KR20050099837A - Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel and constructing method thereof - Google Patents
Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel and constructing method thereof Download PDFInfo
- Publication number
- KR20050099837A KR20050099837A KR1020040025051A KR20040025051A KR20050099837A KR 20050099837 A KR20050099837 A KR 20050099837A KR 1020040025051 A KR1020040025051 A KR 1020040025051A KR 20040025051 A KR20040025051 A KR 20040025051A KR 20050099837 A KR20050099837 A KR 20050099837A
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- unit
- ground
- type
- container
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1692—Shapes conical or convex
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
본 발명은 내부에 공간부가 형성된 팽이형상으로 제작된 단위팽이형 말뚝용기를 팽이말뚝 조립틀에 다수개 조립설치한 현장타설형 팽이말뚝 유니트로 연약지반 또는 절토와 성토 구간의 지반상에 다수개 조립연결설치하여 지반을 강화시킨 현장타설형 팽이말뚝기초의 시공방법에 관한 것이다. The present invention is a field-mounted top pile unit, which is installed in a top-shaped pile container made of a top-shaped pile container manufactured in a shape of a top having a space formed therein, and is assembled on a ground of a soft ground or a cut and a fill section. It relates to the construction method of the field-pouring top pile foundation which is connected and installed to strengthen the ground.
상기 말뚝용기는 팽이형으로 하되 내부는 공간부가 형성되게 제작한 단위팽이형 말뚝용기로 단변기초철근과 장변기초철근을 교차시켜 다수개의 격자형상으로 설치되도록한 일정한 규격의 팽이말뚝 조립틀에, 상기 단위 팽이형 말뚝용기를 격자형상의 조립 공간부내에 삽입설치하고, 연결구로 상호 체결한 현장타설형 팽이말뚝 유니트판넬을 조립제작한 다음, 상기 현장타설형 팽이말뚝 유니트판넬을 연약지반 또는 절토와 성토 구간의 지반상에 다수개를 설치한 후, 서로 연결조립하고, 상기 단위팽이형 말뚝용기의 공간부내에 쇄석 및 콘크리트로 채움을 하면서 고리가 상부로 돌출되도록 설치한 후, 상기 지반과 상기 단위팽이형 말뚝용기사이의 공극부를 쇄석으로 채우고 다짐을 한 다음 기초면검사 및 재하시험을 하고, 상기 단위팽이형 말뚝 용기 상부에 설치된 고리에 상부 연결철근을 배근하여 전후좌우로 서로 결속한 다음, 그 상부에 버림콘크리트인 기초바닥 콘크리트를 타설하여 현장타설형 팽이말뚝기초를 시공하게 되는 것이다. The pile container is a top type, but the inside is a unit top type pile container made so that the space is formed in the top pile assembly frame of a certain standard to be installed in a plurality of lattice shape by crossing the short side base reinforcement and the long side base reinforcement, the Insert and install the unit top type pile container into the lattice-shaped assembly space, assemble and manufacture the field casting type top pile unit panel fastened to each other with a connector, and then use the field casting type top pile unit panel to make soft ground or cut and fill After installing a plurality of pieces on the ground of the section, assembling each other, and filling the space with the crushed stone and concrete in the space portion of the unit-type pile container, the ring is installed so as to protrude upwards, the ground and the unit top Fill the air gap between the type pile containers with crushed stone, compact it, and then inspect the surface and load test, and for the unit top type pile The reinforcement of the upper joint reinforcement ring provided on the top will be the construction of the coupling to each other back and forth and then, the upper abandoned concrete foundation floor concrete cast-in-place type top pile foundation by pouring on.
Description
본 발명은 해안지역의 갯벌등과 같은 연약지반 또는 절토와 성토로 이루어진 지반에 구조물을 구축하고자 할때, 기초지반의 지내력을 강화시키기 위하여 기초구조물을 구축하기 위한 방법에 관한 것으로서, The present invention relates to a method for constructing a foundation structure in order to reinforce the ground strength of the foundation ground when constructing a structure on a soft ground such as a tidal flat in the coastal area or a ground made of cut and fill,
내부에 공간부가 형성된 팽이형상으로 제작된 단위팽이형 말뚝용기로 팽이말뚝 조립틀에 다수개 조립설치한 현장타설형 팽이말뚝 유니트판넬을, 상기의 지반상에 다수개 연결설치하여 지반을 강화시키기 위한 현장타설형 팽이말뚝기초를 설치하고자 하는 방법에 관한 것이다. It is a unit top type pile container manufactured in the shape of a top with a space inside, and a plurality of field-pouring top pile unit panels, which are assembled and installed in a top pile assembly frame, are connected to the above ground to strengthen the ground. The present invention relates to a method of installing a cast-in-place top pile foundation.
말뚝용기는 팽이형으로 하되 내부는 공간부가 형성되게 제작한 상기 단위팽이형 말뚝용기를, 단변기초철근과 장변기초철근을 교차시켜 다수개의 격자형상으로 설치되도록 한 일정한 규격의 팽이말뚝 조립틀에, 상기 단위팽이형 말뚝용기를 상기 팽이말뚝 조립틀의 격자형상의 조립공간부내에 삽입설치하여 현장타설형 팽이말뚝 유니트판넬을 조립제작한 다음, 상기 현장타설형 팽이말뚝 유니트판넬을 연약지반 또는 절토와 성토 구간의 지반 상에 다수개를 설치한 후, 서로 연결조립하고, 상기 단위팽이형 말뚝용기내의 공간부내에 쇄석 및 콘크리트로 채움을 하면서 고리가 외부로 돌출되도록 한후에, 상기 지반과 상기 단위팽이형 말뚝용기사이를 쇄석으로 채우고 다짐을 한 다음 기초면검사와 재하시험을 하고, 상기 단위팽이형 말뚝용기 상부에 설치된 고리에 상부연결철근을 전후좌우로 배근하여 서로 결속한 다음, 그 상부에 버림콘크리트인 기초바닥 콘크리트를 타설하여 현장타설형 팽이말뚝기초를 시공하는 것이다. The pile container is made in a top type, but the inside of the unit-type pile container made so that a space is formed in the top pile assembly frame of a predetermined size, which is installed in a plurality of lattice shapes by crossing the short side base reinforcement and the long side base reinforcement. The unit top type pile container is inserted into and installed in the lattice-shaped assembly space of the top pile assembly frame to assemble and manufacture the site pouring type top pile unit panel, and then the field casting type top pile unit panel is made of soft ground or cut. After installing a plurality of pieces on the ground of the fill section, and assembling each other, and filling the space with the crushed stone and concrete in the space of the unit-type pile container so that the ring protrudes to the outside, the ground and the unit top type Fill the pile container with crushed stone, compact it, and then inspect the surface and load. It is to install the cast-in-place top pile foundation by placing the upper connecting reinforcement in front and rear and right and left to bind to each other, and then laying the ground concrete which is the discarded concrete on the upper part.
본 발명의 목적은 단위팽이형 말뚝용기를 다수개 조립설치한 판넬을 지반상에 연결설치하고 공간부에 쇄석 및 콘크리트를 타설하여 기초지반의 지내력을 강화시켜 주기위한 것으로서, 상기의 방법은 단위팽이형 말뚝 용기를 다수개 조립한 상기 판넬을 지반상에 간단히 설치한 후에 이를 서로 연결하고 쇄석 및 콘크리트로 충전(充塡)하면 기초가 완성되는 아주 간편한 기술로서, 현장에서 조립 및 설치가 모두 이루어지는 점에서 공사비의 절감과 공기의 단축을 이룰 수 있기 때문에 경제적이면서 공사의 효율을 극대화할 수 있는 기술이며, 특히 상기 단위팽이형 말뚝용기가 서로 연결되어 있어서 지반의 부등침하와 지진시에도 강력하게 저항할 수 있는 구조를 갖는 시공방법을 제공하는데 있다. An object of the present invention is to connect a panel having a plurality of unit-type pile container on the ground and to install crushed stone and concrete in the space to reinforce the bearing strength of the foundation ground, the method is a unit top It is a very simple technology that the foundation is completed by simply installing the panel, which is assembled with a plurality of type pile containers, on the ground, connecting them together, and filling them with crushed stone and concrete. It is economical and can maximize the efficiency of construction because it can reduce the construction cost and shorten the air.In particular, the unit-folded pile containers are connected to each other so that they can be strongly resisted in the case of ground subsidence and earthquake. It is to provide a construction method having a structure that can be.
종래에는 연약지반에 모래나 쇄석등을 치환하여 채워넣고 간극수를 배출시켜 연약지반을 안정화시킨 후에 기초를 설치하거나, 또는 연약지반 또는 절토와 성토 구간의 지반에 장대한 길이를 갖는 말뚝을 기반암까지 타입한 후에 기초를 구축하는 방법을 사용하여 왔으나, 이러한 공법은 장대한 길이의 말뚝을 현장에서 항타하여 타입하고자 할때 소음과 진동의 발생 및 대형장비의 사용경비와 공사기간의 장기화로 인한 과다한 공사비는 물론 이러니와, 장대한 말뚝의 경우 지진과 같은 횡압이 작용할 때 저항력이 약해 말뚝이 파괴되는 등으로 소정의 지지력을 발휘할 수 없게 되는 점과, 특히 연약지반의 경우 지반상에 충만되어 있는 간극수를 배출시키기 위하여는 공사기간이 장시간 소요되어 공사비가 증액되는등의 문제점이 대두되어 왔다. Conventionally, sand or crushed stone is replaced and filled into soft ground, and the gap water is discharged to stabilize the soft ground, and then the foundation is installed, or the pile has a long length in the ground of the soft ground or cut and fill sections. However, this method has been used to construct the foundation. However, this construction method uses excessive lengths due to the occurrence of noise and vibration, the cost of using large equipment, and the prolonged construction period. Of course, in the case of magnificent piles, when the lateral pressure such as an earthquake acts, the resistance is weak and the piles cannot be exerted due to the destruction of the piles.In particular, in the soft ground, the gap water filled on the ground is discharged. To this end, problems such as the increase in construction costs due to the long construction period have emerged.
본 발명은 개개의 단위팽이형 말뚝을 지반에 설치하여 기초를 구축할 때 보다 일정한 틀에 다수개의 단위팽이형 말뚝을 삽입설치한 판넬을 지반상에 포설한 다음 이들을 상호 연결하고 쇄석과 콘크리트를 이용하여 기초를 구축하면, 기초면의 단차를 최소화하므로서 설치가 용이하고 또한 판넬을 다수개 설치하면 기초의 설치가 완료되므로 공사기간이 단축되어 공사비의 절감을 가져오며, 또한 지반상에 설치된 상기 단위팽이형 말뚝용기와 이를 삽입설치한 판넬도 상호 연결되어 있으므로 부등침하로 인한 지반의 다양한 변형에도 강하게 대응하여 구조적으로도 안정되어 있는, 기초구조물의 설치를 위한 시공방법을 제공하기 위함이다. In the present invention, when installing the individual unit top piles on the ground to install a panel with a plurality of unit top piles installed in a more uniform framework on the ground and then connect them to each other and use the crushed stone and concrete When the foundation is built, installation is easy by minimizing the step height of the foundation surface, and the installation of the foundation is completed by installing a plurality of panels, so the construction period is shortened, resulting in a reduction in construction cost, and the unit top installed on the ground. It is to provide a construction method for the installation of foundation structures that is structurally stable in response to various deformations of the ground caused by uneven settlement because the mold pile container and the panel in which it is installed are interconnected.
본 발명은 팽이형으로 하되 내부는 공간부가 형성되게 제작한 상기 단위팽이형 말뚝용기(30)를, 단변기초철근(42)과 장변기초철근(41)을 교차시켜 다수개의 일정한 격자형상이 설치되도록 한 상기 팽이말뚝 조립틀(40)의 격자형상인 조립공간부(43)내에 삽입설치하면서, 상기 단위팽이형 말뚝용기(30)의 수직부(36)상에 형성된 연결공(34)에 연결구(미도시)로 상호 체결하여 현장타설형 팽이말뚝 유니트판넬(20)을 조립제작한 다음, 상기 현장타설형 팽이말뚝 유니트판넬(20)을 연약지반 또는 절토와 성토 구간의 지반(12) 상에 다수개를 설치한 후에 서로 연결조립하고, 상기 단위팽이형 말뚝용기(30)내의 공간부(35)내에 쇄석 및 콘크리트로 채움(23)을 하면서 고리(21)가 외부로 돌출되도록 한후에, 상기 지반(12)과 상기 단위팽이형 말뚝용기(30)사이의 공극부에 쇄석(11)으로 채우고 다짐을 한 다음 기초면검사와 재하시험을 하고, 상기 단위팽이형 말뚝용기(30) 상부에 설치된 고리(21)에 상부 연결철근(24)을 전후좌우로 배근하여 서로 결속한 다음, 그 상부에 버림콘크리트인 기초바닥 콘크리트(13)를 타설하여 현장타설형 팽이말뚝기초(10)를 시공하는 것에 특징이 있다. The present invention is to be a top type, but the inside of the unit-type pile container 30 is made so that the space is formed, the short side basic reinforcing bar 42 and the long side basic reinforcing bar 41 so that a plurality of regular lattice shape is installed A connector is inserted into a connection hole 34 formed on the vertical portion 36 of the unit top-type pile container 30 while being installed in the assembly space portion 43 which is a lattice shape of the top pile assembly frame 40. And assemble each of the cast-in-place top pile unit panels 20 on the ground 12 of the soft ground or cut and fill sections. After assembling and assembling each other, and filling the crushed stone and concrete (23) in the space 35 in the unit-type pile container 30 so that the ring 21 is projected to the outside, the ground 12 ) And chain in the air gap between the unit-folded pile container 30 After filling with (11) and compaction, the foundation surface inspection and loading test, and the upper connecting reinforcing bar (24) in the ring 21 installed on the top of the unit-type pile container (30) to the left and right to bind to each other Next, it is characterized by the construction of the cast-in-place top pile foundation (10) by pouring the base concrete (13), which is cast concrete on the top.
이하, 본 발명의 구성 및 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다. Hereinafter, the configuration and operation of the present invention will be described in detail by the accompanying drawings.
도 1은 본 발명의 단위팽이형 말뚝용기를 보여주는 도면이고, 도 2는 본 발명의 단위팽이형 말뚝용기를 다수개 설치하여서 완성된 현장타설형 팽이말뚝 유니트판넬을 평면에서 보여주는 평면도이고, 도 3은 도 2의 사시도이고, 도 4는 본 발명의 현장타설형 팽이말뚝 유니트판넬을 제작하기 위하여 단위팽이형 말뚝용기에 기초철근을 연결하여 팽이말뚝 조립틀을 형성하면서 상기 판넬을 조립할 수 있는 방법을 보여주는 도면이며, 도 5는 본 발명의 단위팽이형 말뚝용기를 조립설치하여 현장타설형 팽이말뚝 유니트판넬을 제작하기 위한 또 다른 팽이말뚝 조립틀의 실시예를 보여주는 도면이며, 도 6은 본 발명의 또 다른 팽이말뚝 조립틀의 실시예를 보여주는 도면이며, 도 7은 본 발명의 현장타설형 팽이말뚝 유니트판넬을 지반상에 다수개 연결설치하여 형성한 현장타설형 팽이말뚝기초의 시공상태를 보여주는 도면이며, 도 8은 도 7의 A-A단면을 상세히 보여주는 도면이며, 도 9(a)(b)는 본 발명의 단위팽이형 말뚝용기의 말뚝부가 지반상에 설치되는 상태에따른 배수공의 위치를 보여주는 도면이다. Figure 1 is a view showing a unit top type pile container of the present invention, Figure 2 is a plan view showing a field casting type top pile unit panel completed by installing a plurality of the unit top type pile container of the present invention, Figure 3 Figure 2 is a perspective view of Figure 2, Figure 4 is a method of assembling the panel while forming a top pile assembly frame by connecting the base reinforcement to the unit top type pile container in order to manufacture the cast-in-place top pile unit panel of the present invention Figure 5 is a view showing an embodiment of another top pile assembly frame for manufacturing a field casting type top pile unit panel by assembling and installing the unit top type pile container of the present invention, Figure 6 is a view of the present invention FIG. 7 is a view showing an embodiment of the top pile pile assembly, and FIG. 7 is a connection of a plurality of field-stacked top pile unit panels of the present invention installed on the ground. Figure 8 is a view showing the construction state of the cast-in-place top pile foundation, Figure 8 is a view showing a cross-section AA of Figure 7, Figure 9 (a) (b) is the pile portion of the unit top type pile container of the present invention The figure shows the position of the drain hole according to the state installed on the ground.
도 1은 본 발명의 단위팽이형 말뚝용기를 보여주는 도면으로서, 상광하협의 팽이형으로 형성하되 내부는 공간부(35)가 형성되게 제작하고, 상부에는 수직부(36)를 형성하여 네방향에 연결공(34)을 형성하여 인접한 용기와 연결구(미도시)를 사용하여 상호 네방향에서 체결하도록 하고, 몸체부(31)와 말뚝부(32)가 접속되는 부분에는 기초철근 삽입공(37)을 두방향 또는 네방향으로 형성하고, 상기 몸체부(31)의 하부에는 일정한 길이의 폭이 좁은 말뚝부(32)를 연장형성하되 상기 말뚝부(32)의 끝단부는 선단부가 형성되도록 한다. 1 is a view showing a unit top type pile container of the present invention, formed in a top shape of the upper and lower narrow, but the interior is formed so that the space portion 35 is formed, the upper portion to form a vertical portion 36 in four directions A connection hole 34 is formed to be fastened in four directions using an adjacent container and a connector (not shown), and the base reinforcement insertion hole 37 is connected to the body part 31 and the pile part 32. It is formed in two or four directions, and the lower portion of the body portion 31 is formed to extend the narrow narrow portion 32 of a predetermined length so that the end portion of the pile portion 32 is formed.
상기 기초철근 삽입공(37)은 후술하는 도 4의 경우 상기 단위팽이형 말뚝용기(30)에 형성된 상기 기초철근 삽입공(37)에 장단변 기초철근(41,42)을 삽입하여 팽이말뚝 조립틀(40)을 형성함과 동시에 현장타설형 팽이말뚝 유니트판넬(20)을 제작하게되는데 이때 기초철근(41,42)을 삽입하기 위하여 형성한 것이며, 또한 도 9(a)의 경우 상기 현장타설형 팽이말뚝 유니트판넬(20)에 조립설치된 상기 단위팽이형 말뚝용기(30)의 말뚝부(32)가 지반(12)내에 삽입되어 설치될때 상기 몸체부(31)와 말뚝부(32)가 서로 만나는 부분에 형성된 상기 기초철근 삽입공(37)을 배수공(33)으로도 활용할 수 있도록 한 것이다. In the case of the basic reinforcement insertion hole 37 is to be described later in Figure 4 by inserting the long-term base reinforcement (41, 42) into the basic reinforcement insertion hole 37 formed in the unit-type pile container 30 Forming the mold 40 and at the same time to manufacture the cast-in-place top pile unit panel 20 is formed to insert the base reinforcement (41, 42), and also in the case of Figure 9 (a) When the pile part 32 of the unit top type pile container 30 assembled to the mold top pile unit panel 20 is inserted and installed in the ground 12, the body part 31 and the pile part 32 are mutually different. The base reinforcement insertion hole 37 formed in the meeting portion is to be utilized as a drain hole 33.
상기 단위팽이형 말뚝용기(30)는 수지 및 철판등 모든 재질을 이용하여 제작할 수 있으며, 공간부(35)내의 채움재(23)는 철근과 콘크리트를 타설하여 양생하도록 하는 것과 쇄석으로 채움을 하고 그라우트재로 주입한 것을 이용한다. The unit top-type pile container 30 can be produced by using any material such as resin and iron plate, the filling material 23 in the space portion 35 is to be cured by pouring reinforcing steel and concrete and grouting and grouting Use the ash injected.
도 2와 3은 본 발명의 단위팽이형 말뚝용기를 다수개 설치하여서 완성된 현장타설형 팽이말뚝 유니트판넬을 평면에서 보여주는 평면도와 사시도로서, 후술하는 도 5와 도 6에서 제작된 팽이말뚝 조립틀(40)의 조립공간부(43)내에 상기 단위팽이형 말뚝용기(30)를 조립설치하고, 수직부(36)에 형성된 연결공(34)에 연결구를 사용하여 상호 체결하고, 상기 용기(30)의 공간부(35)내에 고리(21)를 설치한 다음, 상기 고리에 전후좌우로 상부연결철근(24)을 배근하여 결속한 현장타설형 팽이말뚝 유니트판넬(20)이며, 또는 도 4에서 보는바와 같이 상기 단위팽이형 말뚝용기(30)의 기초철근 삽입공(37)에 장단변 기초철근(41,42)을 두방향 또는 네방향으로 삽입하여 조립하고, 수직부(36)에 형성된 연결공(34)에 연결구를 사용하여 상호 체결하고, 상기 용기(30)의 공간부(35)내에 외부로 돌출되도록 설치된 고리(21)에 전후좌우로 상부연결철근(24)을 배근하여 결속한 현장타설형 팽이말뚝 유니트 판넬(20)이다. 2 and 3 are a plan view and a perspective view showing the field-pouring top pile unit panel completed by installing a plurality of unit top-type pile container of the present invention in a plan view, the top pile assembly frame manufactured in Figures 5 and 6 to be described later Assembling and mounting the unit-type pile container 30 in the assembly space portion 43 of the 40, and fastened to each other by using a connector to the connection hole 34 formed in the vertical portion 36, the container 30 After the installation of the ring 21 in the space 35 of the, and then attached to the top connecting reinforcing bar 24 in front, rear, left and right to the ring is a cast-in-place top pile unit panel 20, or see in Figure 4 As described above, the base reinforcing bar insertion holes 37 of the unit-type pile container 30 are inserted into the reinforcing bars 37 and 42 in two directions or four directions, and the connecting holes formed in the vertical part 36 are assembled. Fastening to each other using a connector to the 34, in the space 35 of the container 30 A back and forth on a ring 21 provided so as to project to the outside cast-in-place form a bond to the reinforcement connecting the upper reinforcement (24) top panel pile unit 20. The
상기 현장타설형 팽이말뚝 유니트판넬(20)의 규격은 상기 단위팽이형 말뚝용기(30)가 20 ~ 40개가 설치되도록 하되 바람직하게는 32개 설치되는 정도의 크기를 갖는 2m×4m의 규격으로 제작하되, 상기의 규격은 지반(12)의 토질상태 및 현장여견에 따라 크기를 다양하게 제작하여 설치할 수 있음도 아울러 밝혀둔다. The size of the cast-in-place top pile unit panel 20 is to be installed 20 to 40 of the unit top-type pile container 30, but preferably manufactured in the size of 2m × 4m having a size of 32 installed However, the above specification also reveals that the size can be produced and installed in various ways depending on the soil condition and site opinion of the ground (12).
또한, 상기에서 사용되는 모든 종류의 철근규격은 상기 유니트 판넬(20)의 규격 및 지반의 강도강화조건에 따라 그 규격을 다양하게 사용할 수 있다. In addition, all kinds of reinforcing standards used in the above can be used in various ways according to the standard of the unit panel 20 and the strength strengthening conditions of the ground.
도 4(a)(b)는 본 발명의 현장타설형 팽이말뚝 유니트판넬을 제작하기 위하여 단위팽이형 말뚝용기에 기초철근을 연결하여 팽이말뚝 조립틀을 형성하면서 상기 판넬을 조립할 수 있는 방법을 보여주는 도면으로서, 먼저 일정한 틀을 형성하기 위하여 네방향에 장단변 기초철근(41,42)을 설치하고, 이들이 서로 만나는 연결부(44)는 용접 또는 철사로 결속하여 직사각형의 외곽틀을 형성한 다음, 그 내부에 상기 단위팽이형 말뚝용기(30)의 기초철근 삽입공(37)에 장단변 기초철근(41,42)을 두방향 또는 네방향으로 삽입하여 조립하는 작업을 연속적으로하고, 상기 외곽틀내에 상기 단위팽이형 말뚝용기(30)의 설치가 완료되면 상기 기초철근 삽입공(37)에 삽입되어 설치된 장단변 기초철근(41,42)과 상기 외곽틀에 설치된 철근을 상호 용접 또는 철사, 연결구로 연결한 다음, 상기 단위팽이형 말뚝용기(30)의 수직부(36)에 형성된 연결공(34)을 이용하여 네방향에 인접하여 설치된 상기 단위팽이형 말뚝용기(30)에 연결구로 상호체결하여, 현장타설형 팽이말뚝 유니트판넬(20)을 조립한 것이다. Figure 4 (a) (b) shows a method for assembling the panel while forming a top pile assembly by connecting the base reinforcement to the unit top type pile container in order to manufacture the cast-in-place top pile unit panel of the present invention As a drawing, first, long-term side reinforcing bars 41 and 42 are installed in four directions to form a constant frame, and the connecting portions 44 where they meet each other are bound by welding or wire to form a rectangular outer frame. Into the basic reinforcing bar insertion hole 37 of the unit top-type pile container 30 to insert the long-term base reinforcing bars (41, 42) in two or four directions in succession, and in the outer frame When the installation of the unit top-type pile container 30 is completed, the long-term side reinforcement (41, 42) and the reinforcing bar installed in the outer frame is inserted into the base reinforcing hole 37 to be welded to each other or wire, connector connect Next, by using the connecting hole 34 formed in the vertical portion 36 of the unit-type pile container 30 to the unit-type pile container 30 installed adjacent to the four directions by the connection port, the site The pouring type top pile unit panel 20 is assembled.
도 (a)는 상기 단위팽이형 말뚝용기(30)의 기초철근 삽입공(37)에 장단변 기초철근(41,42)을 네방향으로 삽입하여 조립하는 작업을 연속적으로하여 현장타설형 팽이말뚝 유니트판넬을 제작하는 것이고, Figure (a) is a field casting type top pile by successively assembling work by inserting the long-term base reinforcement (41, 42) in four directions in the basic reinforcement insertion hole 37 of the unit top type pile container (30) To make a unit panel,
도 (b)는 상기 단위팽이형 말뚝용기(30)의 두방향에 형성된 상기 기초철근 삽입공(37)에 장변 또는 단변 기초철근을 삽입하고 삽입되지 않은 또 다른 기초철근은 삽입된 기초철근과 결속선으로 결속하여 제작한 현장타설형 팽이말뚝 유니트판넬(20)을 조립한 것을 보여주는 것이다. Figure (b) is a long side or a short side reinforcement is inserted into the basic reinforcing hole insertion hole 37 formed in two directions of the unit top type pile container 30 and another non-inserted basic reinforcement is bound with the inserted basic reinforcement It shows the assembly of the field-pouring top pile unit panel 20 produced by binding with a line.
상기의 기초철근 삽입공(37)은 도 9의 경우에서 보는바와 같이 말뚝부(32)가 지반(12)에 삽입되어 설치되는 경우에는 배수공(33)으로도 사용한다. The base reinforcing hole 37 is used as a drain hole 33 when the pile portion 32 is inserted into the ground 12, as shown in the case of FIG.
도 5는 본 발명의 단위팽이형 말뚝용기를 조립설치하여 현장타설형 팽이말뚝 유니트판넬을 제작하기 위한 또 다른 팽이말뚝 조립틀의 실시예를 보여주는 도면으로서, 장단변 기초철근(41,42)을 일정한 간격으로 가로 및 세로 방향인 수평 및 수직으로 서로 교차되도록하여 형성된 격자형의 틀인 조립공간부(43)가 다수개 형성된 일정한 크기의 팽이말뚝 조립틀(40)인 것이다. FIG. 5 is a view showing an embodiment of another top pile assembly frame for assembling and installing a unit top type pile container of the present invention to manufacture a field casting type top pile unit panel. It is a top pile assembly frame 40 having a predetermined size in which a plurality of assembly space portions 43, which are lattice-shaped frames formed by crossing each other horizontally and vertically in a horizontal and vertical direction at regular intervals, are formed.
상기의 조립 공간부(43)내에 상기 단위팽이형 말뚝용기(30)를 삽입설치하여 상기 용기(30)의 말뚝부(32)는 상기 조립 공간부(43)내에 삽입되고 몸체부(31)의 하부가 상기 조립공간부(43)를 형성하고 있는 네방향의 장단변 기초철근(41,42)에 걸쳐지도록 하고 수직부(36)에 형성된 연결공(34)에 연결구를 사용하여 상호 체결한 것이다. The unit top-type pile container 30 is inserted into the assembly space portion 43 so that the pile portion 32 of the container 30 is inserted into the assembly space portion 43 and the body portion 31 The lower ends of the four-way long side reinforcing bars 41 and 42 forming the assembly space 43 are fastened to each other by using connectors at the connection holes 34 formed in the vertical part 36.
또한, 상기의 팽이말뚝 조립틀(40)의 네모서리 하부에 일정한 높이의 다리(45)를 설치하여 지반에 포설할 때 일정한 높이로 유지되게 수평을 조절할 수 있도록 한 것이며, 이렇게 설치된 다리(45)가 연약지반과 같은 토질이 연약한 경우 상기 다리의 하부에 일정한 넓이를 갖는 지지판(46)을 설치하여 연약지반에 포설되는 경우에도 상기 다리가 지반내에 빠지는 것을 방지함과 동시에 수평을 유지할 수 있도록 한 것이다. In addition, by installing a leg 45 of a certain height at the bottom of the four corners of the top pile assembly frame 40 so as to be able to adjust the horizontal level to be maintained at a constant height when installed on the ground, the legs 45 installed in this way When the soil is soft, such as soft ground is to install a support plate 46 having a certain width in the lower portion of the leg to prevent the fall into the ground even when installed in the soft ground and to maintain a level at the same time .
상기의 다리(45) 및 지지판(46)의 설치가 용이하지 않을 경우 별도의 수평조정용 플레이트(미도시)를 지반(12)에 설치한 다음, 상기 팽이말뚝 조립틀(40)에 조립설치되어 제작된 현장타설형 팽이말뚝 유니트판넬(20)을 포설하여 기초를 구축하도록 한다. If the legs 45 and the support plate 46 is not easy to install, a separate horizontal adjustment plate (not shown) is installed on the ground 12, and then assembled and installed on the top pile assembly frame 40. Install the cast-in-place top pile unit panel 20 to build a foundation.
도 6은 본 발명의 또 다른 팽이말뚝 조립틀의 실시예를 보여주는 도면으로서, 상기의 도 5에서 설명한 바와 같이 장단변 기초철근(41,42)을 일정한 간격으로 설치하여 이들이 서로 교차되므로서 형성되는 격자형의 틀내에 일정한 길이의 철근을 대각선으로 설치한 대각선 철근(47)에 의하여 조립 공간부(43)가 형성되도록 한 일정한 규격의 팽이말뚝 조립틀(40)을 형성한 것이다. Figure 6 is a view showing an embodiment of another top pile assembly frame of the present invention, as described in Figure 5 above, the long-term side reinforcing bars (41, 42) are installed at regular intervals are formed by crossing each other The top pile assembly frame 40 having a predetermined size is formed by the diagonal reinforcement 47 having diagonally installed reinforcing bars in a lattice-shaped frame to form the assembly space portion 43.
상기의 조립 공간부(43)내에 상기 단위팽이형 말뚝용기(30)를 삽입설치하고 수직부(36)에 형성된 연결공(34)에 연결구를 사용하여 상호 체결한 것이다. The unit top-type pile container 30 is inserted into the assembly space portion 43 and fastened to each other by using a connector at a connection hole 34 formed in the vertical portion 36.
또한, 상기의 팽이말뚝 조립틀(40)의 네모서리 하부에 일정한 높이의 다리(45)를 설치하여 지반(12)에 포설할 때 일정한 높이로 유지되게 수평을 조절할 수 있도록 한 것이며, 이렇게 설치된 다리(45)가 연약지반과 같은 토질이 연약한 경우 상기 다리의 하부에 일정한 넓이를 갖는 지지판을 설치하여 연약지반에 포설되는 경우에도 상기 다리가 지반내에 빠지지 않고 수평을 유지할 수 있도록 한 것이다. In addition, by installing a leg 45 of a certain height at the bottom of the four corners of the top pile assembly frame 40 is to be able to adjust the horizontal to be maintained at a constant height when installed on the ground (12), the legs installed in this way If the soil is soft, such as the soft ground (45) is to install a support plate having a predetermined width in the lower portion of the leg so that even when installed in the soft ground, the legs do not fall into the ground to maintain a level.
상기의 다리(45) 및 지지판(46)의 설치가 용이하지 않을 경우 별도의 수평조정용 플레이트(미도시)를 지반(12)에 설치한 다음, 상기 팽이말뚝 조립틀(40)에 조립설치되어 제작된 현장타설형 팽이말뚝 유니트판넬(20)을 포설하여 기초를 구축하도록 한다. If the legs 45 and the support plate 46 is not easy to install, a separate horizontal adjustment plate (not shown) is installed on the ground 12, and then assembled and installed on the top pile assembly frame 40. Install the cast-in-place top pile unit panel 20 to build a foundation.
도 7과 8은 본 발명의 현장타설형 팽이말뚝 유니트판넬을 지반상에 다수개 연결설치하여 형성한 현장타설형 팽이말뚝기초의 시공상태를 보여주는 도면과 A-A 단면을 상세히 보여주는 도면으로서, 팽이형으로 하되 내부는 공간부가 형성되게 제작한 상기 단위팽이형 말뚝용기(30)를, 단변 기초철근(42)과 장변기초철근(41)을 교차시켜 다수개의 격자형상이 설치되도록 한 일정한 규격의 상기 팽이말뚝 조립틀(40)의 격자형상 조립공간부(43)내에 삽입설치하고, 상기 단위팽이형 말뚝용기(30)의 수직부(36)상에 형성된 연결공(34)에 연결구를 사용하여 상호 체결하여 현장타설형 팽이말뚝 유니트판넬(20)을 조립제작하거나, 또는 7 and 8 are views showing the construction state of the site-pouring top pile pile foundation formed by connecting a plurality of the field-pouring top pile unit panel of the present invention on the ground, and showing the AA cross section in detail. However, the inside of the top pile pile container 30 is made of a space portion is formed, the top pile of a certain standard so that a plurality of lattice shape is installed by crossing the short side basic reinforcing bar 42 and the long side basic reinforcing bar 41 Inserted into the lattice-shaped assembly space 43 of the assembly frame 40, and fastened to each other by using a connector to the connection hole 34 formed on the vertical portion 36 of the unit-type pile container 30, the site Assemble and manufacture the pouring type top pile unit panel 20, or
먼저 일정한 틀을 형성하기 위하여 네방향에 장단변 기초철근(41,42)을 설치하고, 이들이 서로 만나는 연결부(44)는 용접 또는 철사로 결속하여 직사각형의 외곽틀을 형성한 다음, 그 내부에 상기 단위팽이형 말뚝 용기(30)의 기초철근 삽입공(37)에 장단변 기초철근(41,42)을 네방향으로 삽입하여 조립하는 작업을 연속적으로하여 상기 외곽틀내에 상기 단위팽이형 말뚝용기(30)의 설치가 완료되면, 상기 기초철근 삽입공(37)에 삽입되어 설치된 장단변 기초철근(41,42)과 상기 외곽틀에 설치된 철근을 상호 용접하거나 철사 또는 연결구로 체결한 다음, 상기 단위팽이형 말뚝용기(30)의 수직부(36)에 형성된 연결공(34)을 이용하여 네방향에 인접하여 설치된 상기 단위팽이형 말뚝용기(30)와 연결구를 사용하여 상호체결하여 현장타설형 팽이말뚝 유니트판넬(20)을 조립한 후에, First, long-term side reinforcing bars 41 and 42 are installed in four directions to form a constant frame, and the connecting portions 44 where they meet each other are bound by welding or wire to form a rectangular outer frame. The unit-folded pile container is continuously inserted into the outer frame by inserting the long-term side reinforcing bars 41 and 42 in four directions into the basic reinforcing bar insertion hole 37 of the unit-type pile container 30. 30) is completed, the long-term side reinforcement (41, 42) inserted and inserted into the base reinforcing hole 37 and the reinforcing bar installed in the outer frame mutually welded or fastened with a wire or connector, then the unit By using the connection hole 34 formed in the vertical portion 36 of the top-type pile container 30 adjacent to each other using the unit top-type pile container 30 and the connection port installed adjacent to the four directions on-site casting type top Fasten the pile unit panel (20) After lip
연약지반 또는 절토와 성토 구간의 지반(12)상에 다수개의 상기 유니트판넬(20)을 설치하고 서로 연결조립한 후에, 상기 단위팽이형 말뚝용기(30)내의 공간부(35)내에 고리(21)를 외부로 설치하면서 쇄석(11)을 채우거나 콘크리트로 그라우팅을 한 다음, 상기 지반(12)과 상기 단위팽이형 말뚝 용기(30)사이의 공극부를 쇄석(11)으로 채우고 다짐을 한 후, 기초면검사와 재하시험을 하고, 상기 단위팽이형 말뚝용기(30) 상부에 설치된 고리(21)에 상부연결철근(24)을 전후좌우로 배근하여 서로 결속한 다음, 그 상부에 버림콘크리트인 기초바닥 콘크리트(13)를 타설하여 현장타설형 팽이말뚝기초(10)를 시공하는 것이다. After installing the plurality of unit panels 20 on the soft ground or the ground 12 of the cut and fill sections, and assembling and assembling with each other, the ring 21 in the space 35 in the unit-folded pile container 30 After filling the crushed stone (11) or grouting with concrete while installing the outside), after filling the voids between the ground (12) and the unit-type pile container 30 with crushed stone (11) and compacted, After the basic surface inspection and loading test, the upper connecting reinforcing bar 24 to the front and rear left and right to bind to the ring 21 installed on the unit-type pile container 30, and then bound to each other, the foundation of the concrete By pouring the floor concrete 13 is to construct a site-pouring top pile foundation (10).
상기 쇄석(11)의 규격은 0 ~ 40mm의 크기를 사용하여 공간부내에 채움하도록 한다. The size of the crushed stone 11 is to fill in the space using a size of 0 ~ 40mm.
도 9(a)(b)는 본 발명의 단위팽이형 말뚝용기의 말뚝부가 지반상에 설치되는 상태에 따른 배수공의 위치를 보여주는 도면으로서, 도 (a)는 말뚝슈(32)가 지반(12)에 매입되는 경우를 보여주는 것으로서, 이때에는 배수공(33)을 상기 단위팽이형 말뚝용기(30)의 몸체부(31)와 말뚝부(32)가 만나는 부분에 배수공(33)을 형성한 것인데 말뚝부(32)가 지반(12)내에 매입되므로 지반(12)에 발생된 지하수가 상기 배수공을 통하여 외부로 배출되도록 하기 위한 것이며, 상기 말뚝부(32)의 하단부인 선단부에 형성하지 않고 상부에 설치한 것은 배수공을 말뚝부(32)의 선단부에 설치하는 경우 지하수의 수압이 발생되어 선단부에 설치된 배수공으로 배출되지 않고 상부로 솟아오르게되므로 이러한 현상을 방지하기 위하여 몸체부(31)와 말뚝부(32)가 만나는 부분에 형성한 것이다. Figure 9 (a) (b) is a view showing the position of the drain hole according to the state in which the pile portion of the unit-type pile container of the present invention is installed on the ground, Figure (a) is a pile shoe 32 ground 12 As shown in the case where it is embedded, the drain hole 33 is formed in the drain hole 33 in the portion where the body portion 31 and the pile portion 32 of the unit-folded pile container 30 meets the pile Since the part 32 is embedded in the ground 12, the ground water generated in the ground 12 is discharged to the outside through the drain hole, and is installed on the upper end without being formed at the front end of the pile part 32. One is to install the drain hole at the tip of the pile 32, the water pressure of the ground water is generated is not discharged to the drain hole installed in the tip so that it rises to the top, so to prevent this phenomenon, the body portion 31 and the pile 32 It is formed at the part where) meets .
또한 상기 배수공(33)은 도 4에서 설명한 방법에 의하여 현장타설형 팽이말뚝 유니트판넬(20)을 제작하는 경우에 장단변 기초철근(41,42)을 삽입하는 구멍으로도 동시에 사용이 가능하다. In addition, the drain hole 33 can be used simultaneously as a hole for inserting the long-term base reinforcement (41, 42) in the case of manufacturing the cast-in-place top pile unit panel 20 by the method described in FIG.
(b)는 말뚝부(32)가 지반(12)위에 설치되는 경우로서, 이때에는 지반 위에 상기 말뚝부(32)가 설치되므로 말뚝부의 선단부에 배수공(33)을 형성하여 지반(12)에 발생된 지하수를 외부로 배출되도록 하는 것이다. 이때에는 지반위로 배출된 지하수를 상기 배수공을 통하여 배출되도록 한 것이므로 수압이 없는 상태에서 배출되어 지하수가 상부로 용출되는 현상이 발생되지 않는다. (b) is a case in which the pile part 32 is installed on the ground 12. At this time, since the pile part 32 is installed on the ground, a drain hole 33 is formed at the tip of the pile to generate in the ground 12. Discharged groundwater to the outside. At this time, since the ground water discharged to the ground is discharged through the drain hole, the phenomenon that the ground water is discharged to the upper part is not discharged in the absence of water pressure.
본 발명은 단위팽이형 말뚝용기를 다수개로 조립한 현장타설형 팽이말뚝 유니트판넬을 지반상에 설치하며 이들을 상호 연결하고 쇄석과 콘크리트를 이용하여 기초를 구축하면 기초면의 단차를 최소화하므로서 설치가 용이하고, 판넬을 다수개 설치하면 기초의 설치가 완료되므로 공사기간이 단축되어 공사비의 절감을 가져오며, 또한 지반상에 설치된 상기 단위팽이형 말뚝용기와 이를 삽입설치한 판넬도 상호 연결되어 있으므로, 부등침하로 인한 지반의 다양한 변형에도 강하게 대응하여 구조적으로도 안정되어 있는 경제적이면서도 효율성이 높은 기초를 시공하는 방법인 것이다. The present invention is easy to install by minimizing the step difference of the foundation surface when installing the site-mounted top pile unit panel assembled with a plurality of unit top type pile container on the ground and interconnecting them and building the foundation using crushed stone and concrete In addition, if a plurality of panels are installed, the installation of the foundation is completed, so that the construction period is shortened, resulting in a reduction in construction costs. Also, the unit-folded pile container installed on the ground and the panel in which it is installed are also interconnected. It is a method of constructing a structurally stable economical and efficient foundation by responding strongly to various deformations of the ground caused by settlement.
도 1은 본 발명의 단위팽이형 말뚝용기를보여주는 도면. 1 is a view showing a unit top type pile container of the present invention.
도 2는 본 발명의 단위팽이형 말뚝용기를 다수개 설치하여서 완성된 현장타설형 팽이말뚝 유니트판넬을 평면에서 보여주는 평면도. Figure 2 is a plan view showing a field casting type top pile unit panel completed by installing a plurality of unit top type pile container of the present invention in a plan view.
도 3은 도 2의 사시도. 3 is a perspective view of FIG. 2;
도 4(a)(b)는 본 발명의 현장타설형 팽이말뚝 유니트판넬을 제작하기 위하여 단위팽이형 말뚝용기에 기초철근을 연결하여 팽이말뚝 조립틀을 형성하면서 상기 판넬을 조립할 수 있는 방법을 보여주는 도면. Figure 4 (a) (b) shows a method for assembling the panel while forming a top pile assembly by connecting the base reinforcement to the unit top type pile container in order to manufacture the cast-in-place top pile unit panel of the present invention drawing.
도 5는 본 발명의 단위팽이형 말뚝용기를 조립설치하여 현장타설형 팽이말뚝 유니트판넬을 제작하기 위한 또 다른 팽이말뚝 조립틀의 실시예를 보여주는 도면. FIG. 5 is a view showing an embodiment of another top pile assembly frame for manufacturing a unit top type pile container of the present invention to manufacture a field casting type top pile unit panel. FIG.
도 6은 본 발명의 또 다른 팽이말뚝 조립틀의 실시예를 보여주는 도면. Figure 6 is a view showing an embodiment of another top pile assembly frame of the present invention.
도 7은 본 발명의 현장타설형 팽이말뚝 유니트판넬을 지반상에 다수개 연결설치하여 형성한 현장타설형 팽이말뚝기초의 시공상태를 보여주는 도면. Figure 7 is a view showing the construction state of the field-pouring top pile foundation formed by connecting a plurality of field-pouring top pile unit panel of the present invention on the ground.
도 8은 도 7의 A-A단면을 상세히 보여주는 도면. 8 is a view showing the A-A cross section of Figure 7 in detail.
도 9(a)(b)는 본 발명의 단위팽이형 말뚝용기의 말뚝부가 지반상에 설치되는 상태에 따른 배수공의 위치를 보여주는 도면. Figure 9 (a) (b) is a view showing the position of the drain hole according to the state that the pile portion of the unit-type pile container of the present invention is installed on the ground.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
10 : 현장타설형 팽이말뚝기초 11 :쇄석 10: cast-in-place top pile foundation 11: crushed stone
12 : 지반 13 : 기초바닥 콘크리트 12: ground 13: foundation floor concrete
20 : 현장타설형 팽이말뚝 유니트판넬 21 ; 고리 20: field casting type top pile unit panel 21; ring
22 : 연결구 23 : 채움재 22: connector 23: filler
24 : 상부 연결철근 24: upper connecting bar
30 ; 단위팽이형 말뚝용기 31 : 몸체부 30; Unit-type pile container 31: body part
32 : 말뚝부 33 : 배수공 32: pile 33: drain hole
34 : 연결공 35 : 공간부 34: connecting hole 35: space
36 : 수직부 37 : 기초철근 삽입공 36: vertical portion 37: foundation reinforcement hole
40 : 팽이말뚝 조립틀 41 : 장변 기초철근 40: top pile assembly frame 41: long side reinforcement
42 : 단변 기초철근 43 : 조립공간부 42: short-sided basic reinforcing bar 43: assembly space
44 : 연결부 45 : 다리 44: connection 45: leg
46 : 지지판 47 : 대각선 철근 46: support plate 47: diagonal rebar
Claims (12)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040025051A KR100603741B1 (en) | 2004-04-12 | 2004-04-12 | Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel and constructing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040025051A KR100603741B1 (en) | 2004-04-12 | 2004-04-12 | Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel and constructing method thereof |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0010070U Division KR200356929Y1 (en) | 2004-04-12 | 2004-04-12 | Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20050099837A true KR20050099837A (en) | 2005-10-17 |
KR100603741B1 KR100603741B1 (en) | 2006-07-25 |
Family
ID=37278828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040025051A KR100603741B1 (en) | 2004-04-12 | 2004-04-12 | Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel and constructing method thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100603741B1 (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100725068B1 (en) * | 2006-06-16 | 2007-06-12 | 시지이엔씨주식회사 | Compound foundation method of construction using cast in place top base was formed connection groove and this |
KR100763270B1 (en) * | 2007-06-25 | 2007-10-04 | 박노환 | The construction method which uses the auxiliary equipment the form of on building site placement the soft soil |
KR100763263B1 (en) * | 2007-06-25 | 2007-10-04 | 박노환 | Auxiliary equipment of foundation work form of on building site placement the soft soil |
KR100764837B1 (en) * | 2006-08-03 | 2007-10-09 | 주식회사 남원건설엔지니어링 | Top type block for constructing a honeycomb-shaped mat |
KR100792162B1 (en) * | 2007-09-12 | 2008-01-07 | 박노환 | Constructing method of in field top pile using |
KR100792161B1 (en) * | 2007-09-12 | 2008-01-07 | 박노환 | A top pile for production in field |
KR100798689B1 (en) * | 2007-03-12 | 2008-01-29 | 한국팽이파일 주식회사 | Construction method of ground-making using assembling unit of base pile |
KR100822004B1 (en) * | 2007-05-11 | 2008-04-15 | 시지이엔씨주식회사 | Cone type foundation |
KR100842802B1 (en) * | 2007-03-12 | 2008-07-01 | 한국팽이파일 주식회사 | Hole-plate for base pile of ground concrete work and construction method using the same |
KR100851837B1 (en) * | 2007-12-28 | 2008-08-13 | 문형록 | Ground reinforcing method using top base set case with the vertical side |
KR100910884B1 (en) * | 2009-02-16 | 2009-08-06 | 주식회사 에이스지오 | Multistaged cone foundation |
KR100920688B1 (en) * | 2009-02-05 | 2009-10-09 | 시지엔지니어링(주) | Structure for reinforced of soft ground by using top pile |
KR101111655B1 (en) * | 2009-07-23 | 2012-02-14 | 시지엔지니어링(주) | method for reinforced of soft ground by using top pile |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101401730B1 (en) * | 2007-06-11 | 2014-05-30 | 송기용 | Reinforcing method of bearing power for soft ground and reinforcing apparatus used in the same method |
KR101080159B1 (en) * | 2008-06-25 | 2011-11-07 | 주식회사 에이스지오 | Enlarged endbearing capacity foundation using cone and it's construction work method |
KR101080158B1 (en) * | 2008-06-25 | 2011-11-07 | (주)한토건설 | Enlarged endbearing capacity foundation using cone with screw and it's wet process of construction work |
-
2004
- 2004-04-12 KR KR1020040025051A patent/KR100603741B1/en not_active IP Right Cessation
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100725068B1 (en) * | 2006-06-16 | 2007-06-12 | 시지이엔씨주식회사 | Compound foundation method of construction using cast in place top base was formed connection groove and this |
KR100764837B1 (en) * | 2006-08-03 | 2007-10-09 | 주식회사 남원건설엔지니어링 | Top type block for constructing a honeycomb-shaped mat |
KR100798689B1 (en) * | 2007-03-12 | 2008-01-29 | 한국팽이파일 주식회사 | Construction method of ground-making using assembling unit of base pile |
KR100842802B1 (en) * | 2007-03-12 | 2008-07-01 | 한국팽이파일 주식회사 | Hole-plate for base pile of ground concrete work and construction method using the same |
KR100822004B1 (en) * | 2007-05-11 | 2008-04-15 | 시지이엔씨주식회사 | Cone type foundation |
KR100763263B1 (en) * | 2007-06-25 | 2007-10-04 | 박노환 | Auxiliary equipment of foundation work form of on building site placement the soft soil |
KR100763270B1 (en) * | 2007-06-25 | 2007-10-04 | 박노환 | The construction method which uses the auxiliary equipment the form of on building site placement the soft soil |
KR100792162B1 (en) * | 2007-09-12 | 2008-01-07 | 박노환 | Constructing method of in field top pile using |
KR100792161B1 (en) * | 2007-09-12 | 2008-01-07 | 박노환 | A top pile for production in field |
KR100851837B1 (en) * | 2007-12-28 | 2008-08-13 | 문형록 | Ground reinforcing method using top base set case with the vertical side |
KR100920688B1 (en) * | 2009-02-05 | 2009-10-09 | 시지엔지니어링(주) | Structure for reinforced of soft ground by using top pile |
KR100910884B1 (en) * | 2009-02-16 | 2009-08-06 | 주식회사 에이스지오 | Multistaged cone foundation |
KR101111655B1 (en) * | 2009-07-23 | 2012-02-14 | 시지엔지니어링(주) | method for reinforced of soft ground by using top pile |
Also Published As
Publication number | Publication date |
---|---|
KR100603741B1 (en) | 2006-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100603741B1 (en) | Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel and constructing method thereof | |
KR101041229B1 (en) | Toilet wall constructing structure using precast concrete panel | |
KR101200927B1 (en) | Cnnecting structure of precast body and pile and constructing method of the same | |
CA2425811A1 (en) | Modular wall system with footing form | |
KR102234513B1 (en) | Block type reinforcement retaining wall structure and constructing method for the same | |
KR100721209B1 (en) | Constructing foundation method of soil ground of concrete pile using | |
JP2012211496A (en) | Method for forming building foundation, and temporary support fitting | |
KR100824713B1 (en) | Ledge type revetment using a pc wall plate and construction method thereof | |
KR100583294B1 (en) | A Facing panel for reinforced earth wall and its construction method | |
KR200356929Y1 (en) | Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel | |
CN107288153B (en) | Prefabricated gravity type barricade | |
KR101287739B1 (en) | Sheet pile combined modular bridge abutment and construction method of the same | |
CN216076471U (en) | Reinforced filling wall structure | |
JP5184393B2 (en) | Protective wall and protective wall forming method | |
KR100919921B1 (en) | Retaining Wall using Panel and Constructing Method thereof | |
KR100823348B1 (en) | Installation method of a retaining wall | |
KR101037502B1 (en) | Reinforcement | |
KR101050271B1 (en) | Basic construction work method | |
KR101322420B1 (en) | Precast block wall, Cantilevered slab bridge using precast block wall and Construction method thereof | |
KR100601126B1 (en) | Anchoring structure of afforestation Retaining-Wall | |
JP5843550B2 (en) | Reinforced soil retaining wall and its construction method | |
JP4332651B2 (en) | Foundation reinforcement device and foundation construction method | |
CN117449347B (en) | High-filling existing buttress type retaining wall connection reinforcing structure and construction method | |
CN217870287U (en) | Slope surface reinforcing device and side slope | |
KR20130062586A (en) | Retaining wall form of construction work of block for retaining wall and block for retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
J204 | Invalidation trial for patent | ||
J301 | Trial decision |
Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20091118 Effective date: 20110420 |
|
FPAY | Annual fee payment |
Payment date: 20120713 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20130712 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20140724 Year of fee payment: 9 |
|
LAPS | Lapse due to unpaid annual fee |