KR200411719Y1 - Deck system for floor - Google Patents
Deck system for floor Download PDFInfo
- Publication number
- KR200411719Y1 KR200411719Y1 KR2020050036058U KR20050036058U KR200411719Y1 KR 200411719 Y1 KR200411719 Y1 KR 200411719Y1 KR 2020050036058 U KR2020050036058 U KR 2020050036058U KR 20050036058 U KR20050036058 U KR 20050036058U KR 200411719 Y1 KR200411719 Y1 KR 200411719Y1
- Authority
- KR
- South Korea
- Prior art keywords
- base beam
- fixing bracket
- flooring
- base
- deck system
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02177—Floor elements for use at a specific location
- E04F15/02183—Floor elements for use at a specific location for outdoor use, e.g. in decks, patios, terraces, verandas or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/024—Sectional false floors, e.g. computer floors
- E04F15/02447—Supporting structures
- E04F15/02452—Details of junctions between the supporting structures and the panels or a panel-supporting framework
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/024—Sectional false floors, e.g. computer floors
- E04F15/02447—Supporting structures
- E04F15/02458—Framework supporting the panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/024—Sectional false floors, e.g. computer floors
- E04F15/02447—Supporting structures
- E04F15/02464—Height adjustable elements for supporting the panels or a panel-supporting framework
- E04F15/0247—Screw jacks
- E04F15/02476—Screw jacks height-adjustable from the upper side of the floor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Floor Finish (AREA)
Abstract
본 고안은 바닥재용 데크 시스템을 제공하기 위한 것으로, 바닥패널을 지지하도록 상기 바닥패널과 교차되어 소정간격을 두고 나란하게 설치된 베이스 빔과, 상기 다수개의 베이스 빔을 상호 연결지지 하는 연결 지지부재를 포함하여 구성되는 바닥재용 데크 시스템에 있어서, 측단면이 'ㄱ'형상을 가진 절곡된 구조로 상기 바닥패널이 마감처리 되는 양 가장자리 베이스 빔 및 상기 다수개의 베이스 빔의 앞, 뒤 양단에 각각 설치되는 고정 브라켓과; 상기 바닥패널을 마감처리 하도록 고정 브라켓에 결합된 마감재를 포함하여 구성된다.The present invention is to provide a deck system for the flooring, including a base beam installed side by side with a predetermined interval crossing the floor panel to support the floor panel, and a connection support member for supporting the plurality of base beams interconnected In the deck system for flooring is configured, the side surface is a bent structure having a 'b' shape fixed to be installed on both front and rear ends of both the base beam and the plurality of base beams the bottom panel is finished Brackets; It is configured to include a finishing material coupled to the fixing bracket to finish the bottom panel.
바닥, 패널, 조립, 마감처리, 브라켓 Floor, Panel, Assembly, Finish, Bracket
Description
도 1은 본 고안의 일실시예에 의한 바닥재용 데크 시스템의 분해 사시도,1 is an exploded perspective view of a deck system for flooring according to an embodiment of the present invention,
도 2는 본 고안의 일실시예에 의한 바닥재용 데크 시스템의 구성요소 중 베이스 빔이 설치된 상태를 나타내는 분해 사시도,2 is an exploded perspective view illustrating a state in which a base beam is installed among components of a deck system for flooring according to an embodiment of the present invention;
도 3은 도 2에 도시된 상태에서 고정 브라켓이 베이스 빔 앞단 및 가장자리 베이스 빔 측단에 설치되는 상태를 나타내는 분해 사시도,3 is an exploded perspective view illustrating a state in which the fixing bracket is installed at the front end of the base beam and the edge base beam side end in the state shown in FIG. 2;
도 4는 도 2에 도시된 상태에서 고정 브라켓이 가장자리 베이스 빔 측단에 설치되는 상태를 나타내는 사시도,4 is a perspective view showing a state in which the fixing bracket is installed on the edge base beam side end in the state shown in FIG.
도 5는 도 3 내지 도 4에서 도시된 방법으로 고정 브라켓이 설치된 상태에서 바닥패널이 베이스 빔에 설치되는 상태를 나타내는 사시도,5 is a perspective view showing a state in which the bottom panel is installed on the base beam in a state in which the fixing bracket is installed in the method shown in FIGS.
도 6은 베이스 빔 양 끝단에 결합되는 한 쌍의 바닥패널이 경첩을 통해 연결됨을 나타내는 상태도,6 is a state diagram showing that a pair of bottom panels coupled to both ends of the base beam is connected via a hinge,
도 7 내지 도 8은 도 4 내지 도 6에 의해 바닥패널이 베이스 빔에 설치된 상태에서 마감재를 이용해 마감처리 하는 상태를 나타내는 상태도,7 to 8 is a state diagram showing a state in which the finishing process using a finishing material in a state in which the bottom panel is installed in the base beam according to Figs.
도 9는 본 고안의 일실시예에 의한 바닥재용 데크 시스템의 사시도이다. 9 is a perspective view of the deck system for flooring according to an embodiment of the present invention.
* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
10: 베이스 빔 20: 연결 지지부재10: base beam 20: connecting support member
30: 고정 브라켓 31: 베이스 빔측 슬릿30: fixing bracket 31: base beam side slit
32: 마감재측 슬릿 40: 마감재32: Finishing side slit 40: Finishing material
50: 바닥패널 60: 패널결합부재50: bottom panel 60: panel coupling member
60a: 날개부 61: 고정 패널결합부재60a: wing 61: fixed panel coupling member
70: 높이조절부70: height adjustment
본 고안은 바닥재용 데크 시스템에 관한 것으로, 특히 고정 브라켓을 구비하여 바닥패널의 마감처리를 수월하게 할 수 있는 바닥재용 데크 시스템에 관한 것이다.The present invention relates to a decking system for flooring, and more particularly to a decking system for the flooring having a fixing bracket to facilitate the finishing of the floor panel.
일반적으로 아파트 등의 건물의 발코니나 베란다에 바닥재를 시공함으로서 실내 공간을 보다 효율적으로 활용하고 있다. 이러한 바닥재를 시공하는 방법으로 바닥에 시멘트성형을 하여 마루를 깔거나, 바닥에 수평조절을 위한 받침대를 두고 그 위에 마루바닥재를 접착제로 고정시키는 방법을 이용하였다. 그리고 접착제를 이용하여 바닥제와 마감제를 부착시키는 방법으로 마감처리를 하였다. In general, the floor space is installed on the balcony or veranda of an apartment building to utilize the interior space more efficiently. As a method of constructing the flooring material, cement flooring was used to lay a floor, or a base for horizontal adjustment was used to fix the flooring material with adhesive on the floor. Then, the finishing treatment was performed by attaching the flooring agent and the finishing agent using an adhesive.
그러나 종래 방법에 의해 시공된 바닥재는 마감처리가 견고하지 않아 자주 떨어지는 문제가 있었고, 또한 작업이 매우 전문적으로 이루어져 일반인들이 직접 작업하기에는 어려운 문제점이 있다.However, the flooring constructed by the conventional method has a problem that often fall because the finishing is not strong, and the work is very professional, there is a problem that the general public is difficult to work directly.
이에 본 고안은 상기와 같은 종래의 제반 문제점을 해결하기 위해 제안된 것으로, 본 고안의 목적은 바닥패널의 마감처리를 위해 고정 브라켓을 구비하여 일반인도 손쉽게 작업할 수 있도록 함으로써, 시공하는데 비용과 시간이 적게 소요되는 바닥재용 데크 시스템을 제공함에 있다.The present invention has been proposed to solve the conventional problems as described above, the object of the present invention is to provide a fixed bracket for the finishing of the floor panel, so that the general public can easily work, cost and time to construct It is to provide a low deck floor system.
본 고안에 따른 바닥재용 데크 시스템은 바닥패널을 지지하도록 상기 바닥패널과 교차되어 소정간격을 두고 나란하게 설치된 베이스 빔과, 상기 다수개의 베이스 빔을 상호 연결지지 하는 연결 지지부재를 포함하여 구성되는 바닥재용 데크 시스템에 있어서, 측단면이 'ㄱ'형상을 가진 절곡된 구조로 상기 바닥패널이 마감처리 되는 양 가장자리 베이스 빔 및 상기 다수개의 베이스 빔의 앞, 뒤 양단에 각각 설치되는 고정 브라켓과; 상기 바닥패널을 마감처리 하도록 고정 브라켓에 결합된 마감재를 포함하여 구성된다.The flooring deck system according to the present invention includes a base beam installed side by side with a predetermined interval to cross the floor panel to support the floor panel, and a flooring material comprising a connecting support member for mutually supporting the plurality of base beams Claims [1] A deck system for a system comprising: an edged base beam having a bent structure having a 'b' shape, and fixed brackets installed at both ends of front and rear ends of the bottom panel and the plurality of base beams, respectively; It is configured to include a finishing material coupled to the fixing bracket to finish the bottom panel.
상기 베이스 빔 하면에는 길이방향으로 소정간격을 두고 다수개의 홀이 형성되고, 상기 고정브라켓의 각 면에는 베이스 빔측 슬릿 및 마감재측 슬릿이 형성되는 것이 바람직하다.A plurality of holes are formed on the bottom surface of the base beam at predetermined intervals in the longitudinal direction, and base beam side slits and finish material side slits are formed on each side of the fixing bracket.
상기 고정 브라켓은 한 면은 베이스 빔 하면에 접하도록 하고 다른 한 면은 마감재와 접하도록 하여, 상기 베이스 빔 하면과 접하는 베이스 빔측 슬릿을 상기 베이스 빔 하면에 형성된 홀에 일치시켜 볼트와 너트의 볼트결합을 통해 상기 베이스 빔에 고정 설치하는 것이 바람직하다.The fixing bracket has one side in contact with the bottom surface of the base beam and the other side in contact with the finishing material, so that the base beam side slit in contact with the bottom surface of the base beam coincides with the hole formed in the bottom surface of the base beam so that the bolt and nut are bolted together. It is preferable to fix the base beam through.
또한, 상기 볼트결합은 상기 너트 위에 와셔를 게재하여 결합함으로써, 결합 을 견고히 할 수 있다. 특히, 상기 와셔를 PE(Poly Ethylene)와셔로 사용하면 마찰을 줄어들게 되어 고정 브라켓의 움직임을 원활하게 할 수 있다.In addition, the bolt coupling can be secured by placing the washer on the nut to engage. In particular, when the washer is used as a PE (Poly Ethylene) washer to reduce the friction can be smooth movement of the fixing bracket.
또한, 상기 연결 지지부재에는 나사산이 형성된 홀을 마련하여, 상기 나사산과 볼트와의 결합을 통해 인접하는 두 개의 베이스 빔을 상호 연결 지지시키는 것이 바람직하다.In addition, it is preferable to provide a threaded hole in the connection support member to mutually support two adjacent base beams through coupling of the thread and the bolt.
그리고 상기 베이스 빔과 상기 연결 지지부재가 결합되는 부분에 고정 브라켓이 설치되는 경우는 볼트와 상기 베이스 빔 하면에 형성된 홀과의 볼트결합을 통해 고정 브라켓을 고정 설치하는 것이 바람직하다.When the fixing bracket is installed at the portion where the base beam and the connection support member are coupled, the fixing bracket is preferably fixed through bolt coupling between a bolt and a hole formed on the lower surface of the base beam.
이하, 상기와 같은 본 고안, 바닥재용 데크 시스템의 기술적 사상에 따른 일실시예를 도면을 참조하여 설명하면 다음과 같다.Hereinafter, an embodiment according to the present invention, a technical concept of the deck system for flooring materials as described above with reference to the drawings.
도 1은 본 고안의 일실시예에 의한 바닥재용 데크 시스템의 분해 사시도이다.1 is an exploded perspective view of a deck system for flooring according to an embodiment of the present invention.
이에 도시된 바와 같이, 베이스 빔(10)이 소정간격을 두고 나란하게 다수개가 설치된다. 그리고 상기 베이스 빔(10)은 바닥패널(50)을 지지하도록 상기 바닥패널(50)과 교차되게 위치한다. 베이스 빔(10) 하면에는 길이방향으로 소정간격을 두고 다수개의 홀(11)이 형성되어 있다. 또한 상기 베이스 빔(10)은 높이조절부(70)가 관통 결합되어 높이 조절이 가능하다. 그리고 상기 베이스 빔(10)은 연결 지지부재(20)에 의해 상호 연결 지지된다. As shown in the drawing, a plurality of
또한, 상기 베이스 빔(10) 하면에는 측단면이 'ㄱ'형상을 가진 절곡된 구조로 각 면에는 베이스 빔측 슬릿 및 마감재측 슬릿(31, 32)이 형성된 고정 브라켓 (30)이 설치된다. 그리고 상기 바닥패널(10)을 마감처리 할 수 있도록 고정 브라켓(30)의 절곡된 면에 마감재(40)가 고정 결합된다.In addition, the bottom surface of the
이하, 본 고안의 일실시예에 의한 바닥재용 데크 시스템의 조립순서에 맞쳐 보다 상세히 설명하도록 하겠다.Hereinafter, in accordance with the assembly sequence of the deck system for flooring according to an embodiment of the present invention will be described in more detail.
도 2는 본 고안의 일실시예에 의한 바닥재용 데크 시스템의 구성요소 중 베이스 빔이 설치된 상태를 나타내는 분해 사시도이다.Figure 2 is an exploded perspective view showing a state in which the base beam is installed among the components of the deck system for flooring according to an embodiment of the present invention.
이에 도시된 바와 같이, 소정간격을 두고 베이스 빔(10) 나란하게 위치한다. 상기 베이스 빔(10) 하면에는 길이방향으로 소정간격을 두고 다수개의 홀(11)이 형성되어져 있다. 또한, 상기 베이스 빔(10) 하면에는 높이조절부(70)가 관통 결합되어 상기 베이스 빔(70)을 수평 지지함과 동시에 높이조절을 가능하게 한다. 그리고 연결 지지부재(20)는 인접하는 베이스 빔(10) 하면에 상호 연결되어, 상기 인접하는 베이스 빔(10)을 상호 지지한다. 또한, 상기 베이스 빔(10) 앞, 뒤 양단에는 바닥패널(50, 도 1에 도시됨)을 지지고정하기 위한 고정패널결합부재(61)가 고정 결합된다. As shown in the drawing, the
도 3은 도 2에 도시된 상태에서 고정 브라켓이 베이스 빔 앞단에 설치되는 상태를 나타내는 사시도이다.3 is a perspective view showing a state in which the fixing bracket is installed in front of the base beam in the state shown in FIG.
이에 도시된 바와 같이, 상기 고정 브라켓(30)은 측단면은 'ㄱ' 모양으로 절곡된 형상을 가지며 각 면에는 베이스 빔측 슬릿 및 마감재측 슬릿(31, 32)이 형성되어져 있다. 상기 고정 브라켓(30)을 베이스 빔(10) 앞단 하면에 접하도록 하여, 볼트(80), PE(Poly Ethylene)와셔(100), 너트(90)를 이용하여 볼트 결합한다. 상기 의 볼트결합은 볼트(80)가 베이스 빔측 슬릿(31)과 홀(11, 도 2에 도시됨)을 관통하여 너트(90)와 결합됨으로써 이루어진다.As shown in the drawing, the
도 4는 도 2에 도시된 상태에서 고정 브라켓이 가장자리 베이스 빔 측단에 설치되는 상태를 나타내는 사시도이다. 도시된 바와 같이, 고정 브라켓(30)이 가장자리 베이스 빔(30) 측단에 설치되는 방법은 전술한 도 3의 설명과 동일하나, 연결 지지부재(20)가 위치되는 부분에 상기 고정 브라켓(30)을 고정 설치하는 경우에는 PE와셔(100)와 너트(90)가 이용되지 않고, 상기 연결 지지부재(20)의 홀(21) 내경에 형성된 나사산(도면상 미도시)과 볼트(80)와 결합에 의해 고정 설치된다.4 is a perspective view showing a state in which the fixing bracket is installed on the edge base beam side end in the state shown in FIG. As shown in the drawing, the
상기한 바와 같이, 고정 브라켓(30)이 베이스 빔(30)의 소정 위치에 설치되면 바닥패널(50)을 설치하게 된다. 도 5는 도 3 내지 도 4에서 도시된 방법으로 고정 브라켓이 설치된 상태에서 바닥패널이 베이스 빔에 설치되는 상태를 나타내는 사시도이다.As described above, when the
도시된 바와 같이, 상기 바닥패널(50)은 베이스 빔(10) 상부에 슬라이딩 결합되는 패널결합부재(60)와 결합되어 베이스 빔(10)에 설치된다. 이는 상기 바닥패널의 양측면에는 홈(51)이 형성되어져 있고, 상기 패널결합부재(60)는 양측으로 날개부(60a)가 형성되어 상기 날개부(60a)가 홈(51)에 끼워 맞쳐짐으로써 가능하게 된다.As shown, the
한편, 본 고안의 일실시예에 의한 바닥재용 조립데크의 해체시의 용이함을 위해 도 6에 도시된 바와 같이, 마지막에 조립되는 두 개의 바닥패널(50)은 경첩(110)을 통해 연결하는 것이 바람직하다.On the other hand, as shown in Figure 6 for ease of disassembly of the flooring assembly deck according to an embodiment of the present invention, the two
도 7 내지 도 8은 도 4 내지 도 6에 의해 바닥패널이 베이스 빔에 설치된 상태에서 마감재를 이용해 마감처리 하는 상태를 나타내는 상태도이다. 도7은 바닥패널(50)의 측단부를 마감처리 하는 상태를 도시한 것이고, 도 8은 앞, 뒤 양단을 마감처리 하는 상태를 도시한 것이다.7 to 8 is a state diagram showing a state in which the finishing process using the finishing material in the state in which the bottom panel is installed in the base beam according to Figs. Figure 7 shows a state of finishing the side end portion of the
이에 도시된 바와 같이, 상기 마감재(40)는 소정위치에 나사(81)가 관통되어 결합될 수 있도록 홀(41)이 형성되어 있다. 상기 나사(81)는 홀(41) 및 마감재측 슬릿(32, 도3 내지 도 4에 도시됨)을 관통하여 너트(91)와 결합된다.As shown in the drawing, the
상기와 같은 과정(도 2 내지 도 8에 도시된 본 고안의 조립상태도)을 거쳐 조립된 바닥재용 데크 시스템의 사시도가 도 9에 도시되어 있다. 9 is a perspective view of the deck system for the flooring assembled through the above process (the state of assembly of the present invention shown in Figures 2 to 8).
이상에서 본 고안의 바람직한 실시예를 설명하였으나, 본 고안은 다양한 변화와 변경 및 균등물을 사용할 수 있다. 본 고안은 상기 실시예를 적절히 변형하여 동일하게 응용할 수 있음이 명확하다. 따라서 상기 기재 내용은 하기 특허청구범위의 한계에 의해 정해지는 본 고안의 범위를 한정하는 것이 아니다.While the preferred embodiment of the present invention has been described above, the present invention may use various changes, modifications, and equivalents. It is clear that the present invention can be applied in the same manner by appropriately modifying the above embodiments. Therefore, the above description does not limit the scope of the present invention as defined by the limitations of the following claims.
이상에서 살펴본 바와 같이, 본 고안에 의한 바닥재용 데크 시스템은 고정 브라켓을 구비하여 바닥패널의 마감처리를 일반인도 수월하게 할 수 있다는 장점이 있다As described above, the deck system for the flooring according to the present invention has an advantage that it is possible to facilitate the finishing of the floor panel with a fixing bracket for the general public.
또한, 시공에 따르는 비용과 시간이 절약된다는 장점도 있다.In addition, the cost and time of construction is saved.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020050036058U KR200411719Y1 (en) | 2005-12-22 | 2005-12-22 | Deck system for floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020050036058U KR200411719Y1 (en) | 2005-12-22 | 2005-12-22 | Deck system for floor |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200411719Y1 true KR200411719Y1 (en) | 2006-03-20 |
Family
ID=41762043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020050036058U KR200411719Y1 (en) | 2005-12-22 | 2005-12-22 | Deck system for floor |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200411719Y1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101039942B1 (en) | 2009-06-03 | 2011-06-09 | 주식회사 그린플러스 | Apparatus for fixing structure of rooftop |
KR101368595B1 (en) * | 2013-05-24 | 2014-02-28 | (주)엘지하우시스 | Access floor |
KR101971619B1 (en) * | 2018-08-24 | 2019-04-23 | 보현석재 주식회사 | Installation for Construction of Deck Tiles |
GB2612612A (en) * | 2021-11-05 | 2023-05-10 | Ryno Ltd | Flooring system vertical closure top rail end bracket assembly |
-
2005
- 2005-12-22 KR KR2020050036058U patent/KR200411719Y1/en not_active IP Right Cessation
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101039942B1 (en) | 2009-06-03 | 2011-06-09 | 주식회사 그린플러스 | Apparatus for fixing structure of rooftop |
KR101368595B1 (en) * | 2013-05-24 | 2014-02-28 | (주)엘지하우시스 | Access floor |
KR101971619B1 (en) * | 2018-08-24 | 2019-04-23 | 보현석재 주식회사 | Installation for Construction of Deck Tiles |
GB2612612A (en) * | 2021-11-05 | 2023-05-10 | Ryno Ltd | Flooring system vertical closure top rail end bracket assembly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6237295B1 (en) | Flooring assembly and fastener therefor | |
KR101792440B1 (en) | Wood deck for walk | |
US20180094432A1 (en) | Deck framing system | |
KR200411719Y1 (en) | Deck system for floor | |
JP4268157B2 (en) | Floor structure, terrace deck and joist with engagement tool | |
JP5926706B2 (en) | Ceiling fall prevention device and ceiling fall prevention method | |
JP2014185508A5 (en) | ||
KR101537762B1 (en) | A panel and the manufacture method thereof and the construction method for structures using the panel | |
US10458113B2 (en) | Building assembly structure | |
JP4117788B2 (en) | Curtain wall vertical support structure and construction method | |
KR20180028596A (en) | Panel supporting frame, frame base, assembled wall structure therewith and the execution method thereof | |
KR101336668B1 (en) | truss assembly | |
JP2005344371A (en) | Floor structure and terrace deck | |
CN114908880B (en) | Quick-assembly partition and partition door thereof | |
JP6688494B1 (en) | Light shelf | |
KR20150064361A (en) | Structure construction coupling member by panel | |
JP7419197B2 (en) | Manufacturing method of frame structure | |
KR102300592B1 (en) | Support frame for skin board | |
KR101613694B1 (en) | Prefabricated wall panels | |
KR20190077819A (en) | Wall system for variable type | |
CZ65996A3 (en) | Front panel wall | |
JP5054723B2 (en) | 庇 | |
KR101798647B1 (en) | Connecting Structure Of Members | |
JP6898129B2 (en) | Railings and buildings in the outer corridor | |
WO2013012012A1 (en) | Wooden framework building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20130311 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20140305 Year of fee payment: 9 |
|
EXPY | Expiration of term |