KR20120002152A - Device for supporting concrete wall form - Google Patents
Device for supporting concrete wall form Download PDFInfo
- Publication number
- KR20120002152A KR20120002152A KR1020100062895A KR20100062895A KR20120002152A KR 20120002152 A KR20120002152 A KR 20120002152A KR 1020100062895 A KR1020100062895 A KR 1020100062895A KR 20100062895 A KR20100062895 A KR 20100062895A KR 20120002152 A KR20120002152 A KR 20120002152A
- Authority
- KR
- South Korea
- Prior art keywords
- panel
- formwork
- gap
- protrusion
- binding
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/064—Spacers placed on the bottom of the mould
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G2017/0646—Tying means; Spacers ; Devices for extracting or inserting wall ties made of a flat strip, e.g. of metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention relates to a mold spacing retainer, the object of which provides the convenience of the gap maintaining installation of the panels constituting the formwork and the separation of the formwork after concrete curing, and fully bear the compression and tensile load applied to both panels By firmly sticking to the initial position of panels spaced at regular intervals, the formwork parts are exposed around the cured concrete structure to weaken the rigidity of the concrete, or to maintain the formwork gap to prevent the closing end acting as an interference member in the future finishing work. In providing a sphere.
The present invention provides a horizontal gap between the panel and the panel constituting the formwork for maintaining the gap between the panel and the panel to maintain the gap; A binding portion into which the panel and the lower end of the panel are fitted, respectively, a buried type body which connects the binding portion and is in close contact with the bottom surface and has a cutout recess adjacent to the binding portion, and extends outwardly from the binding portion. The technical gist of the present invention relates to a mold spacing holder composed of a separable fixing part having a fastening hole through which the fastener penetrates to the bottom surface.
Description
The present invention relates to a mold spacing retainer, and more particularly, the convenience of work during the installation or dismantling of the simultaneous formwork that can accurately maintain the distance between the two formwork facing each other so that the concrete mortar is injected and the quality of the concrete structure to be molded Regarding the formwork gap retainer can be expected.
In general, before placing concrete structures such as walls and support columns, both formwork (plywood or steel plates) are disposed to face each other, and a gap maintaining mechanism is used to maintain a constant distance as the thickness of the concrete structure.
In the form similar to the conventional mold spacing mechanism, by tightening the nut fastened to the tie bolts on the outside of both formwork using a tie bolt penetrating the coupling holes formed in both formwork at the same time the worker in the field maintains the distance between both formwork There are formwork gap adjusters that allow the gap to be adjusted.
Forming space maintenance mechanism using tie bolts prevents the problem that the fastening part of the formwork space retaining part is cut off due to the load strength received when concrete is being laid down or cut off by using screw type fasteners. In order to tighten the tie bolts, the entire body of the formwork spacing is formed to reinforce the periphery of the fastening hole.
In addition, as the thickness of the entire formwork gap retainer is thickened to reinforce the periphery of the fastening hole, the price of raw materials is inevitably increased, which causes a price increase for the entire formwork gap retaining tie bolts. When the price of raw materials rises and the shortage of raw materials occurs, the price of raw materials rises further, and the manufacturing cost of the formwork spacing zone is further increased. As a result, the construction site that does not have formwork spacing tie bolts is available. In reality, the problem is that the entire construction work is suspended.
Above all, in order to prevent the failure rate of the structure due to the higher standard of construction and civil construction or the deviation of the workers of the site, the spacing of formwork installed on the site follows the preset position, that is, both formwork is It is only necessary to satisfy the fixed state of the formwork while maintaining the space between them.
1 shows an example of a conventional formwork spacing holder as described above, has a length corresponding to the thickness of the concrete structure, the
However, such a
In addition, the conventional
In addition, the conventional formwork gap holder (5) is not removed after curing of the concrete to be integrated with the concrete, the deformation caused by the corrosion of the gap holder made of concrete and heterogeneous (usually iron plate), such as deterioration of the quality of the concrete structure. It became a factor.
Therefore, the present invention is to solve the conventional problems as described above, the object is to provide the convenience of the field worker during the installation work of maintaining the gap of the panel constituting the formwork and the work of separating the formwork after concrete curing The present invention provides a mold spacing holder that can conveniently perform repositioning of the formwork.
In addition, another object of the present invention is the initial position of the panel spaced apart at regular intervals to bear the compression and tensile load of both panels constituting the form even if using a material of a high strength, such as aluminum or synthetic resin, such as conventional steel sheet To provide a formwork gap holder that can firmly adhere to.
In addition, another object of the present invention after the completion of curing of the concrete mortar, the parts of the formwork is exposed around the concrete structure to weaken the rigidity of the concrete or to prevent the closing end to act as an interference member in the future finishing work In providing a holding tool.
In the present invention for achieving the problem as described above and to eliminate the conventional drawbacks in the formwork gap holder for maintaining the fixed gap between the panel and the panel constituting the formwork,
A binding portion into which the panel and the bottom of the panel are fitted respectively;
A buried body which connects the binding part so that the panel and the panel maintain a predetermined distance and is in close contact with the bottom surface;
It is formed extending from the binding portion to the outside of the panel, characterized in that it comprises a separable fixing portion having a fastening hole for fixing to the bottom surface.
In this case, cutout grooves may be formed at both ends of the buried body adjacent to the binding part.
The binding part may include a first protrusion protruding to be in close contact with the outer surface of the bottom of the panel and a second protrusion to be in close contact with the inner surface of the bottom of the panel so as to form a binding groove into which the bottom of the panel is inserted.
In addition, the first protrusion and the second protrusion may be formed to have a height difference so as to be easily inserted into the bottom of the panel.
In addition, a rib may be further formed on one side of the first protrusion or the second protrusion that is in close contact with the inner surface or the outer surface of the panel.
From the above means, the present invention is an insertion-type fixing method of the panel by the binding unit having the first and second protrusions, rather than the fixing method by a separate fastening means, to provide convenience of the initial panel position fixing operation Of course, after the concrete mortar is cured, it is possible to form a clean surface of the concrete mortar can prevent structural problems such as corrosion caused by oxidation by air or moisture penetrates into the concrete through the groove formed by the conventional fastening means. It has the advantage of providing high quality concrete structures that do not require finishing work, such as talc work on inaccurate parts.
In addition, the present invention is configured by the fastening portion of the spacer to be fixed to the bottom surface to the separable fixed portion extending to the outside of the formwork, the position of the formwork is not properly fixed by the carelessness or design error of the operator in the installation step of the formwork. Even in this case, the operator can loosen the fixing part of the detachable fixing part from the outside of the formwork and easily reposition the form to fix the formwork without having to remove all the panels, thereby improving the work convenience and work efficiency of the field worker installing the formwork. There is an advantage.
In addition, the present invention constitutes a separable fixing part connected to the cutout groove from the main body located inside the formwork where the concrete mortar is poured, and the heterogeneous binding part and the separable high strength that weaken the rigidity of the concrete structure after the completion of the forming of the concrete structure. By removing the government, it is possible to secure excellent rigidity of the concrete structure and to prevent unnecessary additional processes such as cutting of obstacles by preventing the closed end acting as an obstacle in the future finishing work for the concrete structure.
In addition, the present invention can secure enough rigidity when fixing the panel even if the gap holder made of an expensive material such as iron plate for the reinforcement of the low-cost material, and does not require many fastening means as a whole produced There is an effect that can reduce the cost.
1 is an example of a conventional mold spacing holder
2 is a perspective view and a plan view of the formwork gap holder according to the present invention;
3 to 6 is a working example showing the concrete forming step through the formwork gap holder according to the invention
7 is a perspective view of the formwork gap holder according to another embodiment of the present invention
8 is an exemplary view showing the installation of the formwork gap holder according to another embodiment of the present invention.
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
Figure 2 is a perspective view and a plan view of the formwork spacing holder according to the present invention, Figures 3 to 6 shows a working example showing a concrete forming step through the formwork spacing holder according to the present invention.
First, the present invention, when installing the formwork in the workshop where the concrete structure is installed, the bottom panel formwork gap retainer is installed on the floor of the workplace so that both panels (1) (2) constituting the first formwork to maintain a constant distance from each other ( 10), and of course, both panels (1) and (2) constituting the final formwork, after the bottom is bound through the
The
More specifically, the buried
The
The
As described above, the
On the other hand, Figure 7 is a perspective view of the formwork spacing retainer according to another embodiment of the present invention, Figure 8 shows an installation of the formwork spacing retainer according to another embodiment of the present invention, another embodiment of the present invention described above A pair of formwork spacing 10 'consisting of a binding portion 11' and a fixing portion 13 'excluding the construction of the buried
That is, the pair of mold spacing holders 10 'includes a binding portion 11' into which the panel 1 constituting the formwork and the lower end of the
At this time, as in the embodiment, the binding portion 11 'closely adheres to the lower outer surface of the
The pair of formwork spacing holder 10 'according to another embodiment of the present invention is connected to the buried
The detailed configuration and operation of the binding portion 11 'and the fixing portion 13' constituting the pair of spacers 10 'according to another embodiment of the present invention are described in the above-described embodiment. It is omitted as overlapping with (10).
Looking at the installation process of the formwork gap retainer made of the above structure is as follows.
After arranging a plurality of
Subsequently, the lower ends of the
Thus, the panel (1) and the panel (2) according to the present invention are inserted into the binding
On the other hand, after the installation of the formwork is completed, in the case where the installation position of the formwork is not changed or the exact point is not installed without removing the panel (1) (2) detachable fixed part (exposed according to the present invention) It is possible to easily change the installation position of the formwork by removing the fasteners (15) that were fastened to the 13).
In this way, the concrete mortar is put into the formwork, and after the curing process for a certain time, the formwork is separated from the concrete structure.
That is, the tie member (not shown), which is bound to the front and rear side walls of the formwork and the middle or upper portion of the panel, is removed, and the
In addition, after the panel (1) (2) is removed, the fastener (15) bound to the detachable fixing
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.
(1), (2): Panel
(10), (10 '): formwork gap holder
(11), (11 '): binding part
112, 112 ': the first protrusion
(113), (113 '): second protrusion
(115), (115 '): rib
(12): (embedded) main body
(121): Incision groove
(13), (13 '): (separable) fixing part
131, 131 ': Fastener
15,15 ': Fixture
Claims (8)
A binding portion 11 into which the lower ends of the panel 1 and the panel 2 are respectively inserted;
The buried body 12 which connects the binding unit 11 so that the panel 1 and the panel 2 maintain a constant distance and is in close contact with the bottom surface, and
The mold gap holder is formed by extending from the binding portion 11 to the outside of the panel and comprises a separable fixing portion 13 having a fastening hole 131 for fixing to the bottom surface.
Forming gap retainer, characterized in that the cutting recess 121 is formed at both ends of the buried main body 12 adjacent to the binding portion (11).
The binding portion 11, the first protrusion 112 protruding in close contact with the outer surface of the lower end of the panel (1) (2) so as to form a binding groove (110) into which the lower end of the panel (1) (2) is inserted. And, the panel (1) (2) formwork gap holder, characterized in that consisting of the second projection (113) in close contact with the lower inner surface.
The first projection part 112 and the second projection part 113, the mold spacing holder, characterized in that formed with a height difference so as to step between each other easily to insert the bottom of the panel (1) (2).
The die gap holder, characterized in that the rib 115 is further formed on one side of the first protrusion 112 or the second protrusion 113 in close contact with the inner surface or the outer surface of the panel (1) (2).
The die gap holder is a die gap holder, characterized in that made of aluminum or synthetic resin material.
The bottom portion of the panel (1) (2) is fitted with a fastening portion (11 ') and the fastening hole (131') for extending to the outside of the panel formed from the binding portion 11 'and fixed to the bottom surface The die gap holder, characterized in that consisting of a fixing portion (13 ').
The binding part 11 ′ may include a first protrusion part protruding in close contact with an outer surface of the lower end of the panel 1 and 2 so as to form a binding groove 110 ′ into which the lower end of the panel 1 and the second is inserted. 112 'and a second protrusion 113' in close contact with the lower surface of the panel 1, 2, wherein the first protrusion 112 'and the second protrusion 113' are panel 1; (2) the formwork gap holder, characterized in that the lower end is easily formed having a height difference to step with each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100062895A KR20120002152A (en) | 2010-06-30 | 2010-06-30 | Device for supporting concrete wall form |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100062895A KR20120002152A (en) | 2010-06-30 | 2010-06-30 | Device for supporting concrete wall form |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20120002152A true KR20120002152A (en) | 2012-01-05 |
Family
ID=45609609
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100062895A KR20120002152A (en) | 2010-06-30 | 2010-06-30 | Device for supporting concrete wall form |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20120002152A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014115954A1 (en) * | 2013-01-25 | 2014-07-31 | Kang Chang Gyu | Flat tie and formwork method using said flat tie and non-metallic forms |
CN112962831A (en) * | 2021-02-09 | 2021-06-15 | 天造机器人科技(广东)有限公司 | Robot-based rapid installation method for cast-in-place formwork of inner wall |
KR102446198B1 (en) * | 2022-03-07 | 2022-09-21 | 배용웅 | panel type connecting body of concrete form |
EP4357554A1 (en) * | 2022-10-17 | 2024-04-24 | Gerhard Weingartner | Method and formwork system for producing a concrete wall |
WO2024081980A1 (en) * | 2022-10-17 | 2024-04-25 | Gerhard Weingartner | Method and formwork system for producing a concrete wall |
-
2010
- 2010-06-30 KR KR1020100062895A patent/KR20120002152A/en not_active Application Discontinuation
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014115954A1 (en) * | 2013-01-25 | 2014-07-31 | Kang Chang Gyu | Flat tie and formwork method using said flat tie and non-metallic forms |
CN112962831A (en) * | 2021-02-09 | 2021-06-15 | 天造机器人科技(广东)有限公司 | Robot-based rapid installation method for cast-in-place formwork of inner wall |
KR102446198B1 (en) * | 2022-03-07 | 2022-09-21 | 배용웅 | panel type connecting body of concrete form |
EP4357554A1 (en) * | 2022-10-17 | 2024-04-24 | Gerhard Weingartner | Method and formwork system for producing a concrete wall |
WO2024081980A1 (en) * | 2022-10-17 | 2024-04-25 | Gerhard Weingartner | Method and formwork system for producing a concrete wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2018204337B2 (en) | Formwork panel for concreting formworks | |
KR101759197B1 (en) | Removable form for forming angle composite and forming angle composite having the form | |
KR20120002152A (en) | Device for supporting concrete wall form | |
KR101612088B1 (en) | Aluminum molds provided Pin Lock | |
KR102107939B1 (en) | Magnetic type embeded anchor | |
KR101552226B1 (en) | Structure of mounting form on the T-typed deckplate for the hollow core slab | |
KR100918042B1 (en) | Size-adjustable Gang Form | |
KR101142879B1 (en) | Support structure for slab foam panel | |
JP5947105B2 (en) | PCa formwork fixing structure | |
KR101053705B1 (en) | Metal panel connection structure | |
KR102000522B1 (en) | A removable form and forming angle composite having the removable form | |
KR102000523B1 (en) | Removable form for forming angle composite | |
KR101648071B1 (en) | Slab placing deck panels and construction method | |
KR100863003B1 (en) | Handrail installing structure and construction method | |
KR200419767Y1 (en) | a spacer having an anchor bolt mounting portion thereon | |
KR101508898B1 (en) | A sump or elevator pit under structure | |
KR20110006970U (en) | Mould comprising wood plate and steel plate | |
KR100772569B1 (en) | Floating support system of form | |
KR200446594Y1 (en) | Supporting tool for concrete form panel with reinforcement part and join tool | |
KR100770015B1 (en) | Assembly typed big form | |
KR200314569Y1 (en) | A slab panel attachment device for concrete mold of construct | |
KR20160043346A (en) | Slab placing bend prevention deck panels and construction method | |
KR200417999Y1 (en) | Lemod fixing unit for mould | |
JP4798810B1 (en) | PCa bottom panel outline kit for fabric foundation. | |
KR101165446B1 (en) | Reinforcement apparatus for jointing concrete slab and steel column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E601 | Decision to refuse application |