KR20080026879A - 고로의 스테이브 공급관과 배출관의 리크 보수방법 및 그장치 - Google Patents
고로의 스테이브 공급관과 배출관의 리크 보수방법 및 그장치 Download PDFInfo
- Publication number
- KR20080026879A KR20080026879A KR1020060092003A KR20060092003A KR20080026879A KR 20080026879 A KR20080026879 A KR 20080026879A KR 1020060092003 A KR1020060092003 A KR 1020060092003A KR 20060092003 A KR20060092003 A KR 20060092003A KR 20080026879 A KR20080026879 A KR 20080026879A
- Authority
- KR
- South Korea
- Prior art keywords
- collet
- stave
- support shaft
- discharge pipe
- supply pipe
- Prior art date
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/10—Cooling; Devices therefor
- C21B7/103—Detection of leakages of the cooling liquid
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/16—Tuyéres
- C21B7/163—Blowpipe assembly
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D1/00—Casings; Linings; Walls; Roofs
- F27D1/12—Casings; Linings; Walls; Roofs incorporating cooling arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D9/00—Cooling of furnaces or of charges therein
- F27D2009/0002—Cooling of furnaces
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Blast Furnaces (AREA)
Abstract
Description
Claims (2)
- 스테이브의 냉각수 공급관 및 배출관의 리크 여부를 검출하는 검출단계와,스테이브의 냉각수 공급관 및 배출관의 리크 부위를 내시경을 통하여 위치를 검출하는 진단단계와,콜렛 지지축의 단부에 고정되며 외주면이 테이퍼진 제 1콜렛부재와 결합 및 분리 시 직경이 확장 및 축소되는 제 2콜렛부재에 실링재가 코팅된 슬리이브를 지 지시켜 리크부위에 슬리이브가 위치되도록 하는 슬리브 설치단계와,상기 콜렛 지지축을 후퇴시켜 제 2콜렛부재와 제 1콜렛부재를 결합하여 슬리이브를 확장시킴으로써 리크부위를 보수하는 보수단계를 포함하여 된 것을 특징으로 하는 고로의 스테이브 공급 및 배출관의 리크 보수방법.
- 고로의 스테이브의 워터 자켓과 결합되어 냉각수를 공급 및 배출하는 공급관과 배출관의 리크부위를 보수하는 고로의 스테이브 공급 및 배출관의 리크 보수장치에 있어서,스테이브의 배출관 또는 공급관에 삽입되는 콜렛 지지축과,상기 콜렛 지지축의 단부에 고정되며 외주면이 테이퍼진 제 1콜렛부재와,콜랫 지지축에 슬라이딩 가능하게 설치되며 제 1콜렛부재와 결합시 직경이 확장되며 외주면에 결합된 신축부재에 의해 제 1콜랫부재와 분리 시 직경이 작아지는 제 2컬렛부재와,상기 콜렛지지축을 전후진 시키기 위한 액튜에이터와상기 콜렛 지지축에 삽입되며 액튜에이터에 의해 지지된 상태에서 콜렛 지지축의 후퇴 시 제 2콜렛부재를 지지하는 가이드부재를 구비하여 된 것을 특징으로 하는 고로의 스테이브 공급 및 배출관의 리크 보수장치.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060092003A KR100871936B1 (ko) | 2006-09-21 | 2006-09-21 | 고로의 스테이브 공급관과 배출관의 리크 보수방법 및 그장치 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060092003A KR100871936B1 (ko) | 2006-09-21 | 2006-09-21 | 고로의 스테이브 공급관과 배출관의 리크 보수방법 및 그장치 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20080026879A true KR20080026879A (ko) | 2008-03-26 |
KR100871936B1 KR100871936B1 (ko) | 2008-12-05 |
Family
ID=39414087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060092003A KR100871936B1 (ko) | 2006-09-21 | 2006-09-21 | 고로의 스테이브 공급관과 배출관의 리크 보수방법 및 그장치 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100871936B1 (ko) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103114158A (zh) * | 2013-03-14 | 2013-05-22 | 济钢集团有限公司 | 一种高炉冷却壁穿管用的装置 |
CN106041494A (zh) * | 2016-02-02 | 2016-10-26 | 惠州富盛绝缘材料有限公司 | 一种套管的穿管装置及穿管方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102312027B (zh) * | 2011-09-27 | 2015-06-17 | 魏明 | 炼铁高炉冷却水管在线堵漏方法 |
-
2006
- 2006-09-21 KR KR1020060092003A patent/KR100871936B1/ko active IP Right Grant
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103114158A (zh) * | 2013-03-14 | 2013-05-22 | 济钢集团有限公司 | 一种高炉冷却壁穿管用的装置 |
CN106041494A (zh) * | 2016-02-02 | 2016-10-26 | 惠州富盛绝缘材料有限公司 | 一种套管的穿管装置及穿管方法 |
CN106041494B (zh) * | 2016-02-02 | 2019-03-29 | 惠州富盛绝缘材料有限公司 | 一种套管的穿管装置及穿管方法 |
Also Published As
Publication number | Publication date |
---|---|
KR100871936B1 (ko) | 2008-12-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130340874A1 (en) | Method to repair compromised inlet outlet piping | |
EP2577208B1 (en) | A flue gas air preheater, and a method for installation, as well as an air pipe component for a flue gas air preheater | |
KR100871936B1 (ko) | 고로의 스테이브 공급관과 배출관의 리크 보수방법 및 그장치 | |
JP2007308747A (ja) | 高炉用ステーブクーラ | |
JP6691328B2 (ja) | 炉体保護用ステーブ | |
CN104789723B (zh) | 一种高炉炉体结构及其灌浆造衬方法 | |
CN110410619B (zh) | 一种膨胀节保护管 | |
JP6264991B2 (ja) | ステーブクーラの管路の補修器具および補修方法 | |
CN101457265A (zh) | 一种高炉冷却壁修复的方法 | |
CN113088592A (zh) | 一种高炉冷热面在线压浆工艺 | |
CN106092453B (zh) | 检修换热器内漏的方法 | |
CN104789722B (zh) | 一种便于灌浆造衬的高炉炉体结构 | |
CN110921332B (zh) | 一种粉体输送通道连接结构及方法 | |
CN210940437U (zh) | 一种长程修复软管涨管装置 | |
KR20180124665A (ko) | 무용접 배관 플랜지 구조물 | |
CN204550640U (zh) | 一种高炉炉体结构 | |
KR100453630B1 (ko) | 증기발생기 전열관 보수용 슬리브의 수압확관 및 누수시험겸용장치 | |
KR101555140B1 (ko) | 고로 내 스테이브 냉각 파이프의 보수방법 및 장치 | |
CN217572689U (zh) | 转炉氧枪制作密封圈快速安装装置 | |
JP3384192B2 (ja) | 精錬用兼副ノズル付きランス | |
JP3051291B2 (ja) | 高炉々床部に設けられた冷却配管の冷却水漏れの補修方法 | |
CN218032091U (zh) | 一种波纹补偿器修复装置 | |
JP3633519B2 (ja) | 冶金炉用ステーブクーラおよびその取付け方法 | |
KR101185844B1 (ko) | 제철로용 신축이음장치 구동시스템 및 운영방법 | |
CN102041335A (zh) | 一种采用水冷挂管方式代替高炉冷却壁的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121123 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20131127 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20141127 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20151117 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20161128 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20171127 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20181127 Year of fee payment: 11 |