KR100842802B1 - Hole-plate for base pile of ground concrete work and construction method using the same - Google Patents

Hole-plate for base pile of ground concrete work and construction method using the same Download PDF

Info

Publication number
KR100842802B1
KR100842802B1 KR1020070024040A KR20070024040A KR100842802B1 KR 100842802 B1 KR100842802 B1 KR 100842802B1 KR 1020070024040 A KR1020070024040 A KR 1020070024040A KR 20070024040 A KR20070024040 A KR 20070024040A KR 100842802 B1 KR100842802 B1 KR 100842802B1
Authority
KR
South Korea
Prior art keywords
pile
concrete
top pile
plate
pour plate
Prior art date
Application number
KR1020070024040A
Other languages
Korean (ko)
Inventor
정효권
Original Assignee
한국팽이파일 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국팽이파일 주식회사 filed Critical 한국팽이파일 주식회사
Priority to KR1020070024040A priority Critical patent/KR100842802B1/en
Application granted granted Critical
Publication of KR100842802B1 publication Critical patent/KR100842802B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A concrete pouring board for making top piles and a construction method using the same are provided to facilitate concrete pouring work by allowing workers to walk thereon. A concrete pouring board(130) for making top piles is placed on top pile forms(100) whose tops are open. The concrete pouring board has pouring holes(131) whose diameter is smaller than the outer diameter of the top opening of the top pile. Concrete are poured into the top pile forms through the pouring holes of the concrete pouring board.

Description

현장 타설형 팽이파일의 콘크리트 타설판 및 이를 이용한 시공방법{Hole-plate for base pile of ground concrete work and construction method using the same}Hole-plate for base pile of ground concrete work and construction method using the same}

도 1은 본 발명에 따른 연약지반의 콘크리트 시공공정을 보인 블록도.1 is a block diagram showing a concrete construction process of the soft ground according to the present invention.

도 2는 본 발명에 따른 팽이패널의 조립 구성을 보인 사시도.Figure 2 is a perspective view showing the assembly configuration of the top panel according to the present invention.

도 3은 본 발명에 따른 팽이패널 설치 공정을 보인 단면도.Figure 3 is a cross-sectional view showing a top panel installation process according to the present invention.

도 4는 본 발명에 따른 타설판 설치 공정을 보인 사시도.Figure 4 is a perspective view showing a pour plate installation process according to the invention.

도 5는 본 발명에 따른 레미콘 타설 공정을 보인 단면도.5 is a cross-sectional view showing a ready-mixed concrete pouring process according to the present invention.

도 6은 본 발명에 따른 팽이고리 설치 공정을 보인 단면도.Figure 6 is a cross-sectional view showing a entangled ring installation process according to the present invention.

도 7은 본 발명에 따른 골재 채우기 및 다짐 공정을 보인 단면도.Figure 7 is a cross-sectional view showing the aggregate filling and compacting process according to the present invention.

도 8은 본 발명에 따른 기초콘크리트층 포설 공정을 보인 단면도.8 is a cross-sectional view showing a process for laying a foundation concrete layer according to the present invention.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

2 : 지반 3 : 토목용 매트2: ground 3: civil engineering mats

5 : 레미콘/콘크리트 6 : 팽이고리5: ready-mixed concrete / concrete 6: entangled ring

7 : 쇄석 8 : 기초콘크리트층7: crushed stone 8: foundation concrete layer

100 : 팽이패널(panel) 110 : 팽이파일100: top panel 110: top pile

111 : 부양부 112 : 파일부111: support part 112: file part

115 : 스페이스 120 : 연결철근115: space 120: connecting rebar

130 : 타설판 131 : 주입공(注入孔)130: pouring plate 131: injection hole

132 : 핸들132 handle

S10 : 팽이패널 조립 공정S10: top panel assembly process

S20 : 토목용 매트 설치 공정S20: Civil Mat Installation Process

S30 : 팽이패널 설치 공정S30: top panel installation process

S40 : 타설판 설치 공정S40: pouring plate installation process

S50 : 레미콘 타설 공정S50: ready-mixed concrete pouring process

S60 : 팽이고리 설치 공정S60: Enclosure Installation Process

S70 : 골재채우기 및 다짐 공정S70: Aggregate Filling and Compaction Process

S80 : 기초콘크리트 포설 공정S80: Foundation concrete laying process

본 발명은 연약지반의 지반을 보강하기 위한 콘크리트 팽이파일 구조물의 시공에 있어서, 특히 팽이파일 내부로 레미콘을 주입하는 레미콘 타설 공정을 개선한 현장 타설형 팽이파일의 콘크리트 타설판 및 이를 이용한 시공방법에 관한 것이다.The present invention in the construction of the concrete top pile structure for reinforcing the ground of the soft ground, in particular in the concrete pour plate of the field-pouring top pile that improved the ready-mixed concrete pouring process to inject the ready-mixed concrete into the top pile and the construction method using the same It is about.

일반적으로 연약지반에 건축물을 짓거나 각종 토목공사를 수행하기 위해서는 먼저 지반을 견고하게 보강할 필요가 있으며, 연약지반을 보강하기 위해서, 흔히 콘크리트가 적재되는 팽이파일을 기초지반 표면에 깔아서 지반을 다지는 공사를 한다.In general, in order to build a building on a soft ground or to carry out various civil works, it is necessary to reinforce the ground first.In order to reinforce the soft ground, it is often necessary to lay a top pile on which the concrete is loaded to lay the ground. Do construction.

팽이파일은 내부에 콘크리트가 적재될 수 있도록 상단이 개방된 상광하협(上廣下狹) 형태의 역삼각뿔 형상으로 된 부양부와 상기 부양부 하단에서 부양부를 지지하고 하단이 뾰족하게 형성된 파일부로 구성되고, 이것은 제조성과 시공성 등을 고려하여 주로 합성수지로 제조되고 그 형태 또한 다양한데, 일 예로 본 출원인은 다양한 형태의 팽이파일용 거푸집을 안출하였으며, 대한민국 등록특허 제 10-0469143호, 등록특허 제 10-0500599호 등이 그것이다.The top pile is composed of an inverted triangular pyramidal shape having an upper end opening so that concrete can be loaded therein, and a pile part supporting the support at the bottom of the support and having a pointed bottom In consideration of manufacturability and workability, it is mainly made of synthetic resins and various forms thereof. For example, the present applicant has devised various types of formwork for folding piles, and the Republic of Korea Patent Registration No. 10-0469143, Patent Registration No. 10- 0500599 and the like.

이러한 팽이파일을 이용한 종래의 연약지반의 기초 시공방법을 개략적으로 설명하면 다음과 같다.When explaining the basic construction method of the conventional soft ground using the top pile as follows.

먼저, 종과 횡으로 복수 개의 팽이파일을 연접하도록 설치한 다음, 상호 연접한 2개의 팽이파일을 케이블 타이, 철사, 끈과 같은 묶음 수단으로 상호 연결 고정하는 형태로 모든 팽이파일의 상단부를 결속(팽이 연결 공정)하고, 팽이파일의 목 부위에 기초철근을 가로 및/또는 세로 방향으로 배근하고, 이들 기초철근을 케이블 타이, 철사, 끈이나 용접과 같은 고정수단으로 각 팽이파일과 기초철근을 고정함으로써 팽이패널을 조립한다(타이 결속 및 팽이패널 조립 공정).First, the plurality of top piles are installed to be connected to each other horizontally and longitudinally, and then the tops of all top piles are tied together by fixing the two interconnected top piles together using a bundle means such as cable ties, wires, and strings. Top connection process), and reinforce the basic rebar in the horizontal and / or longitudinal direction to the neck of the top pile, and fix the basic rebar and the basic rebar by fixing means such as cable ties, wires, strings or welding. By this, the top panel is assembled (tie binding and top panel assembly step).

이후, 연약지반의 표면을 고르게 작업한 후, 지반 위에 부직포와 같은 토목용 매트를 도포(토목용 매트 설치 공정)하고, 매트 위에 상기 조립된 팽이패널을 복수 개 연이어 설치(팽이패널 설치 공정)한다.Subsequently, after the surface of the soft ground is evenly applied, a civil engineering mat such as a nonwoven fabric is applied on the ground (civil engineering mat installation process), and a plurality of the assembled top panels are successively installed on the mat (top panel installation process). .

팽이패널이 설치되면, 각 팽이파일 내부에 콘크리트를 충진(레미콘 타설 공 정)하고, 콘크리트가 굳기 전에 각 팽이파일의 중심에 팽이고리를 설치(팽이고리 설치 공정)한다.When the top panel is installed, concrete is filled in each top pile (with concrete consolidation process), and a top ring is installed at the center of each top pile before the concrete is hardened (a top hook installation process).

이러한 상태로 약 1일내지 3일 정도 방치하여 콘크리트가 어느 정도 경화(양생 공정)되면, 각 팽이파일의 사이에 형성된 공간에 쇄석을 채우고 이를 모든 공간에 고르고 균일하게 분포하도록 다지는 작업(골재 채우기 및 다짐 공정)을 진행한 다음, 상기 돌출된 각 팽이고리에 연결철근을 배근하여 결속시키는데, 이때 케이블 타이, 철사 또는 끈과 같은 묶음 고정 수단으로 연결(연결철근 배근 및 타이 결속 공정)하고, 이렇게 제조된 팽이패널 상에 콘크리트를 포설하여 양생하여 기초콘크리트층을 형성(기초콘크리트 포설 공정)하여 기초파일의 시공을 완료하는 것이며 팽이파일 내로 레미콘을 주입, 충진하는 레미콘 타설 공정은 다음의 문제점을 내포한다.When the concrete is hardened to some extent (curing process), it is left in this state for about 1 to 3 days to fill the crushed stone in the space formed between each top pile and compact it to distribute it evenly and uniformly in all spaces (aggregate filling and After the compaction process), connecting the reinforcing bar to each of the protruding ponchos and binds, whereby connecting by a bundle fixing means such as cable ties, wires or strings (connecting reinforcement and tie-binding process), and thus produced The concrete is laid on the top panel to be cured to form the foundation concrete layer (base concrete laying process) to complete the construction of the foundation pile. The ready-mixing process of injecting and filling the ready-mixed concrete into the top pile includes the following problems: .

첫째, 팽이파일은 상단 개방된 형태이고 대부분 원형으로 이루어져 있기 때문에 팽이패널 상단은 작업자가 디딜 수 있는 공간이 매우 제한적이어서 작업자가 그 위를 이동할 때 불편하고 다소 위험한 문제가 있다.First, because the top pile is open top and mostly circular, the top of the top panel is very inconvenient and somewhat dangerous when the worker moves on it because the space that the operator can step on is very limited.

둘째, 레미콘이 각 팽이패널 사이의 스페이스로 누설되는 구조이므로 레미콘이 팽이파일 내로 유입되지 않고 버려지는 손실량이 많은 문제가 있다.Second, since the ready-mixed concrete leaks into the space between the top panels, there is a problem in that the lost concrete is discarded without being introduced into the top pile.

셋째, 팽이파일 일부에 작업자의 하중이 집중되고 고속 배출되는 레미콘의 타격으로 팽이파일의 파손이 발생되는 문제가 생겨 숙련작업자가 작업에 임하여야 한다.Third, the worker's load is concentrated on a part of the top file, and a problem arises that the top file is damaged by the hitting of ready-mixed concrete.

이에 상기의 제반 문제점을 해결하기 위한 본 발명은, 레미콘 타설 공정 중에 레미콘이 각 팽이파일 사이의 스페이스로 누설되는 것을 방지하면서도, 작업자가 안전하고 편리하게 팽이패널 상부를 이동하게 하며, 동시에 팽이파일 상단이 파손되는 것을 방지하도록 하는 현장 타설형 팽이파일의 콘크리트 타설판 및 이를 이용한 시공방법을 제공하는데 그 목적이 있다.Accordingly, the present invention for solving the above problems, while preventing the ready-mixed concrete leaks into the space between the top piles during the ready-mixing process, allowing the operator to move the top of the top panel safely and conveniently, at the same time It is an object of the present invention to provide a concrete pouring plate of the field-pouring top pile to prevent the damage and the construction method using the same.

상기 목적을 달성하기 위한 본 발명의 구성적 측면은, 상단이 개방된 팽이파일이 횡 및 종 방향으로 복수 개 연접 배설된 팽이패널 위에 콘크리트를 주입/타설하기 위한 평판 형상의 타설판을 적치하되, 상기 타설판은 상기 각 팽이파일의 상단과 대응하는 위치이고 각 팽이파일의 상단 직경보다 작은 직경을 가진 주입공이 형성 것을 특징으로 한다.A structural aspect of the present invention for achieving the above object, while the top of the open top pile is stacked a plate-shaped pour plate for injecting / placing concrete on the top and the top of the plurality of jointly disposed in the horizontal and longitudinal direction, The pour plate is a position corresponding to the top of each top pile and characterized in that the injection hole having a diameter smaller than the top diameter of each top pile.

여기서 상기 주입공의 종 및 횡 방향의 각 개수는 각각 2개 내지 10개인 것이 바람직하고, 상기 타설판 가장자리에는 핸들을 설치하여 운반성을 향상시킬 수 있다.In this case, the number of each of the longitudinal and transverse directions of the injection hole is preferably 2 to 10, respectively, the handle can be installed on the edge of the pour plate to improve the transportability.

또한 시공방법적 측면으로서 본 발명은, 상단이 개방된 팽이파일이 지반 위에 횡 및 종 방향으로 복수 개 연설하는 팽이패널 조립 공정과, 각 팽이파일의 상단과 대응하는 위치이고 각 팽이파일의 상단 직경보다 작은 직경을 가진 주입공이 형성된 평판 형상의 타설판을 상기 팽이패널 위에 적치한 타설판 설치 공정과, 상기 주입공을 통해 각 팽이파일 내에 콘크리트를 충진하고 양생시키는 레미콘 타설 공정을 포함하는 것을 특징으로 한다.In addition, as a construction method aspect, the present invention provides a top panel assembling process in which a top end of the top end is plural in the horizontal and longitudinal direction on the ground, and a top diameter of each top end in a position corresponding to the top end of each top end. And a pour plate installation process in which a plate-shaped pour plate having an injection hole having a smaller diameter is placed on the top panel, and a ready-mixed concrete pouring process for filling and curing concrete in each top pile through the injection hole. do.

이러한 특징 방법에 있어 본 발명은, 상기 팽이파일 내에 콘크리트 주입 후, 각 팽이파일 내에 ‘U’자형 팽이고리를 역방향으로 하여 팽이고리의 상단에서 일정 높이 상향 돌출되도록 내입하는 팽이고리 설치공정을 더 포함하거나, 또는 레미콘 타설 공정 후 타설판을 제거하고 각 팽이파일 사이의 스페이스에 쇄석을 충진하고 다지는 골재 채우기 및 다짐 공정과 팽이패널 위에 일정한 두께로 기초콘크리트층을 포설하는 기초콘크리트 포설 공정을 더 포함할 수 있다.In this feature method, the present invention, after the concrete is injected into the top pile, each of the top pile inverted 'U' in the reverse direction further includes a step of installing a top ring indented so as to protrude a predetermined height upward from the top of the top Alternatively, after the ready-mixed concrete pouring process, the pour plate may be removed and filled with crushed stone in the spaces between the top piles and the compacting aggregate filling and compacting process, and the basic concrete laying process of laying the base concrete layer to a certain thickness on the top panel. Can be.

여기서 상기 팽이파일은 상광하협(上廣下狹) 형상의 부양부와, 상기 부양부와 일체로 되어 하부로 연장 형성된 파일부로 이루어지며, 연결철근이 상기 부양부의 경사면을 관통하되, 관통 위치는 각 팽이파일의 무게중심점으로 하는 것이 바람직하다.Here, the top pile consists of a buoyancy part of a normal light and down strait, and a pile part integrally formed with the support part and extended downward, and the connecting reinforcing bar penetrates the inclined surface of the support part, and the penetrating position is It is preferable to set it as the center of gravity of a top pile.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예에 대해 보다 상세히 설명하면 다음과 같다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.Configurations shown in the embodiments and drawings described herein are only one of the most preferred embodiments of the present invention and do not represent all of the technical spirit of the present invention, various equivalents that may be substituted for them at the time of the present application It should be understood that there may be variations and variations.

도 1은 본 발명에 따른 연약지반의 콘크리트 시공공정을 보인 블록도로서, 도 1을 참조하는 바와 같이, 본 발명에 따른 현장 타설형 팽이파일의 콘크리트 타설판을 이용한 시공방법은, 상단이 개방된 팽이파일(110)이 횡 및 종 방향으로 복수 개 연설하는 팽이패널(100) 조립 공정(S10)과, 연약지반이나 절토와 성토 구간 등의 의 지반(2)을 고르게 한 다음 지반(2) 상에 부직포와 같이 합성수지(PP)로 제조된 연질의 토목용 매트(3)를 도포하는 토목용 매트 설치 공정(S20)과, 상기 팽이패널 위에 각 팽이파일의 상단과 대응하는 위치이고 각 팽이파일의 상단 직경보다 작은 직경을 가진 주입공(131)이 형성된 평판 형상의 타설판(130)을 적치하는 타설판 설치 공정(S40)과, 상기 타설판(130)의 주입공(131)을 통해 각 팽이파일(110) 내에 콘크리트(5)를 충진하는 레미콘 타설 공정(S50)과, 각 팽이파일 내에 ‘U’자형 팽이고리(6)를 역방향으로 하여 팽이파일(110)의 상단에서 일정 높이 상향 돌출되도록 내입하는 팽이고리 설치공정(S60)과, 각 팽이파일(110) 사이의 스페이스(115)에 쇄석을 충진하고 다지는 골재 채우기 및 다짐 공정(S70)을 포함하고, 최종 공정으로 상기 팽이패널 조립체 상부에 콘크리트를 일정한 두께, 바람직하게는 상기 팽이고리(6)가 매설되도록 도포 및 양생하여 기초콘크리트층(8)을 형성하는 기초콘크리트 포설 공정(S80)을 포함하여 이루어진다.1 is a block diagram showing a concrete construction process of the soft ground according to the present invention, as shown in Figure 1, the construction method using the concrete pour plate of the site-pouring top pile according to the present invention, the top is open The top pile 110 assembles the top panel 100 in a plurality of horizontal and longitudinal directions (S10), and evens the ground (2) of the soft ground, the cut and the fill section, and then the ground (2) on the ground. The civil engineering mat installation process (S20) which apply | coats the soft civil engineering mat 3 made of synthetic resin (PP) like a nonwoven fabric to the said top panel, and is a position corresponding to the top of each top pile on the said top panel, Each top through the pour plate installation process (S40) and the injection hole 131 of the pour plate 130 to place the plate-shaped pour plate 130 formed with the injection hole 131 having a diameter smaller than the top diameter Ready-made concrete filling to fill concrete 5 in pile 110 Step (S50), and the top ring installation step (S60) and each top pile in which the 'U'-shaped enclosing 6 in the top pile in the reverse direction to be projected upward at a predetermined height upward from the top of the top pile 110 Aggregate filling and compacting process (S70) for filling and compacting the crushed stone in the space 115 between (110), the final process of the concrete on top of the top panel assembly of a certain thickness, preferably the top ring 6 It is made to include the basic concrete laying step (S80) of coating and curing so as to form the base concrete layer (8).

이하에서는 도 2 내지 도 8을 참조하여 상기 각 공정의 시공 방법에 대해 설명한다.Hereinafter, the construction method of each process will be described with reference to FIGS. 2 to 8.

도 2는 본 발명에 따른 팽이패널의 조립 구성을 보인 사시도로서, 도 2를 참조하는 바와 같이 팽이패널(100)은, 복수 개의 팽이파일(110)이 가로 및 세로 방향으로 연접하게 한 상태에서 이들이 상호 분리되지 않도록 고정된 조립체를 지칭한다.Figure 2 is a perspective view showing the assembly configuration of the top panel according to the present invention, the top panel 100, as shown in Figure 2 is a plurality of top pile 110 in a state in which they are connected in the horizontal and vertical direction It refers to an assembly that is fixed so as not to be separated from each other.

상기 각 팽이파일(110)은, 내부에 콘크리트가 유입되어 충진되도록 하기 위해 상단이 개방되고 상부가 넓으며 아래로 갈수록 좁아지는 상광하협(上廣下狹) 형 태나, 또는 역삼각뿔 형상으로 되어 경사면을 가진 부양부(111)와, 상기 부양부(111)의 하부에서 일체로 하향 연장 형성되고 하단은 지반으로의 삽입이 용이하도록 하기 위해 뾰족하게 형성된 파일부(112)로 구성되며, 이와 같이 팽이파일(110)이 부양부(111)와 파일부(112)를 가진 형태라면, 평면도 관점에서 원형이나 다각형 등 그 형태는 다양하게 변형이 가능하며, 이에 대해서는 앞서 언급한 본 출원인의 등록특허 상에 제안된 것을 참조하여 본 발명에 적용하는 것도 가능하다.The top pile 110, the upper surface is open so that the concrete is introduced into the filling is wide, the upper side is wider or narrower toward the bottom (上 廣 下 狹) shape, or inverted triangular pyramid shape It is formed with a support portion 111 and downwardly integrally formed downward from the lower portion of the support portion 111 and the lower end is composed of a sharply formed pile portion 112 to facilitate insertion into the ground, so If the file 110 has a support part 111 and the file part 112, the shape such as a circle or a polygon may be variously modified from a plan view point of view. It is also possible to apply the invention with reference to the proposed ones.

한편, 상기 팽이파일(110)을 도시된 일 예와 같이 가로 방향과 세로 방향, 또는 종 방향과 횡 방향으로 각각 4개씩 연접하게 설치한 뒤, 이웃하게 연접한 각 팽이파일을 상호 고정하기 위해, 연결철근(120)을 상기 각 팽이파일(110)의 부양부(111)의 경사진 면을 관통하게 하여 복수 개의 팽이파일(110)을 일체화하여 하나의 조립체를 구성한다.On the other hand, as shown in the example shown in Figure 1, the four horizontally and vertically, or in the longitudinal and transverse direction to install each four in succession, in order to mutually secure each of the neighboring interconnected piles, The connecting reinforcing rods 120 pass through the inclined surface of the buoys 111 of the respective top piles 110 to integrate a plurality of top piles 110 to form one assembly.

이때, 상기 연결철근(120)이 관통하는 부위는 팽이파일(110)의 경사면인 것이 바람직하고, 더욱이 무게중심점을 관통하게 하여 팽이패널(100) 운반 또는 설치시 상호 연접한 각 팽이파일(110)의 상단이 벌어지거나 유동이 없도록 하는 것이 바람직하다.In this case, the portion where the connecting reinforcing rod 120 penetrates is preferably an inclined surface of the top pile 110, and furthermore, each top pile 110 connected to each other at the time of carrying or installing the top panel 100 by penetrating the center of gravity. It is desirable to have no top or flow of the top of.

또한 상기 연결철근(120)은 가로 및 세로 방향으로 각각 배설하여서 연결철근(120)이 하나의 팽이파일(110)에 대해 열십자 형태로 관통시키는 형태로 하면 복수 개의 연접한 팽이파일(110)이 상호 견고하게 고정되어 별도의 묶음 수단(철사나 타이, 끈 등)으로 고정할 필요가 없다.In addition, the connecting reinforcing rods 120 are disposed in the horizontal and vertical directions, respectively, so that the connecting reinforcing rod 120 penetrates in a cross shape with respect to one of the top piles 110. It is firmly secured to each other and does not need to be secured by separate binding means (wire, tie, string, etc.).

도 2는 팽이파일(110)의 종 방향 및 횡 방향의 각 수가 4 × 4로 하였으나, 이에 한정되지 않으며, 팽이파일의 규격에 따라 변동이 가능하고, 팽이패널의 가로 및 세로 각 변의 길이가 1m 내지 4m 인 범위 내에서 그 수가 증감될 수 있다.2 shows that the number of longitudinal and transverse directions of the top pile 110 is 4 × 4. However, the present invention is not limited thereto, and the top and bottom sides of the top pile 110 can be varied, and the length of each side of the top panel is 1 m. The number may be increased or decreased within the range of from 4 m to 4 m.

이와 같이 복수의 팽이파일(110)이 조립된 팽이패널(100)은 팽이파일(110)이 상호 연접한 상태에서 결합돼 있지만, 각 팽이파일(110) 사이에는 스페이스(115)가 존재하게 되며, 상기 스페이스(115)는 후술하는 골재 채우기 공정(S70)에서 반드시 필요하므로, 어느 정도의 크기가 유지되어야 하며, 도시된 바와 같이 원형의 팽이파일(110)이 조립되면, 스페이스(115) 상단은 마름모꼴의 모양을 갖는다.Thus, the top panel 100 in which the plurality of top piles 110 are assembled is coupled in a state in which the top piles 110 are connected to each other, but a space 115 exists between the top piles 110. Since the space 115 is necessary in the aggregate filling process (S70), which will be described later, a certain size should be maintained, and as shown, when the circular top pile 110 is assembled, the top of the space 115 is rhombic. Has the shape of.

도 3은 본 발명에 따른 팽이패널 설치 공정을 보인 단면도로서, 먼저 팽이패널(100)을 지반 상에 설치하기에 앞서, 지반(2)의 표면을 고르게 하고, 부직포와 같이 유연성을 가지고 또한 토목용으로 사용되는 토목용 매트(3)를 상기 고르기가 완료된 지반(2) 상에 깐 다음, 매트(3) 위에 상기 팽이패널 조립 공정(S10)에서 조립된 팽이패널(100)을 적어도 하나 이상 연이어 설치하면 팽이패널 설치 공정(S30)이 완료된다.Figure 3 is a cross-sectional view showing a top panel installation process according to the present invention, first, before installing the top panel 100 on the ground, evenly the surface of the ground (2), such as non-woven fabrics for flexibility and civil engineering The civil engineering mat (3) to be used as a coating on the ground (2) is completed, and then installed at least one successive top panel 100 assembled in the top panel assembly step (S10) on the mat (3) If the top panel installation step (S30) is completed.

상기 팽이패널 설치 공정(S30)은 복수의 팽이패널(100) 중, 서로 이웃하는 팽이패널(100)과의 높이를 정확하게 조절하여 수평을 유지하도록 하는 수평 조절 공정을 포함할 수 있으며, 팽이패널(100)의 수평도 조절이나 이동시 필요한 경우 팽이파일(110)을 관통하여 고정된 연결철근(120)을 이용하여 들어올리거나 운반하는 것이 가능하고, 이때에도 연결철근(120)이 부양부(111)의 경사면을 관통하고 있으므로, 흐트러지지 않고 조립 상태를 그대로 유지한다.The top panel installation step (S30) may include a horizontal adjustment step of maintaining a horizontal level by accurately adjusting the height of the top panel 100, the neighboring top panel 100 of each other, the top panel ( When necessary to adjust or move the horizontal degree of 100, it is possible to lift or transport by using the connecting reinforcing rod 120 fixed through the top pile 110, and in this case, the connecting reinforcing rod 120 of the support portion 111 Since it penetrates the inclined surface, the assembly state is maintained without being disturbed.

도 4는 본 발명에 따른 타설판 설치 공정(S40)을 보인 사시도로서, 팽이패 널(100) 위에 적치된 타설판(130)은, 평판 형상이고, 재질은 금속이나 합성수지로 제조되며, 내부에는 상기 각 팽이파일(110)의 상단과 대응하는 위치에 주입공(131)이 형성된다.4 is a perspective view showing a pour plate installation process (S40) according to the present invention, the pour plate 130 is placed on the top panel 100 is a flat plate shape, the material is made of metal or synthetic resin, therein Injection holes 131 are formed at positions corresponding to the upper ends of the respective top piles 110.

상기 주입공(131)은 도시된 바와 같이 원형으로 천공된 것이거나, 사각형, 육각형 등 다각형으로 천공된 것 모두를 포함하며, 다만 팽이파일(110)의 상단 내경보다 그 지름이 작은 것을 만족해야 하는데, 이는 주입공(131)의 내경이 팽이파일의 외경과 같거나 크면, 타설판(130)이 팽이패널(100) 상부에 적층되지 않고, 스페이스(115)로 추락하기 때문이다.As the injection hole 131 is shown as a round perforated, or includes a polygon, such as a rectangular, hexagonal and all, but the diameter must be smaller than the inner diameter of the top of the top pile 110 This is because if the inner diameter of the injection hole 131 is equal to or larger than the outer diameter of the top pile, the pour plate 130 is not stacked on the top panel 100 and falls into the space 115.

상기 타설판(130)의 다른 바람직한 형태로서, 타설판(130)의 운반이나 팽이패널(100) 위에서의 위치 이동시 사용할 수 있도록 가장자리에 핸들(132)이 구비되고, 상기 주입공(131)의 횡 및 종 방향의 개수는 반드시 팽이패널의 횡 및 종 방향 개수와 일치할 필요는 없고 임의로 구성할 수 있는데, 운반이나 작업성 등을 고려하여 횡 및 종 방향으로 각각 2개 내지 10개 범위로 하는 것이 바람직하다.As another preferred form of the pour plate 130, the handle 132 is provided at the edge to be used when the pour plate 130 is transported or moved in position on the top panel 100, the transverse of the injection hole 131 And the number of longitudinal direction does not necessarily have to match the number of transverse and longitudinal direction of the top panel, but can be configured arbitrarily, it is to be in the range of 2 to 10 in the transverse and longitudinal direction respectively in consideration of transport or workability. desirable.

도 5는 본 발명에 따른 레미콘 타설 공정(S50)을 보인 단면도로서, 도 5를 참조한 레미콘 타설 공정(S50)은, 레미콘 차량이나 레미콘 공급장치로부터 공급되는 레미콘(5)을 각 팽이파일(110)의 내부 공간으로 주입, 충진하는 공정으로서, 전술한 바와 같이 종전에는 숙련된 작업자가 직접 팽이패널(100) 위에 올라서서 레미콘 주입관(5a)을 잡고 각 팽이파일(110) 위로 이동하면서 레미콘을 주입하였으나, 이 경우 작업성이 나쁘고 팽이파일(110)이 파손되기도 하며, 레미콘(5)이 스페이스(115)로 누설되어 레미콘을 낭비하였지만, 본 발명에서와 같이 타설판(130)이 설 치된 경우 일반적작업자가 비교적 넓은 면적의 타설판(130)을 디디면서 이동할 수 있으므로 이동성이 향상되고 그에 따란 작업성이 향상되며, 또한 타설판(130)이 디딤 위치로 집중되는 하중을 분산하므로 팽이파일(110)이 파손되지 않는다.5 is a cross-sectional view showing a ready-mixed concrete placing process (S50) according to the present invention, the ready-mixed concrete placing process (S50) with reference to FIG. 5, each top pile 110, the ready-mixed concrete (5) supplied from the ready-mixed vehicle or the ready-mixed concrete supply device As a process of injecting and filling into the internal space of the above, as described above, a skilled worker directly climbs on the top panel 100 to hold the ready-mixed concrete inlet pipe 5a and moves the topped pile 110 while injecting ready-mixed concrete. However, in this case, the workability is poor and the top pile 110 is broken, and the ready-mixed concrete 5 was leaked into the space 115 to waste the ready-mixed concrete, but when the pour plate 130 is installed as in the present invention, Since the operator can move the pour plate 130 in a relatively large area, the mobility is improved and workability is improved accordingly, and the pour plate 130 distributes the load concentrated in the stepping position. Top file 110 does not become damaged.

더욱이, 도 4를 참조하는 바와 같이 타설판(130)이 스페이스(115)를 차단하고 있으므로, 레미콘(5)이 누설되는 일 없이 각 주입구(131)를 통해 팽이파일(110) 내에 주입되며, 또한 주입량이 과다하여도 넘치더라도 넘친 레미콘(5)은 타설판 상에 있게 되므로, 주변의 다른 팽이파일에 주입하면 된다.Moreover, since the pouring plate 130 blocks the space 115 as shown in FIG. 4, the ready-mixed concrete 5 is injected into the top pile 110 through each injection hole 131 without leaking. Even if the injection amount is excessive, the overflowed ready-mixed concrete (5) will be on the pour plate, so that it may be injected into the other top pile around.

도 6은 본 발명에 따른 팽이고리 설치 공정(S60)을 보인 단면도로서, 도 6을 참조하는 바와 같이, 레미콘(5) 주입이 완료되면 ‘U’자 형태로 된 팽이고리(6)를 각 팽이파일(110) 상부에 설치하는데, 상기 팽이파일(6)은 ‘U’자형 각 선단 중 어느 하나는 길고 어느 하나는 짧은 구조를 가진다.FIG. 6 is a cross-sectional view illustrating a step of installing a claw in accordance with the present invention (S60). As shown in FIG. 6, when the injection of the ready-mixed concrete 5 is completed, the entangled ring 6 having a 'U' shape is encapsulated. Installed on top of the pile 110, the top pile (6) is one of each of the 'U' shaped end is long and one has a short structure.

팽이고리(6)의 설치 방향은 역‘U’자 형태로 하여 팽이파일(110)의 상단에서 일정 높이 상향 돌출되게 설치하는데, 그 돌출 높이는 4 내지 6cm 정도이면 만족하나, 이에 제한되는 것은 아니다.The installation direction of the enclosed ring 6 is inverted 'U' shape is installed so as to protrude a certain height upward from the top of the top pile 110, the protruding height is satisfied 4 to 6cm, but is not limited thereto.

레미콘(5)을 1일내지 3일 정도 양생하여 콘크리트(5)가 어느 정도 경화되면, 상기 팽이고리(6)를 이용하여 연결철근(미도시)을 배근할 수 있으며, 이후 타설판(130)을 제거하여 스페이스(115)가 노출되게 한다.When the concrete 5 is cured to some extent by curing the ready-mixed concrete 5 to 1 to 3 days, the reinforcing bar 6 may be used to reinforce the connecting reinforcing bar (not shown), and then the pouring plate 130 may be used. Is removed so that the space 115 is exposed.

도 7은 본 발명에 따른 골재 채우기 및 다짐 공정(S70)을 보인 단면도로서, 각 팽이파일(110)이 상호 접한 상태에서 각 팽이파일(110) 사이에 형성된 스페이스(115)에 쇄석(분쇄된 돌가루 등)(7)을 충진하는 골재 채우기 및 다짐 공정(S70) 을 수행한다.7 is a cross-sectional view showing the aggregate filling and compacting process (S70) according to the present invention, the crushed stone (crushed stone) in the space 115 formed between each top pile 110 in a state where each top pile 110 is in contact with each other Aggregate filling and compacting step (S70) for filling the powder (7).

쇄석(7)을 채울 때 스페이스(115)에 쇄석(7)이 어느 정도 차면, 바이브레이터(미도시)를 이용하여 내부를 다진 후 더 주입하는 방식으로 스페이스(115)에 쇄석(7)이 충분하고 균일한 밀도가 되도록 충진하고, 또한 팽이파일(110) 상단에서 쇄석(7)이 돌출된 부분을 기계로 평탄화하여 다지는 등의 작업을 하는 것이 바람직하다.When the crushed stone 7 is filled to some extent when the crushed stone 7 is filled, the crushed stone 7 is sufficient in the space 115 by pulverizing the inside with a vibrator (not shown) and further injecting the crushed stone 7. It is preferable to carry out operations such as filling to a uniform density and flattening the machined portion where the crushed stone 7 protrudes from the top of the top pile 110 by using a machine.

도 8은 본 발명에 따른 기초콘크리트층 포설 공정(S80)을 보인 단면도로서, 팽이패널(100)을 이용한 지반 기초 구조의 설치가 완료된 후, 팽이패널(100) 상부에 일정한 두께로 콘크리트를 포설하여 양생하면 도시된 바와 같이 일정한 두께를 갖는 기초콘크리트층(8)이 형성되며, 이때 상기 연결고리(6)는 기초콘크리트층(8) 내에 매설되어 기초콘크리트층(8)과 견고하게 결합되도록 할 수 있다.8 is a cross-sectional view showing the step of laying the foundation concrete layer according to the present invention (S80), after the installation of the ground foundation structure using the top panel 100 is completed, by laying concrete with a certain thickness on the top panel 100 When cured, a base concrete layer 8 having a constant thickness is formed as shown, wherein the connecting ring 6 is embedded in the base concrete layer 8 so as to be firmly bonded to the base concrete layer 8. have.

이상의 설명에서와 같이 본 발명에 따르면, 레미콘 타설 공정 중에 타설판에 의해서 각 팽이파일 사이의 스페이스가 폐쇄되고 주입공은 각 팽이파일의 개방부 일부만 개방함은 물론, 그만큼 작업자가 디딜 수 있는 유효공간이 넓어지므로, 레미콘이 스페이스로 누설되는 것이 방지되고 팽이파일로의 주입이 과다하여 넘치더라도 넘친 레미콘을 주변의 팽이파일에 다시 주입이 가능하여 레미콘의 누설 손실을 제거할 수 있고, 또한 작업자가 안전하고 편리하게 팽이패널 상부를 이동할 수 있으므로 작업성이 향상되는 효과를 가진다.As described above, according to the present invention, the space between the top piles is closed by the pouring plate during the ready-mixing process, and the injection hole opens only a part of the opening of each top pile, as well as the effective space that an operator can take. Because of this widening, it is possible to prevent the ready-mixed concrete from leaking into the space. Even if the injection into the top pile is excessive, the overflowed ready-mixed concrete can be re-injected into the surrounding top pile to eliminate the leakage loss of the ready-mixed concrete. And it can move the top panel conveniently and has the effect of improving workability.

더욱이 타설판은 작업자의 하중이 팽이파일의 디딤 위치에 집중되지 않게 분 산시키고, 또한 유도관에서 고속으로 배출되는 레미콘이 직접 팽이파일을 타격하지 않게 하여 팽이파일이 파손되는 것을 방지할 수 있으므로, 결국 공사기간을 대폭 단축하고 작업성이 향상되며, 시공 비용을 혁신적으로 절감할 수 있는 매우 향상된 발명이다.Moreover, the pour plate disperses the load of the operator so that it is not concentrated at the stepping position of the top pile, and also prevents the top pile from being damaged by preventing the ready-mixed concrete discharged at high speed from the guide pipe directly hitting the top pile. As a result, it is a very improved invention that can significantly shorten the construction period, improve workability, and innovatively reduce construction costs.

Claims (7)

상단이 개방된 팽이파일(110)이 횡 및 종 방향으로 복수 개 연접 배설된 팽이패널(100) 위에 콘크리트를 주입/타설하기 위한 평판 형상의 타설판(130)이 적치되되,The top-opened top pile 110 has a flat plate-shaped pouring plate 130 for injecting / pouring concrete onto the top panel 100 in which a plurality of joints are arranged in the horizontal and longitudinal directions, 상기 타설판(130) 내부에 상기 각 팽이파일의 상단과 대응하는 위치이고 각 팽이파일의 상단 외경보다 작은 내경의 주입공(131)이 형성된 것을 특징으로 하는 현장 타설형 팽이파일의 콘크리트 타설판.The concrete pour plate of the in-site pouring type top pile, characterized in that the injection hole 131 having a position corresponding to the upper end of each top pile and smaller than the top outer diameter of each top pile in the pour plate 130. 제 1항에 있어서,The method of claim 1, 상기 주입공의 종 및 횡 방향의 수는 각각 2개 내지 10개인 것을 특징으로 하는 현장 타설형 팽이파일의 콘크리트 타설판.The number of the longitudinal direction and the transverse direction of the injection hole is 2 to 10 concrete pour plate of the field pourable top pile. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 상기 타설판(130) 가장자리에 운반용 핸들(132)이 구비된 것을 특징으로 하는 현장 타설형 팽이파일의 콘크리트 타설판.The concrete pour plate of the field pour type top pile, characterized in that the handle 132 is provided on the edge of the pour plate 130. 상단이 개방된 팽이파일(110)이 지반(2) 위에 횡 및 종 방향으로 복수 개 연설하는 팽이패널(100) 조립 공정과,A top panel 100 assembling the top panel 100 in which the top end 110 is opened in a plurality of transverse and longitudinal directions on the ground 2; 상기 팽이패널 위에 각 팽이파일의 상단과 대응하는 위치이고 각 팽이파일의 상단 외경보다 작은 내경의 주입공(131)이 형성된 평판 형상의 타설판(130)을 적치하는 타설판 설치 공정과,A pour plate installation step of placing a plate-shaped pour plate 130 having a hole corresponding to an upper end of each top pile and having an injection hole 131 having an inner diameter smaller than the top outer diameter of each top pile; 상기 주입공을 통해 각 팽이파일 내에 콘크리트(5)를 충진하고 양생시키는 레미콘 타설 공정을 포함하는 것을 특징으로 하는 현장 타설형 팽이파일의 콘크리트 타설판을 이용한 시공방법.Construction method using a concrete pour plate of the field-pouring top pile, characterized in that it comprises a concrete concreting process for filling and curing the concrete (5) in each top pile through the injection hole. 제 4항에 있어서,The method of claim 4, wherein 상기 레미콘 타설 공정 후, 각 팽이파일 내에 ‘U’자형 팽이고리(6)를 역‘U’자 방향으로 하여 팽이파일(110)의 상단에서 일정 높이 상향 돌출되도록 내입하는 팽이고리 설치공정을 더 포함하는 것을 특징으로 하는 현장 타설용 팽이파일의 콘크리트 타설판을 이용한 시공방법.After the ready-mixed concrete pouring process, each top pile in the 'U'-shaped enclosing 6 in the reverse' U 'direction further includes a step of installing the top end engraved to protrude a predetermined height upward from the top of the top pile 110 Construction method using the concrete pour plate of the top pile for on-site casting. 제 4항 또는 제 5항에 있어서,The method according to claim 4 or 5, 상기 레미콘 타설 공정 후, 타설판을 제거하고, 각 팽이파일(110) 사이의 스페이스(115)에 쇄석을 충진하고 다지는 골재채우기 및 다짐 공정을 더 포함하는 것을 특징으로 하는 현장 타설용 팽이파일의 콘크리트 타설판을 이용한 시공방법.After the ready-mixed concrete pouring process, the pour plate is removed, and filling the crushed stone in the space 115 between the top pile 110, and compacting aggregate filling and compacting process for the site pour pile, characterized in that it further comprises Construction method using pour plate. 제 4항 또는 제 5항 중 어느 한 항에 있어서,The method according to any one of claims 4 to 5, 상기 팽이파일은 상광하협(上廣下狹) 형상의 부양부(111)와, 상기 부양 부(111)와 일체로 되어 하부로 연장 형성된 파일부(112)로 이루어지며, 연결철근이 상기 부양부의 경사면을 관통하되, 관통 위치는 각 팽이파일의 무게중심점인 것을 특징으로 하는 현장 타설용 팽이파일의 콘크리트 타설판을 이용한 시공방법.The top pile is composed of a buoyant portion 111 of the upper and lower strait (上 廣 下 狹) shape, and the pile portion 112 formed integrally with the support portion 111 extending downward, the connecting reinforcing bar is Penetrating the slope, but the penetrating position is the center of gravity of each top pile construction method using the concrete pour plate of the in-place casting top pile.
KR1020070024040A 2007-03-12 2007-03-12 Hole-plate for base pile of ground concrete work and construction method using the same KR100842802B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070024040A KR100842802B1 (en) 2007-03-12 2007-03-12 Hole-plate for base pile of ground concrete work and construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070024040A KR100842802B1 (en) 2007-03-12 2007-03-12 Hole-plate for base pile of ground concrete work and construction method using the same

Publications (1)

Publication Number Publication Date
KR100842802B1 true KR100842802B1 (en) 2008-07-01

Family

ID=39823394

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070024040A KR100842802B1 (en) 2007-03-12 2007-03-12 Hole-plate for base pile of ground concrete work and construction method using the same

Country Status (1)

Country Link
KR (1) KR100842802B1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100903136B1 (en) 2009-01-16 2009-06-16 시지엔지니어링(주) Structure and method for measuring subsidence of reinforced portion of soft ground by using top pile
WO2010059016A2 (en) * 2008-11-24 2010-05-27 에이치엔티환경건설개발주식회사 Construction method for improving soft ground
KR101172519B1 (en) * 2008-11-24 2012-08-14 에이치엔티환경건설개발주식회사 Soft Soil Improvement Method
KR101233120B1 (en) 2011-03-23 2013-02-14 (주)대명엔지니어링 Foundation structure and construction method thereof
KR101263989B1 (en) 2010-02-24 2013-05-13 에스트건설 주식회사 Analysis method on load-settlement characteristics of a top-base foundation
KR101442560B1 (en) * 2012-05-23 2014-09-19 스키너스 주식회사 Construction method for top-shaped foundation using soil stabilizer
KR20140127096A (en) * 2013-04-24 2014-11-03 김갑부 Foundation construction method using solid column blocks
KR20170019953A (en) 2015-08-13 2017-02-22 박광호 Based on top file assembly of the soft ground and concrete structure using the same
KR101816141B1 (en) * 2017-04-20 2018-01-08 (주)삼일이엔씨 Cast-in-place top pile and construction method thereof
KR101842474B1 (en) * 2017-04-20 2018-03-27 (주)삼일이엔씨 Reinforcement for cast in place top pile, monolithically poured top pile foundation using the same, and construction method of top pile foundation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200358088Y1 (en) 2004-04-28 2004-08-07 만 철 박 Concrete mold holder of top piletype
KR100483437B1 (en) 2004-09-24 2005-04-19 한국팽이파일 주식회사 A concrete pile in the shape of atop
KR20050099876A (en) * 2004-04-12 2005-10-17 시지이엔씨주식회사 Manufacturing stand for fabrication frame of located reinforcing bar and manufacturing method for mat-type fabrication frame of located reinforcing bar using the manufacturing stand
KR20050099837A (en) * 2004-04-12 2005-10-17 시지이엔씨주식회사 Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel and constructing method thereof
KR20050116959A (en) * 2004-06-09 2005-12-14 시지이엔씨주식회사 Top-shaped pile container cover having a through hole in the center and construction method of field-striked top foundation using the cover
KR100654198B1 (en) 2003-11-25 2006-12-06 가부시끼가이샤 마이코마세븐 Fundamental structure of buildings

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100654198B1 (en) 2003-11-25 2006-12-06 가부시끼가이샤 마이코마세븐 Fundamental structure of buildings
KR20050099876A (en) * 2004-04-12 2005-10-17 시지이엔씨주식회사 Manufacturing stand for fabrication frame of located reinforcing bar and manufacturing method for mat-type fabrication frame of located reinforcing bar using the manufacturing stand
KR20050099837A (en) * 2004-04-12 2005-10-17 시지이엔씨주식회사 Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel and constructing method thereof
KR200358088Y1 (en) 2004-04-28 2004-08-07 만 철 박 Concrete mold holder of top piletype
KR20050116959A (en) * 2004-06-09 2005-12-14 시지이엔씨주식회사 Top-shaped pile container cover having a through hole in the center and construction method of field-striked top foundation using the cover
KR100483437B1 (en) 2004-09-24 2005-04-19 한국팽이파일 주식회사 A concrete pile in the shape of atop

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010059016A2 (en) * 2008-11-24 2010-05-27 에이치엔티환경건설개발주식회사 Construction method for improving soft ground
WO2010059016A3 (en) * 2008-11-24 2010-09-23 에이치엔티환경건설개발주식회사 Construction method for improving soft ground
KR101172519B1 (en) * 2008-11-24 2012-08-14 에이치엔티환경건설개발주식회사 Soft Soil Improvement Method
KR100903136B1 (en) 2009-01-16 2009-06-16 시지엔지니어링(주) Structure and method for measuring subsidence of reinforced portion of soft ground by using top pile
KR101263989B1 (en) 2010-02-24 2013-05-13 에스트건설 주식회사 Analysis method on load-settlement characteristics of a top-base foundation
KR101233120B1 (en) 2011-03-23 2013-02-14 (주)대명엔지니어링 Foundation structure and construction method thereof
KR101442560B1 (en) * 2012-05-23 2014-09-19 스키너스 주식회사 Construction method for top-shaped foundation using soil stabilizer
KR101579494B1 (en) * 2013-04-24 2015-12-22 김갑부 Foundation construction method using solid column blocks
KR20140127096A (en) * 2013-04-24 2014-11-03 김갑부 Foundation construction method using solid column blocks
KR20170019953A (en) 2015-08-13 2017-02-22 박광호 Based on top file assembly of the soft ground and concrete structure using the same
KR101816141B1 (en) * 2017-04-20 2018-01-08 (주)삼일이엔씨 Cast-in-place top pile and construction method thereof
KR101842474B1 (en) * 2017-04-20 2018-03-27 (주)삼일이엔씨 Reinforcement for cast in place top pile, monolithically poured top pile foundation using the same, and construction method of top pile foundation
KR101859136B1 (en) * 2017-04-20 2018-05-16 (주)삼일이엔씨 Cast in place top base having deep pile and construction method thereof
WO2018194279A1 (en) * 2017-04-20 2018-10-25 (주)삼일이엔씨 Cast-in-place top pile base and construction method therefor
WO2018194394A1 (en) * 2017-04-20 2018-10-25 (주)삼일이엔씨 Cast-in-place integrated top pile base having lower pile and construction method thereof
JP2020517844A (en) * 2017-04-20 2020-06-18 サミレンク カンパニー, リミテッド.Samilenc Co., Ltd. On-site cast top type pile foundation and its construction method
JP7101408B2 (en) 2017-04-20 2022-07-15 サミレンク カンパニー,リミテッド. On-site casting top-type pile foundation and its construction method

Similar Documents

Publication Publication Date Title
KR100842802B1 (en) Hole-plate for base pile of ground concrete work and construction method using the same
KR20140047118A (en) Foundation system for bridges
KR101842474B1 (en) Reinforcement for cast in place top pile, monolithically poured top pile foundation using the same, and construction method of top pile foundation
KR100756680B1 (en) Wall using precast concrete building material and construction method therefor
CN101787708A (en) Integrally-assembled cantilever-type retaining wall and construction method thereof
KR100933660B1 (en) Structure for supporting stone wall for reinforcement and construction method thereof
US9695558B2 (en) Foundation system for bridges and other structures
CN109648696A (en) Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method
JPH07300820A (en) Close contact type protective construction method against falling rock and rope/net anchor structure thereof
JP7101407B2 (en) On-site placement reinforcement top type pile foundation and its construction method
KR100583294B1 (en) A Facing panel for reinforced earth wall and its construction method
KR100798689B1 (en) Construction method of ground-making using assembling unit of base pile
KR101111655B1 (en) method for reinforced of soft ground by using top pile
KR100679480B1 (en) Drain board
US20170247843A1 (en) Foundation system for bridges and other structures
KR102149662B1 (en) Method for constructing transfer layer of building using precast concrete slab
RU2379424C1 (en) Method for erection of foundation slab of framed structure
RU2006141286A (en) METHOD FOR WATERPROOFING OF UNDERGROUND PART OF BUILDING AND STRUCTURE
KR100780216B1 (en) Method for constructing a honeycomb-shaped mat
KR20090070643A (en) Molding for top base concrete and the method for the same
JP3749995B2 (en) Ground improvement method and ground improvement body
RU224782U1 (en) Modular retaining wall block
KR102510850B1 (en) Fixed Grid Structure for Earth Filling Part Reinforcement, and Blast-Stone Wall Construction Method by Using This
KR20090074426A (en) Molding for top base concrete and the method for the same
JP5851088B2 (en) Construction method of cast-in-place concrete block formwork and retaining wall

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee