, the formwork
상기 체결부(110)는 벽체거푸집(11)의 상부에 삽입되는 체결지지구(113)의 하부에 체결공간(112)을 형성하도록 양측 하부로 측부체결구(114)를 구비한 체결몸체(111)를 형성하도록 구성한다.The
여기서, 체결부(110)는 측부체결구(114)의 일측으로 결합몸체(121)가 형성되는 부분에 보강편(115)을 형성하여 상부거푸집(13)의 고정으로 전달되는 하중을 보강편(115)으로 분산하여 체결된 벽체거푸집(11)으로 전달되는 것을 방지하도록 구성하는 것이 바람직하다.Here, the fastening
상기 결합부(120)는 체결부(110)의 대향되는 벽체거푸집(11)방향 일측의 측부체결구(114)가 연장되어 측부로 절곡한 결합지지구(123)를 형성하고, 결합지지구(123)의 상부로 상부거푸집(13)을 고정시키는 결합목재(125)를 안치하는 결합공간(122)을 구비되도록 일측 상부에 측부결합구(124)를 구비한 결합몸체(121)를 형성하여 체결부(110)와 일체로 결합목재(125)를 안치하도록 구성한다.The
여기서, 결합부(120)는 결합목재(125)의 상부에 천정(C)의 보강부분이 구비되는 보강천정부(B) 타설공간을 형성하도록 보강거푸집(126)을 고정 설치하여 천정(C) 타설 시에 보강되는 보강천정부(B)가 형성되도록 결합목재(125)에 보강거푸집(126)을 설치하도록 구성하는 것이 바람직하다.Here, the
이와 같이, 구성된 본 발명의 거푸집 상부체결구를 이용한 시공방법에 따른 작용을 살펴보면 다음과 같다.Thus, look at the action according to the construction method using the formwork upper fastener of the present invention is as follows.
먼저, 벽체(W)가 설치되는 위치의 바닥에 형성된 기초부(12) 상부에 형성된 벽체거푸집(11)을 설치하는 벽체거푸집 설치단계(S1)로 벽체거푸집(11)을 설치한다.First, the
이렇게, 벽체거푸집 설치단계(S1)에서 설치된 벽체거푸집(11)의 상부에 삽입 설치되도록 체결지지구(113)의 하부로 측부체결구(114)를 형성하여 체결공간(112)을 구비한 체결몸체(111)의 측부체결구(114) 일측으로 연장부분에 보강편(115)을 형성한 체결부(110)를 구비하고, 체결부(110)의 일측으로 측부체결구(114)가 연장되어 측부로 절곡한 결합지지구(123)의 일측 상부로 측부결합구(124)를 형성하여 결합공간(122)을 구비한 결합몸체(121)를 형성한 결합부(120)의 결합공간(122) 내부에 결합목재(126)를 수납 형성하는 상부체결구 형성단계(S2)에서 체결부(110)와 결합부(120)를 구비한 상부체결구(100)를 형성한다.Thus, the fastening body having a
상기와 같이, 상부체결구 형성단계(S2)에서 형성된 상부체결구(100)를 대향되는 벽체거푸집(11)의 상부에 결합부(120)가 대향되는 측으로 마주보게 설치되도록 체결부(110)의 체결공간(112)에 벽체거푸집(11)의 상부를 삽입 설치하는 상부체결구 설치단계(S3)로 상부체결구(100)를 벽체거푸집(11)에 설치한다.As described above, the
이렇게, 상부체결구 설치단계(S3)에서 천정(C)을 구비하도록 대향되는 벽체거푸집(11)의 상부에 상부체결구(100)를 설치한 상태로 결합부(110)의 결합목재(125)에 상부거푸집(13)을 고정시키는 상부거푸집 고정단계(S4)로 상부거푸집(13)을 결합부(120)의 결합목재(125)에 고정시킨다.Thus, in the upper fastener installation step (S3) in the state in which the
이때, 상부거푸집 고정단계(S4)는 천정(C)의 하부 측으로 콘크리트 타설부분을 확대하여 보강하는 보강천정부(B)를 구비하도록 상부체결구(100)의 결합목재(125) 상부에 보강천정부(B) 타설공간을 확보하도록 단부에 보강거푸집(126)을 설치하고, 대향되는 벽체(W)에 형성된 보강거푸집(126)의 상부로 상부체결구(100) 의 체결부(110)를 체결한 상태로 결합목재로 상부거푸집(13)을 고정시켜 보강천정부(B)가 타설하여 시공한다.At this time, the upper formwork fixing step (S4) is a reinforcement ceiling (top) in the upper part of the joining wood (125) of the upper fastener (100) to have a reinforcement ceiling (B) to expand and reinforce the concrete pouring portion to the lower side of the ceiling (C) ( B) the
상기와 같이, 상부거푸집 고정단계(S4)에서 상부체결구(100)에 상부거푸집(13)을 고정한 상태로 상부거푸집(13)의 하부에 세로바(15)와 가로바(14)를 지지대(S3)로 지지하도록 설치하여 상부거푸집(13)을 지지하여 상부거푸집(13)의 시공을 마치는 상부거푸집 시공완성단계(S5)로 상부체결구(100)로 고정된 상부거푸집(13)의 하부를 지지하여 시공을 완성시킨다.As described above, the vertical bar (15) and the horizontal bar (14) in the lower portion of the
따라서, 대향되는 벽체(W)의 천정(C)을 형성하도록 벽체거푸집(11)의 상부에 결합목재(125)를 대향되는 측으로 결합부(120)에 수납 형성한 상부체결구(100)를 삽입 체결하여 설치한 상태로 결합목재(125)에 상부거푸집(13)을 고정하도록 구성함에 따라 설치 및 해체가 용이하고, 결합목재(125)의 상부에 보강거푸집(126)을 설치하여 보강천정부(B)를 타설할 수 있음에 따라 시공의 범용성을 확대한다.Accordingly, the
이와 같이, 구성된 본 발명의 거푸집 상부체결구 및 이를 이용한 시공방법은 벽체를 형성하는 벽체거푸집을 연결하면서 층간의 천장을 구비하는 상부거푸집을 설치하도록 벽체거푸집의 상부에 체결공간에 삽입되어 체결되는 체결부를 형성하고, 체결부의 대향되는 벽체거푸집 측으로 상부거푸집에 결합되는 결합목재를 결합몸체의 결합공간에 형성하여 상부거푸집의 고정력을 향상시키고, 벽체거푸집에 상부 삽입체결됨에 따라 시공과 해체가 용이하여 시공효율성을 증대시키는 효과를 제 공한다.Thus, the formwork upper fastener of the present invention and the construction method using the same is connected to the wall formwork to form a wall fastening is inserted into the fastening space is inserted into the fastening space on the top of the wall formwork to install the upper formwork having a ceiling between the floor Forming a part, to form the joining wood coupled to the upper formwork to the wall formwork facing the fastening part in the joining space of the coupling body to improve the fixing force of the upper formwork, the construction and disassembly is easy as the upper insert is fastened to the wall formwork It provides the effect of increasing efficiency.
또한, 본 발명의 거푸집 상부체결구 및 이를 이용한 시공방법은 천정을 형성하도록 대향되게 형성된 벽체거푸집의 상부에 삽입되는 체결지지구의 하부에 체결공간을 형성하도록 양측 하부로 측부체결구를 구비한 체결몸체를 형성한 체결부를 구비하고, 체결부의 대향되는 벽체거푸집방향 일측의 측부체결구를 절곡하여 체결지지구를 형성하고, 체결지지구의 상부로 상부거푸집을 고정시키는 결합목재를 안치하는 결합공간을 구비되도록 일측 상부에 측부결합구를 형성하여 체결부와 일체로 결합목재를 안치하도록 형성한 결합부를 구비하여 체결부와 결합부를 일체로 형성하여 제조단가를 저감하고, 공정을 축소하여 생산성을 향상시키는 효과를 제공한다.In addition, the formwork upper fastener of the present invention and the construction method using the same fastening body having side fasteners on both sides to form a fastening space in the lower portion of the fastening support inserted into the upper portion of the wall formwork formed to form a ceiling. It is provided with a fastening portion formed to form a side fasteners on one side of the wall formwork direction opposite to the fastening portion to form a fastening support, so as to have a coupling space for seating the joining wood for fixing the upper formwork to the top of the fastening support A side coupling tool is formed on one side and the coupling part is formed to settle the coupling wood integrally with the coupling part. The coupling part and the coupling part are integrally formed to reduce the manufacturing cost and reduce the process, thereby improving productivity. to provide.
그리고, 본 발명의 거푸집 상부체결구 및 이를 이용한 시공방법은 벽체거푸집의 상부에 삽입한 상태로 조립되고, 대향되는 측으로 상부거푸집이 고정되는 결합목재를 수납시킨 결합부를 일체로 구성함에 따라 시공이 간편하고, 시공 후에 해체가 용이하여 시공성을 향상시키는 효과를 제공한다.In addition, the formwork upper fasteners and the construction method using the same of the present invention is assembled in the state inserted into the upper portion of the wall formwork, and the construction is simple by constructing a coupling part that accommodates the joining wood to which the upper formwork is fixed to the opposite side And it is easy to dismantle after construction, and provides the effect of improving workability.
또한, 본 발명의 거푸집 상부체결구 및 이를 이용한 시공방법은 벽체거푸집이 체결되는 체결부의 일측으로 결합구가 일체로 형성되도록 절곡된 부분에 보강편을 형성하여 결합부의 상부거푸집에서 발생되는 하중을 분산시켜 벽체거푸집으로 전달되는 하중을 축소함에 따라 거푸집의 수명을 증대시키고 타설 시에 거푸집 이송을 방지하여 건물의 수명을 증대시키는 효과를 제공한다.In addition, the formwork upper fastener of the present invention and the construction method using the same to form a reinforcing piece in the bent portion so that the coupler is integrally formed to one side of the fastening portion to which the wall formwork is fastened to distribute the load generated in the upper formwork of the joining portion By reducing the load transmitted to the wall formwork, it increases the life of the formwork and prevents the formwork transfer during pouring, thereby increasing the life of the building.
아울러, 본 발명의 거푸집 상부체결구 및 이를 이용한 시공방법은 벽체거푸 집의 상부에 형성된 상부체결구의 결합목재 상부로 보강거푸집을 설치하고, 보강거푸집의 상부에 상부체결구를 형성하여 상부거푸집을 고정하도록 형성하여 천정의 하부 측으로 보강되도록 타설면을 확대하는 보강천정부를 용이하게 형성함에 따라 보강천정부 형성을 위한 거푸집의 설치를 최소화 하여 시공의 편의성을 향상시키는 효과를 제공한다.In addition, the formwork upper fastener of the present invention and the construction method using the same, install the reinforcement formwork to the upper part of the joining wood of the upper fastener formed on the top of the wall formwork, and form the upper fastener on the upper part of the reinforcement form to fix the upper formwork Forming so as to easily form a reinforcement ceiling for expanding the pour surface to be reinforced to the lower side of the ceiling provides an effect of improving the convenience of construction by minimizing the installation of formwork for forming the reinforcement ceiling.
본 발명은 도면에 도시된 일 실시예를 참고로 하여 설명하였으나 이는 예시적인 것에 불과하며 당해 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 실시예의 변형이 가능하다는 점을 이해할 것이다. 따라서 본 발명의 진정한 기술적 보호범위는 첨부된 특허청구범위의 기술적 사상에 의해서 정해져야 할 것이다.Although the present invention has been described with reference to one embodiment shown in the drawings, this is merely exemplary and will be understood by those of ordinary skill in the art that various modifications and variations can be made therefrom. Therefore, the true technical protection scope of the present invention will be defined by the technical spirit of the appended claims.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070036434A KR100757030B1 (en) | 2007-04-13 | 2007-04-13 | Contracting instrument for form and constructing method of using thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070036434A KR100757030B1 (en) | 2007-04-13 | 2007-04-13 | Contracting instrument for form and constructing method of using thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100757030B1 true KR100757030B1 (en) | 2007-09-07 |
Family
ID=38737118
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070036434A KR100757030B1 (en) | 2007-04-13 | 2007-04-13 | Contracting instrument for form and constructing method of using thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100757030B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160018130A (en) * | 2014-08-08 | 2016-02-17 | 윤흥규 | Construction form assembly |
KR102099182B1 (en) | 2018-10-23 | 2020-04-09 | 안태옥 | The euro-form fixing structure for a ceiling structure |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5231523A (en) | 1973-09-10 | 1977-03-10 | Riyouichi Nakajima | Method of placing concrete floor plate and receiving fitting used for carrying out said method |
KR200298117Y1 (en) | 2002-09-19 | 2002-12-12 | 이광국 | framable set mold for construction |
KR20060041382A (en) * | 2004-11-08 | 2006-05-12 | (주)태양건설 | The construction structure of concrete forms |
-
2007
- 2007-04-13 KR KR1020070036434A patent/KR100757030B1/en not_active IP Right Cessation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5231523A (en) | 1973-09-10 | 1977-03-10 | Riyouichi Nakajima | Method of placing concrete floor plate and receiving fitting used for carrying out said method |
KR200298117Y1 (en) | 2002-09-19 | 2002-12-12 | 이광국 | framable set mold for construction |
KR20060041382A (en) * | 2004-11-08 | 2006-05-12 | (주)태양건설 | The construction structure of concrete forms |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160018130A (en) * | 2014-08-08 | 2016-02-17 | 윤흥규 | Construction form assembly |
KR102302211B1 (en) | 2014-08-08 | 2021-09-14 | 윤흥규 | Construction form assembly |
KR102099182B1 (en) | 2018-10-23 | 2020-04-09 | 안태옥 | The euro-form fixing structure for a ceiling structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9175466B2 (en) | Tension reinforcement for concrete | |
KR100936403B1 (en) | Formed steel plate concrete beam having fire-resistant coating material attaching structure and construction method thereof | |
US20080104913A1 (en) | Lightweight Concrete Wall Panel With Metallic Studs | |
KR100757030B1 (en) | Contracting instrument for form and constructing method of using thereof | |
KR20080084130A (en) | Coupling structure of dek for slab execution | |
KR100979264B1 (en) | mold of form panel comprising paper corrugated cardboard | |
KR200384386Y1 (en) | Euro-form for outer appearance of concrete body | |
KR20070027431A (en) | A fastener for fixing a reinforcing bar assembly, a mold panel, and a ceiling panel by spot welding | |
KR100788742B1 (en) | Coupling structure of dek in narrow space | |
WO2019194324A1 (en) | Prefabricated form | |
KR200414945Y1 (en) | A slab panel for euro form of deck panel construct | |
KR102181071B1 (en) | Form connecting apparatus for curved wall construction | |
KR101083062B1 (en) | Hybrid reinforced concrete system | |
KR200486761Y1 (en) | Corner angle for connecting form panels | |
KR200380884Y1 (en) | The construction structure of concrete forms for slab | |
JPH08165727A (en) | Construction panel body and joint method thereof | |
KR100812250B1 (en) | Assembling vertical system form | |
KR100663378B1 (en) | Euro-form for outer appearance of concrete body | |
KR200189909Y1 (en) | Panel for steel concrete | |
KR200391961Y1 (en) | Finish panal for forms | |
KR100758627B1 (en) | Assembling vertical system form | |
KR102246944B1 (en) | Prefab rack pannel for logistics warehouse including concret | |
KR200375082Y1 (en) | The construction structure of concrete forms for slab | |
JP2005351068A (en) | Structure for reinforcing reentrant part of existing wooden building | |
KR200375081Y1 (en) | The construction structure of concrete forms |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20110830 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20120914 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |