KR200439750Y1 - Anchor for psc beam - Google Patents

Anchor for psc beam Download PDF

Info

Publication number
KR200439750Y1
KR200439750Y1 KR2020070011470U KR20070011470U KR200439750Y1 KR 200439750 Y1 KR200439750 Y1 KR 200439750Y1 KR 2020070011470 U KR2020070011470 U KR 2020070011470U KR 20070011470 U KR20070011470 U KR 20070011470U KR 200439750 Y1 KR200439750 Y1 KR 200439750Y1
Authority
KR
South Korea
Prior art keywords
formwork
fixing
anchorage
fastening
head
Prior art date
Application number
KR2020070011470U
Other languages
Korean (ko)
Inventor
이광재
이재선
Original Assignee
이광재
이재선
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이광재, 이재선 filed Critical 이광재
Priority to KR2020070011470U priority Critical patent/KR200439750Y1/en
Application granted granted Critical
Publication of KR200439750Y1 publication Critical patent/KR200439750Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은 교량의 거더로 사용되는 PSC 빔 용 정착구 및 이를 이용한 거푸집 설치구조에 관한 것이다.The present invention relates to a fixture for a PSC beam used as a girder of a bridge and a formwork for the formwork using the same.

정착구는 긴장재가 삽입고정되게 관통공을 가지며 동일 평면상에 거푸집을 고정하기 위한 체결수단이 구비된 헤드와, 상기 헤드를 지지하는 정착지압판과, 상기 정착지압판의 후단에 결합되며 콘크리트에 삽입되는 정착쐐기로 구성된다.The fixing unit has a through hole for fastening the tension member, and includes a head having fastening means for fixing the formwork on the same plane, a fixing plate supporting the head, and a fixing unit coupled to the rear end of the fixing plate. It consists of wedges.

거푸집 설치는 정착구를 PSC 빔의 양 끝단부에 설치하고, 상기 정착구로 거푸집과 지지판을 밀착시켜 볼트에 의해 결합 된다.Formation installation is installed in the both ends of the PSC beam anchorage, the formwork and the support plate in close contact with the anchorage is coupled by a bolt.

정착구, PCS, 거푸집, PSC 정착구 Fixture, PCS, Formwork, PSC Fixture

Description

피에쓰씨 빔용 정착구 및 이를 이용한 거푸집 설치구조{ANCHOR FOR PSC BEAM}PSC beam anchorage device and formwork installation structure using same {ANCHOR FOR PSC BEAM}

본 고안은 교량 등을 시공할 때 사용되는 피에쓰씨 빔용 정착구 및 이를 이용한 거푸집 설치구조에 관한 것이다.The present invention relates to a PS C beam anchorage used when constructing bridges, etc. and a formwork installation structure using the same.

PSC 빔은 통상의 I형 단면의 빔 콘크리트 하부플랜지에 PSC 긴장재를 U자 형상으로 빔의 복부를 경유하여 단부에 긴장 후 정착시켜, 빔 자중을 포함한 설계 하중에 의한 휨 모멘트에 의하여 발생되는 인장응력을 상쇄시킬 수 있는 압축응력이 미리 빔 단면에 도입되도록 제작된 구조용 빔이라고 할 수 있다.PSC beam is a U-shaped PSC tension member in a beam concrete lower flange of a normal I-shaped cross section, which is tensioned and fixed at the end via the abdomen of the beam, and the tensile stress generated by the bending moment due to the design load including the beam weight. It can be said that the structural beam produced so that the compressive stress that can cancel the is introduced into the beam cross section in advance.

이러한 PSC 빔은 교량용 거더(Girder)로 이용되며, 교대 또는 교각에 설치되고 그 위에 슬래브가 형성되도록 하여 주로 30 ~ 40m 지간의 교량시공에 이용된다.These PSC beams are used as girders for bridges, and are installed in bridges or piers, and have slabs formed thereon, which are mainly used for bridge construction between 30 and 40 meters.

상기한 PSC 빔의 구조를 살피면 첨부 도면 도 1a 및 도 1b에 도시된 바와 같다. I형 빔의 양 끝단에 정착구(101)를 설치하고 상기 정착구(101) 사이에 긴장재(102)를 연결한 후 외부에 콘크리트 몰탈을 양생함으로써 PSC 빔(100)이 완성된다.Looking at the structure of the PSC beam described above is as shown in Figure 1a and 1b. The PSC beam 100 is completed by installing the anchors 101 at both ends of the I-beam, connecting the tension member 102 between the anchors 101, and curing the mortar to the outside.

상기 정착구(101)가 설치되는 부위에는 마무리 공사를 하기 위한 공간 부(105)가 형성된다. 정착구(101)와 긴장재(102)간에 연결마무리 공사가 끝나면 공간부(105)에 콘크리트 몰탈을 부어 양생한다.In the site where the fixing device 101 is installed, a space portion 105 for finishing construction is formed. After finishing the connection between the anchorage 101 and the tension member 102, the concrete part mortar is poured into the space 105 to cure.

종래에는 PSC 빔(100)의 측부로 고정부재(104)를 설치하고 철선(103)을 이용하여 공간부(105)의 전면으로 거푸집(106)을 밀착시켜 콘크리트를 부어 양생하였다.Conventionally, the fixing member 104 is installed on the side of the PSC beam 100 and the mold 106 is brought into close contact with the front of the space portion 105 using the iron wire 103 to pour concrete to cure.

이때, 거푸집(106)과 공간부(105) 사이에는 약간의 틈새(d)가 발생하게 된다. 이러한 틈새(d)는 철선(103)이 거푸집(106)의 양 끝단에 가하는 힘이 크기 때문에 거푸집(106)이 PSC 빔에 완전 밀착되지 않고 휨 현상이 발생하여 공간부(105)와 거푸집(106) 사이에 틈새(d)가 발생하였다.At this time, a slight gap d occurs between the formwork 106 and the space portion 105. Since the gap d has a large force applied to both ends of the formwork 106 by the steel wire 103, the formwork 106 does not come into close contact with the PSC beam and a warpage occurs, thereby causing the space portion 105 and the formwork 106 to be formed. There was a gap d) between).

상기와 같이 틈새(d)가 발생한 상태에서 콘크리트를 타설하면 틈새(d)로 콘크리트가 스며들어 양생 되므로 불규칙한 면을 갖는 단부가 형성된다.When the concrete is poured in the state in which the gap (d) occurs as described above, the concrete penetrates into the gap (d) and is cured, thereby forming an end portion having an irregular surface.

상기와 같이 불규칙한 단부를 갖는 PSC 빔을 교량용 거더로 사용할 경우 외관상 미려하지 못하다.As described above, when the PSC beam having the irregular end is used as the bridge girder, the appearance is not beautiful.

또한, 상기와 같이 거푸집을 철선으로 묶어 설치하여야 함으로써 거푸집의 설치에 따른 작업이 불편하다.In addition, the work according to the installation of the formwork is inconvenient because the formwork should be bundled with an iron wire as described above.

본 고안은 정착구를 이용하여 거푸집을 용이하게 설치함으로써, 작업성을 향상시킴과 아울러 마무리 공간부를 균일한 면을 갖게 콘크리트 몰탈을 타설함에 그 목적이 있다.The object of the present invention is to install the formwork using the anchorage, thereby improving the workability and placing the concrete mortar to have a uniform surface finish portion.

본 고안은 상기한 목적을 달성하기 위하여, 정착구는 긴장재가 삽입고정되게 관통공이 형성되며 동일 평면상에 거푸집을 고정하기 위한 체결수단이 구비된 헤드와, 상기 헤드를 지지하는 정착지압판과, 상기 정착지압판의 후단에 결합되며 콘크리트에 삽입되는 정착쐐기로 구성된다.The present invention, in order to achieve the above object, the fixing unit is a through-hole is formed in the tension material is inserted and fixed, the head is provided with a fastening means for fixing the formwork on the same plane, the fixing pressure plate to support the head, and the fixing It is coupled to the rear end of the pressure plate and consists of a fixing wedge inserted into the concrete.

본 발명의 다른 목적은 위의 정착구를 이용한 거푸집 설치구조에 있다. 이 설치구조는; 상기 체결수단으로서의 체결공과 일치하는 위치에 결합공이 타공된 거푸집을 PSC 빔의 양 끝단부에 대고; 상기 거푸집을 지지하기 위하여 상기 체결공과 일치하는 위치에 결합공이 타공된 지지판을 상기 거푸집 위에 받친 후; 상기 결합공 및 체결공에 볼트를 체결함으로써; 상기 거푸집을 고정시키게 되는 것을 특징으로 한다. Another object of the present invention is a formwork installation structure using the above anchorage. This installation structure is; Placing both ends of the PSC beam with the formwork with the coupling holes drilled at positions coinciding with the coupling holes as the fastening means; Supporting the formwork with a support plate with a coupling hole at the position corresponding to the fastening hole to support the formwork on the formwork; By fastening bolts to the coupling hole and the fastening hole; It is characterized in that the formwork is fixed.

본 고안은 정착구에 의해 거푸집을 안정적으로 고정설치하여 콘크리트를 타설함으로써, 초기에 양생한 콘크리트 면과 동일 평면상으로 콘크리트를 타설함으로써, 외관상 미려할 뿐만 아니라, 정착구를 이용하여 거푸집을 설치함에 있어 작업시간이 최소화되어 작업능률을 향상시킬 수 있다.The present invention stably installs the formwork by means of the anchorage to pour concrete, and by placing concrete on the same plane as the concrete surface cured at the beginning, it is not only beautiful in appearance but also works to install the formwork using the anchorage. Time can be minimized to improve work efficiency.

이하 첨부된 도면에 의하여 본원 고안을 더욱 구체적으로 설명하기로 한다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

도 2는 본 고안에 따른 정착구를 설명하기 위한 사시도 이며, 도 3은 본 고안의 정착구와 거푸집의 결합상태를 설명하기 위한 분해 사시도이다.Figure 2 is a perspective view for explaining the anchorage according to the present invention, Figure 3 is an exploded perspective view for explaining the coupling state of the anchorage and the formwork of the present invention.

본 고안의 정착구(1)는 크게 헤드(2)와, 정착지압판(3)과 정착쐐기(4)로 구성된다. 헤드(2)는 수가닥으로 엮인 긴장재(6)가 끼워지도록 다수의 통공(2a)을 가지며, 동일 평면의 소정부위에 거푸집(11)을 고정하기 위한 체결수단(5)을 가진다.The fixing device 1 of the present invention is largely composed of a head 2, a fixing pressure plate 3 and a fixing wedge (4). The head 2 has a plurality of through holes 2a so that the tension members 6 intertwined with male threads can be fitted therein, and fastening means 5 for fixing the formwork 11 to a predetermined portion of the same plane.

이때 체결수단(5)은 암나사산을 갖는 체결공(5a)이나 수나사산을 갖는 볼트(5b)로 구성함이 바람직하다.At this time, the fastening means 5 is preferably composed of a fastening hole 5a having a female thread or a bolt 5b having a male thread.

정착지압판(3)은 원형 또는 다각으로 구성되는 것이 바람직하다. 정착쐐기(4)는 후단부에 나사산이 형성된다.The fixing pressure plate 3 is preferably composed of a circle or a polygon. The fixing wedge 4 is threaded at the rear end.

정착구를 이용한 거푸집 설치를 구조를 살펴 보면 다음과 같다. The structure of the formwork installation using the anchorage is as follows.

PSC 빔(10)의 양 단부에 정착구(1)가 설치하고, 거푸집(11)을 정착구(1)로 밀착시켜 마무리 공간부(7)를 밀폐시킨다. 그리고 후단으로 지지판(12)을 밀착시켜 볼트(B)를 끼워 고정한다.Fixtures 1 are provided at both ends of the PSC beam 10, and the formwork 11 is brought into close contact with the anchorage 1 to seal the finishing space 7. Then, the support plate 12 is brought into close contact with the rear end to fix the bolt B.

상기 지지판(12)은 가로 지지목(13)과 세로지지목(14)을 결합구성하되, 가로 지지목에는 체결을 위한 결합공(13a)가 형성된다.The support plate 12 is configured to couple the horizontal support wood 13 and the vertical support wood 14, the horizontal support neck is formed with a coupling hole (13a) for fastening.

상기 볼트(B)는 지지판(12)의 결합공(13a), 거푸집(11)의 결합공(11a)을 관통하여 정착구(1)의 체결공(5a)으로 끼워진다.The bolt (B) is inserted through the coupling hole (13a) of the support plate 12, the coupling hole (11a) of the mold 11 is fitted into the fastening hole (5a) of the fixing unit (1).

도면 도 4a 내지 4b는 정착구(1)를 이용한 거푸집(11)의 설치구조에 관한 것 으로, 정착구(1)가 설치되는 공간부(7)의 폭 보다 거푸집(11)의 폭을 크게 형성시켜 거푸집으로 하여금 공간부(7)에 밀착시켜 볼트(B)에 의해 설치되는 것이다.Figures 4a to 4b relates to the installation structure of the formwork 11 using the anchorage 1, forming the width of the formwork 11 larger than the width of the space portion 7 in which the anchorage 1 is installed This is to be installed by the bolt (B) in close contact with the space (7).

또한, 정착구(1)가 설치되는 공간부(7)의 폭과 거푸집(11)의 폭을 동일하게 형성하여 거푸집(11)을 공간부(7) 내부로 삽입 결합하고, 거푸집(11)의 후단에 지지판(12)을 밀착시켜 볼트(B)로 고정설치할 수 있다.In addition, the width of the space portion 7 in which the fixing unit 1 is installed and the width of the formwork 11 are formed in the same manner so that the formwork 11 is inserted into the space portion 7 and coupled to the rear end of the formwork 11. The support plate 12 can be brought into close contact with each other and fixedly installed with the bolt B.

도 4b는 정착구(1)가 설치되는 공간부(7)의 폭 보다 거푸집(11)의 폭을 크게 형성하여 PSC 빔(10)의 단부측면에 밀착시켜 볼트(B)에 의해 설치되는 것이다.4B shows that the width of the formwork 11 is made larger than the width of the space 7 in which the anchorage 1 is installed, and is closely attached to the end side surface of the PSC beam 10 so as to be installed by the bolt B. FIG.

또한, 정착구(1)가 설치되는 공간부(7)의 폭과 거푸집(11)의 폭을 동일하게 형성하여 거푸집(11)을 공간부(7) 내부로 삽입 결합하고, 볼트(B)로 고정 설치할 수 있다.In addition, the width of the space portion 7 in which the fixing unit 1 is installed and the width of the formwork 11 are formed in the same manner so that the form 11 is inserted into the space portion 7 and coupled thereto, and fixed with a bolt B. Can be installed.

도 5는 정착구의 다른 실시예로서, 정착구(1)는 크게 헤드(2)와, 정착지압판(3)과 정착쐐기(4)로 구성되되, 상기 헤드(2)는 수가닥으로 엮인 긴장재(6)가 끼워지도록 다수의 통공(2a)이 형성되며, 동일 평면의 소정부위에 거푸집(5a)을 고정할 수 있게 체결수단(5)을 구비하되, 상기 체결수단(5)은 볼트(5b)로 구성된다.5 is another embodiment of the anchorage, the anchorage 1 is largely composed of the head (2), the anchoring plate (3) and the fixing wedge (4), the head (2) is a tension material woven in the strands (6) A plurality of through holes (2a) is formed to be fitted, and is provided with a fastening means (5) to fix the formwork (5a) to a predetermined portion of the same plane, the fastening means (5) is a bolt (5b) It is composed.

도 6a, 6b는 도 5의 정착구의 설치상태를 보여주는 도면으로써, 정착구(1)에 구비된 체결수단(5)인 볼트(5b)에 거푸집(11)을 끼우고, 그 후단에 지지판(12)을 밀착시켜 너트로 고정설치한 것이다.6A and 6B are diagrams showing the installation state of the anchorage of FIG. 5, in which the die 11 is inserted into a bolt 5b which is a fastening means 5 provided in the anchorage 1, and a support plate 12 is disposed at a rear end thereof. It is fixedly installed with nut by closely contacting.

또한, 정착구(1)에 구비된 볼트(5b)로 거푸집(11)을 끼우고 너트로 체결한다.In addition, the mold 11 is inserted into the bolt 5b provided in the fixing unit 1 and fastened with a nut.

상기와 같은 구성으로 이루어진 정착구의 사용상태 및 정착구를 이용한 거푸 집 설치방법을 설명하면 다음과 같다.Referring to the state of use of the anchorage made of the configuration and the method of installing the formwork using the anchorage as follows.

먼저, I형 빔의 끝 단부에 긴장재(6)가 결속된 정착구(1)를 각각 설치하여 정착구 외의 부분은 콘크리트로 양생한다. 이때, 정착구(1)가 설치되는 부위에는 마무리 작업을 하기 위해 공간부(7)가 형성된다.First, the fixing fixtures 1, to which the tension member 6 is bound, are respectively provided at the end of the I-beam, and the portion outside the fixing apparatus is cured with concrete. At this time, the space portion 7 is formed in the site where the fixing fixture 1 is installed for finishing.

이러한 상태에서 공간부(7)에 내설된 정착구(1)와 긴장재(6)간에 결속 상태를 마무리 한 다음, 거푸집(11)을 설치하여 공간부(7)로 콘크리트를 타설하여 양생하면 된다.In this state, after the binding state between the anchorage 1 and the tension member 6 in the space portion 7 is finished, the mold 11 is installed to pour concrete into the space portion 7 to cure.

이러한 거푸집(11) 설치는 다음과 같이 행하면 된다. 공간부(7)의 폭과 동일하거나 크게 거푸집(11)을 형성한 상태에서 거푸집(11)을 공간부(7)로 끼워 거푸집(11)의 결합공(11a)과 정착구(1)의 체결수단(5)과 일치하도록 설치하면 된다.Such formwork 11 installation may be performed as follows. Fastening means of the coupling hole 11a of the formwork 11 and the fixing device 1 by inserting the formwork 11 into the space portion 7 in a state in which the formwork 11 is formed to be equal to or larger than the width of the space portion 7. It is good to install so that it matches (5).

그리고 거푸집(11)의 후단으로 지지판(12)을 밀착시켜 지지하되, 지지판(12)의 결합공(13)을 거푸집(11) 결합공(11a) 및 정착구(1) 체결수단(5)과 일치하도록 설치한다. 이러한 상태에서 볼트(B)를 이용하여 지지판(12) 및 거푸집(11)을 관통시켜 정착구(1)의 체결수단(5)에 끼워 고정하면 된다. 지지판(12)은 통상 합판으로 된 거푸집(11)의 강성을 보강하기 위한 것으로서 프레임 구조를 가진다. And support the support plate 12 in close contact with the rear end of the formwork 11, the coupling hole 13 of the support plate 12 coincides with the formwork 11, the coupling hole (11a) and the fastener (1) fastening means (5) Install it. In such a state, the support plate 12 and the formwork 11 may be penetrated by the bolt B to be fixed to the fastening means 5 of the fixing unit 1. The support plate 12 is for reinforcing the rigidity of the formwork 11 usually made of plywood and has a frame structure.

상기와 같이 거푸집(11)을 마무리 공간부에 완전 밀착함으로써 거푸집(11) 과 PSC 빔(10) 간에 틈새를 없앨 수 있으며, 콘크리트 타설시 콘크리트가 측면으로 스며들어 타설되는 것을 방지할 수 있다.By completely adhering the formwork 11 to the finishing space as described above, it is possible to eliminate the gap between the formwork 11 and the PSC beam 10, it is possible to prevent the concrete seeping into the side when pouring concrete.

상기한 결합구조 및 방법에 의해 공간부(7)를 효율적으로 콘크리트 타설함으로써, 타설 후 외관상 미려함을 극대화할 수 있다.By placing concrete space 7 efficiently by the above-described coupling structure and method, it is possible to maximize the appearance beauty after pouring.

도 1a, 1b는 종래의 콘크리트 양생을 하기 위한 구조의 보인 도면.Figure 1a, 1b is a view showing a structure for the conventional concrete curing.

도 2는 본 고안에 따른 정착구를 설명하기 위한 사시도.Figure 2 is a perspective view for explaining the fixing unit according to the present invention.

도 3은 본 고안의 정착구와 거푸집의 결합상태를 설명하기 위한 분해사시도.Figure 3 is an exploded perspective view for explaining the coupling state of the anchorage and the formwork of the present invention.

도 4a, 4b는 정착구의 사용상태를 설명하기 위한 평단면도.Figures 4a, 4b is a cross-sectional view for explaining the use state of the anchorage.

도 5는 본 고안에 따른 정착구의 다른 실시를 보이는 사시도.5 is a perspective view showing another embodiment of the fixing unit according to the present invention.

도 6a, 6b는 도 5에 따른 정착구의 사용상태를 설명하기 위한 평단면도.Figure 6a, 6b is a cross-sectional view for explaining the state of use of the anchorage according to FIG.

< 도면의 주요 부분에 대한 부호의 설명><Description of the reference numerals for the main parts of the drawings>

1:정착구 2:헤드1: fastener 2: head

3:정착지압판 4:정착쐐기3: fixing pressure plate 4: fixing wedge

5:체결수단 6:긴장재5: Fastener 6: Tension

7:공간부 11:거푸집7: space part 11: formwork

12:지지판12: support plate

Claims (4)

교량의 거더(Girder)로 사용되는 PSC 빔에 긴장력을 주기 위해 설치되는 정착구에 있어서,In the anchorage which is installed to give tension to the PSC beam used as the girder of the bridge, 1가닥 이상의 긴장재(6)가 삽입고정되게 관통공이 형성된 헤드(2)와, 상기 헤드(2)를 지지하는 정착지압판(3)과, 상기 정착지압판(3)의 후단에 결합되며 콘크리트에 삽입되는 정착쐐기(4)로 구성되되, 상기 헤드(2)의 평면상에 거푸집(11)을 고정하기 위한 체결수단(5)이 형성되는 것을 특징으로 하는 피에스씨 빔용 정착구.One or more strands of tension material 6 are inserted into and fixed to the head 2 having a through hole, the fixing plate 3 for supporting the head 2, and the rear end of the fixing plate 3 to be inserted into concrete Fixing wedge (4), the fastening means for the PS beam, characterized in that the fastening means (5) for fixing the formwork (11) on the plane of the head (2) is formed. 제 1항에 있어서, 상기 체결수단(5)은 체결공(5a) 또는 볼트인 것을 특징으로 하는 피에쓰씨 빔용 정착구.2. The anchorage of a PS beam according to claim 1, wherein the fastening means (5) is a fastening hole (5a) or a bolt. 교량의 거더(Girder)로 사용되는 PSC 빔에 긴장력을 주기 위해 설치되는 것으로서, 1가닥 이상의 긴장재(6)가 삽입고정되게 관통공이 형성되며 동일 평면상에 거푸집(11)을 고정하기 위한 체결공(5a)이 구비된 헤드(2)와, 상기 헤드(2)를 지지하는 정착지압판(3)과, 상기 정착지압판(3)의 후단에 결합되며 콘크리트에 삽입되는 정착쐐기(4)로 구성되는 피에쓰씨 빔용 정착구(1);It is installed to give tension to the PSC beam used as the girder of the bridge, the through-hole is formed so that one or more strands of tension material (6) is inserted and fixed fastening hole for fixing the formwork (11) on the same plane ( 5a) is composed of a head (2), a fixing pressure plate (3) for supporting the head (2), and a fixing wedge (4) coupled to the rear end of the fixing pressure plate (3) and inserted into the concrete SCC beam anchorage device 1; 를 이용하여 PSC 빔의 양 끝단부에 형성되는 공간부(7)에 콘크리트를 타설하기 위한 것으로서;For placing concrete in the spaces 7 formed at both ends of the PSC beam by using; 상기 체결공(5a)과 일치하는 위치에 결합공(11a)이 타공된 거푸집(11)을 PSC 빔의 양 끝단부에 대고; 상기 거푸집(11)을 지지하기 위하여 상기 체결공(5a)과 일치하는 위치에 결합공(13a)이 타공된 지지판(12)을 상기 거푸집(11) 위에 받친 후; 상기 결합공(11a,13a) 및 체결공(5a)에 볼트(B)를 체결함으로써; 상기 거푸집(11)을 고정시키게 되는 것을 특징으로 하는 피에쓰씨 빔용 정착구(1)를 이용한 거푸집 설치구조.Placing the dies 11 with the coupling holes 11a at both ends of the PSC beam at positions coincident with the fastening holes 5a; After supporting the support plate 12 on which the coupling hole 13a is perforated at the position corresponding to the fastening hole 5a to support the formwork 11 on the formwork 11; By fastening bolts (B) to the coupling holes (11a, 13a) and the fastening holes (5a); Formwork installation structure using the PSS beam anchorage (1) characterized in that the formwork (11) is fixed. 삭제delete
KR2020070011470U 2007-07-12 2007-07-12 Anchor for psc beam KR200439750Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020070011470U KR200439750Y1 (en) 2007-07-12 2007-07-12 Anchor for psc beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020070011470U KR200439750Y1 (en) 2007-07-12 2007-07-12 Anchor for psc beam

Publications (1)

Publication Number Publication Date
KR200439750Y1 true KR200439750Y1 (en) 2008-05-02

Family

ID=41641653

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020070011470U KR200439750Y1 (en) 2007-07-12 2007-07-12 Anchor for psc beam

Country Status (1)

Country Link
KR (1) KR200439750Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929050A (en) * 2015-06-24 2015-09-23 北京铁五院工程机械有限公司 Construction device and construction method for perforated formwork leakage stopping
KR20180044052A (en) * 2016-10-21 2018-05-02 혜동브릿지 주식회사 Strand Fixing Device for Girder

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929050A (en) * 2015-06-24 2015-09-23 北京铁五院工程机械有限公司 Construction device and construction method for perforated formwork leakage stopping
KR20180044052A (en) * 2016-10-21 2018-05-02 혜동브릿지 주식회사 Strand Fixing Device for Girder

Similar Documents

Publication Publication Date Title
KR100665876B1 (en) The prestressed opening trapezoid waveform still girder construction method of having installed concrete caisson in the upper flange
KR101170922B1 (en) The rahmen bridge construction technique for which tendon and the connection support stand was used
AU2020100507A4 (en) Prefabricated Concrete Frame Beam-Column Connection Joint With Steel Strands Anchored
KR100903211B1 (en) Deck plate with support member
KR100343960B1 (en) Steel concrete structure
KR101705002B1 (en) Prefabricated double composite plate girder bridge and its construction method
KR101013009B1 (en) Apparatus having a girder connection anchor plate and the continuous construction method for a psc girder bridge by using the same apparatus
KR101251118B1 (en) A manufacturing method of a composite steel box girder using prestressed concrete for a positive moment area of a bridge
KR100984249B1 (en) Bridge construction method using strength connector detail and composite curing pannel
KR200439750Y1 (en) Anchor for psc beam
KR101845717B1 (en) Aseismatic Reinforcement Steel Frame with Hinge Type Friction Slip Brace and Aseismatic Reinforcement Method using thereof
KR100653283B1 (en) Method for connecting reinforced concrete structures
KR100894808B1 (en) Connector of truss girder
KR20070027432A (en) A fastener for fixing a reinforcing bar assembly, a mold panel, and a ceiling panel by fixing pin
KR20200123654A (en) Moment connection structure between cft column and pc girder
KR101374701B1 (en) Concrete beam construction method with anchorage apparatus for bi-pressing compression member
KR100696646B1 (en) External prestressing method of ps concrete composite girder bridge by tendon anchored/supported to prefabricated cross beam
JP2003138523A (en) Construction method for tension string girder bridge
KR100989153B1 (en) Psc girder connection structure with strength connector detail for substitution of rebar placement in deck and bridge construction method using the same
KR101001443B1 (en) A continuity method of the composite bridges using reusable anchorage devices
KR101535180B1 (en) Concrete Girder for Upper Structure of Bridge
KR20010090294A (en) Precast concrete structure for variable plan of apartment house
KR102546964B1 (en) Bridge cantilever construction method
JP2005054493A (en) Precast built-up culvert block construction method
KR102273072B1 (en) Wall mold construction method and the mold structure in which the construction property is improved

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20110419

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee