KR20130028846A - Apparatus for keeping distance of flash board - Google Patents

Apparatus for keeping distance of flash board Download PDF

Info

Publication number
KR20130028846A
KR20130028846A KR1020120044328A KR20120044328A KR20130028846A KR 20130028846 A KR20130028846 A KR 20130028846A KR 1020120044328 A KR1020120044328 A KR 1020120044328A KR 20120044328 A KR20120044328 A KR 20120044328A KR 20130028846 A KR20130028846 A KR 20130028846A
Authority
KR
South Korea
Prior art keywords
formwork
shaft rod
rotary shaft
link
tie bolt
Prior art date
Application number
KR1020120044328A
Other languages
Korean (ko)
Inventor
서갑수
Original Assignee
서갑수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 서갑수 filed Critical 서갑수
Priority to KR1020120044328A priority Critical patent/KR20130028846A/en
Publication of KR20130028846A publication Critical patent/KR20130028846A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE: A spacer of a form is provided to separate the form by pulling a link and separating a plurality of mold assemblies simultaneously by connecting a link with a wire. CONSTITUTION: A spacer of a form comprises a fixture(210), a rotary shaft rod(220), separating rods(221a,221b), an installation box(231), and a link(235). The fixture is fixed or separated according to a rotational angle of a hanging piece arranged on an end portion of a tie bolt. The separating rods are extended from the outer periphery of the rotary shaft rod, thereby being arranged to be faced. The rotary shaft rod is installed by penetrating through the opened front and rear sides of the installation box, and the vertical slots(232a,233a) are formed on both surfaces of the installation box. The link is connected to the rotary shaft rod. The rotary shaft rod rotates when the link is pulled so that the spacer and the tie bolt becomes separated.

Description

거푸집 간격 유지장치{Apparatus for keeping distance of flash board}Die spacing device {Apparatus for keeping distance of flash board}

본 발명은 거푸집 사이에 콘크리트 타설시 상기 타설된 콘크리트의 압력에 의해 거푸집 사이의 간격이 서로 벌어지는 것을 방지하는 거푸집 간격 유지장치에 관한 것으로, 더욱 상세하게는 일측 거푸집에 설치되는 타이 볼트를 타측 거푸집에 설치되는 간격 유지구에 끼워넣고 돌리는 작업만으로 조립이 완료되고, 해제시에는 링크를 당기는 작업만으로 조립이 해제됨은 물론, 상기 링크를 와이어로 서로 연결하면 동시에 여러 개의 조립도 해제할 수 있는 거푸집 간격 유지장치에 관한 것이다.The present invention relates to a mold spacing device that prevents the gap between the molds from being spaced apart by the pressure of the cast concrete when the concrete is poured between the formwork, and more particularly, tie bolts installed in one formwork to the other formwork. Assembling is completed only by inserting and turning the gap holder to be installed, and when it is released, the assembly is released only by pulling the link. Also, when the links are connected to each other by wires, the mold gap can be released at the same time. Relates to a device.

건축이나 토목 공사 현장에서 콘크리트 건축물의 벽체 등을 조성할 때 사용되는 거푸집은 그 두께에 맞게 간격을 유지하도록 배치된 한 쌍으로 이루어지며, 보통 벽체의 내측에 위치하는 거푸집으로는 유로폼을 사용하고 외측에 위치하는 거푸집으로는 갱폼을 사용한다.Formwork used when constructing walls of concrete buildings in construction or civil engineering works consists of a pair arranged to maintain a gap according to its thickness, and formwork located inside the wall usually uses Euroform and the outside Gang forms are used for the formwork located in.

유로폼은 철재틀에 합판면을 붙여서 제작한 것으로서 벽체의 내측 거푸집의 용도 이외에 다양한 목적으로 사용되고, 갱폼은 철재로 넓게 제작된 것으로서 주로 아파트 외벽과 같이 외벽 중 면이 넓은 곳에 사용된다.Eurofoam is made by attaching plywood to the steel frame, and is used for various purposes in addition to the inner formwork of the wall. Gangfoam is widely made of steel, and is mainly used in a wide area of the outer wall such as an exterior wall of an apartment.

이처럼 유로폼과 갱폼으로 이루어진 한 쌍의 거푸집을 거푸집용 체결 부재를 이용해 체결하여 유로폼과 갱폼이 일정한 간격을 유지하도록 한 후, 유로폼과 갱폼 사이에 콘크리트를 타설하여 일정 시간 동안 양생함으로써 건축물의 벽체가 완성되는 것이다.As such, a pair of formwork consisting of euroforms and gangforms is fastened using formwork fastening members to maintain a constant distance between the euroforms and gangforms, and then concrete is cast between the euroforms and gangforms to cure for a predetermined time to complete the walls of the building. Will be.

한편, 유로폼과 갱폼 간의 간격 유지를 위해 사용되는 거푸집용 체결 부재는 주로 갱폼(외측 벽면용)에서 유로폼(내측 벽면용) 쪽으로 투입되는 간격 유지구와, 일단부는 상기 간격 유지구의 내측 단부에 결속되고, 타단부는 유로폼에 쇄기 등으로 결속되어 유로폼과 갱폼 간의 간격을 유지하는 타이 볼트로 구성된다.On the other hand, the formwork fastening member used for maintaining the gap between the euroform and the gangform is mainly a gap holder which is introduced into the euroform (for the inner wall surface) from the gangform (for the outer wall surface), one end is bound to the inner end of the gap holder, The other end is composed of tie bolts that are bonded to the euroform with wedges to maintain a gap between the euroform and the gangform.

따라서, 거푸집의 설치와 해체를 용이하게 하기 위하여 타이 볼트와 간격 유지구는 결합과 분리가 간편하게 이루어지도록 함과 동시에 설치 구조의 특성상 결합부를 눈으로 직접 보지 않고도 쉽게 결합할 수 있도록 단순화된 구조를 갖추어야 하기 때문에 거푸집용 체결 부재는 구조 개선을 위한 연구, 개발이 지속적으로 이루어지고 있는 실정이다.Therefore, in order to facilitate the installation and dismantling of the formwork, the tie bolts and the spacing retainers should be provided with a simplified structure so that the joining and detaching can be easily performed and the joining part can be easily combined without looking directly at the eyes due to the characteristics of the installation structure. Therefore, the fastening member for formwork is a situation that continues to be researched and developed for structural improvement.

이에, 등록실용신안 제423830호 '거푸집용 간격 유지구'에서는 타이 볼트와 간격 유지구를 나사 체결 방식으로 결합하는 방식을 제안하였으나, 나사식의 경우에는 그 나사를 풀거나 조이는데 수회에 걸쳐 돌려야 하므로 작업 시간이 소요됨으로써 작업의 능률이 저하되는 문제점이 있었다.Accordingly, the Utility Model Registration No. 423830 'Forming spacing holder' proposed a method of combining the tie bolt and the spacing tool by screwing, but in the case of a screw type, the screw must be rotated several times to loosen or tighten the screw. Therefore, there is a problem in that the work efficiency is deteriorated by the time required for the work.

또한, 상기 나사 체결 방식의 문제점을 해결하기 위해, 공개실용신안 제2010-0006679호 '거푸집용 체결 부재' 등에서는 타이 볼트의 단부에 걸림돌부를 형성하고, 간격 유지구의 단부에는 상기 타이 볼트의 걸림돌부가 끼워지는 결합공을 형성함으로써, 타이 볼트를 간격 유지부에 끼운 후 돌리기만 하면 결합이나 분리가 이루어지는 구조로 개선을 하였다.In addition, in order to solve the problem of the screw fastening method, in the Utility Model No. 2010-0006679 'Forming fastening member' and the like to form a locking portion at the end of the tie bolt, the end of the spacing retainer is a locking protrusion of the tie bolt By forming the fitting holes to be fitted, the tie bolts were inserted into the gap holding part and then rotated to improve the structure in which the joining or separating was performed.

그러나, 이상과 같은 결합구조는 결합과 분리가 어느 정도 편리해진 장점은 있지만, 거푸집 사이에 콘크리트를 타설 및 양생 후 간격 유지구를 제거함에 있어서, 간격 유지구가 타이 볼트로부터 분리될 수 있는 특정 각도로 정확히 회전시키는 것은 여전히 어렵다는 문제점이 있었다.However, the coupling structure as described above has the advantage that the coupling and separation is somewhat convenient, but in the removal of the gap holder after placing and curing the concrete between the formwork, the specific angle that the gap holder can be separated from the tie bolts There was a problem that it is still difficult to rotate exactly.

특히, 이러한 문제점은 벽면이 넓어서 많은 수의 타이 볼트를 일정 간격 마다 배치하고 그 각각에 간격 유지구를 설치한 경우일수록, 간격 유지구의 설치 위치가 높은 곳일수록 더욱 심각해진다는 문제점이 있었다.In particular, such a problem has a problem that the larger the wall surface is, the larger the number of tie bolts are arranged at regular intervals and the interval holders are installed in each of them, the more serious the installation position of the spacer holders is.

본 발명은 전술한 바와 같은 문제점을 해결하기 위해 제안된 것으로, 서로 이격된 한 쌍의 거푸집 중 일측 거푸집에 설치되는 타이 볼트를 타측 거푸집에 설치되는 간격 유지구에 끼워넣고 돌리는 작업만으로 조립이 완료되고, 해제시에는 링크를 당기는 작업만으로 조립이 해제됨은 물론, 상기 링크를 와이어로 서로 연결하면 동시에 여러 개의 조립도 해제할 수 있는 거푸집 간격 유지장치를 제공하고자 한다.The present invention has been proposed to solve the problems as described above, the assembly is completed only by inserting and turning the tie bolts installed in one formwork among the pair of formwork spaced apart from each other in the interval holder is installed in the other formwork. When releasing, the assembly is released only by pulling the link, as well as providing a mold spacing device capable of releasing several assemblies at the same time by connecting the links with each other.

이를 위해, 본 발명에 따른 거푸집 간격 유지장치는 일측 거푸집에 설치되는 타이 볼트(tie bolt)와 타측 거푸집에 설치되는 간격 유지구를 서로 조립하여 상기 거푸집 사이의 간격을 유지시키는 거푸집 간격 유지장치에 있어서, 상기 간격 유지구는, 상기 타이 볼트의 단부에 구비된 걸림편이 끼워지며, 상기 걸림편이 끼워진 상태에서 회전하는 각도에 따라 걸림 동작 또는 해제 동작이 일어나는 고정구와; 상기 고정구에 연결되어 있으며, 길이가 긴 관 형상으로 이루어진 회전축 봉과; 상기 회전축 봉의 외주면으로부터 외측 방향으로 연장 형성되되, 서로 마주보는 방향에 배치된 한 쌍의 걸림 해제 봉과; 개방된 전후방을 관통하여 상기 회전축 봉이 설치되되, 양측면에는 각각 상기 해제 봉이 끼워진 상태로 이동하는 수직 장공이 형성되어 있어서 상기 회전축 봉의 회전을 안내하는 설치 박스; 및 상기 설치 박스 내부에 위치하여 상기 해제 봉 중 어느 하나와 연결되며, 일부는 상기 설치 박스 외부에 위치하는 링크;를 포함하여, 상기 링크를 잡아당기면, 상기 회전축 봉이 회전하면서 상기 간격 유지구와 타이 볼트의 조립이 해제되는 것을 특징으로 한다.To this end, the formwork spacing device according to the present invention in the formwork spacing device to maintain the gap between the formwork by assembling the tie bolt (tie bolt) installed in one formwork and the spacing device installed in the other formwork each other The spacing holder includes: a fastener to which a locking piece provided at an end of the tie bolt is fitted, and a locking operation or a release operation occurs according to an angle of rotation in the state where the locking piece is fitted; A rotating shaft rod connected to the fixture and having a long tubular shape; A pair of locking release rods extending in an outward direction from the outer circumferential surface of the rotating shaft rod and disposed in a direction facing each other; An installation box for guiding the rotation of the rotation shaft rod through vertical openings formed in the rotation shaft rod through the open front and rear sides, each of which is formed with a vertical long hole moving in the state where the release rod is fitted; And a link positioned inside the installation box and connected to any one of the release rods, and a portion of which is located outside the installation box. When the link is pulled out, the rotary shaft rod rotates to maintain the gap holder and the tie bolt. It is characterized in that the assembly of the release.

이때, 상기 고정구는 상기 타이 볼트의 걸림편이 끼워지도록 상기 걸림편에 대응하는 형상의 결합공이 길이 방향으로 관통 형성되어 있는 잠금 블럭과, 전단부 내측에 상기 잠금 블럭이 삽입 고정되되 상기 잠금 블럭보다는 길이가 길어서, 상기 잠금 블럭을 통과한 걸림편이 회전할 수 있는 공간을 제공하는 해제 블럭을 포함하는 것이 바람직하다.At this time, the fastener is a locking block is formed through the coupling hole of the shape corresponding to the locking piece in the longitudinal direction so that the locking piece of the tie bolt is fitted, and the locking block is inserted into the front end of the fixed block is longer than the lock block It is preferable to include a release block which is long and provides a space in which the locking piece that has passed through the lock block can rotate.

또한, 상기 설치 박스의 일측면에 형성된 수직 장공의 상단과 상기 설치 박스의 타측면에 형성된 수직 장공의 하단에는 각각 상기 거푸집으로부터 멀어지는 방향으로 수평 장공이 연결 형성되어 있는 것이 바람직하다.In addition, the upper end of the vertical long hole formed on one side of the installation box and the lower end of the vertical long hole formed on the other side of the installation box, it is preferable that the horizontal long hole is formed in a direction away from the formwork, respectively.

또한, 상기 회전축 봉의 단부에는 지지편이 돌출 형성되어 있고, 상기 회전축 봉에는 스프링이 끼워지며, 상기 스프링의 일단은 상기 지지편에 지지되고 상기 스프링의 타단은 설치 박스에 지지되는 것이 바람직하다.In addition, a support piece protrudes from an end of the rotating shaft rod, and a spring is fitted into the rotating shaft rod, one end of the spring is supported by the support piece, and the other end of the spring is supported by the installation box.

또한, 상기 링크 중 상기 설치 박스 내부에 위치하여 상기 해제 봉 중 어느 하나와 연결되는 작동부는 상기 해제 봉이 전후방으로 이동할 수 있는 공간부를 갖는 것이 바람직하다.In addition, it is preferable that the operating portion located inside the installation box of the link and connected to any one of the release rods has a space for moving the release rods forward and backward.

또한, 상기 링크에 연결된 와이어를 더 구비하여 상기 와이어를 잡아당기면 상기 상기 회전축 봉이 회전하면서 상기 간격 유지구와 타이 볼트의 조립이 해제되는 것이 바람직하다.In addition, it is preferable to further include the wire connected to the link to pull the wire, the assembly of the spacing holder and the tie bolt is released while the rotating shaft rod is rotated.

한편, 본 발명의 다른 실시예에 따른 거푸집 간격 유지장치는 상기 간격 유지구가 타이 볼트의 단부에 구비된 걸림편이 끼워지며, 상기 걸림편이 끼워진 상태에서 회전하는 각도에 따라 걸림 동작 또는 해제 동작이 일어나는 고정구와; 상기 고정구에 연결되어 있으며, 길이가 긴 관 형상으로 이루어진 회전축 봉과; 상기 회전축 봉의 외주면에 끼워진 상태로 수평왕복운동하는 판 브라켓과; 상기 회전축 봉의 단부에는 구비되며 와이어가 연결되는 해제봉이 설치되어 있는 지지편; 및 상기 회전축 봉에 끼워져 일단은 상기 지지편에 지지되고 타단은 상기 판 브라켓에 지지되어 탄성 복원력을 발생시키는 스프링;을 포함하여, 상기 와이어를 잡아당기면, 상기 회전축 봉이 회전하면서 상기 간격 유지구와 타이 볼트의 조립이 해제되는 것을 특징으로 한다.On the other hand, the die gap holding device according to another embodiment of the present invention is fitted with the engaging piece is provided at the end of the tie bolt, the interval retainer, the locking operation or release operation occurs according to the angle of rotation in the state that the engaging piece is fitted A fixture; A rotating shaft rod connected to the fixture and having a long tubular shape; A plate bracket which horizontally reciprocates while being fitted to an outer circumferential surface of the rod; A support piece provided at an end of the rotary shaft rod and having a release rod connected to the wire; And a spring inserted into the rotary shaft rod and supported by the support piece and the other end supported by the plate bracket to generate elastic restoring force. When pulling the wire, the rotary shaft rod rotates to maintain the gap holder and the tie bolt. It is characterized in that the assembly of the release.

이상과 같은 본 발명에 따른 거푸집 간격 유지장치에 의하면, 타설된 콘크리트의 압력에 의해 거푸집 사이의 간격이 서로 벌어지는 것을 방지함에 있어서 일측 거푸집에 설치되는 타이 볼트를 타측 거푸집에 설치되는 간격 유지구에 끼워넣고 돌리는 작업만으로 조립이 완료되므로 작업시간을 단축시킬 수 있게 한다. According to the formwork gap maintaining apparatus according to the present invention as described above, in the gap between the formwork to prevent the gap between the formwork by the pressure of the placed concrete is sandwiched in the gap retainer installed in the other formwork tie bolts. It is possible to shorten the working time because the assembly is completed only by putting and turning.

또한, 본 발명은 해제시 링크를 당기는 작업만으로 조립이 해제되므로 제거 작업이 편리하고 높은 위치의 것은 지면에서 막대 등을 이용하여 링크를 건드리기만 하면 되므로 안전사고를 방지하며, 특히 상기 링크를 와이어로 서로 연결하면 동시에 여러 개의 조립도 해제할 수 있게 한다.In addition, the present invention is the assembly is released only by pulling the link at the time of release, the removal work is convenient, and the high position of the ground just to touch the link by using a rod or the like to prevent safety accidents, in particular the wire By connecting them together, it is possible to release several assemblies at the same time.

도 1은 본 발명에 따른 거푸집 간격 유지장치를 나타낸 분해 사시도이다.
도 2는 본 발명에 따른 거푸집 간격 유지장치의 조립 상태도이다.
도 3은 본 발명에 따른 거푸집 간격 유지장치의 동작 상태도이다.
도 4는 본 발명에 따른 거푸집 간격 유지장치의 브라켓을 나타낸 배면도이다.
도 5는 본 발명에 따른 거푸집 간격 유지장치의 링크를 나타낸 정면도이다.
도 6은 본 발명에 따른 거푸집 간격 유지장치의 링크의 다른 실시예를 나타낸 것이다.
도 7은 본 발명에 따른 거푸집 간격 유지장치의 벽면 거푸집 설치 상태도이다.
도 8은 본 발명에 따른 거푸집 간격 유지장치의 와이어 적용 예를 나타낸 도이다.
도 9는 본 발명에 따른 거푸집 간격 유지장치를 나타낸 다른 실시예이다.
1 is an exploded perspective view showing a formwork gap maintaining apparatus according to the present invention.
2 is an assembled state diagram of the formwork gap maintaining apparatus according to the present invention.
3 is an operational state diagram of the formwork gap maintaining apparatus according to the present invention.
Figure 4 is a rear view showing the bracket of the formwork gap maintaining apparatus according to the present invention.
5 is a front view showing a link of the formwork gap maintaining apparatus according to the present invention.
Figure 6 shows another embodiment of a link of the formwork gap maintaining apparatus according to the present invention.
7 is a wall formwork installation state diagram of the formwork spacing device according to the invention.
8 is a view showing a wire application example of the formwork gap maintaining apparatus according to the present invention.
9 is another embodiment showing a formwork gap maintaining apparatus according to the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 바람직할 실시예에 따른 거푸집 간격 유지장치에 대해 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail with respect to the mold spacing device according to an embodiment of the present invention.

단, 이하에서는 건물 벽체를 형성하기 위해 사용되는 거푸집에 본 발명이 적용된 것을 예로 들어 설명하나, 그 공사 목적물에 특정한 제한이 없음은 당연하다.
However, hereinafter, the present invention is applied to the formwork used to form a building wall as an example, but there is no particular limitation on the object of construction.

먼저, 도 1을 통해 알 수 있는 바와 같이 본 발명에 따른 거푸집 간격 유지장치는 크게 일측 거푸집을 통해 설치되는 타이 볼트(tie bolt)(100) 및 타측 거푸집을 통해 설치되는 간격 유지구(200)를 포함하며, 타이 볼트(100)와 간격 유지구(200)는 상기 한 쌍의 거푸집 사이의 콘크리트 타설 공간 내에서 서로 결합(도 7 참조)된다. First, as can be seen through Figure 1 formwork gap maintaining apparatus according to the present invention is largely spaced through the tie bolts (tie bolt) 100 is installed through one formwork and the other side formwork 200 is installed through the formwork. The tie bolt 100 and the spacer 200 are coupled to each other (see FIG. 7) in the concrete placing space between the pair of formwork.

일반적으로 타이 볼트(tie bolt)(100)가 체결되는 일측 거푸집은 벽체의 내측(즉, 실내측)에 위치하는 거푸집으로서 유로폼이 사용되고, 간격 유지구(200)가 설치되는 타측 거푸집은 벽체의 외측(즉, 실외측)에 위치하는 거푸집으로서 갱폼이 사용되며, 이러한 유로폼과 갱폼이 벽체의 두께만큼 서로 이격되 한 쌍의 거푸집을 구성한다.In general, one formwork to which the tie bolt 100 is fastened is a formwork located on the inner side (ie, the interior side) of the wall, and Euroform is used, and the other formwork on which the spacer 200 is installed is the outside of the wall. Gang forms are used as the formwork (that is, the outdoor side), and these flow forms and the form form a pair of formwork spaced apart from each other by the thickness of the wall.

따라서, 거푸집 사이에 콘크리트를 타설하여 외측으로 압력이 작용하더라도, 서로 결합된 타이 볼트(100)와 간격 유지구(200)에 의해 거푸집이 외측으로 밀려나는 것을 방지하고, 그에 따라 콘크리트 양생시 벽체의 두께가 시공 설계상의 두께보다 두꺼워지는 등의 하자를 방지한다.Therefore, even if the pressure is applied to the outside between the formwork, the pressure is prevented from being pushed outward by the tie bolt 100 and the gap retainer 200 coupled to each other, thereby preventing the wall of the concrete during curing This prevents defects such as the thickness becoming thicker than the construction design thickness.

이를 위해, 타이 볼트(100)는 환봉(110)의 양단부를 각각 가공함으로써, 시공시 거푸집의 외측에 배치되는 일단부에는 삽입공(121)과 절단홈(122)을 형성하고, 거푸집 사이에 배치되는 타단부에는 턴 키(turn key) 역활을 하는 걸림편(130)을 형성한다.To this end, the tie bolts 100 are formed by processing both ends of the round bar 110, respectively, to form an insertion hole 121 and a cutting groove 122 at one end disposed outside the formwork during construction, and disposed between the formwork The other end portion is formed with a locking piece 130 to serve as a turn key (turn key).

삽입공(121)은 고정핀(쐐기 등)(도 7의 P 참조)이 삽입되어 당해 타이 볼트(100)가 거푸집으로부터 이탈되는 것을 방지하는 것이고, 절단홈(122)은 콘크리트 양생 완료 후 거푸집을 제거한 상태에 벽체로부터 돌출된 타이 볼트(100)의 일부분을 제거하는데 사용된다.Insertion hole 121 is a fixing pin (wedge, etc.) (see P of Figure 7) is inserted to prevent the tie bolt 100 is separated from the formwork, the cutting groove 122 is a formwork after the completion of concrete curing It is used to remove a portion of the tie bolt 100 protruding from the wall in the removed state.

걸림편(130)은 간격 유지구(200)의 고정구(210) 내부로 끼워지며, 그 상태에서 간격 유지구(200)가 회전되면 조립 또는 분리가 이루어질 수 있게 한다. The engaging piece 130 is fitted into the fixture 210 of the gap holder 200, and when the gap holder 200 is rotated in that state, assembly or separation may be performed.

타이 볼트(100)가 고정되어 있는 상태에서 간격 유지구(200)가 회전하므로, 엄밀히는 걸림편(130)을 능동적으로 회전하는 턴 키라고 할 수 없지만, 타이 볼트(100)도 간격 유지구(200)에 대한 상대적인 관점에서는 회전하는 것이 되므로, 걸림편(130)이 턴 키의 역할을 하는 것처럼 되는 것이다.Since the interval holder 200 rotates while the tie bolt 100 is fixed, it is not strictly referred to as a turn key that actively rotates the engaging piece 130, but the tie bolt 100 is also a spacer holder ( Since it is to be rotated in a relative view relative to 200, the locking piece 130 is to act as a turn key.

이러한 걸림편(130)은 일 예로 도시한 바와 같이 십자('+') 형상으로 이루어져 있는데, 이는 후술할 간격 유지구(200)의 결합공(211a)이 십자 형상으로 이루어져 있어서, 걸림편(130)이 결합공(211a)에 맞물려 끼워진 상태에서는 회전하지 않도록 하기 위함이다. This locking piece 130 is made of a cross ('+') shape as shown as an example, which is a coupling hole (211a) of the interval holder 200 to be described later is made of a cross shape, the locking piece 130 This is to prevent the rotation in the state in which the) is engaged with the coupling hole (211a).

따라서, 걸림편(130)은 일자('-') 형상으로 이루어져 있어도 그 일자 형상의 걸림편(130)이 십자 형상의 결합공(211a)에 끼워질 수 있고, 또한 결합공(211a)도 일자 형상으로 할 수 있으며, 나아가 걸림편(130)이 결합공(211a)에 끼워질 수 만 있으면 그외 다양한 형상도 적용가능할 것이다.Therefore, even when the locking piece 130 is formed in a straight ('-') shape, the locking piece 130 of the straight shape can be fitted into the cross coupling hole 211a, and the coupling hole 211a is also straight. It may be in the shape, and furthermore, if the locking piece 130 can be fitted in the coupling hole (211a) will be applicable to other various shapes.

다만, 조립시 간격 유지구(200)와 접촉하는 환봉(110)의 일측부에는 고무패킹(111)을 설치함으로써, 당해 타이 볼트(100)와 간격 유지구(200)를 서로 결합한 상태에서 콘크리트 타설시 상기 타이 볼트(100)와 간격 유지구(200) 사이의 틈새에 콘크리트가 유입되어, 콘크리트 양생 후 타이 볼트(100)와 간격 유지구(200)가 분리되지 않는 것을 방지하는 것이 바람직하다.
However, by installing the rubber packing 111 on one side of the round bar 110 in contact with the spacing holder 200 during assembly, the concrete bolt is placed in a state in which the tie bolt 100 and the spacing holder 200 are coupled to each other. When the concrete is introduced into the gap between the tie bolt 100 and the gap holder 200, it is preferable to prevent the tie bolt 100 and the gap holder 200 from being separated after curing the concrete.

한편, 간격 유지구(200)는 잠금 블럭(211)이 해제 블럭(212)에 조립되어 이루어진 고정구(210)와, 상기 고정구(210)에 연결된 회전축 봉(220)과, 상기 회전축 봉(220)에 구비된 한 쌍의 걸림 해제 봉(221a, 221b)과, 일측에 브라켓(234)을 구비하며 회전축 봉(220)이 관통 설치되는 설치 박스(231) 및 상기 설치 박스(231)의 일측에 승하강 가능하도록 설치된 링크(235)를 포함한다.
On the other hand, the spacing holder 200 is a fastener 210 made of a locking block 211 is assembled to the release block 212, a rotary shaft rod 220 connected to the fixture 210, and the rotary shaft rod 220 A pair of locking release rods (221a, 221b) provided in the, and having a bracket 234 on one side, the installation shaft 222 is installed in the rotation shaft rod 220 and the side of the installation box 231 And a link 235 installed to be descendable.

이때, 고정구(210)는 타이 볼트(100)의 단부에 구비된 걸림편(130)이 내부로 삽입되어 끼워지며, 상기 걸림편(130)이 끼워진 상태에서 회전하는 각도에 따라 걸림 동작 또는 해제(즉, 분리) 동작이 일어나게 한다.At this time, the fastener 210 is inserted into the locking piece 130 provided at the end of the tie bolt 100 is inserted into the inside, the locking operation or release (depending on the angle of rotation in the state that the locking piece 130 is fitted ( That is, the separation) operation occurs.

이러한 고정구(210)는 잠금 블럭(211)과 해제 블럭(212)을 포함하는데, 잠금 블럭(211)은 해제 블럭(212) 내부로 삽입된 상태에서 용접 등을 통해 견고하게 결합된다. 도 1에서는 잠금 블럭(211)의 단부(211c)가 해제 블럭(212) 내부의 점선부분까지 삽입된다.The fixture 210 includes a lock block 211 and a release block 212, the lock block 211 is firmly coupled through welding or the like in the inserted state into the release block 212. In FIG. 1, the end portion 211c of the locking block 211 is inserted to the dotted line inside the release block 212.

잠금 블럭(211)은 타이 볼트(100)의 걸림편(130)이 끼워지도록 걸림편(130)에 대응하는 형상의 결합공(211a)이 길이 방향으로 관통 형성되어 있고, 외측 단부에는 삽입 제한턱(211b)이 형성되어 있어서 잠금 블럭(211)의 단부와 해제 블럭(212)의 단부가 일치되면 더 이상의 삽입이 제한된다.The locking block 211 has a coupling hole 211a having a shape corresponding to the locking piece 130 so as to fit the locking piece 130 of the tie bolt 100 in the longitudinal direction, and an insertion limiting jaw at the outer end thereof. If 211b is formed so that the end of the locking block 211 and the end of the release block 212 coincide, further insertion is restricted.

결합공(211a)은 도시된 바와 같이 단면이 십자 형상으로 이루어져 있고 잠금 블럭(211)의 길이 방향을 따라 형성되어 있어서 대략 일자 형상으로 이루어진 걸림편(130)이 맞물려 끼워진다. As shown in the coupling hole 211a is formed in the cross section of the cross-sectional shape is formed along the longitudinal direction of the lock block 211, the engaging piece 130 made of a substantially straight shape is engaged.

다만, 걸림편(130) 역시 십자 형상이 되도록 할 수 있음은 자명하고, 결합공(211a)과 걸림편(130)의 형상은 서로 맞물려 끼워질 수 있다면 다양한 형상이 적용될 수 있다.However, it is obvious that the locking piece 130 can also be cross-shaped, and the shape of the coupling hole 211a and the locking piece 130 may be engaged with each other, and various shapes may be applied.

해제 블럭(212)은 원통 형상으로 이루어지되 잠금 블럭(211) 보다는 길이가 길다. 바람직하게 해제 블럭(212)은 내주면에 나사산이 형성된 것을 제외하면 콘 너트(cone nut)와 같이 테이퍼진 형상을 갖는 것이 콘크리트 양생 후 인출시 유리하다. The release block 212 has a cylindrical shape but has a longer length than the lock block 211. Preferably, the release block 212 has a tapered shape, such as a cone nut, except that threads are formed on the inner circumferential surface, which is advantageous when the concrete block is taken out after curing.

또한, 해제 블럭(212)이 잠금 블럭(211)보다 길기때문에 잠금 블럭(211)이 해제 블럭(212)의 일측 개방공을 통해 삽입되더라도 해제 블럭(212) 내부에는 잠금 블럭(211)이 없는 빈 공간(길이가 긴 만큼)을 가지며, 이 빈 공간에서 걸림편(130)이 회전할 수 있다.In addition, since the release block 212 is longer than the lock block 211, even if the lock block 211 is inserted through an opening in one side of the release block 212, the bin without the lock block 211 is not present inside the release block 212. It has a space (as long as it is long), and the locking piece 130 can rotate in this empty space.

따라서, 걸림편(130)을 결합공(211a)에 끼운 상태에서 타이 볼트(100)를 고정구(210)에 밀어넣으면, 걸림편(130)이 해제 블럭(212) 내의 빈 공간에 위치하게 되고, 이때 간격 유지구(200)를 회전시키면 걸림편(130)과 결합공(211a)이 불일치하여 잠금 동작이 일어나고, 그 후 간격 유지구(200)를 다시 회전시켜 걸림편(130)과 결합공(211a)을 일치시키면 잠금을 해제하고 간격 유지구(200)를 인출할 수 있게 된다.
Therefore, when the tie bolt 100 is pushed into the fixture 210 while the locking piece 130 is inserted into the coupling hole 211a, the locking piece 130 is positioned in an empty space in the release block 212, At this time, when the interval retainer 200 is rotated, the locking piece 130 and the engagement hole 211a are inconsistent, and a locking operation occurs. Then, the interval retainer 200 is rotated again to engage the locking piece 130 and the engagement hole ( If 211a) is matched, the lock can be released and the gap holder 200 can be withdrawn.

회전축 봉(220)은 상기 고정구(210)의 일단에 연결되어 있으며, 길이가 긴 관 형상으로 이루어져 있다. 회전축 봉(220)은 타이 볼트(100)와의 연결을 통해 거푸집이 서로 멀어지는 것을 억제하는 지지력을 제공하고, 타이 볼트(100)와의 결합 해제시에는 고정구(210)를 회전시키는 회전축으로서의 역할도 한다.Rotary shaft rod 220 is connected to one end of the fixture 210, it is made of a long tubular shape. Rotating shaft rod 220 provides a support force to suppress the formwork from moving away from each other through the connection with the tie bolt 100, and also serves as a rotating shaft for rotating the fixture 210 when the coupling with the tie bolt 100.

이러한 회전축 봉(220)의 측부에는 한 쌍의 걸림 해제 봉(221a, 221b)이 설치되어 있고, 단부에는 지지편(222)이 돌출 형성되어 있으며, 스프링(223)이 그 외주면을 둘러싸도록 끼워져 있다. 또한, 일측부에는 실링장치(224)가 설치되어 있다.A pair of locking release rods 221a and 221b are provided at the side of the rotating shaft rod 220, a support piece 222 is protrudingly formed at the end thereof, and a spring 223 is fitted to surround the outer circumferential surface thereof. . In addition, the sealing device 224 is provided on one side.

걸림 해제 봉(221a, 221b)은 회전축 봉(220)이 설치 박스(231) 내에서 회전하거나 전후방으로 이동하는데 사용되는 것으로, 회전축 봉(220)의 외주면으로부터 외측 방향으로 연장 형성되되, 서로 마주보는 방향에 배치된 한 쌍으로 이루어져 있어서, 설치 박스(231)의 양측에 형성된 장공(232, 233)에 끼워진다.The locking release rods 221a and 221b are used to rotate or move forward and backward in the installation box 231 in the rotation shaft rod 220, and are formed to extend outward from the outer circumferential surface of the rotation shaft rod 220 to face each other. It consists of a pair arrange | positioned in the direction, and is fitted in the long holes 232 and 233 formed in both sides of the installation box 231. As shown in FIG.

지지편(222)은 스프링(223)의 일단을 지지하여 탄성 복원력을 발생시키는데 사용되고, 또한 필요시에는 당해 지지편(222)을 잡고 돌림으로써 회전축 봉(220)과 고정구(210)를 회전시키는데 사용된다. The support piece 222 is used to support one end of the spring 223 to generate an elastic restoring force, and if necessary, to support and rotate the rotary shaft rod 220 and the fixture 210 by holding and rotating the support piece 222. do.

실링장치(224)는 고정구(210)가 거푸집을 관통하여 삽입하는데 사용되는 구멍을 막아 콘크리트 타설이 그에 포함된 수분이나 콘크리트가 누출되는 것을 방지하는 것으로, 일 예로 회전축 봉(220)이 설치 박스(231)에 끼운 후 회전축 봉(220)의 외주면에 형성된 끼움홈에 끼우는 방식으로 조립된다.
The sealing device 224 is to prevent the leakage of water or concrete contained in the concrete pouring by blocking the hole used to insert the fixture 210 through the formwork, for example, the rotary shaft rod 220 is installed box ( 231 and then assembled in a fitting groove formed on the outer circumferential surface of the rotary shaft rod 220.

설치 박스(231)는 그 내부 회전축 봉(220)이 관통 설치되는 것으로, 일 예로 전방과 후방이 개방된 사각 박스 형상으로 이루어져 있어서 회전축 봉(220)이 그 전방과 후방을 관통하여 설치된다. The installation box 231 is installed through the inner rotation shaft rod 220, for example, is formed in a rectangular box shape of the front and rear open so that the rotation shaft rod 220 is installed through the front and rear.

또한, 개방된 설치 박스(231)의 후방에는 브라켓(234)이 설치되어 있는데, 브라켓(234)은 당해 간격 유지구(200)를 타 물체에 지지시키는데 사용되며, 도 4에 도시된 바와 같이 회전축 봉(220)이 끼워지는 제1조립공(234a) 및 걸림 해제 봉(221a, 221b)이 끼워지는 제2조립공(234b)이 형성되어 있다.In addition, a bracket 234 is installed at the rear of the installation box 231 that is open, and the bracket 234 is used to support the gap holder 200 to other objects, and as shown in FIG. The first assembly hole 234a into which the rod 220 is fitted and the second assembly hole 234b into which the locking release rods 221a and 221b are fitted are formed.

따라서, 걸림 해제 봉(221a, 221b)이 양측으로 돌출되어 있는 회전축 봉(220)을 제1조립공(234a)과 제2조립공(234b)을 통해 끼워넣을 수 있게 하고, 그 후에는 제1조립공(234a)이 회전축 봉(220)을 지지함으로써 회전축 봉(220)이 안정적으로 회전할 수 있게 한다.Therefore, it is possible to insert the rotary shaft rod 220 with the locking release rods 221a and 221b protruding to both sides through the first assembly hole 234a and the second assembly hole 234b, and thereafter, the first assembly hole ( 234a supports the rotating shaft rod 220 to allow the rotating shaft rod 220 to rotate stably.

또한, 양측면에는 각각 걸림 해제 봉(221a, 221b)이 끼워진 상태로 이동할 수 있는 수직 장공(232a, 233a)이 형성되어 있는데, 일측 수직 장공(232a)과 타측 수직 장공(233a)의 길이는 서로 동일한 반면, 일측 수직 장공(232a)의 하단이 타측 수직 장공(233a)의 상단과 일치하고 있어서 이들 간의 설치 높이는 서로 다르다.In addition, both sides are formed with vertical long holes 232a and 233a, which can be moved in a state where the engaging rods 221a and 221b are fitted, respectively, and the lengths of one vertical long hole 232a and the other vertical long hole 233a are the same. On the other hand, the lower end of one vertical long hole 232a is coincident with the upper end of the other vertical long hole 233a, and the installation height therebetween is different.

이러한 수직 장공(232a, 233a)은 걸림 해제 봉(221a, 221b)의 회동 거리를 제한함으로써 일측 방향으로 끝까지 회전시키면 자연스럽게 타이 볼트(100)의 걸림편(130)이 고정구(210)의 결합공(211a)과 일치되게 한다. 이를 위해 수직 장공(232a, 233a)의 위치와 길이는 미리 계산된다.When the vertical long holes 232a and 233a rotate to the end in one direction by limiting the rotation distance of the locking release rods 221a and 221b, the locking piece 130 of the tie bolt 100 is naturally coupled to the coupling hole of the fixture 210 ( 211a). To this end, the positions and lengths of the vertical holes 232a and 233a are calculated in advance.

또한, 설치 박스(231)의 일측면에 형성된 수직 장공(232a)의 상단과 상기 설치 박스(231)의 타측면에 형성된 수직 장공(233a)의 하단에는 각각 상기 거푸집으로부터 멀어지는 방향으로 수평 장공(232b, 233b)이 연결 형성되어 있다.
In addition, the upper end of the vertical long hole 232a formed on one side of the installation box 231 and the lower end of the vertical long hole 233a formed on the other side of the installation box 231, respectively, in the direction away from the formwork horizontal hole 232b. , 233b) is connected.

링크(235)는 걸림 해제 봉(221a)을 들어올려 회전축 봉(220)이 회전되도록 함으로써 타이 볼트(100)와 간격 유지구(200)의 결합이 해제되도록 하는 것으로, 일 예로서 그 하부(235a)와 상부(235b)는 설치 박스(231) 상측과 하측으로 각각 노출되어 있어서 후술하는 바와 같이 와이어(도 8의 'W' 참조)가 연결될 수 있도록 하고, 설치 박스(231) 내부에 위치하는 부분에는 연결구(235c)를 구비하여 걸림 해제 봉(221a, 221b) 중 어느 하나가 연결되게(혹은, 놓여지게) 한다. 도에서는 일측 걸림 해제 봉(221a)에 걸려있는 것을 예로 들었다.The link 235 is to lift the locking rod 221a to rotate the rotating shaft rod 220 to release the coupling of the tie bolt 100 and the spacer 200, for example, the lower portion 235a. ) And the upper portion 235b are respectively exposed to the upper side and the lower side of the installation box 231 so that a wire (see 'W' in FIG. 8) can be connected as described below, and a portion located inside the installation box 231. It is provided with a connector 235c so that any one of the engaging rods (221a, 221b) is connected (or placed). In the figure, an example of hanging on one side of the release rod 221a is given.

이러한 링크(235)는 도 5에 도시된 바와 같이 관체를 굴곡시켜 만든 폐루프의 중간에 상기 연결구(235c)를 가로질러 설치한 것이 사용될 수 있다. 폐루프 형상의 링크(235)는 그 연결구(235c) 위에 걸림 해제 봉(221a 또는 221b)을 걸어 놓는 방식으로 걸림 해제 봉(221a, 221b)과의 연결을 형성하고, 이때 링크(235)의 폭은 넓어서 걸림 해제 봉(221a 또는 221b)이 전후방으로 이동하는 공간부를 제공한다.As shown in FIG. 5, the link 235 may be used to be installed across the connector 235c in the middle of a closed loop made by bending a tubular body. The closed loop shaped link 235 forms a connection with the unlocking rods 221a and 221b in such a manner as to hold the unlocking rods 221a or 221b on the connector 235c, where the width of the link 235 is determined. Is wide to provide a space portion through which the release bar 221a or 221b moves forward and backward.

물론, 도 6의 (a)에 도시된 바와 같이 링크(235')의 다른 예로서 하부(235a')는 폐루프 형상을 갖도록 하고, 상부(235b')는 걸고리를 사용함으로써 이상과 동일한 효과를 갖게 할 수 있다.Of course, as shown in (a) of FIG. 6, as another example of the link 235 ', the lower portion 235a' has a closed loop shape, and the upper portion 235b 'has the same effect as above by using a hook. I can have it.

또한, 도 6의 (b)와 같이 하부(236a)와 상부(236b)를 갖되 중심에 걸림 해제 봉(221a)이 끼워지는 연결부(236c)를 관통 형성하고, 설치 박스(231)의 외부로 노출되는 하부(236a)와 상부(236b)에는 각각 와이어(W)가 체결되는 체결공이 형성되어 있는 링크(236)도 사용될 수 있다.In addition, as shown in (b) of FIG. 6, the lower portion 236a and the upper portion 236b are formed through the connecting portion 236c into which the locking release rod 221a is fitted, and exposed to the outside of the installation box 231. Links 236 having a fastening hole to which wires W are fastened to each of the lower portions 236a and 236b may also be used.

또한, 도 6의 (c)와 같은 하부(237a)와 상부(237b)를 갖는 링크(237) 역시 사용될 수 있는데, 이러한 경우에는 별도의 연결구(235c 등)가 필요 없는 대신 하부(237a)에 걸림 해제 봉(221a 또는 221b) 놓여지며, 하부(237a)는 외부로 노출되지 않고 설치 박스(231) 내부에 위치한다.
In addition, a link 237 having a lower portion 237a and an upper portion 237b as shown in FIG. 6C may also be used. In this case, a separate connector 235c or the like is not required and is caught by the lower portion 237a. The release rods 221a or 221b are placed, and the lower portion 237a is positioned inside the installation box 231 without being exposed to the outside.

이하, 첨부된 도면을 참조하여 이상과 같은 구성으로 이루어진 본 발명의 거푸집 간격 유지장치의 조립 상태 및 동작 상태에 대해 설명한다.
Hereinafter, with reference to the accompanying drawings will be described the assembly state and the operating state of the formwork gap holding device of the present invention made of the above configuration.

도 2는 타이 볼트(100)와 간격 유지구(200)가 서로 고정된 결합상태를 나타낸 것이고, 도 3은 링크(235)를 잡아당겨 타이 볼트(100)와 간격 유지구(200)가 서로 분리되고 있는 상태를 나타낸 것이다.FIG. 2 shows a state in which the tie bolt 100 and the spacing holder 200 are fixed to each other, and FIG. 3 shows the tie bolt 100 and the spacing holder 200 separated from each other by pulling the link 235. It is a state of being.

도 2와 같이 타이 볼트(100)의 걸림편(130)이 간격 유지구(200)의 결합공(211a)에 끼워지면 작업자가 간격 유지구(200)를 회전시켜 걸림편(130)과 결합공(211a)이 일치되지 않도록 함으로써, 당해 타이 볼트(100)와 간격 유지구(200)가 콘크리트 타설시의 팽창력에 대항하여 거푸집 사이의 간격이 벌어지는 것을 방지한다.When the locking piece 130 of the tie bolt 100 is fitted into the coupling hole 211a of the gap holder 200 as shown in FIG. 2, the operator rotates the gap holder 200 to engage the locking piece 130 and the coupling hole. By making the 211a not coincide with each other, the tie bolt 100 and the gap holder 200 prevent the gap between the formwork from being opened against the expansion force during the concrete placing.

이때, 회전축 봉(220)에 구비된 걸림 해제 봉(221a, 221b) 중 하나(221a)는 설치 박스(231)의 일측면에 형성된 수직 장공(232a)의 하단에 위치하고, 걸림 해제 봉(221a, 221b) 중 다른 하나(221b)는 설치 박스(231)의 타측면에 형성된 수직 장공(233a)의 상단에 위치하여, 이와 같이 서로 마주보는 한 쌍의 걸림 해제 봉(221a, 221b)은 수평을 유지한다.At this time, one of the locking rods (221a, 221b) provided in the rotary shaft rod 220 (221a) is located at the bottom of the vertical long hole 232a formed on one side of the installation box 231, the locking rod (221a, The other one of the 221b (221b) is located at the top of the vertical long hole 233a formed on the other side of the installation box 231, the pair of engaging release rods (221a, 221b) facing each other in this way is horizontal do.

아울러, 회전축 봉(220)에 끼워진 스프링(223)의 일단은 지지편(222)에 의해 지지되고, 스프링(223)의 타단은 설치 박스(231)(더욱 정확히는 브라켓(234))에 의해 지지되며, 그와 동시에 고정구(210)가 걸림편(130)에 끼워지도록 회전축 봉(220)을 밀어넣어 걸림 해제 봉(221a, 221b)이 수직 장공(232a, 233a)에 끼워지는 과정에서 스프링(223)이 압축되므로 탄성 복원력은 회전축 봉(220)이 타이 볼트(100)로부터 멀어지는 방향으로 작용하고 있다.
In addition, one end of the spring 223 fitted to the rotary shaft rod 220 is supported by the support piece 222, the other end of the spring 223 is supported by the installation box 231 (more precisely the bracket 234) At the same time, the spring 223 in the process of fitting the locking rods (221a, 221b) to the vertical long holes (232a, 233a) by pushing the rotary shaft rod 220 so that the fixture 210 is fitted to the locking piece (130). Because of this compression, the elastic restoring force acts in a direction away from the tie bolt 100.

이상과 같은 상태에서 거푸집 사이에 콘크리트를 타설하고 양생을 한 후 간격 유지구(200)는 제거된다. 간격 유지구(200)의 제거는 그 제거 용이성을 위해 콘크리트 타설 후 약 2일이 경과하여 콘크리트가 완전히 굳기 이전에 수행된다. After pouring concrete and curing between the formwork in the above state, the spacer 200 is removed. Removal of the gap holder 200 is performed before the concrete is completely hardened by about two days after the concrete is placed for ease of removal.

타이 볼트(100)는 벽체 외부로 돌출된 일부분을 제외하고는 벽체 내에 잔존하게 되며, 콘크리트가 완전히 굳은 후 거푸집을 제거한 상태에서 상기 일부분(즉, 타이 볼트(100)의 단부에서 절단홈(122)까지)을 제거한다. 제거는 돌출된 부분을 강하게 내리쳐 구부리거나 부러뜨려 제거하는 방식 등을 사용한다.The tie bolt 100 remains in the wall except for a portion that protrudes out of the wall, and the cutting groove 122 at the end of the portion (ie, the end of the tie bolt 100) is removed after the concrete is completely hardened. To remove). The removal may be performed by strongly lowering the protruding portion by bending it or breaking it.

본 발명은 간격 유지구(200)를 제거함에 있어서 도 3에 도시된 바와 같이 링크(235)를 잡아당기기만 하면 된다는 점에서 종래기술과 차이가 있다.The present invention differs from the prior art in that the gap holder 200 only needs to pull the link 235 as shown in FIG. 3.

즉, 도 5의 (a)와 같이 일측 걸림 해제 봉(221a)은 조립 박스 내에서 링크(235) 위에 놓여 있어서, 링크(235)를 잡아당기면 도 5의 (b)와 같이 걸림 해제 봉(221a) 역시 들어 올려지므로, 회전축 봉(220)에 연결된 걸림 해제 봉(221a, 221b)이 반시계 방향으로 회전된다.
That is, one side release rod 221a is placed on the link 235 in the assembling box as shown in FIG. 5A, and when the link 235 is pulled out, the release rod 221a as shown in FIG. 5B. ) Is also lifted, the locking rods (221a, 221b) connected to the rotating shaft rod 220 is rotated in the counterclockwise direction.

따라서, 들어 올려진 일측 걸림 해제 봉(221a)은 일측 수직 장공(232a, 233a)의 상단에 위치하고, 나머지 걸림 해제 봉(221b)은 타측 수직 장공(233a)의 하단에 위치하게 되며, 회전축 봉(220)이 회전하면서 타이 볼트(100)의 걸림편(130)이 간격 유지구(200)의 결합공(211a)과 일치하게 된다. Therefore, the lifted one side lifting release bar 221a is located at the top of one side vertical long hole 232a and 233a, and the remaining stop rod 221b is positioned at the bottom of the other vertical long hole 233a, and the rotating shaft rod ( As the 220 rotates, the engaging piece 130 of the tie bolt 100 coincides with the engaging hole 211a of the gap holder 200.

상술한 바와 같이 수직 장공(232a, 233a)의 길이가 미리 설계되어 있어서 링크(235)를 끝까지 잡아당기면 자동으로 걸림편(130)과 결합공(211a)이 일치하게 된다.As described above, the lengths of the vertical long holes 232a and 233a are designed in advance, and when the link 235 is pulled to the end, the locking piece 130 and the coupling hole 211a automatically coincide with each other.

또한, 걸림편(130)과 결합공(211a)이 일치하면 타이 볼트(100)와 간격 유지구(200)가 서로 이탈 가능하게 되는데, 이때 스프링(223)은 간격 유지구(200)의 이탈 방향으로 탄성 복원력이 작용하고 있고, 걸림 해제 봉(221a, 221b)은 수평 장공(232b, 233b)과 동축선상에 위치하고 있다.In addition, when the locking piece 130 and the coupling hole 211a coincide with each other, the tie bolt 100 and the gap holder 200 may be separated from each other. In this case, the spring 223 may be separated from the gap holder 200. The elastic restoring force acts, and the locking release rods 221a and 221b are coaxial with the horizontal long holes 232b and 233b.

따라서, 걸림 해제 봉(221a, 221b)은 수평 장공(232b, 233b)을 따라 후방으로 이동하면서 간격 유지구(200)는 자동으로 이탈된다. 물론, 스프링(223)이 없더라도 링크(235)를 들어올린 상태에서 회전축 봉(220)을 잡아당기면 수동으로 간격 유지구(200)를 이탈시킬 수 있다.Therefore, the gap retainer 200 is automatically released while the locking release rods 221a and 221b move backward along the horizontal long holes 232b and 233b. Of course, even if there is no spring 223, pulling the rotary shaft rod 220 in the lifted state of the link 235 can be manually separated from the spacer 200.

간격 유지구(200)가 이탈되면 걸림 해제 봉(221a, 221b) 역시 수평 장공(232b, 233b)을 따라 이동하므로, 도 5의 (b)와 도 6에 각각 도시한 바와 같이 링크(235) 내에서의 위치 역시 변경된다. 간격 유지구(200)의 이탈을 위해 링크(235)의 하부에는 충분한 이동 공간을 갖고 있는 것이다.
When the gap retainer 200 is separated, the locking release rods 221a and 221b also move along the horizontal holes 232b and 233b, so as shown in FIGS. 5B and 6, respectively, in the link 235. The position at is also changed. In order to separate the gap holder 200, the lower portion of the link 235 has a sufficient moving space.

이상과 같은 본 발명에 따른 거푸집 간격 유지장치의 설치는 도 7에 예시된 바와 같이 거푸집(3, 4)에 설치된다. 도시된 바와 같이 타이 볼트(100)는 고정핀(쐐기 등)(P)을 이용하여 일측 거푸집(4)에 고정되고, 간격 유지구(200)는 타측 거푸집(3)에 고정되며, 이러한 타이 볼트(100)와 간격 유지구(200)는 거푸집(3, 4) 사이에서 서로 연결된다.Installation of the formwork gap maintaining device according to the present invention as described above is installed in the formwork (3, 4) as illustrated in FIG. As shown, the tie bolt 100 is fixed to one formwork 4 using a fixing pin (wedge, etc.) (P), the spacing holder 200 is fixed to the other formwork (3), such a tie bolt 100 and the spacing holder 200 are connected to each other between the formwork (3, 4).

거푸집(3, 4) 위에는 수직 프레임(Y)이 일정 간격마다 고정되어 있고, 수직 프레임(Y) 위에는 수평 프레임(X)이 일정 간격마다 고정되어 있어서, 격자 형상을 이루며 이들 간이 틈새로 설치 박스(231)와 회전축 봉(220)이 삽입되며, 브라켓(234)은 수평 프레임(X)에 걸쳐 있어서 당해 거푸집 간격 유지장치를 지지한다. 이와 같이 거푸집 간격 유지장치가 설치된 상태에서 콘크리트(C)가 타설된다.
The vertical frames Y are fixed at regular intervals on the dies 3 and 4, and the horizontal frames X are fixed at regular intervals on the vertical frame Y, forming a lattice shape and installing boxes with these gaps. 231 and the rotating shaft rod 220 is inserted, the bracket 234 is supported over the horizontal frame (X) to support the mold spacing device. Thus, the concrete (C) is poured in a state in which the formwork gap maintaining device is installed.

한편, 도 8에 도시된 바와 같이 상기 링크(235)에 연결되는 와이어(W)를 더 구비하면 작업자가 와이어(W)를 잡아당김에 따라 링크(235)가 들어올려져서 회전축 봉(220)이 회전하고, 간격 유지구(200)와 타이 볼트(100)의 조립을 해제할 수 있게 한다. On the other hand, as shown in Figure 8 is further provided with a wire (W) connected to the link 235, as the operator pulls the wire (W), the link 235 is lifted to rotate the rod 220 Rotate and release the assembly of the gap holder 200 and the tie bolt 100.

특히, 각 열을 따라 설치된 복수개의 링크(235)들을 하나의 와이어(W)로 공통 연결하고, 복수개의 열을 위해 사용된 복수개의 와이어(W)를 공통 프레임(F)에 연결하면, 상기 공통 프레임(F)에 고정된 걸고리(L)를 들어올림으로써 모든 간격 유지구(200)를 동시에 제거할 수 있게 된다.In particular, when the plurality of links 235 installed along each column are commonly connected with one wire W, and the plurality of wires W used for the plurality of rows are connected to the common frame F, the common By lifting the hook L fixed to the frame F, all the gap holders 200 can be removed at the same time.

와이어(W)를 이용하여 모든 링크(235)를 동시에 연결하는 방법으로서 도 5와 같은 링크(235)를 예로 들면, 설치 박스(231)의 외부로 노출된 링크(235)의 하부(235a)와 다른 링크(235)의 상부(235b)를 와이어(W)에 의해 서로 연결하는 방법이 사용될 수 있다. 최상부에 위치한 링크(235)의 상부(235b)는 와이어(W)에 의해 공통 프레임(F)과 연결된다.As a method of connecting all the links 235 at the same time using the wire (W), for example, the link 235 as shown in Figure 5, the lower portion (235a) of the link 235 exposed to the outside of the installation box 231 and A method of connecting the upper portion 235b of the other link 235 to each other by the wire W may be used. The upper portion 235b of the link 235 located at the top thereof is connected to the common frame F by a wire W.

따라서, 본 발명은 벽면이 넓어서 많은 수의 거푸집 간격 유지장치를 설치하거나, 거푸집 간격 유지장치의 위치가 높은 곳이라 하더라도 간격 유지구(200)를 안전하고, 신속하며, 편리하게 제거할 수 있게 한다.
Therefore, the present invention allows a large number of formwork spacing devices to be installed on the wall, or even if the location of the formwork spacing devices is high, so that the spacer 200 can be safely, quickly and conveniently removed. .

이하, 첨부된 도면을 참조하여 본 발명의 다른 실시예에 따른 거푸집 간격 유지장치에 대해 설명한다.Hereinafter, a formwork gap maintaining apparatus according to another embodiment of the present invention will be described with reference to the accompanying drawings.

도 9에 도시된 바와 같이 본 발명의 다른 실시예는 위에서 설명한 타이 볼트(100)가 끼워져 상기 타이 볼트(100)와 함께 거푸집의 간격을 유지하는 또 다른 실시예의 간격 유지구(300)가 사용될 수 있다.As shown in FIG. 9, another embodiment of the present invention may use the gap holder 300 of another embodiment in which the tie bolt 100 described above is inserted to maintain the gap of the formwork with the tie bolt 100. have.

이러한 간격 유지구(300)는 타이 볼트의 걸림편(130)이 끼워지는 고정구(310)와, 상기 고정구(310)에 연결된 회전축 봉(320)과, 상기 회전축 봉(320)의 외주면에 끼워진 상태로 이동하는 판 브라켓(330)을 포함한다.The spacing holder 300 is a fixture 310 to which the locking piece 130 of the tie bolt is fitted, a rotary shaft rod 320 connected to the fixture 310, and a state fitted to the outer circumferential surface of the rotary shaft rod 320. It includes a plate bracket 330 to move to.

또한, 회전축 봉(320)의 단부에는 지지편(321)이 구비되어 있고, 지지편(321)에는 와이어(W)와의 연결을 위한 해제봉(321a)이 돌출되어 있다. 회전축 봉(320)에는 스프링(322)이 끼워져 있는데, 스프링(322)의 일단은 지지편(321)에 지지되고 타단은 판 브라켓(330)에 지지되어 탄성 복원력을 발생시킨다.In addition, a support piece 321 is provided at an end of the rotating shaft rod 320, and a release bar 321a for connecting to the wire W protrudes from the support piece 321. A spring 322 is inserted into the rotating shaft rod 320, and one end of the spring 322 is supported by the support piece 321 and the other end is supported by the plate bracket 330 to generate an elastic restoring force.

따라서, 전술한 바와 유사하게 수평 프레임(X) 위에 판 브라켓(330)이 걸려 지지되도록 한 상태에서 고정구(310)에 타이 볼트(100)를 끼워 거푸집의 간격을 유지하고, 콘크리트 양생후에는 와이어(W)를 잡아당기기만 하면 회전축 봉(320)과 타이 볼트(100)의 결합이 해제되며, 이때 스프링(322)의 탄성 복원력에 의해 외측으로 자동 이탈된다.
Accordingly, similarly to the above, the tie bolts 100 are inserted into the fixture 310 in a state in which the plate bracket 330 is supported on the horizontal frame X to maintain the spacing of the formwork. Simply pull W) to release the coupling of the rotating shaft rod 320 and the tie bolt 100, and at this time, the spring 322 is automatically released to the outside by the elastic restoring force.

이러한 간격 유지구(300) 역시 복수개 나열되고, 그 복수개의 간격 유지구(300)를 하나의 와이어(W)에 의해 공통 연결함으로써, 상기 와이어(W)를 잡아당기면 복수개의 간격 유지구(300)가 동시에 분리되도록 할 수 있다.A plurality of such spacing holders 300 are also listed, and by connecting the plurality of spacing holders 300 in common by a single wire W, when pulling the wires W, a plurality of spacing holders 300 are provided. Can be separated at the same time.

이상, 본 발명의 특정 실시예에 대하여 상술하였다. 그러나, 본 발명의 사상 및 범위는 이러한 특정 실시예에 한정되는 것이 아니라, 본 발명의 요지를 변경하지 않는 범위 내에서 다양하게 수정 및 변형이 가능하다는 것을 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 이해할 것이다. The specific embodiments of the present invention have been described above. It is to be understood, however, that the scope and spirit of the present invention is not limited to these specific embodiments, and that various modifications and changes may be made without departing from the spirit of the present invention. If you have, you will understand.

100: 타이 볼트 121: 삽입공
130: 걸림편 200: 간격 유지구
210: 고정구 211: 잠금 블럭
211a: 결합공 212: 해제 블럭
220: 회전축 봉 221a, 221b: 걸림 해제 봉
222: 지지편 223: 스프링
224: 실링장치 231: 설치 박스
232a, 233a: 수직 장공 232b, 233b: 수평 장공
234: 브라켓 235: 링크
X: 수평 프레임 Y: 수직 프레임
L: 걸고리 F: 공통 프레임
W: 와이어
100: tie bolt 121: insertion hole
130: jam piece 200: gap holder
210: fixture 211: lock block
211a: engagement hole 212: release block
220: rotating shaft rod 221a, 221b: locking release rod
222: support piece 223: spring
224: sealing device 231: installation box
232a, 233a: vertical slot 232b, 233b: horizontal slot
234: bracket 235: link
X: horizontal frame Y: vertical frame
L: Hook F: Common Frame
W: wire

Claims (1)

일측 거푸집에 설치되는 타이 볼트와 타측 거푸집에 설치되는 간격 유지구를 서로 조립하여 상기 거푸집 사이의 간격을 유지시키는 거푸집 간격 유지장치에 있어서,
상기 간격 유지구는,
상기 타이 볼트의 단부에 구비된 걸림편이 끼워지며, 상기 걸림편이 끼워진 상태에서 회전하는 각도에 따라 걸림 동작 또는 해제 동작이 일어나는 고정구와;
상기 고정구에 연결되어 있으며, 길이가 긴 관 형상으로 이루어진 회전축 봉과;
상기 회전축 봉의 외주면에 끼워진 상태로 수평왕복운하는 판 브라켓과;
상기 회전축 봉의 단부에는 구비되며 와이어가 연결되는 해제봉이 설치되어 있는 지지편; 및
상기 회전축 봉에 끼워져 일단은 상기 지지편에 지지되고 타단은 상기 판 브라켓에 지지되어 탄성 복원력을 발생시키는 스프링;을 포함하여,
상기 와이어를 잡아당기면, 상기 회전축 봉이 회전하면서 상기 간격 유지구와 타이 볼트의 조립이 해제되는 것을 특징으로 하는 거푸집 간격 유지장치.
In the formwork space maintaining device for assembling each other the tie bolts installed in one formwork and the spacing device installed in the other formwork to maintain the spacing between the formwork,
The gap holder,
A fastener to which a locking piece provided at an end of the tie bolt is fitted, and which engages or releases according to an angle of rotation when the locking piece is fitted;
A rotating shaft rod connected to the fixture and having a long tubular shape;
A plate bracket which horizontally reciprocates while being fitted to an outer circumferential surface of the rotary shaft rod;
A support piece provided at an end of the rotary shaft rod and having a release rod connected to the wire; And
And a spring inserted into the rotary shaft rod and having one end supported by the support piece and the other end supported by the plate bracket to generate an elastic restoring force.
Pulling the wire, form the gap holding device characterized in that the assembly of the spacing holder and the tie bolt is released while the rotary shaft rod is rotated.
KR1020120044328A 2012-04-27 2012-04-27 Apparatus for keeping distance of flash board KR20130028846A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120044328A KR20130028846A (en) 2012-04-27 2012-04-27 Apparatus for keeping distance of flash board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120044328A KR20130028846A (en) 2012-04-27 2012-04-27 Apparatus for keeping distance of flash board

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020110092297A Division KR101162725B1 (en) 2011-09-11 2011-09-11 Apparatus for keeping distance of flash board

Publications (1)

Publication Number Publication Date
KR20130028846A true KR20130028846A (en) 2013-03-20

Family

ID=48179136

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120044328A KR20130028846A (en) 2012-04-27 2012-04-27 Apparatus for keeping distance of flash board

Country Status (1)

Country Link
KR (1) KR20130028846A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101708470B1 (en) * 2015-11-25 2017-03-08 한철호 A Spacer device for constructing Gangform
CN115419254A (en) * 2022-08-24 2022-12-02 西安鸿发建筑工程有限公司 Efficiency-improving and consumption-reducing aluminum formwork and construction method thereof
KR20230080649A (en) * 2021-11-30 2023-06-07 윤도영 Detachable structure of the space keeping device for formwork

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101708470B1 (en) * 2015-11-25 2017-03-08 한철호 A Spacer device for constructing Gangform
KR20230080649A (en) * 2021-11-30 2023-06-07 윤도영 Detachable structure of the space keeping device for formwork
CN115419254A (en) * 2022-08-24 2022-12-02 西安鸿发建筑工程有限公司 Efficiency-improving and consumption-reducing aluminum formwork and construction method thereof
CN115419254B (en) * 2022-08-24 2024-02-27 西安鸿发建筑工程有限公司 Synergistic consumption-reducing aluminum template and construction method thereof

Similar Documents

Publication Publication Date Title
KR20130028846A (en) Apparatus for keeping distance of flash board
KR101152340B1 (en) Fast column waler
KR101262852B1 (en) Space keep goods for mold
KR102105585B1 (en) Nut assembly for fastening mold and mold jointing apparatus using the same
KR20180022216A (en) Dice fixing band for the concrete pillars pouring
KR200474402Y1 (en) Support and connection equipment for form frame
KR101332415B1 (en) Maintain distance device of concrete mold
KR101641339B1 (en) Device for maintaining distance of concrete mold and method for constructing concrete building
KR101162725B1 (en) Apparatus for keeping distance of flash board
KR101264501B1 (en) Headed coupler form-tie connecting panel and construction method using the same
JP5123441B1 (en) Anchor unit, foundation and foundation construction method, leveling method
KR101142879B1 (en) Support structure for slab foam panel
KR20120002152A (en) Device for supporting concrete wall form
KR20130081934A (en) Phc pile column manufacturing method
KR20090010281A (en) Concrete closing device
KR101365266B1 (en) Distance maintenance implement for mold
KR101722021B1 (en) System pillar form
KR20120128455A (en) Device fixing water proof concrete mold for aluminum form
KR100978025B1 (en) Concrete form
KR200436632Y1 (en) Conclusion structure of space maintenance device for mold
KR101381660B1 (en) Space keep goods for mold
KR102007382B1 (en) Mold jointing apparatus
KR200397601Y1 (en) conclusion structure of space maintainer for mold
KR101513394B1 (en) Installation structure a form panel for construction concrete wall
KR200395266Y1 (en) Mold fixing unit

Legal Events

Date Code Title Description
A107 Divisional application of patent
WITN Withdrawal due to no request for examination