KR20080078518A - A rock-making structures for environmental friendliness and constructing method the same - Google Patents
A rock-making structures for environmental friendliness and constructing method the same Download PDFInfo
- Publication number
- KR20080078518A KR20080078518A KR1020070103061A KR20070103061A KR20080078518A KR 20080078518 A KR20080078518 A KR 20080078518A KR 1020070103061 A KR1020070103061 A KR 1020070103061A KR 20070103061 A KR20070103061 A KR 20070103061A KR 20080078518 A KR20080078518 A KR 20080078518A
- Authority
- KR
- South Korea
- Prior art keywords
- artificial
- artificial cancer
- unit
- filling
- main frame
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 23
- 230000007613 environmental effect Effects 0.000 title abstract 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 10
- 206010028980 Neoplasm Diseases 0.000 claims description 62
- 201000011510 cancer Diseases 0.000 claims description 62
- 238000010276 construction Methods 0.000 claims description 13
- 238000004519 manufacturing process Methods 0.000 claims description 9
- 238000004040 coloring Methods 0.000 claims description 5
- 238000009415 formwork Methods 0.000 claims description 5
- 230000001788 irregular Effects 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000005507 spraying Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 2
- 230000006641 stabilisation Effects 0.000 claims description 2
- 238000011105 stabilization Methods 0.000 claims description 2
- 238000005429 filling process Methods 0.000 claims 1
- 239000011435 rock Substances 0.000 abstract description 15
- 238000010586 diagram Methods 0.000 description 8
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 239000004575 stone Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 2
- 230000003628 erosive effect Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000003796 beauty Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000005253 cladding Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B44—DECORATIVE ARTS
- B44C—PRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
- B44C1/00—Processes, not specifically provided for elsewhere, for producing decorative surface effects
- B44C1/18—Applying ornamental structures, e.g. shaped bodies consisting of plastic material
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
Description
도1은 본 발명에 의한 환경친화형 인공의암 구축물이 설치된 호안방파제의 전체구성을 나타낸 개략도.Figure 1 is a schematic diagram showing the overall configuration of the lake bank breakwater equipped with environmentally friendly artificial cancer construct according to the present invention.
도2는 본 발명의 요부인 인공의암유닛의 구축상태를 나타낸 측면도.Figure 2 is a side view showing the construction of the artificial cancer unit which is the main part of the present invention.
도3은 본 발명의 요부인 본체구축물의 구성을 나타낸 개략도.Figure 3 is a schematic diagram showing the configuration of the main body structure, which is the main part of the present invention.
도4는 본 발명의 요부인 거치 프레임의 구성을 나타낸 사시도.Figure 4 is a perspective view showing the configuration of the mounting frame which is the main part of the present invention.
도5는 인공의암유닛의 제작공정을 나타낸 개략도.5 is a schematic view showing a manufacturing process of an artificial cancer unit.
도6은 인공의암유닛이 거치 프레임에 부착된 상태를 나타낸 모식도. Figure 6 is a schematic diagram showing a state in which the artificial cancer unit is attached to the mounting frame.
도7은 인공의암 유닛을 본체구축물에 장착한 구성을 나타낸 개략도.7 is a schematic view showing a configuration in which an artificial cancer unit is mounted on a main body structure.
도8은 본체 구축물에 부착된 인공의암 유닛간의 틈새부분을 처리하는 상태를 나타낸 개략도.Fig. 8 is a schematic diagram showing a state of processing gaps between artificial cancer units attached to the main body construct.
도9은 인공의암 유닛을 거푸집으로 하여 콘크리트를 거체 프레임에 타설하는 과정을 나타낸 개략도.Figure 9 is a schematic diagram showing the process of pouring concrete into the frame of the artificial cancer unit as a formwork.
도10은 콘크리트 타설용 구멍을 메우는 과정을 나타낸 개략도.10 is a schematic view showing a process of filling the hole for concrete pouring.
도11은 완성된 인공의암에 착색하는 과정을 나타낸 개략도.Figure 11 is a schematic diagram showing the process of coloring the finished artificial cancer.
도12 및 도13은 본 발명의 인공의암 구축물이 방파제와 돌제에 적용되는 상태를 나타낸 개략도. 12 and 13 are schematic views showing a state in which the artificial cancer construct of the present invention is applied to a breakwater and a jetty.
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
2: 기초지반 4: 본체구축물2: foundation ground 4: body structure
6: 상부구축물 8: 메인프레임6: upper structure 8: mainframe
10: 인공의암유닛 11: 보조프레임10: artificial cancer unit 11: subframe
12: 암피스 14: 인서트앵커12: armpiece 14: insert anchor
16: 소파블럭 18: 피복석16: sofa block 18: cladding
본 발명은 인공암석을 이용한 구축물 및 그의 구축방법에 관한 것으로, 더욱 상세하게는 해안침식을 방지하거나, 연안부등에 설치되는 호안, 방파제, 제방등의 경관 또는 인공바위가 많은 곳등에 적용할 수 있는 환경친화형 인공의암 구축물 및 구축방법에 관한 것이다.The present invention relates to a construct using artificial rock and its construction method, and more particularly, to prevent coastal erosion or to be applied to landscapes such as shores, breakwaters, embankments, or the like, where there are many artificial rocks. The present invention relates to an environmentally friendly artificial cancer construct and a construction method.
일반적으로, 해안선을 따르는 연안부는 파도에 대한 보호를 위하여 콘크리트로 제조된 다수의 호안구조물로 이루어져 있다. 종래의 호안 구조물은 불록화된 형태로 형상의 자유도가 높고 제작이 용이하지만, 질감이 좋지 않아 주변 환경과 조 화를 이루기가 어렵고, 벽면이 수직으로 이루어져 있어 물가 주변으로 접근하기가 어려운 문제점이 있었다.Generally, coastal areas along the coastline consist of a number of shoreline structures made of concrete for protection against waves. Conventional revetment structure has a high degree of freedom in shape and easy to manufacture in a blocky form, but it is difficult to harmonize with the surrounding environment due to poor texture, and difficult to approach near the water because the wall is vertical. .
이러한, 문제점을 해소하고자, 종래에는 해안 구조물의 표면에 자연석을 입히거나, 구조물의 법면을 계단모양으로 하여 호안을 완만하게 구축하는 사례가 있었으나, 전자의 경우는 자연석의 입수가 어렵고, 후자의 경우에는 질감이 떨어져 자연경관의 풍경을 느낄 수 없으며, 설치시에 해상공사의 단축이나 파랑 대책등 여러가지 해결하여야 할 사항이 많아 실제 적용하기가 까다로운 문제점이 있었다.In order to solve such a problem, there have been cases where a natural stone is applied to the surface of a coastal structure or a smooth construction of a lake is made by stepping the surface of the structure. However, in the latter case, the natural stone is difficult to obtain. Due to the lack of texture, it is impossible to feel the scenery of the natural landscape, and there are many problems that need to be resolved such as shortening of the sea works or countermeasures during installation.
따라서, 본 발명은 상기와 같은 제반 문제점을 해결하기 위해 제안된 것으로서, 수중에 설치된 기초사석에 골조 형태의 본체 구축물을 형성하고, 그 외면에 인공의암을 부착함으로써 호안의 방파기능과 함께 미려한 자연 경관을 부여할 수 있도록 한 환경친화형 인공의암 구축물 및 그의 구축방법을 제공함에 그 목적이 있다.Accordingly, the present invention has been proposed to solve the above problems, by forming a body structure in the form of a frame in the foundation stone installed in the water, by attaching artificial cancer on the outer surface of the beautiful natural beauty along with the breakwater function of the revetment The purpose of the present invention is to provide an environmentally friendly artificial cancer construct and a method of constructing the same to provide a landscape.
상기 목적을 달성하기 위하여 본 발명은, 수중에 설치되는 기초지반; 상기 기초지반의 상부에 설치되는 본체구축물; 상기 본체구조물의 상부에 설치되어 방파제로서의 기능을 수행하는 상부구축물; 상기 상부구축물의 일측 외면에 설치되는 메인 프레임; 박스 형태의 거치프레임 표면에 불규칙한 형태의 암피스가 장착되어 단위체를 구성하는 인공의암 유닛; 및 상기 인공의암 유닛의 후방으로 돌출되게 구비되어 메인프레임에 인공의암 유닛을 고정하는 인서트앵커를 포함하는 환경친화형 인공암석 구축물을 제공한다.In order to achieve the above object, the present invention, the base is installed in water; A main body structure installed on an upper portion of the foundation ground; An upper structure installed on an upper portion of the main body structure to perform a function as a breakwater; A main frame installed on one outer surface of the upper structure; An artificial arm unit having an armpiece of irregular shape mounted on a surface of the box-shaped mounting frame to constitute a unit; And it is provided to protrude to the rear of the artificial cancer unit provides an environmentally friendly artificial rock construction comprising an insert anchor to secure the artificial cancer unit to the mainframe.
또한, 본 발명은 지주로서 기능하는 케이슨(caisson)을 수중에 매입하고 콘크리트를 타설하되, 표면에 철근이 돌출되도록 하여 기초지반을 형성하는 제1 단계; 상기 기초지반의 상부에 안정화단면을 이루도록 상부구축물을 설치하고, 상부구축물의 외면에 메인 프레임을 설치하는 제2 단계; 박스형태의 거치프레임과, 후방측으로 인서트앵커가 돌출된 암피스를 각각 제작하되, 상기 인서트앵커를 상기 거치프레임에 용접하여 인공의암유닛을 제작하는 제3 단계; 상기 인공의암유닛을 소정크기로 절단하여 현장으로 운반하고, 인서트앵커를 매개로 절단된 인공의암 유닛을 메임프레임에 고정하는 제4 단계; 상기 인공의암유닛을 거푸집으로 하여 내부에 콘크리트를 타설하여 속채움을 실시하고, 상기 속채움 콘크리트 타설공정이 완료되면 콘크리트 타설용 구멍을 메워 인공의암의 구축을 완료하는 제5 단계; 및 In addition, the present invention is to purchase a caisson (caisson) in the water functioning as a support and pouring concrete, the first step of forming the foundation ground so that the reinforcing bar on the surface; A second step of installing an upper structure to form a stabilization cross section on an upper portion of the foundation ground, and installing a main frame on an outer surface of the upper structure; A third step of manufacturing a box-shaped mounting frame and an arm piece having an insert anchor protruded to the rear side thereof, and manufacturing the artificial arm unit by welding the insert anchor to the mounting frame; A fourth step of cutting the artificial cancer unit to a predetermined size and transporting the artificial cancer unit to a site, and fixing the artificial cancer unit cut through an insert anchor to a main frame; A fifth step of filling the interior of the artificial cancer unit with the formwork and filling it; and completing the construction of the artificial cancer by filling the hole for concrete placing when the filling concrete pouring process is completed; And
속채움 콘크리트 타설공정이 완료되면 뿜칠도구를 이용하여 인공의암에 착색을 수행하는 제6 단계를 포함하는 환경친화형 인공암석 구축물의 구축방법을 제공한다.When the filling concrete pouring process is completed, the present invention provides a method for constructing an environmentally friendly artificial rock structure including a sixth step of performing coloring on artificial cancer using a spraying tool.
이하, 첨부된 도1 내지 도13을 참조하여 본 발명의 실시예를 상세히 설명한다.Hereinafter, with reference to the accompanying Figures 1 to 13 will be described an embodiment of the present invention;
본 발명에 의한 환경친화형 인공의암 구축물 및 그의 구축방법은 각종 호안의 방파제나 돌제등의 기능을 그대로 유지하면서 자연경관과 같은 질감을 느낄 수 있도록 구현한 것이다.Environmentally friendly artificial cancer construct and its construction method according to the present invention is implemented to feel the texture like natural landscape while maintaining the function of the breakwater or stone of various lakes as it is.
도1은 본 발명에 의한 인공의암 구축물이 설치된 호안방파제의 전체구성을 나타낸 개략도이고, 도2는 메인 프레임에 인공의암 유닛이 장착된 상태를 나타낸 측단면도이다. 1 is a schematic diagram showing the overall configuration of a lake breakwater installed with an artificial cancer construct according to the present invention, Figure 2 is a side cross-sectional view showing a state in which the artificial cancer unit is mounted on the main frame.
도면에 도시한 바와 같이 본 발명에 따른 인공의암 구축물은, 수중에 설치되는 기초지반(2)과; 상기 기초지반(2)의 상부에 설치되며, 만조때의 바닷물이 넘치지 못하도록 차단하는 본체구축물(4)과; 상기 본체구조물(4)의 상부에 설치되어 방파제로서의 기능을 수행하는 상부구축물(6)과; 상기 상부구축물(6)의 일측 외면에 설치되는 메인 프레임(8)과; 박스 형태의 거치프레임(11) 표면에 불규칙한 형태의암피스(12)가 장착되어 단위체를 구성하는 인공의암 유닛(10); 및 상기 인공의암 유닛(10)의 후방으로 돌출되게 구비되어 메인프레임(8)에 인공의암 유닛(10)을 고정하는 인서트앵커(14)를 포함한다.As shown in the figure, the artificial cancer construct according to the present invention includes: an underlying ground (2) installed in the water; A main body structure (4) installed at an upper portion of the foundation ground (2) and blocking sea water from overflowing during high tide; An upper structure (6) installed above the main body structure (4) and performing a function as a breakwater; A
본 발명에서 본체구축물(4)과 상부구축물(6)은 콘크리트 구조체로 이루어질 수 있다.In the present invention, the
상기 메인프레임(8)은 콘크리트의 중량이나 측압에 의해서 인공의암 유닛(10)이 변위되지 않도록 기초 콘크리트나 기설 구조물과 결합시키기 위한 부재이다. 상기 메인프레임(8)은 H형강과 같은 비교적 큰 단면의 강재를 주로 이용하며, 규칙성이 있는 부재이므로 도면에 정확하게 기입할 것을 요한다.The
상기 인공의암 유닛(10)의 인공암석편(12)은 매우 불규칙한 형상, 요철을 하고 있다. 이것을 메인 프레임(8)에 규칙적으로 설치하기가 곤란하다. 그러한 경우 인공암석(12)의 형상에 맞추어 적당히 이용하는 것이 거치 프레임(11)이다. 50x 50의 L형강을 주로 이용하며, 설치방법에 규칙성이 없기 때문에 도면에는 거의 기술하지 않는다.The
미설명 부호 16은 소파블럭을 나타내며, 18은 기초지반의 둘레에 설치되는 피복석을 나타낸다.
상기와 같이 구성된 본 발명에 따른 인공의암 구축물의 구축방법을 도3 내지 도11을 참조하여 설명한다.A method of constructing an artificial cancer construct according to the present invention configured as described above will be described with reference to FIGS.
도3은 기초지반을 구성을 나타낸 개략적인 단면도이다. 3 is a schematic cross-sectional view showing the structure of the foundation ground.
도면에 도시한 바와 같이, 지주로서 기능하는 케이슨(caisson)(22)을 수중에 매입하고 콘크리트를 타설하되, 표면에 철근(24)이 돌출되도록 하여 기초지반(2)을 형성한다. 그리고, 상기 기초지반(2)의 상부에 안정화단면을 이루도록 상부구축물(4)을 설치하고, 또 상부구축물(4)에 메인 프레임(8)(본 도에는 도시하지 않음)을 설치한다.As shown in the figure, a
도4는 인공의암 유닛용 거치프레임의 형태를 나타낸 것이고, 도5는 인공의암유닛의 제작공정도이며, 도6은 인공의암유닛이 거치 프레임에 부착된 상태를 나타낸 모식도이다.Figure 4 shows the form of the mounting frame for an artificial cancer unit, Figure 5 is a manufacturing process of the artificial cancer unit, Figure 6 is a schematic diagram showing a state in which the artificial cancer unit is attached to the mounting frame.
도4 및 도5에 도시한 바와 같이, L형강을 박스형태로 조립하여 틀체의 거치프레임(11)을 제작하고, 또한 필요한 모양과 두께를 갖는 암피스(12)를 제작한다. 상기 암피스(12)는 후방측으로 돌출된 인서트앵커(14)를 매개로 상기 거치프레임(11)에 용접한다. 그리고, 상기 암피스(12)의 틈새부분은 철망으로 가설한 후 연 결조형(19)으로 메움으로써 인공의암유닛(10)의 제작을 완료한다.As shown in Figs. 4 and 5, the L-shaped steel is assembled into a box shape to manufacture the
도7은 인공의암유닛을 메인프레임(8)에 거치하는 상태를 나타낸 단면도이고, 도8은 본체 구축물에 부착된 인공의암 유닛간의 틈새부분을 처리하는 상태를 나타낸 개략도이다.FIG. 7 is a cross-sectional view showing a state in which the artificial cancer unit is mounted on the
도면에 도시한 바와 같이, 인공의암유닛(10)은 소정크기로 절단하여 현장으로 운반하고, 인서트앵커(14)를 매개로 절단된 인공의암 유닛(10)을 메임프레임(8)에 고정한다. 그리고, 도8에 도시한 바와 같이 상기 메인프레임(8)에 부착된 인공의암유닛(10)간의 틈새부분은 철망을 가설한 후 연결조형(19)으로 메운다.As shown in the figure, the
상기 인공의암유닛(10)을 메인프레임(8)에 연결하는 방법을 좀더 상세히 설명한다.A method of connecting the
먼저, 인공의암유닛(10)의 이면(후방)에서 돌출되어 있는 인서트 앵커(14)에 나사볼트를 끼운다. 이 상태로 인공의암유닛(10)을 메인프레임(8)에 붙여 인공의암유닛(10)의 위치나 각도를 조정한다. 위치 결정이 확정하면 나사볼트와 메인 프레임(8)의 위치 관계에 맞추어 적당한 길이의 거치 프레임(11)을 용접해 고정한다. 이때, 거치 프레임(11)과 메인프레임(8), 거치 프레임(11)과 나사볼트가 확실히 용접할 수 있는 각도로 접한다고는 할 수 없다. 암피스(12) 설치시 쇠장식(길이 50 mm정도의 L형강)을 붙여 각도를 조정한다.First, a screw bolt is inserted into the
도9는 인공의암유닛의 내부에 속채움 콘크리트를 타설하는 상태를 나타낸 단면도이고, 도10은 콘크리트 타설용 구멍을 메우는 과정을 나타낸 단면도이다.9 is a cross-sectional view showing a state of pouring stuffed concrete into the interior of the artificial cancer unit, Figure 10 is a cross-sectional view showing a process of filling the hole for concrete placing.
도면에 도시한 바와 같이, 상기 인공의암유닛(10)을 거푸집으로 하여 콘크리 트 구멍(26)으로 내부에 콘크리트를 타설하여 속채움을 실시한다. 속채움 콘크리트(15) 타설공정이 완료되면 콘크리트 타설용 구멍을 메워 인공의암의 구축을 완료한다.As shown in the figure, the
도11은 인공의암에 착색을 수행하여 마무리하는 공정을 나타낸 단면도이다.11 is a cross-sectional view showing a process of finishing by coloring the artificial cancer.
도면에 도시한 바와 같이, 속채움 콘크리트 타설공정이 완료되면 뿜칠도구(28)를 이용하여 인공의암에 착색함으로써 자연색에 근접한 질감을 유지시킨다.As shown in the figure, when the filling concrete pouring process is completed by using a
상기한 과정을 통해 구축되는 인공의암 구축물은 도12에 도시한 바와 같이 방파제나 도13에 도시된 바와 같은 돌제에 적용된다.The artificial cancer construct constructed through the above process is applied to a breakwater as shown in FIG. 12 or a jet as shown in FIG.
이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능함은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 있어 명백할 것이다.The present invention described above is not limited to the above-described embodiment and the accompanying drawings, and various substitutions, modifications, and changes are possible within the scope without departing from the technical spirit of the present invention. It will be evident to those who have knowledge of.
전술한 바와 같이 본 발명에 따르면, 기본 골조에 체결 유니트를 매개로 인공암석을 연결하여 자연 조형물을 구축함으로써 해안의 침식을 방지하는 기능외에 자연경관에 가깝게 미려하게 장식할 수 있는 효과가 있다.As described above, according to the present invention, by connecting the artificial rock to the basic frame via a fastening unit to build a natural sculpture, there is an effect that can be beautifully decorated close to the natural landscape in addition to the function to prevent the erosion of the coast.
또한, 상기 인공암석을 거푸집으로 사용할 수 있으므로 구축비용을 저감할 수 있고 공사기간을 단축할 수 있는 다른 효과가 있다. In addition, since the artificial rock can be used as a formwork, there is another effect that can reduce the construction cost and shorten the construction period.
Claims (4)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20070018237 | 2007-02-23 | ||
KR1020070018237 | 2007-02-23 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20080078518A true KR20080078518A (en) | 2008-08-27 |
Family
ID=39880687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070103061A KR20080078518A (en) | 2007-02-23 | 2007-10-12 | A rock-making structures for environmental friendliness and constructing method the same |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20080078518A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101296045B1 (en) * | 2008-12-17 | 2013-08-12 | 현대중공업 주식회사 | Portable Protection Wall to Escape from Fender at The Quay |
KR102181064B1 (en) * | 2020-07-09 | 2020-11-19 | 주식회사 새누리산업 | Artificial rock structure for low crested structures wave dissipating block improving combination with scenic beauty |
-
2007
- 2007-10-12 KR KR1020070103061A patent/KR20080078518A/en not_active Application Discontinuation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101296045B1 (en) * | 2008-12-17 | 2013-08-12 | 현대중공업 주식회사 | Portable Protection Wall to Escape from Fender at The Quay |
KR102181064B1 (en) * | 2020-07-09 | 2020-11-19 | 주식회사 새누리산업 | Artificial rock structure for low crested structures wave dissipating block improving combination with scenic beauty |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100738488B1 (en) | Pier basis caisson structure using a precast concrete block | |
KR102097760B1 (en) | Coastal assembly for preventing coastal erosion and manufacturing method thereof | |
KR100965427B1 (en) | A environmental friendliness type rock-making and manufacturing method the same, constructing method a rock-making structures and the rock-making structures constructed by the same | |
KR100818551B1 (en) | Wharf or quay wall of upper part and lower part assembly style | |
CN102277860A (en) | Construction method for fill mortar junction stone dam of mortar stone precast block masonry dam shell | |
KR20070038196A (en) | The structure of coastal erosion prevention system constructed by the construction method of costal erosion prevention system & related method | |
KR100807958B1 (en) | Method for constructing breakwater structure and breakwater structure | |
KR20080078518A (en) | A rock-making structures for environmental friendliness and constructing method the same | |
JP4819835B2 (en) | Offshore structure and construction method of offshore structure | |
JP2006161402A (en) | Construction method for improving water breaking structure | |
KR101834430B1 (en) | Gabion unit having stone panel and Constructing method retaining wall using the gabion | |
JP2601395B2 (en) | Construction method of structure using artificial rock | |
JP6881916B2 (en) | How to install the structure | |
JP6501547B2 (en) | Existing bank body repair structure and repair method of existing bank body | |
JP4163827B2 (en) | Construction method of wave-dissipating structure using artificial rock | |
KR101035411B1 (en) | Retaining wall structure and method thereof | |
JP4387919B2 (en) | Seismic countermeasures for tunnels using seismic isolation materials, construction methods for seismic isolation walls, and construction structures | |
JP2006045814A (en) | Raised dam, and existing dam raising method | |
KR100705934B1 (en) | Interval adjusting device of gardening block and anchor block | |
JP6393352B2 (en) | Repair method for existing waterways | |
JP6298688B2 (en) | Embankment | |
KR102338340B1 (en) | the improved apparatus for reinforcing slope and the reinforcing slope structure using the same | |
CN217811040U (en) | Structure for controlling thickness of net-sprayed concrete | |
JP4082624B1 (en) | Precast members for masonry simulated structures | |
JP2000008384A (en) | Construction block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E90F | Notification of reason for final refusal | ||
E601 | Decision to refuse application |