KR20050079911A - Fixing bracket - Google Patents

Fixing bracket Download PDF

Info

Publication number
KR20050079911A
KR20050079911A KR1020050033392A KR20050033392A KR20050079911A KR 20050079911 A KR20050079911 A KR 20050079911A KR 1020050033392 A KR1020050033392 A KR 1020050033392A KR 20050033392 A KR20050033392 A KR 20050033392A KR 20050079911 A KR20050079911 A KR 20050079911A
Authority
KR
South Korea
Prior art keywords
locking
fixing
shaft
coupled
formwork
Prior art date
Application number
KR1020050033392A
Other languages
Korean (ko)
Other versions
KR100641409B1 (en
Inventor
장창근
Original Assignee
장창근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 장창근 filed Critical 장창근
Priority to KR1020050033392A priority Critical patent/KR100641409B1/en
Publication of KR20050079911A publication Critical patent/KR20050079911A/en
Application granted granted Critical
Publication of KR100641409B1 publication Critical patent/KR100641409B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/07Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members
    • E04G17/0728Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members the element consisting of several parts
    • E04G17/0742Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members the element consisting of several parts remaining completely or partially embedded in the cast material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 발명은 고정샤프트와 샤프트바디부가 결합되어지는 고정브라켓에 관한 것으로서 보다 상세하게는 승강로 하우징이나 기타 벽체형성을 시공하기 위하여 고정샤프트의 고정봉 양측에 형성된 고정편이 내부거푸집과 외부거푸집 사이에 체결고정되어 내,외부 거푸집사이를 지지함과 동시에 내,외부 거푸집간의 균등한 간격을 형성하도록 제공된 것이다.The present invention relates to a fixing bracket to which a fixed shaft and a shaft body are coupled. More specifically, fixing pieces formed on both sides of a fixed rod of a fixed shaft in order to construct a hoistway housing or other wall formation are fastened between an internal formwork and an external formwork. It is provided to support the inner and outer formwork at the same time to form an even gap between the inner and outer formwork.

상기와 같이 형성된 내,외부 거푸집사이에 콘크리트 타설작업에 따른 벽체시공시에는 상기 고정샤프트의 고정편이 컷팅되어 고정봉이 벽체에 심지되는 것으로서 상기 고정봉이 골조역할을 제공하여 벽체의 강도가 긴밀하게 유지가능한 것이며 작업의 단순화와 철거의 신속화등에 따른 공사시간의 단축과 공사비용의 절감효과가 제공되는 매우 유용한 발명이다.When constructing the wall according to the concrete placing work between the internal and external formwork formed as described above, the fixing rod of the fixing shaft is cut so that the fixing rod is wicked to the wall, so that the fixing rod provides a skeleton role so that the strength of the wall can be maintained closely. It is a very useful invention that provides the effect of shortening the construction time and reducing the construction cost by simplifying work and speeding up the dismantling.

Description

고정브라켓{FIXING BRACKET}Fixed Bracket {FIXING BRACKET}

본 발명은 고정샤프트와 샤프트바디부가 결합되어지는 고정브라켓에 관한 것으로서 보다 상세하게는 승강로 하우징이나 기타 벽체형성을 시공하기 위하여 내부거푸집과 외부거푸집 사이에 타설되는 콘크리트작업시 상기 내,외부 거푸집사이를 지지함과 동시에 내,외부 거푸집간의 균등한 간격을 형성하고자 고정브라켓을 발명해 낸 것이다.The present invention relates to a fixing bracket to which a fixed shaft and a shaft body are coupled, and more particularly, between the internal and external formwork when concrete is cast between an internal formwork and an external formwork to construct a hoist housing or other wall formation. At the same time to support and to form an even gap between the inner and outer formwork, the fixed bracket was invented.

상기와 같이 발명된 고정브라켓의 고정편을 내부거푸집과 외부거푸집에 각각 고정한 후 상기 고정브라켓에 형성된 컷팅홈을 절단함으로서 상기 절단되지 않은 고정봉은 콘크리트타설에 따른 벽체형성시 철근과 같은 골조역할을 제공하게 되어 벽체의 강도를 보강하게 되며 긴밀성과 결합성이 우수한 벽체가 형성되어지는 것이다.After fixing the fixing pieces of the fixing bracket to the inner formwork and the outer formwork respectively, as described above, by cutting the cutting grooves formed in the fixing bracket, the non-cut fixing rods provide a framework role such as reinforcement when forming walls according to concrete placing. It is to reinforce the strength of the wall is to form a wall excellent in tightness and bonding.

주지되는 바와 같이 종래에 사용되는 대부분의 승강로 하우징 내지 기타 벽체형성 시공시는 내부거푸집과 외부거푸집 사이에 공간부를 형성하고 상기 공간부에 콘크리트를 타설하는 것으로서 이때 상기 공간부의 폭이 균등하기 위하여 내,외부 거푸집간의 간격이 등간격으로 형성되는 것으로서 상기와 같이 내,외부 거푸집간의 간격을 균등하게 하기 위하여 내부거푸집과 외부거푸집 사이에는 봉체를 결합하고 상기 봉체의 양단부가 거푸집 외측으로 돌출되어 상기 돌출된 양단부에 나비너트와 같은 조임수단을 이용하여 조여줌으로서 상기 내,외부 거푸집의 간격을 조정하는 것이다.As is well known, most of the conventional hoistway housings or other wall forming constructions form a space between the internal formwork and the external formwork, and cast concrete into the space, so that the width of the space is equal, The gap between the outer formwork is formed at equal intervals, so as to equalize the spacing between the inner and outer formwork as described above, a rod is coupled between the inner formwork and the outer formwork, and both ends of the rod protrude outward from the formwork, so that the protruding ends By tightening using a fastening means such as a butterfly nut to adjust the distance between the inner and outer formwork.

그러나 상기와 같이 내,외부 거푸집간의 간격을 수작업으로 진행함으로서 내,외부 거푸집간의 간격이 균등하지 못하여 실질적인 벽체의 폭이 상이하게 제공되어 균열등의 문제점이 야기되는 것이며 또한 공사비용부담과 시간의 비효율성의 문제점 및 특히 각층별로 시공되어지는 승강로 하우징 내지 기타 벽체형성 시공상에는 많은 문제점등이 제기되는 것이다.However, as the gap between the inner and outer formwork is progressed by hand as described above, the gap between inner and outer formwork is not equal and the width of the actual wall is provided differently, which causes problems such as cracking. Problems of efficiency and in particular, many problems are raised in the hoistway housing or other wall formation construction that is constructed for each floor.

따라서 본 발명의 목적은 고정샤프트의 고정봉 양측에 형성된 고정편이 내부거푸집과 외부거푸집사이에 체결고정되어 상기 거푸집사이에 타설된 콘크리트를 보강지지하도록 구성된 것을 본 발명의 목적으로 한다.Therefore, it is an object of the present invention that the fixing pieces formed on both sides of the fixing rod of the fixing shaft are fastened and fixed between the inner formwork and the outer formwork so as to reinforce and support the concrete poured between the formwork.

본 발명의 또 다른 목적은 상기 고정편에 형성된 록킹홈이 록킹부의 록킹돌기에 탄성결합되고 상기 록킹홈일측의 통공이 상기 컷팅홀더의 가이드돌기와 체결되어 상기 컷팅홀더를 이용하여 컷팅홈이 용이하게 컷팅되는 것을 본 발명의 목적으로 한다.Still another object of the present invention is that the locking groove formed on the fixing piece is elastically coupled to the locking protrusion of the locking portion, and the through hole on one side of the locking groove is engaged with the guide protrusion of the cutting holder, thereby easily cutting the cutting groove by using the cutting holder. It is an object of the present invention.

이하 본 발명의 구성요소를 설명하면 다음과 같다.Hereinafter, the components of the present invention will be described.

고정샤프트(B)와 샤프트바디부(C)가 결합되어지는 고정브라켓(A)에 있어서, 상기 고정브라켓(A)은 원형의 고정봉(20) 양측으로 고정편(21),(21')이 형성된 고정샤프트(B)와 몸체부(30) 중앙에 형성된 걸림환홈(301)에 회전체(31)의 걸림환턱(311)이 회전결합되어진 샤프트바디부(C)로 형성되어지되, 상기 회전체(31)의 일측에는 록킹부(32)가 일체로 형성되고 중앙에는 안내공(312)이 형성되어 상기 고정샤프트(B)의 고정편(21)에 형성된 록킹홈(211)이 회전체(31)의 안내공(312)을 관통하여 록킹부(32)의 록킹돌기(321)와 결합되어진 것이다.In the fixing bracket (A) to which the fixed shaft (B) and the shaft body portion (C) are coupled, the fixing bracket (A) is fixed to the both sides of the circular fixing rod (20) (21, 21 ') The fixed shaft (B) and the locking ring groove 301 formed in the center of the body portion 30 is formed in the shaft body portion (C) that the locking ring jaw 311 of the rotating body 31 is rotationally coupled, The locking part 32 is integrally formed at one side of the whole 31 and the guide hole 312 is formed at the center thereof so that the locking groove 211 formed at the fixing piece 21 of the fixed shaft B is rotated. Through the guide hole 312 of the 31 is coupled to the locking projection 321 of the locking portion (32).

상기와 같이 결합된 록킹부(32)는 일측으로 록킹돌기(321)가 형성되고 상기 록킹돌기(321)의 배면부는 록킹부(32)와 탄성결합되어지도록 상,하부에 걸림턱(322)이 형성되고 상기 걸림턱(322)과 록킹부(32)의 공간부(323)에는 스프링(324)이 체결되어진 것이며 상기 고정샤프트(B)는 고정봉(20)의 일측에 외주연을 따라 컷팅홈(201)이 형성되어진 것이다.The locking part 32 coupled as described above has a locking protrusion 321 formed at one side thereof, and a rear end of the locking protrusion 321 has an upper and lower locking jaw 322 to be elastically coupled with the locking part 32. The spring 324 is fastened to the space 323 of the locking jaw 322 and the locking portion 32 and the fixed shaft B is cut along the outer circumference of one side of the fixed rod 20. 201 is formed.

또한 상기와 같이 구성된 고정샤프트(B)의 일측 고정편(21)에는 록킹홈(211)의 일측으로 통공(212)이 형성되고 타측 고정편(21')에는 양측으로 V자형 컷팅홈(212')이 형성되어진 것이며 상기 고정샤프트(B)가 록킹결합된 록킹부(32)의 일측에는 상기 록킹부(32)가 결합되어지는 결합홈부(401)가 헤드부(40)의 전면에 형성되고 상기 헤드부(40)의 일측에는 가이드돌기(402)가 돌설되어 고정편(21)의 통공(212)과 끼움결합되어지는 컷팅홀더(D)가 형성되어진 것이다.In addition, a hole 212 is formed at one side of the locking groove 211 in one fixing piece 21 of the fixed shaft B configured as described above, and a V-shaped cutting groove 212 'at both sides in the other fixing piece 21'. ) Is formed and a coupling groove 401 to which the locking portion 32 is coupled is formed at one side of the locking portion 32 to which the fixed shaft B is coupled to the front of the head portion 40. One side of the head portion 40 is formed with a cutting holder (D) which is guided to the guide projection 402 is fitted with the through-hole 212 of the fixing piece (21).

이하 첨부된 도면에 의하여 본 발명을 보다 상세히 설명하고자 한다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

도 1은 본 발명이 설치된 상태의 사시도를 도시한 것으로서 상기 승강로가 형성되어지는 내부거푸집(100)은 양측 코너부에 코너패널이 설치되는 것이며 상기 코너패널의 내측으로 승강패널이 설치되어 상기 코너패널을 상측으로 승강시 승강패널의 경사면을 따라 상기 코너패널이 승강하게 되는 것으로서 상기 승강패널의 중앙에는 샤프트바디부(C)가 형성되어 상기 샤프트바디부(C)에 고정샤프트(B)가 결합되어지는 것으로서 상기 도 2는 도 1의 a-a선 단면도로서 상기 단면도와 같이 내부거푸집(100)의 후면에는 도 1에서 미도시된 외부거푸집(110)과 콘크리트가 타설된 상태를 추가적으로 도시한 것인바 상기 상측의 확대도와 같이 내부거푸집(100)에는 샤프트바디부(C)가 형성되고 상기 샤프트바디부(C)에 고정샤프트(B)가 결합되어지는 것으로서 상기 고정샤프트(B)의 록킹홈(211)은 샤프트바디부(C)의 회전체(31)와 용접 및 기타방법에 의하여 결합된 록킹부(32)의 록킹돌기(321)와 결합되는 것으로서 상기 록킹돌기(321)의 배면부는 걸림턱(322)이 형성되고 상기 걸림턱(322)의 배면에는 탄성스프링(324)이 결합되어 상기 고정편(21)이 안내공(312)을 관통하여 결합시 상기 록킹돌기(321)는 스프링(324) 방향으로 이동되는 것이며 상기 고정편(21)의 록킹홈(211)이 록킹돌기(321)와 동일선상에 위치시는 상기 록킹돌기(321)가 스프링(324)의 탄성을 이용하여 록킹홈(211)에 끼움결합되는 것을 도시한 것이다.1 is a perspective view showing a state in which the present invention is installed, the inner formwork 100 is formed in the hoistway is a corner panel is installed at both corners and the lifting panel is installed inside the corner panel is the corner panel When the elevating upwards, the corner panel is elevated along the inclined surface of the elevating panel, and the shaft body portion C is formed at the center of the elevating panel, and the fixed shaft B is coupled to the shaft body portion C. 2 is a cross-sectional view taken along line aa of FIG. 1, which further illustrates a state in which the external formwork 110 and concrete that are not shown in FIG. 1 are placed on the rear surface of the internal formwork 100 as shown in the cross-sectional view. As the enlarged view of the inner die 100, the shaft body portion (C) is formed and the fixed shaft (B) is coupled to the shaft body portion (C) as the fixed The locking groove 211 of the shaft B is coupled with the locking protrusion 321 of the locking portion 32 coupled by welding and other methods with the rotor 31 of the shaft body portion C. The rear portion of the back portion 321 has a locking jaw 322 is formed and the elastic spring 324 is coupled to the rear surface of the locking jaw 322 is coupled to the fixing piece 21 through the guide hole 312 when the locking The protrusion 321 is moved in the direction of the spring 324 and the locking protrusion 321 is the spring 324 when the locking groove 211 of the fixing piece 21 is located in the same line as the locking protrusion 321. It is shown to be fitted to the locking groove 211 using the elasticity of the.

한편 상기 샤프트바디부(C)는 내측으로 걸림환홈(301)이 형성된 몸체부(30)에 걸림환턱(311)이 형성된 회전체(31)가 결합되어진 것으로서 상기 회전체(31)가 회전가능하도록 구성됨으로서 실질적으로 후술되는 컷팅홀더(D)가 고정샤프트(B)의 고정편(21)을 좌,우로 회전하며 컷팅작업을 원할하게 제공할 수 있도록 구성된 것이다. On the other hand, the shaft body portion (C) is coupled to the rotating body 31 having the locking ring jaw 311 is coupled to the body portion 30 having the locking ring groove 301 inward so that the rotating body 31 is rotatable. As it is configured, the cutting holder D, which will be described below substantially, is configured to rotate the fixing piece 21 of the fixed shaft B to the left and right to provide a cutting operation smoothly.

도 3a내지 도 3f는 본 발명의 주요부인 샤프트바디부(C)에 고정샤프트(B)가 결합되어 컷팅홀더(D)에 의하여 상기 고정샤프트(B)의 고정편(21)이 컷팅되는 것을 과정을 구체적으로 도시한 것이다.3A to 3F are processes in which the fixing shaft B is coupled to the shaft body portion C, which is the main part of the present invention, and the fixing piece 21 of the fixing shaft B is cut by the cutting holder D. It is shown in detail.

즉 도 3a는본 발명의 결합되기 이전상태의 분리사시도를 도시한 것으로서 일측에는 고정샤프트(B)가 형성되고 타측에는 컷팅홀더(D)가 형성되며 중앙에는 샤프트바디부(C)가 형성되는 것을 각각 도시한 것이고 도 3b는 고정샤프트(B)가 샤프트바디부(C)에 결합되어지는 상태의 사시도를 도시한 것으로서 상기 고정샤프트(B)의 일측 고정편(21)이 샤프트바디부(C)의 안내공(312)을 관통하면서 상기 안내공(312)의 일측에 위치한 록킹부(32)의 록킹돌기(321)가 록킹부(32)의 내측으로 밀려지는 상태를 도시한 것이며 도 3c는 고정샤프트(B)의 록킹홈(211)이 록킹부(32)에 결합되어진 상태의 사시도를 도시한 것으로서 상기 고정샤프트(B)가 완전히 끼움결합되어 상기 록킹돌기(321)가 내부 스프링(324)의 복원력에 의하여 고정편(21)의 록킹홈(211)에 탄성결합되어지는 것을 도시한 것으로서 상기와 같이 결합된 상태에서 내부거푸집(100)과 외부거푸집(110)사이에 콘크리트를 타설하여 상기 고정샤프트(B)가 더이상 이동하는 것을 방지하는 작업이 진행되는 것이다.That is, Figure 3a shows a separate perspective view of the state before the combination of the present invention is fixed shaft (B) is formed on one side and the cutting holder (D) is formed on the other side and the shaft body portion (C) is formed in the center, respectively Figure 3b is a perspective view showing a state in which the fixed shaft (B) is coupled to the shaft body portion (C), one side fixing piece 21 of the fixed shaft (B) of the shaft body portion (C) The locking protrusion 321 of the locking part 32 located on one side of the guide hole 312 while being pushed through the guide hole 312 is shown to be pushed into the locking part 32, Figure 3c is a fixed shaft (B) is a perspective view of the locking groove 211 is coupled to the locking portion 32, the fixing shaft (B) is fully fitted to the locking projection 321 is the restoring force of the inner spring (324) By being elastically coupled to the locking groove 211 of the fixing piece 21 by One as would be the task of the in the engaged state as described above, pouring concrete between the inner die 100 and outer die 110, preventing the fixing shaft (B) is moved no more proceeds.

상기와 같이 콘크리트타설에 의하여 샤프트바디부(C)에 결합된 고정샤프트(B)가 완전히 고정된 상태에서 도 3d는 고정샤프트(B)가 결합된 록킹부(32)에 컷팅홀더(D)가 결합되어진 사시도로서 상기 컷팅홀더(D)의 헤드부(40)에 형성된 결합홈부(401)가 록킹부(32)와 끼움결합되고 상기 컷팅홀더(D)의 일측에 돌출형성된 가이드돌기(402)는 고정편(21)의 통공에 결합된 상태를 도시한 것이고 도 3e는 상기 컷팅홀더(D)가 좌,우로 이동되는 것을 도시한 사시도로서 상기와 같이 컷팅홀더(D)를 좌,우로 이동함으로서 상기 콘크리트에 고정된 고정샤프트(B)의 고정편(21)이 지지력을 상실하여 절단가능한 것이며 도 3f는 상기 컷팅홀더(D)에 의하여 고정편(21)이 제거된 상태의 사시도로서 상기 컷팅홀더(D) 일측의 손잡이(41)를 잡은 상태에서 좌,우로 흔들어줌으로서 고정편(21)이 절단됨과 동시에 외부거푸집(110)에 별도의 결합부재를 이용하여 록킹홈(311')이 결합된 타측 고정편(21')은 상기 V자형 컷팅홈(212')을 중심으로 절단하여 외측면 역시 별도의 돌출부가 더 이상 마련되지 않도록 형성된 것이다.In the state in which the fixed shaft (B) coupled to the shaft body portion (C) by concrete casting is completely fixed as described above, FIG. 3D shows a cutting holder (D) in the locking portion (32) to which the fixed shaft (B) is coupled. As a perspective view that is coupled to the coupling groove 401 formed in the head portion 40 of the cutting holder (D) is fitted with the locking portion 32 and the guide protrusion 402 protruding on one side of the cutting holder (D) is 3E is a perspective view showing that the cutting holder D is moved left and right, and the cutting holder D is moved left and right as described above. The fixing piece 21 of the fixed shaft B fixed to the concrete can be cut by losing the supporting force, and FIG. 3F is a perspective view of the fixing piece 21 removed by the cutting holder D, and the cutting holder ( D) the fixed piece 21 by shaking left and right while holding the handle 41 on one side At the same time, the other fixing piece 21 'having the locking groove 311' coupled to the outer die 110 by using a separate coupling member is cut around the V-shaped cutting groove 212 'and the outer surface thereof. It is also formed so that a separate protrusion is no longer provided.

도 4a는 본 발명이 설치된 상태의 사시도를 도시한 것이고 도 4b는 본 발명의 내,외부 거푸집(100),(110)이 분리되는 상태의 사시도를 도시한 것으로서 상기 고정샤프트(B)가 콘크리트 타설에 의하여 고정된 상태에서 상기 고정샤프트(B)의 고정편(21),(21')을 각각 컷팅하여 내부거푸집(100)과 외부거푸집(110)을 벽체(120)와 분리가능하게 형성한 후 도 4b와 같이 크레인등과 같은 승강수단을 상기 코너패널을 상측으로 이동시 상기 코너패널이 승강패널의 상측으로 경사지게 슬라이드 이동하여 골조역할을 제공하는 고정봉(20)이 심지된 벽체(120)만 남도록 구성되는 것이다.Figure 4a is a perspective view of a state in which the present invention is installed and Figure 4b is a perspective view of a state in which the inner and outer formwork 100, 110 of the present invention is separated, the fixed shaft (B) is concrete pouring After cutting the fixing pieces 21, 21 'of the fixed shaft (B) in the fixed state to form the inner formwork 100 and the outer formwork 110 and the wall 120 to be separated from the As shown in Figure 4b when moving the lifting means such as a crane upwards the corner panel slides the corner panel to the upper side of the lifting panel inclined so that only the fixed wall 20, which provides the skeleton role is left only the wall 120 It is composed.

이하 본 발명의 효과를 설명하면 다음과 같다.Hereinafter, the effects of the present invention will be described.

내부거푸집과 외부거푸집간을 연결하는 고정샤프트에 의하여 내,외부 거푸집간의 간격을 균등하게 조절가능하며 상기 컷팅홀더등에 의하여 고정샤프트의 고정편을 분리제거함으로서 내,외부 거푸집이 벽체와 분리됨은 물론 상기 벽체의 내측으로 고정봉이 심지되어 골조역할을 제공함으로서 보다 강도가 우수한 벽체가 완성되는 효과를 제공한다.The distance between the inner and outer formwork can be adjusted evenly by the fixing shaft connecting the inner formwork and the outer formwork, and the inner and outer formwork is separated from the wall by separating and removing the fixing piece of the fixing shaft by the cutting holder. Fixing rods are wicked to the inside of the wall to provide a framing role, thereby providing an effect of completing the wall with higher strength.

또한 상기 고정샤프트의 록킹홈을 이용하여 설치함으로서 작업의 단순화와 철거의 신속화등은 물론 공사비용의 절감등의 효과등이 기대되는 것으로서 한편 본 발명은 도면에 도시된 예를 참조로 설명되었으나 이는 예시적인 것에 불과하며 본 기술분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능한 것은 자명한 사실로서 본 고안의 진정한 기술적 보호 범위는 첨부된 청구 범위의 기술적 사상에 의해 정해져야만 할 것이다.In addition, the installation by using the locking groove of the fixed shaft is expected to be effective in simplifying work, speeding up dismantling, etc., as well as reducing construction costs. It is obvious that various modifications and equivalent other embodiments are possible to those skilled in the art, and the true technical protection scope of the present invention should be determined by the technical spirit of the appended claims. something to do.

도 1은 본 발명이 설치된 상태의 사시도1 is a perspective view of a state in which the present invention is installed

도 2는 본 발명의 a-a선 단면도2 is a-a cross-sectional view of the present invention

도 3a은 본 발명의 결합되기 이전상태의 분리사시도Figure 3a is an exploded perspective view of a state before the combination of the present invention

도 3b는 고정샤프트가 샤프트바디부에 결합되어지는 상태의 사시도Figure 3b is a perspective view of a state in which the fixed shaft is coupled to the shaft body

도 3c는 고정샤프트의 록킹홈이 록킹부에 결합되어진 상태의 사시도Figure 3c is a perspective view of the locking groove of the fixed shaft is coupled to the locking portion

도 3d는 고정샤프트가 결합된 록킹부에 컷팅홀더가 결합되어진 사시도Figure 3d is a perspective view of the cutting holder is coupled to the locking portion coupled to the fixed shaft

도 3e는 상기 컷팅홀더가 좌,우로 이동되는 것을 도시한 사시도Figure 3e is a perspective view showing that the cutting holder is moved left and right

도 3f는 상기 컷팅홀더에 의하여 고정편이 제거된 상태의 사시도Figure 3f is a perspective view of the fixing piece is removed by the cutting holder

도 4a는 본 발명이 설치된 상태의 사시도Figure 4a is a perspective view of the present invention installed

도 4b는 본 발명의 내,외부 거푸집이 분리되는 상태의 사시도Figure 4b is a perspective view of the inner and outer formwork of the present invention is separated

<도면의 주요부분에 대한 간단한 설명><Brief description of the main parts of the drawing>

A-고정브라켓 B-고정샤프트A-Lock Bracket B-Lock Shaft

C-샤프트바디부 D-컷팅홀더C-Shaft Body D-Cutting Holder

20-고정봉 21,21'-고정편20-Anchor 21,21'-Anchor

30-몸체부 31-회전체30-body 31-rotating body

32-록킹부 40-헤드부32-locking part 40-head part

201-컷팅홈 211,211'-록킹홈201-cutting groove 211,211'-locking groove

212-통공 212'-V자형 컷팅홈212-Through Hole 212'-V Shaped Cutting Groove

301-걸림환홈 311-걸림환턱301-Janghwan Homepage

312-안내공 321-록킹돌기312-Guide 321-Locking Projection

322-걸림턱 323-공간부322-Jumping 323-Space

324-스프링 401-결합홈부기324-spring 401-combination groove

402-가이드돌기402-guide protrusion

Claims (5)

고정샤프트와 샤프트바디부가 결합되어지는 고정브라켓에 있어서,In the fixed bracket to which the fixed shaft and the shaft body are coupled, 상기 고정브라켓(A)은 원형의 고정봉(20) 양측으로 고정편(21),(21')이 형성된 고정샤프트(B)와 몸체부(30) 중앙에 형성된 걸림환홈(301)에 회전체(31)의 걸림환턱(311)이 회전결합되어진 샤프트바디부(C)로 형성되어지되, 상기 회전체(31)의 일측에는 록킹부(32)가 일체로 형성되고 중앙에는 안내공(312)이 형성되어 상기 고정샤프트(B)의 고정편(21)에 형성된 록킹홈(211)이 회전체(31)의 안내공(312)을 관통하여 록킹부(32)의 록킹돌기(321)와 결합되어진 것을 특징으로 하는 고정브라켓.The fixing bracket (A) is a rotating body in the locking shaft (301) formed in the center of the fixed shaft (B) and the body portion 30, the fixing piece 21, 21 'formed on both sides of the circular fixing rod (20) The engaging ring jaw 311 of the 31 is formed as a shaft body portion C is rotationally coupled, one side of the rotating body 31, the locking portion 32 is formed integrally with a guide hole 312 in the center Is formed so that the locking groove 211 formed in the fixing piece 21 of the fixed shaft (B) penetrates through the guide hole 312 of the rotating body 31 and coupled with the locking protrusion 321 of the locking portion 32 Fixed bracket characterized in that the end. 제 1항에 있어서,The method of claim 1, 상기 록킹부(32)는 일측으로 록킹돌기(321)가 형성되고 상기 록킹돌기(321)의 배면부는 록킹부(32)와 탄성결합되어지도록 상,하부에 걸림턱(322)이 형성되고 상기 걸림턱(322)과 록킹부(32)의 공간부(323)에는 스프링(324)이 체결되어진 것을 특징으로 하는 고정브라켓.The locking portion 32 has a locking protrusion 321 is formed on one side and the rear surface of the locking protrusion 321 is formed in the upper and lower locking jaw 322 to be elastically coupled with the locking portion 32 and the locking Fixing bracket, characterized in that the spring 324 is fastened to the space portion 323 of the jaw 322 and the locking portion 32. 제 1항 내지 제 2항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 2, 상기 고정샤프트(B)는 고정봉(20)의 일측에 외주연을 따라 컷팅홈(201)이 형성되어진 것을 특징으로 하는 고정브라켓.The fixing shaft (B) is a fixing bracket, characterized in that the cutting groove 201 is formed along the outer periphery on one side of the fixing rod (20). 제 1항 내지 제 2항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 2, 상기 고정샤프트(B)의 일측 고정편(21)에는 록킹홈(211)의 일측으로 통공(212)이 형성되고 타측 고정편(21')에는 양측으로 V자형 컷팅홈(212')이 형성되어진 것을 특징으로 하는 고정브라켓.A through hole 212 is formed at one side of the locking groove 211 in one fixing piece 21 of the fixing shaft B, and a V-shaped cutting groove 212 'is formed at both sides in the other fixing piece 21'. Fixed bracket, characterized in that. 제 4항에 있어서,The method of claim 4, wherein 상기 고정샤프트(B)가 록킹결합된 록킹부(32)의 일측에는 상기 록킹부(32)가 결합되어지는 결합홈부(401)가 헤드부(40)의 전면에 형성되고 상기 헤드부(40)의 일측에는 가이드돌기(402)가 돌설되어 고정편(21)의 통공(212)과 끼움결합되어지는 컷팅홀더(D)가 형성되어진 것을 특징으로 하는 고정브라켓.On one side of the locking portion 32 to which the fixed shaft B is locked, a coupling groove 401 to which the locking portion 32 is coupled is formed on the front of the head portion 40 and the head portion 40 Guide bracket 402 is protruded on one side of the fixing bracket, characterized in that the cutting holder (D) is formed to be fitted with the through hole (212) of the fixing piece (21).
KR1020050033392A 2005-04-22 2005-04-22 Fixing bracket KR100641409B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050033392A KR100641409B1 (en) 2005-04-22 2005-04-22 Fixing bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050033392A KR100641409B1 (en) 2005-04-22 2005-04-22 Fixing bracket

Publications (2)

Publication Number Publication Date
KR20050079911A true KR20050079911A (en) 2005-08-11
KR100641409B1 KR100641409B1 (en) 2006-10-31

Family

ID=37266746

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050033392A KR100641409B1 (en) 2005-04-22 2005-04-22 Fixing bracket

Country Status (1)

Country Link
KR (1) KR100641409B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100641412B1 (en) * 2005-04-22 2006-10-31 장창근 The structure to construct inner mold of elevator housing
KR100800536B1 (en) * 2006-04-06 2008-02-04 깨뱉시스템주식회사 The large-sized form for removing easily, coupling structure of form-reinforcing bar and wall construction method using the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100641412B1 (en) * 2005-04-22 2006-10-31 장창근 The structure to construct inner mold of elevator housing
KR100800536B1 (en) * 2006-04-06 2008-02-04 깨뱉시스템주식회사 The large-sized form for removing easily, coupling structure of form-reinforcing bar and wall construction method using the same

Also Published As

Publication number Publication date
KR100641409B1 (en) 2006-10-31

Similar Documents

Publication Publication Date Title
KR100641409B1 (en) Fixing bracket
US20140352241A1 (en) Dynamic Concrete Form
KR100826556B1 (en) Panel structure for slab
KR101050493B1 (en) Embedded cone apparatus for supporting vertical concrete form, installation structure of form supporting assembly, and constructing method of vertical concrete
KR20090113476A (en) Insert for concrete slab
KR100641412B1 (en) The structure to construct inner mold of elevator housing
CN205329728U (en) Line well well lid
JP5538150B2 (en) Temporary material ruler for temporary material used to form the foundation for housing
KR100619466B1 (en) the side reinforcement equipment of steel forming for building construction work
KR20110000140U (en) Structure for connection unit of aluminum foam panel
KR200423402Y1 (en) euro form
KR20130028846A (en) Apparatus for keeping distance of flash board
KR100650919B1 (en) Fixing bracket
JP4780439B2 (en) Steel pipe column
JP2003184305A (en) Form assembling hook bolt
JP7462101B1 (en) Concrete pouring formwork and formwork installation method
JP2007092310A (en) Inner form structure
KR100641411B1 (en) Fixing bracket
JP5913265B2 (en) Beam reinforcing method and structure, and auxiliary beam support
JP4938808B2 (en) Support installation hardware
KR20100007478U (en) Clamp fixing gang form
JP2011208412A (en) Unit form and form installation method using the same
KR200268189Y1 (en) scaffolding ring structure of girder for bridge
TWM608450U (en) Detachable mold
JP2020109243A (en) Form support tool

Legal Events

Date Code Title Description
A201 Request for examination
G15R Request for early opening
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121025

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20131025

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20141023

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20151026

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20161025

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20171025

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20181023

Year of fee payment: 13