KR20050092325A - Sewage pipe unexcavated lining composite pipe repair material and repair method using the same - Google Patents

Sewage pipe unexcavated lining composite pipe repair material and repair method using the same Download PDF

Info

Publication number
KR20050092325A
KR20050092325A KR1020040017488A KR20040017488A KR20050092325A KR 20050092325 A KR20050092325 A KR 20050092325A KR 1020040017488 A KR1020040017488 A KR 1020040017488A KR 20040017488 A KR20040017488 A KR 20040017488A KR 20050092325 A KR20050092325 A KR 20050092325A
Authority
KR
South Korea
Prior art keywords
lining
repair
pipe
sewer
lining material
Prior art date
Application number
KR1020040017488A
Other languages
Korean (ko)
Other versions
KR100838923B1 (en
Inventor
유정식
Original Assignee
유정식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유정식 filed Critical 유정식
Priority to KR1020040017488A priority Critical patent/KR100838923B1/en
Publication of KR20050092325A publication Critical patent/KR20050092325A/en
Application granted granted Critical
Publication of KR100838923B1 publication Critical patent/KR100838923B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C63/00Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor
    • B29C63/26Lining or sheathing of internal surfaces
    • B29C63/34Lining or sheathing of internal surfaces using tubular layers or sheathings
    • B29C63/341Lining or sheathing of internal surfaces using tubular layers or sheathings pressed against the wall by mechanical means
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • E03F2003/065Refurbishing of sewer pipes, e.g. by coating, lining

Abstract

본 발명은 하수관 비굴착 전체보수시 보수 품질을 향상시킬 목적으로 개량된 라이닝 복합판 보수재 및 이를 이용한 보수공법에 관한 것이다.The present invention relates to an improved lining composite plate repair material and a repair method using the same for the purpose of improving the quality of repair in sewage pipe unexcavated overall repair.

한가지 실시예인 하수관 비굴착 라이닝 반전공법의 경우에는 라이닝재의 관경을 보수 대상 하수관의 내경보다 소정의 칫수만큼 축소시켜 제작하여 들뜸 및 그 라우팅 공간부가 형성되도록 경화시킨 후 소정 압력의 그라우트재를 충진시켜 경화된 라이닝재와 그라우트재가 기존의 하수관과 복합관을 형성하도록 구성된 공법이고, 상기 라이닝 복합관 보수재는 하수관의 내경보다 소정의 칫수만큼 축소시킨 관경으로 경화시킨 라이닝재와 하수관 사이에 그라우트재가 충진되도록 구성하였으며, 또 다른 실시예인 하수관 비굴착 라이닝 견인공법은 라이닝재의 관경을 하수관의 내경보다 소정의 칫수만큼 축소시켜 제작하여 들뜸 및 그라우팅 공간부가 형성되도록 경화시킨 후 소정 압력의 그라우트재를 충진시켜 경화된 라이닝재와 그라우트재가 기존 하수관과 복합관을 형성하도록 구성된 공법이고, 상기 라이닝 복합관 보수재는 하수관의 내경보다 소정의 칫수만큼 축소시킨 관경으로 경화시킨 라이닝재와 하수관 사이에 그라우트재로 충진되도록 구성함으로써 들뜸부의 처리, 이음부 세굴 공간부의 그라우팅 및 강도보강을 포함한 종합적인 보수 품질을 향상시킬 수 있는 효과가 기대된다.In one embodiment of the sewage pipe unexcavated lining reversal method is to reduce the diameter of the lining material by a predetermined dimension than the inner diameter of the sewage pipe to be repaired to harden to form a lifting and its routing space portion, and then filled by filling the grout material of a predetermined pressure The lining material and the grout material is a method configured to form a composite pipe and the existing sewer pipe, the lining composite pipe repair material is configured so that the grout material is filled between the lining material and the sewer pipe cured to a tube diameter reduced by a predetermined dimension than the inner diameter of the sewer pipe, Another embodiment of the sewage pipe unexcavated lining traction method is produced by reducing the diameter of the lining material by a predetermined dimension than the inner diameter of the sewer pipe to harden to form a lifting and grouting space portion, and then filling the grout material of a predetermined pressure and the lining material cured Grout material is existing It is a method configured to form a water pipe and a composite pipe, and the lining composite pipe repair material is configured to be filled with grout material between the lining material and the sewer pipe cured to a pipe diameter reduced by a predetermined dimension than the inner diameter of the sewer pipe, the scour space of the lifting portion It is expected to improve the overall quality of repair, including negative grouting and strength reinforcement.

Description

하수관 비굴착 라이닝 복합관 보수재 및 이를 이용한 보수공법{omitted}Sewage pipe unexcavated lining composite pipe repair material and repair method using the same

본 발명은 하수관 비굴착 전체보수시 보수 품질을 향상시킬 목적으로 개량된 라이닝 복합관 보수재 및 이를 이용한 보수공법에 관한 것이다.The present invention relates to an improved lining composite pipe repair material and a repair method using the same for the purpose of improving the quality of repair in sewage pipe unexcavated overall repair.

일반적으로 지중의 도로 하부에 매설되는 하수관은 도로상을 통과하는 중차량의 진동이나 충격하중으로 인하여 부등침하가 발생되기 쉽고, 반영구적인 구조물인 성격상 시간이 경과함에 따라 콘크리트의 열화현상으로 인하여 노후화가 진행되게 되며, 공업단지 등 산업지대가 확대됨에 따라 유독성이 강한 오·폐수가 하수관으로 유입됨으로써 부식이 가속화 되고 있고, 홍수시에는 하수관 이음부의 세굴현상으로 인하여 공동이 점차 확대되며, 상기 이음부의 세굴 공동부를 대상으로 보수를 포함한 유지관리를 소홀히 하거나 지연시킴으로써 이음부의 상단부로부터 종방향 균열이 발생하게 되어 하수관은 점차 파손되어 결과적으로는 하수관의 수명이 단축되는 문제점이 발생하게 된다. In general, sewer pipes buried beneath underground roads are prone to sedimentation due to the vibration or impact loads of heavy vehicles passing through the roads, and due to the characteristics of semi-permanent structures, the deterioration of concrete due to deterioration of concrete over time As industrial zones, such as industrial complexes, expand, corrosion is accelerated by introducing toxic wastewater into sewage pipes, and during flooding, the cavity gradually expands due to the scour of sewage pipe joints. By neglecting or delaying maintenance including the repair of the scour cavity, longitudinal cracking occurs from the upper end of the joint, and the sewer pipe is gradually damaged, resulting in a shortening of the life of the sewer pipe.

상기한 바와 같이 하수관의 노후화 또는 파손에 따른 수명 연장의 일환으로 지반을 굴착하지 않고 보수하는 비굴착 보수공법의 적용이 점차 확대 적용되고 있는 실정이며, 현장에서 주로 적용되고 있는 종래의 라이닝 전체보수공법을 대별하여 보면 수압 또는 공기압 반전공법과 견인공법으로 구분할 수 있는데, 이들 라이닝 공법의 공통적인 주요 재료 중의 하나인 수지는 경화 과정에서 수축에 따른 들뜸 현상이 불가피하게 발생되고 있고, 이로 인하여 라이닝 보수재 자체의 강도는 우수함에도 불구하고 하수관과는 분리된 상태로 보수되어 소정의 빈 공간이 발생하게 됨으로써 하수관 내에 흐르는 하수의 누수방지를 포함한 지수는 가능하나 하수관의 노후화 또는 파손에 기인한 전체보수공법에 필수적인 실질적인 강도 보강의 측면에서는 효과를 기대하기 어려운 실정이었다.As described above, the application of the non-excavation repair method for repairing the ground without digging the ground as part of the life extension due to the aging or damage of the sewage pipe is gradually being applied. In general, it can be divided into hydraulic or pneumatic reversal method and traction method. Resin, which is one of the common main materials of these lining methods, inevitably occurs due to shrinkage during hardening, and thus the lining repair material itself Although the strength of sewage is excellent, it is repaired in a state separated from the sewer pipe, and a predetermined empty space is generated, so that the index including sewage prevention of sewage flowing in the sewage pipe is possible, but it is essential for the whole repair method due to aging or damage of sewage pipe. In terms of substantial strength reinforcement It was a difficult situation for you.

상기 들뜸 현상에 관하여 실례를 들어 설명하면, 유리섬유 또는 부직포의 종류로 구성되는 보강재 상에 수지를 함침시켜 경화시킨 에프 알 피(F.R.P)로 구성되는 라이닝 보수재는 수지의 경화과정에서 화학적 수축을 포함하여 수지의 종류와 배합비의 차이, 물리적 수축에 해당되는 급냉각 및 급감압의 시공 조건, 자연온도 변화 등에 의하여 들뜸 현상이 불가피하게 발생하게 되는데, 이 중에서 함침 수지의 경화반응에 의한 최대 들뜸량은 관경의 2퍼센트(%) 정도까지 나타날 수 있어서 하수관의 일부 단면을 기준으로 한 최대 들뜸량은 관경의 1퍼센트(%)정도까지 나타날 수 있는 실정이며, 이를 하수관의 주종을 이루고 있는 관경 300 밀리미터(mm)의 경우에 적용해 보면 최대 들뜸량은 3 밀리미터(mm) 이내에 해당될 수 있고, 이 3 밀리미터(mm) 이내의 공간을 콘크리트 구조물의 균열폭으로 간주하면 미세 균열 정도에 해당되어 통상적으로 수 십 미터(m) 길이에 상당하는 하수관 전체보수공법의 경우에는 들뜸 공간 자체만으로는 그라우트재의 주입공간이 상대적으로 좁아 시공성이 저하될 뿐더러 그라우트재의 두께가 상대적으로 얇아 강도 보강을 포함한 보수 품질이 감소되어 보다 더 큰 그라우트재의 주입공간이 필요하여 들뜸 공간을 포함하여 하수의 통수단면상 지장을 초래하지 않는 보수재 두께 이하의 범위 내에서 라이닝재 두께를 포함한 그라우트재 충진두께를 적용할 필요성이 있는 실정이다.For example, the lifting phenomenon of lining repair material composed of FRP hardened by impregnating a resin on a reinforcing material composed of a kind of glass fiber or nonwoven fabric includes chemical shrinkage during curing of the resin. As a result, the lifting phenomenon is inevitably generated due to the difference in the type and compounding ratio of the resin, the construction conditions of the rapid cooling and the sudden reduction and pressure corresponding to the physical shrinkage, and the maximum lifting amount due to the curing reaction of the impregnated resin. It can appear up to 2 percent (%) of the pipe diameter, so the maximum lift based on some cross-sections of the sewer pipe can be up to 1 percent (%) of the pipe diameter, which is the main diameter of the 300 mm ( mm), the maximum lift may be within 3 millimeters (mm), and within this 3 millimeters (mm) When considering the crack width of a concrete structure, in the case of the whole sewage pipe repair method, which corresponds to the degree of fine cracking, which is usually several tens of meters (m) in length, the lifting space itself is relatively small, and the grout material injection space is relatively narrow, and thus the groutability is reduced. Since the thickness of the ash is relatively thin, the quality of repair, including the reinforcement of strength, is reduced, so that a larger injection space for grout material is required, so that the thickness of the lining material is within the range of the thickness of the repair material, which is less than the thickness of the repair material, which does not cause problems in the passage surface of the sewage including the lifting space There is a need to apply the grout filling thickness, including.

여기서, 라이닝재를 사용하여 하수관의 내면을 보수할 경우에는 라이닝재 자체의 표면이 매끄러워서 조도계수가 작아 하수의 유속이 빠르므로 동일한 유량을 통과시키는 조건 하에서는 상대적으로 통수단면이 소정의 칫수만큼 작아도 되므로 하수의 통수상 여유 단면 또는 공간이 존재하여 강도보강을 위한 그라우팅 공간이 확보될 수 있어 이 그라우팅 공간을 강도보강 측면에서 활용할 필요성이 있는 실정이다.Here, when repairing the inner surface of the sewage pipe using the lining material, the surface of the lining material itself is smooth and the roughness coefficient is small, so the flow rate of the sewage is fast. Therefore, the passage surface may be relatively small by a predetermined dimension under the condition of passing the same flow rate. There is a need to utilize this grouting space in terms of strength reinforcement because a grouting space for strength reinforcement can be secured due to the presence of extra sections or spaces in the passage of sewage.

또한, 맨홀과 맨홀 사이를 대상으로 하여 상대적으로 긴 구간에 대한 전체보수를 실시할 경우에는 단위 보수구간 내에 하수관 이음부의 수량이 많고, 보수 전전처리 공사로서 이음부 한 개소씩 일일이 이음부 세굴 공간부를 대상으로 그라우트재 충진을 실시하려면 공사비가 크게 증가됨은 물론 공사기간도 길게 소요되므로 이음부 세굴 공간부를 대상으로 그라우트재 충진을 실시하는 것이 현실적으로 필수적임에도 불구하고 이를 생략한 채 라이닝 전체보수 자체만을 실시하는 실정이었고, 이렇게 이음부의 세굴 공간부에 대한 그라우트재 충진을 생략한 채 라이닝 전체보수를 실시할 경우에는 라이닝재와 하수관 사이의 들뜸 공간부를 통해 이음부에서 유입된 침입수의 이동으로 인하여 하수관 부등침하의 현상이 라이닝 전체보수 후에도 추가로 발생될 수 있어 보수 품질이 저하될 수 있는 문제점이 있는 실정이었다.In addition, if the total repair for a relatively long section is performed between the manhole and the manhole, the quantity of sewer pipe joints is large in the unit repair section. The grout material filling process will not only significantly increase the construction cost but also the construction period, and it will take a long time to complete the grouting process. In this case, when the entire lining is repaired without omitting grout material filling in the scour space of the joint, sewage pipes are inevitably settled due to the movement of intrusion water introduced from the joint through the lifting space between the lining material and the sewer pipe. Phenomenon occurs after the entire lining repair There was a problem that can be generated so that the quality of maintenance can be reduced.

본 발명은 상기와 같은 종래의 문제점을 시정하고자 착상된 것으로서 다음과 같이 두가지 실시예를 대상으로 공통적인 사항과 세부적인 사항으로 구분하여 각각 하수관 비굴착 라이닝 복합관 보수재 및 이를 이용한 보수공법으로 구성하였다.The present invention was conceived to correct the conventional problems as described above, and divided into common and detailed matters for the two embodiments as follows, respectively, and composed of a sewer pipe non-excavated lining composite pipe repair material and a repair method using the same.

본 발명의 공통적인 사항으로는 들뜸 공간을 포함하는 통수 허용 단면 이하의 보수 두께에서 라이닝재의 두께를 제외한 들뜸 및 그라우팅 공간부에 대한 그라우트재 충진 공정을 추가하고, 라이닝 보수 전 전처리 공정에 해당되는 이음부 세굴 공간부에 대한 그라우트재 충진 공정을 생략하는 대신 라이닝 보수 후 들뜸 및 그 라우팅 공간부에 대한 그라우트재 충진 공정과 병행하여 이음부 세굴 공간부에 대한 그라우트재 충진 공정을 동시에 일괄적으로 실시하면, 보수 대상 하수관과 그라우트재와 라이닝재를 합친 하수관 라이닝 복합관 보수재 및 이를 이용한 보수공법으로 구성하였다.Common matters of the present invention include a grout material filling process for the lifting and grouting spaces excluding the thickness of the lining material from the repair thickness below the water permissible cross section including the lifting space, and a joint corresponding to the pretreatment process before the lining repair. Instead of omitting the grout material filling process for the secondary scour space, if the grout material filling process for the joint scour space is carried out simultaneously in parallel with the lifting and repairing the grout material for the routing space, In addition, it consists of the sewage pipe lining composite pipe repair material combining the sewage pipe to be repaired, grout material and lining material, and the repair method using the same.

여기서, 들뜸 공간을 포함하는 통수 허용 단면 이하의 보수 두께에서 라이닝재의 두께를 제외한 들뜸 및 그라우팅 공간부에 대한 그라우트재 충진시 바람직한 실시예로 정량화 해 보면, 통수 허용 단면 이하의 보수 두께는 통상적으로 20밀리미터(mm) 정도로서 하수관의 주종을 이루고 있는 소구경 관경의 경우 통상적인 라이닝재의 두께 3 내지 10밀리미터(mm)를 제외하면 들뜸 및 그라우팅 공간부는 17 내지 10밀리미터(mm) 정도에 해당되어 이 들뜸 및 그라우팅 공간부가 콘크리트의 미세 균열폭을 초과되도록 함으로써 그라우트재 충진 상의 시공성 측면에서도 바람직하도록 구성하였다.Here, when quantified by the preferred embodiment when filling the grout material for the lifting and grouting space except the thickness of the lining material in the repair thickness below the water permissible cross section including the lifting space, the water repair thickness below the water permissible cross section is usually 20 In the case of the small diameter diameter of the sewage pipe, which is the millimeter (mm), the lifting and grouting spaces are about 17 to 10 mm (mm), except for the thickness of 3 to 10 mm (mm) of the usual lining material. The grouting space portion was made to exceed the fine crack width of the concrete so as to be preferable also in terms of workability on the grout material filling.

상기 두가지 공법별 라이닝 복합관 보수재 및 이를 이용한 보수공법에 관한 세부사항은 다음과 같다.Details of the two composite lining composite pipe repair material and repair method using the same are as follows.

첫째로, 한가지 실시예인 하수관 비굴착 라이닝 반전공법의 경우에는 이음부 세굴공간부의 그라우트재 충진 공정은 생략한 채 통상적인 보수 전 전처리 공정을 거친 다음 수압 또는 공기압을 이용하여 보수 대상 하수관의 내부로 라이닝재를 반전시켜 삽입시킨 후 물 또는 공기를 주입하여 팽창시킨 상태에서 온수 또는 증기로 경화시키거나 또는 광경화 장치를 이용하여 경화시키는 방법을 포함하며, 라이닝재의 관경을 보수 대상 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시켜 제작하여 들뜸 및 그라우팅 공간부가 형성되도록 경화시킨 후 연결관 천공 및 라이닝 또는 그라우팅 부분보수를 실시하고, 관입구 마무리공사의 수행과정에서 라이닝재와 하수관 사이의 들뜸 및 그라우팅 공간부와 이음부 세굴 공동부를 대상으로 팽창성 몰탈을 포함한 그라우트재를 충진시켜 경화된 라이닝재와 그라우트재가 기존의 하수관과 복합관을 형성하도록 구성된 공법으로서 들뜸부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 종합적인 보수 품질을 향상시키도록 구성하였다.First, in the case of the sewage pipe unexcavated lining reversal method, one embodiment, the grout material filling process of the joint scour space is omitted, followed by the normal pre-treatment process, and then lining the inside of the sewage pipe to be repaired using water pressure or air pressure. And inserting the material by inverting it and then inflation with water or air to swell it with hot water or steam, or hardening it using a photocuring device, wherein the diameter of the lining material is more conventional than that of the sewer pipe to be repaired. Including the amount of lifting, it is made by reducing the predetermined dimension corresponding to the repair thickness below the permissible end surface, and hardened so that the lifting and grouting space is formed. And grazing between lining material and sewer pipe Filling grouting material including expandable mortar is filled in the wuting space part and joint scour cavity, and the hardening lining material and grout material is formed to form the existing sewer pipe and composite pipe. It is designed to improve overall repair quality including reinforcement.

한편, 상기 수압 또는 공기압을 이용한 하수관 비굴착 라이닝 반전공법은 라이닝재를 보수 대상 하수관의 내부로 반전시켜 삽입시킨 후 온수, 증기 또는 광경화 장치를 이용하는 경화방법을 포함하며, 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시킨 관경으로 경화시킨 라이닝재와 하수관 사이에 이음부 세굴 공동부를 포함하여 팽창성 몰탈을 포함한 그라우트재가 충진된 라이닝 복합관 보수재를 구성함으로써 들뜸 공간부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 종합적인 보수품질을 향상시키도록 하였다.On the other hand, the sewer pipe unexcavated lining reversal method using the water pressure or air pressure includes a hardening method using a hot water, steam or a photocuring apparatus after inverting and inserting the lining material into the interior of the sewage pipe to be repaired, and more conventional than the inner diameter of the sewer pipe The lining composite pipe repair material filled with grout material including expandable mortar is included between the lining material cured to a predetermined dimension corresponding to the repair thickness below the permissible cross section including the lifting amount and the sewage pipe and the joint scour cavity. The construction was designed to improve the overall quality of repair, including the treatment of lifting spaces, grouting of joint scouring spaces, and strength enhancement.

둘째로, 또 다른 실시예인 하수관 비굴착 라이닝 견인공법을 이음부 세굴공간부의 그라우트재 충진 공정은 생략한 채 통상적인 보수 전 전처리 공정을 거친 다음 윈치를 이용하여 하수관 내에 라이닝재를 견인시켜 삽입시킨 후 온수, 증기 또는 광경화 장치를 이용하여 경화시키는 방법을 포함하며, 라이닝재의 관경을 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시켜 제작하여 들뜸 및 그라우팅 공간부가 형성되도록 경화시킨 후 냉각시켜서 연결관 천공 및 라이닝 또는 그라우팅 부분보수를 실시하고, 관입구 마무리공사의 수행과정에서 경화된 라이닝재와 하수관 사이의 들뜸 및 그라부팅 공간부와 이음부 세굴 공동부를 대상으로 팽창성 몰탈을 포함한 그라우트재를 충진시켜 경화된 라이닝재와 그라우트재가 기존 하수관과 복합관을 형성하도록 구성된 공법으로서 들뜸 공간부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 종합적인 보수 품질을 향상시키도록 구성하였다.Second, another embodiment of the sewage pipe unexcavated lining traction method, the grout material filling process of the scoured space of the joint is omitted, after the normal pre-treatment process, and then by pulling the lining material into the sewer pipe using a winch It includes a method of curing by using hot water, steam or photocuring apparatus, by reducing the pipe diameter of the lining material by a predetermined dimension corresponding to the repair thickness below the permissible cross section, including the normal lifting amount than the inner diameter of the sewer pipe After hardening to form a lifting and grouting space part, it is cooled to carry out connection pipe perforation and lining or grouting part repair, and the lifting and grouting space part and joint part between the hardened lining material and sewage pipe during the completion of the inlet finishing work. Filling scour cavity with grout material containing expandable mortar The hardened lining material and grout material are constructed to form existing sewer pipes and composite pipes, and are designed to improve overall repair quality including treatment of lifting spaces, grouting of joint scour spaces, and strength reinforcement.

한편, 상기 견인공법은 하수관 내에 라이닝재를 견인시켜 삽입시킨 후 온수, 증기 또는 광경화 장치를 이용하여 경화시키는 방법을 포함하며, 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시킨 관경으로 경화시킨 라이닝재와 하수관 사이에 이음부 세굴 공동부를 포함하여 팽창성 몰탈을 포함한 그라우트재로 충진된 라이닝 복합관 보수재를 구성함으로써 들뜸부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 종합적인 보수 품질을 향상시키도록 구성하였다.On the other hand, the traction method includes a method of pulling the lining material in the sewage pipe and inserting it, followed by curing using hot water, steam, or a photocuring device. Treatment of the lifting part and joint scour space by constructing the lining composite pipe repair material filled with grout material including expandable mortar including the joint scour cavity between the lining material cured to a predetermined diameter corresponding to the thickness and the sewer pipe It is designed to improve the overall quality of repair, including grouting and strength reinforcement.

본 발명의 구성 및 작용에 관하여 세부 내용별로 첨부된 예시 도면과 함께 상세히 설명하면 다음과 같다.The configuration and operation of the present invention will be described in detail with reference to the accompanying drawings in detail.

본 발명은 다음과 같이 두가지 실시예를 대상으로 공통적인 사항과 세부적인 사항으로 구분하여 하수관 비굴착 라이닝 복합관 보수재 및 이를 이용한 보수공법으로 구성하였다.The present invention is composed of a sewage pipe non-excavated lining composite pipe repair material and a repair method using the same by dividing the common matters and details for the two embodiments as follows.

본 발명의 공통적인 사항으로는 들뜸 공간을 포함하여 통수 허용 단면 이하의 보수 두께에서 라이닝재의 두께를 제외한 들뜸 및 그라우팅 공간부에 대한 그라우트재 충진 공정을 추가하고, 라이닝 보수 전 전처리 공정에 해당되는 이음부 세굴 공간부에 대한 그라우트재 충진 공정을 생략하는 대신 라이닝 보수 후 들뜸 및 그 라우팅 공간부(15)에 대한 그라우트재 충진 공정과 병행하여 이음부 세굴 공간부에 대한 그라우트재 충진 공정을 동시에 일괄적으로 실시하며, 보수 대상 하수관(5)과 그라우트재(17)와 라이닝재(9)를 합친 하수관 라이닝 복합관 보수재 및 이를 이용한 보수공법으로 구성하였다. Common matters of the present invention include a grout material filling process for the lifting and grouting spaces excluding the thickness of the lining material from the repair thickness below the permissible cross section including the lifting space, and joints corresponding to the pretreatment process before the lining repair. Instead of omitting the grout material filling process for the secondary scour space, the grout material filling process for the joint scour space is simultaneously carried out in parallel with the grout material filling process for the lifting space and its routing space 15 after lining repair. It consists of a sewage pipe lining composite pipe repair material combining the sewage pipe (5), the grout material (17) and the lining material (9) to be repaired, and a repair method using the same.

여기서, 들뜸 공간을 포함하는 통수 허용 단면 이하의 보수 두께에서 라이닝재의 두께를 제외한 들뜸 및 그라우팅 공간부(15)에 대한 그라우트재 충진시 바람직한 실시예로 정량화 해 보면, 통수 허용 단면 이하의 보수 두께는 통상적으로 20밀리미터(mm) 정도로서 하수관(5)의 주종을 이루고 있는 소구경 관경의 경우 통상적인 라이닝재(9)의 두께 3 내지 10밀리미터(mm)를 제외하면 들뜸 및 그라우팅 공간부(15)는 17 내지 10밀리미터(mm) 정도에 해당되어 이 들뜸 및 그라우팅 공간부가 콘크리트의 미세 균열폭을 초과되도록 함으로써 그라우트재 충진 상의 시공성 측면에서도 바람직하도록 구성하였다.Here, when quantified in the preferred embodiment when filling the grout material for the lifting and grouting space portion 15 except the thickness of the lining material in the repair thickness below the water permissible cross section including the lifting space, the water repair thickness below the water permissible cross section is In the case of the small diameter diameter of about 20 mm (mm), the main diameter of the sewage pipe (5), except for the thickness of 3 to 10 mm (mm) of the conventional lining material 9, the lifting and grouting space 15 is Corresponding to about 17 to 10 millimeters (mm), this lifting and grouting space portion was configured to be preferable in terms of workability on the grout material filling by exceeding the fine crack width of the concrete.

상기 두가지 공법별 라이닝 복합관 보수재 및 이를 이용한 보수공법에 관한 세부사항은 다음과 같다.Details of the two composite lining composite pipe repair material and repair method using the same are as follows.

첫째로, 한가지 실시예인 하수관 비굴착 라이닝 반전공법은 일종의 전체보수공법으로서 지반(1) 상에 매설된 맨홀(3)과 맨홀(3) 사이의 하수관(5)을 대상으로 고압수를 사용하여 하수관 준설 및 세정을 실시하는 공정과, 보수 대상 구간의 상류부에 물막이를 실시한 후 양수작업을 통하여 물돌리기를 실시하는 공정과, 하수관의 이음부나 파손부로부터 외부의 지하수가 유입되는 침입수를 차단하기 위한 지수 공정을 포함하여 도면상에서 별도로 표기하지 않은 통상적인 전처리 공정을 기본적으로 실시한다.Firstly, the sewage pipe unexcavated lining reversal method, which is an embodiment, is a kind of overall repair method, and uses sewage pipes using high pressure water for the sewer pipe 5 between the manhole 3 and the manhole 3 buried on the ground 1. To dredge and clean, to perform water reclamation after draining upstream of the section to be repaired, and to block inflow water from which external groundwater flows from the joint or damage part of the sewer pipe. Conventional pretreatment processes, which are not otherwise indicated in the drawings, including the indexing process for the above, are basically implemented.

상기 전처리 공정을 실시한 후 본 발명에 속하는 라이닝재(9)의 관경을 보수대상 하수관(5)의 관경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시켜 제작한 다음 이 라이닝재(9)를 하수관(5) 내에 삽입시키기 위하여 도면상의 B에 표시된 바와 같이 라이닝재(9)의 투입구쪽 맨홀(3) 상의 지상에 설치된 물 주입구(11)로부터 소정의 수압이 작용하는 물을 주입하여 라이닝재(9)를 하수관(5) 내로 수압에 의해서 반전시켜 삽입시키는 수압반전을 적용하는 방법과 상기 수압 대신 도면상의 A에 표시된 바와 같이 라이닝재(9)의 투입구쪽 맨홀(3) 상의 라이닝재(9)의 한쪽 끝단부를 전방 밀폐전(25')이나 이와 같은 구조로 밀폐되어 송풍되며 도면상에서 별도로 표기하지 않은 송풍기에 직접 연결하여 밀폐시킨 후 공기 주입구(13)로부터 작용되는 소정의 공기압을 이용하여 하수관(5) 내로 라이닝재(9)를 반전시켜 삽입시키는 공기압반전을 적용하는 방법의 두가지가 적용될 수 있도록 구성하였다.After carrying out the pretreatment step, the diameter of the lining material 9 belonging to the present invention is reduced by a predetermined dimension corresponding to the repair thickness below the water permissible cross section, including the amount of normal lifting than the diameter of the sewage pipe 5 to be repaired. After the fabrication, a predetermined hydraulic pressure from the water inlet 11 installed on the ground on the manhole 3 on the inlet side of the lining material 9 as indicated in B on the drawing to insert the lining material 9 into the sewer pipe 5 is shown. The method of applying a hydraulic pressure inversion by injecting this acting water into the sewer pipe 5 by inserting it into the sewer pipe 5 and inserting the lining material 9 into the inlet side of the lining material 9 instead of the water pressure. One end of the lining material (9) on the manhole (3) is sealed by air in front of the front seal (25 ') or the like and blown directly connected to a blower not separately shown in the drawings and sealed Two methods of applying a pneumatic inversion for inverting and inserting the lining material 9 into the sewage pipe 5 by using a predetermined air pressure applied from the air inlet 13 are configured.

상기 수압 또는 공기압 반전에 의하여 라이닝재(9)를 하수관(5) 내에 벨트 상태로 펼쳐지도록 삽입시킨 다음 수압반전의 경우 라이닝재(9) 내에 소정량의 물이 채워져 팽창시킨 상태에서 온수를 주입하여 소정의 온도와 압력으로 유지시키면서 소정의 시간동안 온수 경화시키는 방법과, 공기압 반전의 경우 라이닝재(9) 내에 소정의 공기압을 작용시켜 팽창시킨 상태에서 증기를 소정의 온도와 압력으로 유지시키면서 소정의 시간동안 증기 경화시키는 방법이 적용될 수 있도록 구분하였다.By inserting the lining material (9) in the sewage pipe (5) to be unfolded in a belt state by the hydraulic or pneumatic reversal, and in the case of hydraulic pressure inversion, hot water is injected in a state in which a predetermined amount of water is filled and expanded in the lining material (9). The method of curing hot water for a predetermined time while maintaining at a predetermined temperature and pressure, and in the case of inversion of air pressure, while maintaining the steam at a predetermined temperature and pressure in the expanded state by applying a predetermined air pressure in the lining material 9 The method of steam curing over time can be applied.

여기서, 온수 경화의 경우 물 주입구(13)를 통해 가열된 온수를 공급하는 과정은 도면상에서 별도로 표기하지 않았으나 발전기로부터 동력이 공급되어 보일러를 가동하여 공급되는 증기를 라이닝재(9)의 내부로 공급하여 경화시키게 되며, 증기 경화의 경우 공기 주입구(11)를 통해 가열된 증기를 공급하는 과정은 도면상에서 별도로 표기하지 않았으나 발전기로부터 동력이 공급되어 콤프레서를 가동시키게 되고 이 때 발생되는 압축공기는 히터를 경유하면서 증기를 발생시켜 라이닝재(9)의 내부로 공급되어 경화시키게 되고, 도면상에서 별도로 표기하지는 않았으나 광경화성 수지를 사용하는 경우에는 통상적인 광경화 램프를 이용하여 팽창시킨 상태의 라이닝재 내부의 길이방향으로 이동시키면서 빛을 투과하여 경화시킨 다음 도면상에서 별도로 표기하지 않았으나 상온의 압축공기를 주입하는 냉각공정을 거쳐 라이닝재(9)의 경화가 완료되어 상기 방법별로 공통적으로 경화된 라이닝재(9)와 하수관(5) 사이에 소정의 공간을 갖는 들뜸 및 그라우팅 공간부(15)가 형성되도록 구성하였다.Here, in the case of hot water curing, the process of supplying hot water heated through the water inlet 13 is not separately indicated in the drawings, but power is supplied from a generator to supply steam supplied by the boiler to the lining material 9. In the case of steam curing, the process of supplying the heated steam through the air inlet 11 is not separately indicated in the drawing, but power is supplied from the generator to operate the compressor, and the compressed air generated at this time Steam is generated while being supplied to the inside of the lining material (9) to harden, and not shown separately in the drawing, but in the case of using a photocurable resin in the expanded state of the lining material using a conventional photocuring lamp Cured by transmitting light while moving in the longitudinal direction, and then separately Although not mentioned, the curing of the lining material 9 is completed through the cooling process of injecting compressed air at room temperature, and the floating and having a predetermined space between the lining material 9 and the sewer pipe 5 commonly cured by the above methods. The grouting space 15 is configured to be formed.

상기 라이닝재(9)의 경화가 완료된 후에는 별도로 도면상에 표기하지 않았으나 통상적인 라이닝 비굴착 보수공법의 후처리 공정인 연결관 부위의 천공부(24)에 대하여 컷팅작업을 실시하고 선택적으로는 라이닝 또는 그라우팅 부분보수(26)도 실시하도록 구성하였다.After completion of the curing of the lining material 9 is not separately shown in the drawings, but the cutting operation is performed on the perforations 24 of the connector portion, which is a post-treatment process of a conventional lining non-excavation repair method, and optionally Lining or grouting minor maintenance 26 was also configured.

상기 공정 후에는 경화된 라이닝재(9)를 양쪽 맨홀(3)의 끝단부와 길이가 일치하도록 라이닝재(9)를 통상적인 컷터를 사용하여 절단한 다음 한쪽 맨홀(3)의 끝단부에 위치한 경화된 라이닝재(9)와 하수관(5) 사이의 들뜸 및 그라우팅 공간부(15) 사이의 상단부에 그라우트재 주입구(19)를 설치한 후 그라우트재 주입구(19) 주변의 경화된 라이닝재(9)와 하수관(5) 사이의 들뜸 및 그라우팅 공간부(15)를 몰탈을 사용하여 관구 마무리부(20)를 시공하고, 다른 한쪽 맨홀(3)의 끝단부에 위치한 경화된 라이닝재(9)와 하수관(5) 사이의 들뜸 및 그라우팅 공간부(15) 사이의 상단부에도 그라우트재 배출구(21)를 설치한 후 그라우트재 배출구(21) 주변의 경화된 라이닝재(9)와 하수관(5) 사이의 들뜸 및 그라우팅 공간부(15)를 몰탈을 사용하여 관구 마무리부(20)를 시공한 다음 그라우트재 주입구(19)의 전 단계에 설치된 그라우트재 충진용 펌프(23)를 가동하여 소정 압력의 그라우트재(17)를 들뜸 및 그라우팅 공간부(15) 와 이음부 세굴 공동부 내에 충진시켜 그라우트재 배출구(21)를 통하여 소정량의 그라우트재(17)가 배출되기 시작하여 그라우트재(17)의 충진이 충분히 실시된 것을 확인한 후 그라우트재(17)의 충진을 중지하고 그라우트재 주입구(19)와 그라우트재 배출구(21)를 밀폐시켜 그라우트재(17) 충진작업을 종료하도록 구성하였다.After the process, the cured lining material 9 is cut using a conventional cutter so that the length coincides with the ends of both manholes 3, and then the end of one manhole 3 is placed. A hardened lining material (9) around the grout material inlet (19) is provided after the grout material inlet (19) is installed at the upper end between the hardened lining material (9) and the sewer pipe (5) and the grouting space (15). And the hardened lining material (9) located at the end of the other manhole (3) by constructing the tube finish portion (20) using mortar for the lifting and grouting space portion (15) between the pipe and the sewer pipe (5). The grout material outlet 21 is also installed at the upper end between the lifting and grouting space portions 15 between the sewer pipes 5, and then, between the cured lining material 9 and the sewer pipe 5 around the grout material outlet 21. After lifting and grouting space portion 15 by using mortar to construct the end of the tube 20 The grout material filling pump 23 installed at the previous stage of the route material injection port 19 is operated to lift the grout material 17 at a predetermined pressure and to fill the grout space 15 and the joint scour cavity to grout the material. After the predetermined amount of grout material 17 begins to be discharged through the outlet 21 to confirm that the filling of the grout material 17 is sufficiently performed, the filling of the grout material 17 is stopped, and the grout material injection port 19 and The grout material outlet 21 was sealed to finish the grout material 17 filling operation.

상기 그라우트재(17) 충진작업 후에는 별도로 도면상에 표기하지 않았으나 통상적인 라이닝 비굴착 전체보수공법의 후처리 작업인 보수 후 품질화인 공정을 거쳐 본 발명의 하수관 비굴착 라이닝 복합관 보수공법을 종료하도록 구성함으로써 들뜸 공간부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 보수 품질을 향상시키도록 구성하였다.After filling the grout material (17), but not separately shown in the drawings, but after completion of the repair of the normal lining non-excavation overall repair method through the quality assurance process to end the sewage pipe non-excavated lining composite pipe repair process of the present invention It was configured to improve the quality of repair, including treatment of lifting space, grouting of joint scour space, and strength reinforcement.

한편, 상기 수압 또는 공기압을 이용하여 반전을 실시한 후 온수, 증기 또는 광경화 장치를 이용하여 경화시키는 방법을 적용하는 하수관 비굴착 라이닝 반전공법용 라이닝 복합관 보수재의 구성에 있어서는 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시킨 관경으로 경화시킨 라이닝재(9)와 보수 대상 하수관(5) 사이의 들뜸 및 그라우팅 공간부(15)와 이음부 세굴 공동부에 팽창성 몰탈을 포함한 그라우트재(17)가 충진된 라이닝 복합관 보수재를 구성함으로써 들뜸 공간부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 보수 품질을 향상시키도록 구성하였다.On the other hand, in the configuration of the composite pipe repair material for sewage pipe non-excavation lining reversal method applying the method of hardening using hot water, steam or a photocuring device after the reversal using the water pressure or air pressure, it is more conventional than the inner diameter of the sewage pipe. Lifting and grouting space 15 and joint scour between the lining material 9 cured to a diameter reduced to a predetermined dimension corresponding to the repair thickness below the permissible cross section including the amount of water and the sewer pipe 5 to be repaired. By constructing a lining composite pipe repair material filled with grout material 17 including expandable mortar in the cavity, it was configured to improve the repair quality including treatment of the lifting space, grouting of the joint scour space, and strength reinforcement.

여기서, 경화 전의 라이닝재(9)는 내부필름과 외부필름 사이에 유리섬유 또는 부직포의 종류가 삽입된 보강재 내에 열경화성 또는 광경화성 수지를 함침시킨 상태로 구성된다.Here, the lining material 9 before curing is composed of a state in which a thermosetting or photocurable resin is impregnated in a reinforcing material in which a kind of glass fiber or nonwoven fabric is inserted between the inner film and the outer film.

둘째로, 또 다른 실시예인 하수관 비굴착 라이닝 견인공법은 일종의 전체보수공법으로서 지반(1) 상에 매설된 맨홀(3)과 맨홀(3) 사이의 하수관(5)을 대상으로 고압수를 사용하여 하수관 준설 및 세정을 실시하는 공정과, 보수 대상 구간의 상류부에 물막이를 실시한 후 양수작업을 통하여 물돌리기를 실시하는 공정과, 하수관의 이음부나 파손부로부터 외부의 지하수가 유입되는 침입수를 차단하기 위한 지수공정을 포함하여 도면상에서 별도로 표기하지 않은 통상적인 전처리 공정을 기본적으로 실시한다.Secondly, another embodiment of the sewage pipe unexcavated lining traction method is a kind of overall repair method using high pressure water for the sewer pipe 5 between the manhole 3 and the manhole 3 buried on the ground 1. The process of dredging and washing sewage pipes, the process of turning water through a water pump after draining the water upstream of the section to be repaired, and blocking the inflow of external groundwater from the joint or damaged part of the sewer pipe The conventional pretreatment step, which is not separately indicated on the drawing, including an indexing step for performing the step is basically performed.

상기 전처리 공정을 실시한 후 본 발명에 속하는 라이닝재(9')의 관경을 보수 대상 하수관(5)의 관경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시켜 제작한 다음 이 라이닝재(9')를 하수관(5) 내에 삽입시키기 위하여 도면상에 별도로 표기하지 않았으나 통상적인 윈치를 사용하여 라이닝재(9')의 한쪽 끝단을 한쪽 맨홀(3)로부터 다른 한쪽 맨홀(3)로 견인시켜 삽입시킨 다음 한쪽 맨홀(3)쪽 라이닝재(9')의 끝단부에 전방 밀폐전(25)을 고정시키고, 다른 한쪽 맨홀(3)쪽 라이닝재(9')의 끝단부에 후방 밀폐전(27)을 고정시킨 후 전방 밀폐전(25) 상에 설치된 공기 또는 물 공급관(29)을 통해 소정의 압력을 가진 공기나 물을 채워 넣은 상태로 라이닝재(9')를 팽창시킨 다음 온수 또는 증기를 소정의 온도와 압력의 상태로 일정하게 유지시키면서 경화시키기 위해서 후방 밀폐전(27) 상에 공기의 온도와 압력을 유지시키기 위한 공기 배출구(31)가 설치되며, 라이닝재(9')의 내면에 응축되어 고이는 물을 라이닝재(9')의 외부로 배출할 수 있는 물 배출구(33)도 후방 밀폐전(27) 상에 설치되도록 구성하였고, 공기 또는 물 공급관(29)을 통해 라이닝재(9')의 내부로 증기를 공급하는 과정은 도면상에서 별도로 표기하지 않았으나 발전기로부터 동력을 공급받아 콤프레서를 가동하고 이 때 발생되는 압축공기를 히터로 가열시켜 라이닝재(9')의 내부로 증기를 공급하게 되고, 공기 배출구(31)의 끝단부에는 도면상에서 별도로 표기하지 않았으나 증기의 온도 측정을 위한 온도계와 증기의 압력 측정을 위한 압력계가 설치되며, 또 다른 방법인 공기 또는 물 공급관(29)을 통해 온수를 공급하는 과정은 도면상에서 별도로 표기하지 않았으나 발전기로부터 동력을 공급받아 보일러를 가동시키고 이때 발생되는 증기를 라이닝재(9')의 내부로 공급하게 되고, 배출구(33)를 통하여 온수의 온도 및 압력을 유지시킬 수 있도록 하였으며, 광경화성 수지를 사용할 경우에는 도면상에서 별도로 표기하지 않았으나 통상적인 광경화 램프를 이용하여 팽창시킨 라이닝재(9')의 길이방향으로 이동시키면서 빛을 투과하여 경화시키도록 구성하였다.After carrying out the pretreatment step, the diameter of the lining material 9 'pertaining to the present invention is reduced by a predetermined dimension corresponding to the repair thickness below the water permissible cross section, including the usual lifting amount than the diameter of the sewage pipe 5 to be repaired. The lining material 9 'is not separately shown in the drawings for inserting the lining material 9' into the sewer pipe 5, but one end of the lining material 9 'is different from one manhole 3 using a conventional winch. Towed into one manhole (3), and then fixed the front seal (25) to the end of the lining material (9 ') of one manhole (3), the lining material (9') of the other manhole (3) Lining material (9 ') in a state in which air or water having a predetermined pressure is filled through the air or water supply pipe (29) installed on the front airtight (25) after fixing the rear airtight (27) at the end of the ) And then pressurize the hot water or steam to An air outlet 31 is provided on the rear seal 27 to maintain the temperature and pressure of the air in order to harden while maintaining it in a constant state. The water condensed on the inner surface of the lining material 9 ' The water outlet 33 which can be discharged to the outside of the lining material 9 'is also configured to be installed on the rear seal before 27, and through the air or water supply pipe 29 to the inside of the lining material 9'. Although the process of supplying steam is not separately shown in the drawing, the compressor is supplied with power from the generator to operate the compressor, and the compressed air generated at this time is heated by a heater to supply steam into the lining material 9 ', and the air outlet port Although not shown separately in the drawing at the end of the (31), a thermometer for measuring the temperature of the steam and a pressure gauge for measuring the pressure of the steam are installed, through another method of air or water supply pipe 29 Although the process of supplying water is not separately indicated in the drawings, the boiler is operated by receiving power from the generator, and the steam generated at this time is supplied into the lining material 9 ', and the temperature of the hot water through the outlet 33 and In order to maintain the pressure, the photocurable resin is not separately indicated in the drawing, but the light curable is transmitted through the light while moving in the longitudinal direction of the expanded lining material 9 'using a conventional photocuring lamp. Configured.

상기 경화공정 이후에는 도면상에 별도로 표기하지 않았으나 공통적으로 상온의 압축공기를 주입하는 냉각공정을 거침으로써 경화된 라이닝재(9')와 하수관(5) 사이에 소정의 공간을 갖는 들뜸 및 그라우팅 공간부(15)가 형성되도록 구성하였다.After the curing process, although not separately shown in the drawings, the cooling and injecting compressed air at room temperature are commonly performed to lift and grout the space having a predetermined space between the cured lining material 9 'and the sewer pipe 5. The part 15 was configured to be formed.

상기 라이닝재(9')의 경화가 완료된 후에는 별도로 도면상에 표기하지 않았으나 통상적인 라이닝 비굴착 전체보수공법의 후처리 공정인 연결관 부위에 대한 천공부(24) 컷팅작업을 실시하고 선택적으로는 라이닝 또는 그라우팅(26)을 실시하도록 구성하였다.After hardening of the lining material 9 'is completed, the cutting of the perforated part 24 for the connection pipe part, which is not a separate drawing on the drawing but is a post-treatment process of a general lining non-excavation whole repair method, is performed. Was configured to effect lining or grouting (26).

상기 공정 후에는 경화된 라이닝재(9')를 양쪽 맨홀(3)의 끝단부와 길이가 일치하도록 라이닝재(9)를 통상적인 컷터를 사용하여 절단한 다음 한쪽 맨홀(3)의 끝단에 위치한 경화된 라이닝재(9')와 하수관(5) 사이의 들뜸 및 그라우팅 공간부(15) 사이의 상단부에 그라우트재 주입구(19)를 설치한 후 그라우트재 주입구(19) 주변의 경화된 라이닝재(9')와 하수관(5) 사이의 들뜸 및 그라우팅 공간부(15)를 몰탈을 사용하여 관구 마무리부(20)를 시공하고, 다른 한쪽 맨홀(3)의 끝단에 위치한 경화된 라이닝재(9')와 하수관(5) 사이의 들뜸 및 그라우팅 공간부(15) 사이의 상단부에도 그라우트재 배출구(21)를 설치한 후 그라우트재 배출구(21) 주변의 경화된 라이닝재(9)와 하수관(5) 사이의 들뜸 및 그라우팅 공간부(15)를 몰탈을 사용하여 관구 마무리부(20)를 시공한 다음 그라우트재 주입구(19)의 전 단계에 설치된 그라우트재 충진용 펌프(23)를 가동하여 소정 압력의 그라우트재(17)를 들뜸 및 그라우팅 공간부(15)와 이음부 세굴 공간부 내에 충진시켜 그라우트재 배출구(21)를 통하여 소정량의 그라우트재(17)가 배출되기 시작하여 그라우트재(17)의 충진이 충분히 실시된 것을 확인한 후 그라우트재(17)의 충진을 중지하고 그라우트재 주입구(19)와 그라우트재 배출구(21)를 밀폐시켜 그라우트재(17)의 충진작업을 종료하도록 구성하였다.After the process, the cured lining material 9 'is cut using a conventional cutter so that the length coincides with the ends of both manholes 3, and then the end of one manhole 3 is placed. After the grout material inlet 19 is installed at the upper end between the cured lining material 9 'and the sewer pipe 5 and the grouting space 15, the cured lining material around the grout material inlet 19 ( 9 ') and the grouting space 15 between the sewer and the sewer pipe 5, using the mortar to construct the finish 20, and the hardened lining material (9') located at the end of the other manhole (3) ) And the grouting material outlet (21) and the sewer pipe (5) around the grout material outlet (21) after the grout material outlet (21) is installed at the upper end between the lifting and the grouting space (15) between the sewer pipe (5) and the sewer pipe (5). After lifting and grouting space 15 between the construction using the mortar mortar finish 20 The grout material filling pump 23 installed at all stages of the inlet material inlet 19 is operated to lift and grout the grout material 17 having a predetermined pressure and fill it in the grouting space 15 and the joint scour space. After the predetermined amount of grout material 17 begins to be discharged through the outlet 21 to confirm that the filling of the grout material 17 is sufficiently performed, the filling of the grout material 17 is stopped, and the grout material injection port 19 and The grout material outlet 21 was sealed to finish the filling operation of the grout material 17.

상기 그라우트재(17) 충진작업 후에는 별도로 도면상에 표기하지 않았으나 통상적인 라이닝 비굴착 전체보수공법의 후처리 작업인 보수 후 품질확인 공정을 거쳐 본 발명의 하수관 비굴착 라이닝 복합관 보수공법을 종료하도록 구성함으로써 들뜸 공간부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 보수 품질을 향상시키도록 구성하였다.After filling the grout material (17), but not separately shown in the drawings, but after completion of the repair of the general lining non-excavation overall repair method through the quality check process after repairing the sewage pipe non-excavation lining composite pipe repair process of the present invention It was configured to improve the quality of repair, including treatment of lifting space, grouting of joint scour space, and strength reinforcement.

한편, 상기 하수관 비굴착 라이닝 견인방법을 적용한 후 온수, 증기 또는 광경화 장치를 이용하여 경화시키는 방법을 포함하는 하수관 비굴착 라이닝 견인공법용 라이닝 복합관 보수재의 구성에 있어서는 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시킨 관경의 경화된 라이닝재(9')와 보수 대상 하수관(5) 사이에 이음부 세굴 공동부를 포함하여 팽창성 몰탈을 포함하는 그라우트재(17)가 충진된 라이닝 복합관 보수재를 구성함으로써 들뜸 공간부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 보수 품질을 향상시키도록 구성하였다.On the other hand, in the configuration of the composite pipe repair material for sewage pipe unexcavated lining traction method including the method of applying the sewage pipe unexcavated lining traction method and hardening using hot water, steam or a photocuring device than the inner diameter of the sewage pipe than conventional Including expandable mortar including a joint scour cavity between the cured lining material 9 'of the tube diameter reduced to a predetermined dimension corresponding to the repair thickness below the permissible cross section including the water and the sewer pipe 5 to be repaired. By constructing the lining composite pipe repair material filled with the grout material 17 was configured to improve the quality of repair, including the treatment of the lifting space portion, the grouting of the joint scour space portion and the strength reinforcement.

여기서, 경화 전의 라이닝재(9')는 내부필름과 외부필름 사이에 유리섬유 또는 부직포의 종류로 구성되는 보강재 내에 열경화성 또는 광경화성 수지를 함침시킨 상태로 구성된다.Here, the lining material 9 'before curing is composed of a state in which a thermosetting or photocurable resin is impregnated in a reinforcing material composed of a kind of glass fiber or nonwoven fabric between the inner film and the outer film.

상기한 바와 같이 본 발명의 하수관 비굴착 라이닝 복합관 보수재 및 이를 이용한 보수공법을 실시함으로써 다음과 같은 효과가 기대된다. As described above, the following effects are expected by performing the sewage pipe unexcavated lining composite pipe repair material and the repair method using the same.

첫째로, 한가지 실시예인 하수관 비굴착 라이닝 반전공법의 경우에는 라이닝재의 관경을 보수 대상 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시켜 제작하여 들뜸 및 그라우팅 공간부가 형성되도록 경화시킨 후 관입구 마무리공사의 수행과정에서 라이닝재와 하수관 사이의 들뜸 및 그라우팅 공간부와 이음부 세굴 공간부를 대상으로 팽창성 몰탈을 포함한 그라우트재를 충진시켜 경화된 라이닝재와 그라우트재가 기존의 하수관과 복합관을 형성하도록 구성함으로써 들뜸부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 종합적인 보수 품질을 향상시킬 수 있는 효과가 기대된다.First, in the case of the sewage pipe unexcavated lining reversal method as an embodiment, the diameter of the lining material is reduced by a predetermined dimension corresponding to the repair thickness below the permissible end surface, including the normal lifting amount than the inner diameter of the sewer pipe to be repaired. Lining material cured by filling the grout material including expandable mortar to the lifting and grouting space between the lining material and sewage pipe and the scouring space between the lining material and sewer pipe during the process of finishing the inlet after the curing By constructing and grouting material to form the existing sewer pipe and composite pipe, it is expected to improve the overall quality of repair, including treatment of the lifting portion, grouting of the scour space of the joint and strengthening the strength.

한편, 상기 수압 또는 공기압을 이용한 하수관 비굴착 라이닝 반전공법용 라이닝 복합관 보수재는 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시킨 관경으로 경화시킨 라이닝재와 하수관 사이에 이음부 세굴 공간부를 포함하여 팽창성 몰탈을 포함한 그라우트재가 충진되도록 구성함으로써 들뜸 공간부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 종합적인 보수 품질을 향상시킬 수 있는 효과가 기대된다.Meanwhile, the lining composite pipe repairing material for the sewer pipe unexcavated lining reversing method using water pressure or air pressure is cured into a tube diameter reduced by a predetermined dimension corresponding to the repair thickness of less than the permissible end surface, including a normal lifting amount than the inner diameter of the sewer pipe. The grout including expandable mortar is filled between the lining material and the sewage pipe to fill the grout, including expansion mortar, so that the overall repair quality including the treatment of the lifting space, the grouting of the joint scrubbing space, and the reinforcement of the strength can be improved. It is expected.

둘째로, 또 다른 실시예인 하수관 비굴착 라이닝 견인공법은 라이닝재의 관경을 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시켜 제작하여 들뜸 및 그라우팅 공간부가 형성되도록 경화시킨 후 관입구 마무리공사의 수행과정에서 경화된 라이닝재와 하수관 사이의 들뜸 및 그라우팅 공간부와 이음부 세굴 공간부를 대상으로 팽창성 몰탈을 포함한 그라우트재를 충진시켜 경화된 라이닝재와 그라우트재가 기존 하수관과 복합관을 형성하도록 구성함으로써 들뜸 공간부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 종합적인 보수 품질을 향상시킬 수 있는 효과가 기대된다.Secondly, another embodiment of the sewage pipe unexcavated lining traction method is produced by reducing the diameter of the lining material by a predetermined dimension corresponding to the repair thickness below the permissible cross section including the normal lifting amount than the inner diameter of the sewage pipe. After hardening to form the space part, the lining material cured by filling the grout material including expandable mortar to the floating and grouting space between the hardened lining material and sewage pipe and the scoured space part of the joint during filling process By forming the grout material to form a composite pipe with the existing sewage pipe, it is expected that the overall repair quality including the treatment of the lifting space portion, the grouting of the joint scour space portion, and the strength reinforcement will be improved.

한편, 상기 하수관 비굴착 라이닝 견인공법용 라이닝 복합관 보수재는 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시킨 관경으로 경화시킨 라이닝재와 하수관 사이에 이음부 세굴 공간부를 포함하여 팽창성 몰탈을 포함한 그라우트재로 충진되도록 구성함으로써 들뜸부의 처리, 이음부 세굴공간부의 그라우팅 및 강도보강을 포함한 종합적인 보수 품질을 향상시킬 수 있는 효과가 기대된다.On the other hand, the sewage pipe non-excavating lining traction composite lining composite pipe repair material between the lining material and the sewer pipe cured to a predetermined diameter reduced by a predetermined dimension corresponding to the repair thickness less than the permissible cross section, including the amount of conventional lifting than the inner diameter of the sewage pipe It is expected to improve the overall quality of repair including the treatment of the lifting portion, the grouting of the joint scouring space, and the strength reinforcement by configuring to be filled with grout material including the expandable mortar including the scour space of the joint.

도 1은 본 발명의 바람직한 한가지 실시예에 따른 하수관 비굴착 반전공법을 적용하여 반전 및 삽입이 완료된 경화 전의 설명도.1 is an explanatory diagram before the inversion and insertion is completed by applying the sewer pipe unexcavation inversion method according to an embodiment of the present invention.

도 2는 도 1의 경화 후 그라우트재 충진작업의 설명도.Figure 2 is an explanatory view of the grout material filling operation after curing of FIG.

도 3은 본 발명의 바람직한 또 다른 실시예에 따른 하수관 비굴착 견인공법을 적용하여 견인 및 삽입이 완료된 경화 전의 설명도.Figure 3 is an explanatory diagram before the hardening of the traction and insertion is completed by applying the sewer pipe unexcavated traction method according to another preferred embodiment of the present invention.

도 4는 도 3의 경화 후 그라우트재 충진작업의 설명도.4 is an explanatory view of a grout material filling operation after curing of FIG.

도 5는 도 2의 C에 대한 확대도.5 is an enlarged view of FIG. 2C.

도 6은 도 5의 E-E단면에 따른 확대 단면도.6 is an enlarged cross-sectional view taken along the line E-E of FIG.

도 7은 도 4의 D에 대한 확대도.7 is an enlarged view of detail D shown in FIG. 4.

도 8은 도 7의 F-F단면에 따른 확대 단면도.8 is an enlarged cross-sectional view taken along the line F-F of FIG.

※ 도면의 주요부분에 대한 부호의 설명※ Explanation of code for main part of drawing

1 : 지반 3 : 맨홀1: Ground 3: Manhole

5 : 하수관 7 : 연결관5: sewer pipe 7: connector

9, 9' : 라이닝재 11 : 물 주입구9, 9 ': lining material 11: water inlet

13 : 공기 주입구 15 : 들뜸 및 그라우팅 공간부13: air inlet 15: lifting and grouting space

16 : 이음부 세굴 공동부 17 : 그라우트재 16: joint scour cavities 17: grout material

19 : 그라우트재 주입구 20 : 관구 마무리부19: grout material injection hole 20: tube finish portion

21 : 그라우트재 배출구 23 : 그라우트재 충진용 펌프21: grout material outlet 23: grout material filling pump

24 : 천공부 25, 25' : 전방 밀폐전24: perforation 25, 25 ': front seal

26 : 라이닝 또는 그라우팅 부분보수 27 : 후방 밀폐전26: partial repair of lining or grouting 27: before rear closing

29 : 공기 또는 물 공급관 31 : 공기 배출구29: air or water supply pipe 31: air outlet

33 : 물 배출구33: water outlet

Claims (4)

하수관 보수 및 유지관리를 위한 비굴착 전체보수에 있어서,In the whole non-excavation maintenance for sewer repair and maintenance, 지반 상에 매설된 하수관을 대상으로 하수관 준설 및 세정을 실시한 후 보수 대상 구간의 물돌리기를 실시한 다음 외부로부터 유입되는 침입수에 대한 지수를 실시한 후 보수 대상 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시켜 제작된 라이닝재를 수압 또는 공기압을 이용하여 보수 대상 하수관의 내부로 반전시켜 삽입시킨 후 물 또는 공기를 주입하여 라이닝재를 팽창시킨 상태에서 온수 또는 증기로 경화시키거나 또는 광경화 장치를 이용하여 들뜸 및 그라우팅 공간부가 형성되도록 경화시킨 다음 연결관 천공 및 라이닝 또는 그라우팅 부분보수를 실시한 후 경화된 라이닝재와 하수관 사이의 들뜸 및 그라우팅 공간부와 이음부 세굴 공간부를 대상으로 그라우트재를 충진시키도록 구성된 것을 특징으로 하는 하수관 비굴착 라이닝 복합관 보수공법.After dredging and washing sewage pipes buried on the ground, watering of the section to be repaired is carried out, and the index of intrusion water from the outside is carried out, and then the amount of water lifted more than the inner diameter of the sewage pipe to be repaired is included. The lining material manufactured by reducing the size by a predetermined dimension corresponding to the repair thickness less than the permissible cross section is inverted and inserted into the sewer pipe to be repaired by using water pressure or air pressure, and then inflated with the lining material by injecting water or air. Hardened with hot water or steam or with a photocuring device to form a lifting and grouting space, followed by a perforation and lining or grouting of the connecting pipe, and a lifting and grouting space between the cured lining material and the sewer pipe. Grout material for the scour space Sewer trenchless lining bokhapgwan compensation method, characterized in that configured so that it. 하수관 보수 및 유지관리를 위한 비굴착 전체보수에 있어서,In the whole non-excavation maintenance for sewer repair and maintenance, 하수관 내에 라이닝재를 반전시켜 삽입시키는 보수공법을 적용하는 경우 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시킨 관경으로 경화시킨 라이닝재와 하수관 사이에 이음부 세굴 공간부를 포함하여 그라우트재가 충진되도록 구성된 것을 특징으로 하는 하수관 비굴착 라이닝 복합관 보수재.Lining material and sewage pipe hardened to a diameter reduced by a predetermined dimension corresponding to the repair thickness below the permissible section, including the normal lifting amount than the inner diameter of the sewage pipe, when applying the repairing method of reversing and inserting the lining material into the sewer pipe. Sewage pipe non-excavated lining composite pipe repair material, characterized in that the grout material is configured to be filled, including the joint scour space. 제 1항에 있어서, 라이닝재를 반전시켜 삽입시키는 보수공법의 또 다른 실시예인 라이닝재를 견인시켜 삽입시키는 보수공법의 경우 지반 상에 매설된 하수관을 대상으로 하수관 준설 및 세정을 실시한 후 보수 대상 구간의 물돌리기를 실시한 다음 외부로부터 유입되는 침입수에 대한 지수를 실시한 후 보수 대상 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시켜 제작된 라이닝재를 견인시켜 하수관의 내부로 삽입시킨 후 물 또는 공기를 주입하여 라이닝재를 팽창시킨 상태에서 온수 또는 증기로 경화시키거나 또는 광경화 장치를 이용하여 들뜸 및 그라우팅 공간부가 형성되도록 경화시킨 다음 연결관 천공 및 라이닝 또는 그라우팅 부분보수를 실시한 후 경화된 라이닝재와 하수관 사이의 들뜸 및 그라우팅 공간부와 이음부 세굴 공간부를 대상으로 그라우트재를 충진시키도록 구성된 것을 특징으로 하는 하수관 비굴착 라이닝 복합관 보수공법.According to claim 1, in the case of the repair method for pulling and inserting the lining material is another embodiment of the repair method for reversing the insertion of the lining material after the sewer pipe dredging and cleaning on the sewer pipe buried on the ground after repairing section Lining fabricated after the water is turned on and then reduced by a predetermined dimension corresponding to the repair thickness below the permissible cross section, including the normal lifting amount than the inner diameter of the sewer pipe Towing the ash and inserting it into the sewer, and then injecting water or air to cure the lining material in the expanded state to cure with hot water or steam, or by using a photocuring device to cure the lifting and grouting space to form Hardening lining material and hardening after perforation and lining or grouting partial repair Lifting and grouting space portion and the joint space scour sewer trenchless lining bokhapgwan compensation method, characterized in that configured to filling the grout material into the target portion between the tubes. 제 2항에 있어서, 라이닝재를 반전시켜 삽입시키는 보수공법용 보수재의 또 다른 실시예인 라이닝재를 견인시켜 삽입시키는 보수공법용 보수재의 경우 하수관의 내경보다 통상적인 들뜸량을 포함하여 통수 허용 단면 이하의 보수 두께에 상당하는 소정의 칫수만큼 축소시킨 관경으로 경화시킨 라이닝재와 하수관 사이에 이음부 세굴 공간부를 포함하여 그라우트재가 충진되도록 구성된 것을 특징으로 하는 하수관 비굴착 라이닝 복합관 보수재.According to claim 2, which is another embodiment of the repair method for the repair method for reversing and inserting the lining material in the case of the repair method for the repair method for pulling and inserting the lining material is less than the water permissible cross section, including the lifting amount more than the inner diameter of the sewage pipe than usual A sewer pipe non-excavated lining composite pipe repair material, characterized in that the grout material is filled between the lining material cured into a diameter reduced by a predetermined dimension corresponding to the repair thickness of the sewage pipe, including a joint scour space portion.
KR1020040017488A 2004-03-15 2004-03-15 Sewage pipe unexcavated lining composite pipe repair KR100838923B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040017488A KR100838923B1 (en) 2004-03-15 2004-03-15 Sewage pipe unexcavated lining composite pipe repair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040017488A KR100838923B1 (en) 2004-03-15 2004-03-15 Sewage pipe unexcavated lining composite pipe repair

Publications (2)

Publication Number Publication Date
KR20050092325A true KR20050092325A (en) 2005-09-21
KR100838923B1 KR100838923B1 (en) 2008-06-16

Family

ID=37273712

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040017488A KR100838923B1 (en) 2004-03-15 2004-03-15 Sewage pipe unexcavated lining composite pipe repair

Country Status (1)

Country Link
KR (1) KR100838923B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100915425B1 (en) * 2007-10-30 2009-09-03 웅진고분자 주식회사 Method for standing water in branch pipe
KR20160123407A (en) 2015-04-15 2016-10-26 영원파이프솔루션 주식회사 A repairing method of a pipe

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101018684B1 (en) * 2010-05-18 2011-03-04 김철환 Pipe reparing method using liner
KR101221347B1 (en) 2010-07-14 2013-01-11 현대엠코 주식회사 Apparatus for Supplying Mortar in Pipe-forming Machine
KR101002710B1 (en) 2010-08-19 2010-12-21 주식회사 도화종합기술공사 Non-digging lining method and apparatus
KR101105312B1 (en) * 2010-09-08 2012-01-18 주식회사 뉴보텍 Unmanned device for non-excavating lining method
KR101645635B1 (en) * 2014-10-21 2016-08-05 주식회사 강물 Polyethylene pipe inserted rebirthing method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0684042B2 (en) * 1987-08-10 1994-10-26 積水化学工業株式会社 Lining method for existing pipes
JPH08426B2 (en) * 1993-04-13 1996-01-10 株式会社湘南合成樹脂製作所 Pipe lining material and its manufacturing method and pipe repair method
JP2002323174A (en) * 2001-02-20 2002-11-08 Shonan Gosei Jushi Seisakusho:Kk Tubular connecting member, manufacturing method therefor, and pipe lining method
JP2003021263A (en) * 2001-07-06 2003-01-24 Shonan Gosei Jushi Seisakusho:Kk Tubular body, manufacturing method therefor and pipe lining method
JP2003025444A (en) * 2001-07-16 2003-01-29 Shonan Gosei Jushi Seisakusho:Kk Pipe lining technique

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100915425B1 (en) * 2007-10-30 2009-09-03 웅진고분자 주식회사 Method for standing water in branch pipe
KR20160123407A (en) 2015-04-15 2016-10-26 영원파이프솔루션 주식회사 A repairing method of a pipe

Also Published As

Publication number Publication date
KR100838923B1 (en) 2008-06-16

Similar Documents

Publication Publication Date Title
KR101354120B1 (en) Method and apparatus for non-digging renovation
CN111750206A (en) Ultraviolet light curing pipeline repairing method
KR20050092325A (en) Sewage pipe unexcavated lining composite pipe repair material and repair method using the same
KR100718247B1 (en) Close-fit pipes lining system of trenchless technology using means for removing pleat and apparatus thereby
KR100639268B1 (en) Top and bottom water pipe part repair device and method of construction
KR102064714B1 (en) Full repair system and construction method for non-bending of sewer pipes using reverse curing method
KR101083363B1 (en) A turning inside out repairing device of water pipe by non-digging using nulti-function safety high pressure hose and method of construction thereof
CN111809712A (en) Non-excavation repairing device and repairing method for inspection well
KR100934194B1 (en) Epoxy liner tube repairing apparatus and method using vacuum pressure
KR100901804B1 (en) Tunnel leakage controlling method
KR20170126546A (en) The inner surface of pipelines medium and large repair and reinforcement
KR100784617B1 (en) Method for rehabilitating pipe conduit
KR100454605B1 (en) High-density and pressurization repair method about new/old concrete joint part
JP5893276B2 (en) Ground reinforcement method around underground pipes
JP5793289B2 (en) Mounting pipe repair method
KR20090041835A (en) Trenchless technology with selective flange use lay underground water pipe supply and drainage
CN209636932U (en) Reinforce the prefabricated pipe section structure of subdrainage box drain
KR100378208B1 (en) Repair Stuff for Water Leakage Prevention and Repair Method of Tunnel
KR101254464B1 (en) Non-digging sewerage mending apparatus and its manufacturing method
KR101109660B1 (en) Non-digging sewerage mending apparatus and its manufacturing method
KR102507488B1 (en) Partial repair method of non-drilling sewer pipe to which heat curing method is applied
KR20090043892A (en) Method for standing water in branch pipe
CN212478002U (en) Non-excavation prosthetic devices of inspection shaft
KR20080063723A (en) Mending method for water pipe
KR102105152B1 (en) Reinforcement method for stabilization and structural resistance in ramen structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee
R401 Registration of restoration
FPAY Annual fee payment

Payment date: 20130610

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140610

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150610

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee