JP4268157B2 - Floor structure, terrace deck and joist with engagement tool - Google Patents

Floor structure, terrace deck and joist with engagement tool Download PDF

Info

Publication number
JP4268157B2
JP4268157B2 JP2005203282A JP2005203282A JP4268157B2 JP 4268157 B2 JP4268157 B2 JP 4268157B2 JP 2005203282 A JP2005203282 A JP 2005203282A JP 2005203282 A JP2005203282 A JP 2005203282A JP 4268157 B2 JP4268157 B2 JP 4268157B2
Authority
JP
Japan
Prior art keywords
floor
joist
engaging
tool
engagement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005203282A
Other languages
Japanese (ja)
Other versions
JP2007023505A (en
Inventor
謙二 川端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eidai Kako KK
Original Assignee
Eidai Kako KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eidai Kako KK filed Critical Eidai Kako KK
Priority to JP2005203282A priority Critical patent/JP4268157B2/en
Publication of JP2007023505A publication Critical patent/JP2007023505A/en
Application granted granted Critical
Publication of JP4268157B2 publication Critical patent/JP4268157B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02044Separate elements for fastening to an underlayer
    • E04F2015/0205Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer
    • E04F2015/02066Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional fastening elements between furring elements and flooring elements
    • E04F2015/02077Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional fastening elements between furring elements and flooring elements the additional fastening elements located in-between two adjacent flooring elements
    • E04F2015/02094Engaging side grooves running along the whole length of the flooring elements

Landscapes

  • Floor Finish (AREA)

Description

この発明は、例えば、テラスデッキとして好適に用いられる床構造体に関する。   The present invention relates to a floor structure suitably used as, for example, a terrace deck.

なお、この明細書において、「アルミニウム」の語は、アルミニウム及びその合金を含む意味で用いる。   In this specification, the term “aluminum” is used to include aluminum and its alloys.

従来、テラスデッキ等の床構造体としては、縦横方向に所定間隔をあけて配置された束の上に平行状に複数本の大引を載置固定し、これら大引の上に直交状態に複数本の根太を載置して金具で固定すると共に、これら根太の上面に、複数枚の長尺の床板を根太に対して直交する状態に載置して固定した構成が公知である(特許文献1参照)。   Conventionally, as a floor structure such as a terrace deck, a plurality of large pulls are placed and fixed in parallel on a bundle arranged at predetermined intervals in the vertical and horizontal directions, and orthogonally placed on these large pulls. A configuration is known in which a plurality of joists are placed and fixed with metal fittings, and a plurality of long floor boards are placed and fixed on the upper surface of these joists in a state orthogonal to the joists (patents). Reference 1).

前記長尺の床板を根太に固定する手法としては、例えば、床板(デッキ材)を根太(被係止部材)の上に載置して床板を貫通したビスを根太にねじ込んで固定する方法(特許文献2参照)、相隣接する床板(デッキ材)の段部間の任意の位置に平板状の止板を橋渡し、該止板を貫通したビスを根太にねじ込んで固定する方法(特許文献3、4参照)、水平片と垂直片とを備えた倒立T字形の固定金具の垂直片を床板(デッキ材)の側面に予め固着しておき、床板を順次根太の上に載置して床板に固着されている固定金具の垂直片を隣り合う床板の側面に当接させた状態で前記固定金具の水平片を根太にビス止め固定する方法(特許文献5参照)が公知である。
登録実用新案第3046295号公報 特開2004−190449号公報(請求項1、図1〜4) 特開平11−280144号公報(請求項1、図1〜4) 特開2004−218311号公報(請求項1、図3) 特開2001−271417号公報(請求項1、図1〜4)
As a method for fixing the long floor board to the joist, for example, a method of placing the floor board (deck material) on the joist (locked member) and screwing and fixing the screw penetrating the floor board to the joist ( Patent Document 2), a method of bridging a flat plate at an arbitrary position between steps of adjacent floor plates (deck materials), and screwing a screw penetrating the plate into the joist to fix (Patent Document 3) 4), a vertical piece of an inverted T-shaped fixing bracket provided with a horizontal piece and a vertical piece is fixed in advance to the side surface of the floor board (deck material), and the floor board is sequentially placed on the joists. A method is known in which the horizontal piece of the fixing bracket is screwed and fixed to the joist with the vertical piece of the fixing bracket fixed to the side face of the adjacent floor plate (see Patent Document 5).
Registered Utility Model No. 3046295 JP 2004-190449 A (Claim 1, FIGS. 1 to 4) JP-A-11-280144 (Claim 1, FIGS. 1 to 4) JP 2004-218111 A (Claim 1, FIG. 3) JP 2001-271417 A (Claim 1, FIGS. 1 to 4)

しかしながら、上記特許文献2に記載の固定技術は、床板を貫通したビスを根太にねじ込んで固定するものであり、ビスのねじ込み固定作業が床板毎に必要となるために、施工作業性が悪いという問題があった。また、ビスを床板の上面から打ち込むので、施工後の床板表面に多数個のビスの頭部が外観されるものとなるため、デッキの外観体裁が悪いという問題もあった。また、施工後において床板を交換する必要が生じた場合、交換対象の床板に打ち込まれたビスを引き抜くだけで該床板を取り外すことができて交換作業は容易であるものの、この時新たな床板をビスで固定する際には十分な引き抜き強度を確保する観点から同じ位置にビスを打ち込むことはできず、従ってずらした位置にビスを打ち込むことになるが、この場合、施工当初から床板上面に打ち込まれていた他の多くのビスの位置とずれた位置になるので、意匠性が低下することが懸念される。   However, the fixing technique described in Patent Document 2 is to fix the screw that penetrates the floor board by screwing it into the joist, and the screw work fixing work is required for each floor board, so that the workability is poor. There was a problem. Further, since the screws are driven from the upper surface of the floor board, the heads of a large number of screws appear on the surface of the floor board after the construction, and there is a problem that the appearance of the deck is poor. In addition, if it becomes necessary to replace the floorboard after construction, the floorboard can be removed by simply pulling out the screw driven into the floorboard to be replaced. When fixing with screws, it is not possible to drive the screw into the same position from the viewpoint of securing sufficient pulling strength, so the screw will be driven into a shifted position, but in this case, it will be driven into the upper surface of the floor board from the beginning of construction. Since it is in a position shifted from the position of many other screws, there is a concern that the designability is lowered.

また、特許文献3〜5に記載の固定技術では、同様に施工時にビスを根太にねじ込んで固定する作業が床板毎に必要となるために、施工作業性が悪いという問題があった。また、隣り合う床板の隙間から床板の上面に取付固定されたビスや止板(または固定金具)が外観されて少し目立つことから、デッキの外観体裁が良好でないという問題もあった。また、施工後において床板を交換する必要が生じた場合には、床板毎に打ち込んだビスを1つずつ順次引き抜いていかねばならず、床板交換時の作業性が悪いという問題もあった。   In addition, the fixing techniques described in Patent Documents 3 to 5 similarly have a problem that the workability is poor because the work of screwing the screws into the joists and fixing them at the time of construction is required for each floor board. In addition, there is a problem in that the appearance of the deck is not good because the screws and the fixing plates (or fixing brackets) attached and fixed to the upper surface of the floor plate from the gap between adjacent floor plates are visible and slightly noticeable. In addition, when it is necessary to replace the floor board after the construction, it is necessary to sequentially pull out the screws driven into the floor board one by one, and there is a problem that workability at the time of replacing the floor board is poor.

この発明は、かかる技術的背景に鑑みてなされたものであって、外観体裁が良好であり、施工作業性に優れると共に、床板交換時の取り外し作業性にも優れた床構造体及びテラスデッキを提供することを目的とする。   The present invention has been made in view of such a technical background, and has a floor structure and a terrace deck that have a good external appearance, excellent construction workability, and excellent removal workability when replacing floorboards. The purpose is to provide.

前記目的を達成するために、本発明は以下の手段を提供する。   In order to achieve the above object, the present invention provides the following means.

[1]根太の上面に複数枚の長尺の床板が相互に隣接した状態で載置固定されてなる床構造体において、
前記床板として、幅方向の両端の側面に側方開放の係合凹部が設けられた床板が用いられ、
前記根太の少なくとも一側面に係合具の脚部が転回自在に取り付けられ、
前記係合具は、前記脚部と、該脚部の先端側から脚部の幅方向外方に向けて突設された左右一対の係合凸部とを備え、
前記隣り合う床板の対向する係合凹部の下壁間に前記係合具の脚部が挟み込まれると共に、前記隣り合う床板の対向する係合凹部によって形成された空間内に前記係合具の左右一対の係合凸部が配置され、前記係合具の一方の係合凸部が前記隣り合う床板の一方の床板の係合凹部の下壁に係合され、前記係合具の他方の係合凸部が前記隣り合う床板の他方の床板の係合凹部の下壁に係合されることによって、前記床板が前記根太に固定されていることを特徴とする床構造体。
[1] In a floor structure in which a plurality of long floor boards are placed and fixed in a state adjacent to each other on an upper surface of a joist,
As the floor plate, a floor plate provided with side-opening engagement recesses on both side surfaces in the width direction is used,
A leg portion of the engagement tool is attached to at least one side surface of the joist so as to be freely rotatable.
The engaging tool includes the leg portion and a pair of left and right engaging convex portions protruding from the distal end side of the leg portion toward the outer side in the width direction of the leg portion,
The leg portion of the engagement tool is sandwiched between the lower walls of the adjacent engagement recesses of the adjacent floor plates, and the left and right sides of the engagement tools are placed in a space formed by the engagement recesses of the adjacent floor plates facing each other. A pair of engaging convex portions are arranged, and one engaging convex portion of the engaging tool is engaged with a lower wall of an engaging concave portion of one floor plate of the adjacent floor plate, and the other engaging portion of the engaging tool is engaged. The floor structure is characterized in that the floor plate is fixed to the joist by engaging a mating convex portion with a lower wall of an engagement concave portion of the other floor plate of the adjacent floor plates.

[2]前記係合具に、その先端側から切り欠かれて脚部まで達する切欠空隙部が形成されている前項1に記載の床構造体。   [2] The floor structure according to the preceding item 1, wherein the engagement tool is formed with a notch gap portion that is notched from the distal end side to reach the leg portion.

[3]前記係合具に、転回した際に前記根太の上面に当接して下方側への転回移動を阻止し得るストッパー突起が設けられている前項1または2に記載の床構造体。   [3] The floor structure according to the above item 1 or 2, wherein the engaging tool is provided with a stopper projection that abuts on the upper surface of the joist when it is turned to prevent the turning movement downward.

[4]前記ストッパー突起は、切り起こし加工によって突設されたものである前項3に記載の床構造体。   [4] The floor structure according to item 3 above, wherein the stopper protrusion is provided by cutting and raising.

[5]前記係合具の係合凸部の周側面が外方に向けて張り出す曲面に形成されている前項1〜4のいずれか1項に記載の床構造体。   [5] The floor structure according to any one of the preceding items 1 to 4, wherein a circumferential side surface of the engagement convex portion of the engagement tool is formed as a curved surface projecting outward.

[6]前記係合具の脚部は、段付きビスを介して前記根太の側面に転回自在に取り付けられている前項1〜5のいずれか1項に記載の床構造体。   [6] The floor structure according to any one of the preceding items 1 to 5, wherein a leg portion of the engagement tool is rotatably attached to a side surface of the joist via a stepped screw.

[7]前記床板は、床板の長さ方向に沿って延ばされた複数個の中空部を備えた中空押出材からなる前項1〜6のいずれか1項に記載の床構造体。   [7] The floor structure according to any one of [1] to [6], wherein the floor board is made of a hollow extruded material having a plurality of hollow portions extending along the length direction of the floor board.

[8]前記根太として、アルミニウム製の根太が用いられている前項1〜7のいずれか1項に記載の床構造体。   [8] The floor structure according to any one of items 1 to 7, wherein an aluminum joist is used as the joist.

[9]前項1〜8のいずれか1項に記載の床構造体からなるテラスデッキ。   [9] A terrace deck comprising the floor structure according to any one of items 1 to 8.

[10]根太と、脚部の先端側から脚部の幅方向外方に向けて左右一対の係合凸部が突設されてなる係合具とを備え、前記根太の少なくとも一側面に前記係合具の脚部が転回自在に取り付けられていることを特徴とする係合具付き根太。   [10] A joist comprising: a joist and an engagement tool having a pair of left and right engaging projections projecting outward from the front end side of the leg portion in the width direction; A joist with an engagement tool, wherein a leg portion of the engagement tool is rotatably attached.

[1]の発明では、床板を根太の上面に敷設するに際し、根太の上面で床板を略水平移動させるだけで、根太に転回自在に取り付けられた係合具を上方に起き上がらせつつ、前記係合具を介した床板の根太への係合固定操作を行うことができるので、施工作業性に非常に優れている。即ち、従来技術のようなビス止めを要することなく床板を根太に固定することができる。また、係合具は根太の側面に取り付けられているから、隣り合う床板の隙間から係合具が外観されても殆ど目立つことがなく外観体裁が良好なものとなる。更に、施工後に床板を交換する必要が生じた場合には、係合具が根太に対して転回自在に取り付けられているので、両端部の固定具のうちのいずれか一方(好ましくは交換対象の床板に近い固定具)を取り外せば、根太の上面の床板を端から順次略水平移動させるだけで床板の取り外しを行うことができ、従来技術のように打ち込まれたビスを1つずつ順次引き抜いていく煩雑な作業をしなくて済むから、床板交換時の取り外し作業性に優れている。加えて、交換対象の床板を取り外した後に新たな床板を敷設施工する際には前記同様に作業性良く施工することができる。   In the invention of [1], when the floorboard is laid on the upper surface of the joist, the engaging member attached to the joist so as to be able to rotate is raised upward by simply moving the floorboard substantially horizontally on the upper surface of the joist, while Since it is possible to perform the engaging and fixing operation to the joist of the floor board via the joint tool, the workability is very excellent. That is, the floor board can be fixed to the joist without requiring screwing as in the prior art. In addition, since the engaging tool is attached to the side surface of the joist, even if the engaging tool is externally seen from the gap between adjacent floor boards, the appearance is hardly noticeable. Furthermore, when it becomes necessary to replace the floor board after construction, the engaging tool is attached to the joist so that it can rotate freely. If you remove the fixtures close to the floorboard), you can remove the floorboard by simply moving the floorboard on the top side of the joists one after another from the end. Pull out the screws that have been driven in one by one as in the prior art. Since it does not require a lot of troublesome work, it is excellent in removal workability when replacing floorboards. In addition, when a new floor board is laid and constructed after removing the floor board to be replaced, it can be constructed with good workability as described above.

[2]の発明では、係合具にその先端側から切り欠かれて脚部まで達する切欠空隙部が形成されているから、床板が経時的に伸びを生じても、該切欠空隙部で伸び分を吸収させることができ、これにより床板の経時的な伸びによる床板の反り、湾曲等の不良発生を防止することができる。   In the invention of [2], the engagement tool is formed with a notch gap portion that is notched from the distal end side to reach the leg portion. Therefore, even if the floor board expands with time, the engagement tool extends at the notch gap portion. Thus, it is possible to prevent occurrence of defects such as warping and bending of the floor board due to the elongation of the floor board over time.

[3]の発明では、係合具に、転回した際に根太の上面に当接して下方側への転回移動を阻止し得るストッパー突起が設けられており、転回自在に取り付けられた係合具の下方側への移動を阻止できるので、床板を根太の上面に敷設するに際し、根太の上面で床板を略水平移動させるだけで係合具を上方に起き上がらせて係合固定作業を遂行できる(例えば係合具を手で上方に起き上がらせるというような補助動作を特に要しない)ので、施工作業効率をさらに高めることができる。   In the invention of [3], the engaging tool is provided with a stopper projection that abuts on the upper surface of the joist when it is turned to prevent the turning movement downward. Therefore, when the floorboard is laid on the upper surface of the joist, the engagement tool can be raised upward by simply moving the floorboard substantially horizontally on the upper surface of the joist (the engagement fixing work can be performed). For example, it is not necessary to perform an auxiliary operation such as raising the engaging tool upward by hand), so that the construction work efficiency can be further improved.

[4]の発明では、ストッパー突起は切り起こし加工によって突設されており、ストッパー突起の形成が容易であるから、生産コストを低減できる利点がある。   In the invention of [4], since the stopper protrusion is provided by cutting and raising, and it is easy to form the stopper protrusion, there is an advantage that the production cost can be reduced.

[5]の発明では、係合具の係合凸部の周側面が外方に向けて張り出す曲面に形成されているから、床板を根太の上面に敷設するに際し、根太の上面で床板を略水平移動させて係合具を上方に起き上がらせる操作をよりスムーズに行うことができて、施工作業性をより向上させることができる。   In the invention of [5], since the peripheral side surface of the engaging convex portion of the engaging tool is formed in a curved surface projecting outward, when the floor plate is laid on the upper surface of the joist, the floor plate is placed on the upper surface of the joist. The operation of causing the engaging tool to rise substantially upward by moving it substantially horizontally can be performed more smoothly, and the construction workability can be further improved.

[6]の発明では、係合具の脚部は、段付きビスを介して根太の側面に転回自在に取り付けられており、このように簡易な構成で係合具を転回自在に取り付け得るから、コストの低減を図り得ると共に、施工作業性をより一層向上させることができる。   In the invention of [6], the leg portion of the engagement tool is rotatably attached to the side face of the joist via the stepped screw, and the engagement tool can be attached to be rotatable with such a simple configuration. The cost can be reduced and the construction workability can be further improved.

[7]の発明では、床板は中空部を備えているので軽量化できるし低コスト化も図り得る。かつ、床板の長さ方向に沿って延ばされた複数個の中空部を備えているので、即ち長さ方向に沿って延ばされた仕切板部が存在するので、床板としての強度も十分に確保することができる。   In the invention of [7], since the floor board has a hollow portion, it can be reduced in weight and cost can be reduced. And since it has a plurality of hollow parts extended along the length direction of the floor board, that is, since there is a partition plate part extended along the length direction, the strength as a floor board is also sufficient. Can be secured.

[8]の発明では、根太はアルミニウム製であるから、軽量性を維持しつつ、ビス等の取付手段を取り付けた際の根太の剪断強度を十分に確保できる利点がある。   In the invention of [8], since the joist is made of aluminum, there is an advantage that the shear strength of the joist when the attaching means such as a screw is attached can be sufficiently secured while maintaining the lightness.

[9]の発明では、外観体裁が良好であり、施工作業性に優れると共に、床板交換時の取り外し作業性にも優れた高品質のテラスデッキを提供できる。   In the invention of [9], it is possible to provide a high-quality terrace deck that has a good external appearance, excellent workability, and excellent removal workability at the time of floor plate replacement.

[10]の発明では、床板をこの根太(係合具付き)の上に敷設するに際し、根太の上面で床板を略水平移動させるだけで、根太に転回自在に取り付けられた係合具を上方に起き上がらせつつ、係合具を介した床板の根太への係合固定を行うことができるので、施工作業性を格段に向上させることができる。即ち、従来技術のようなビス止めを要することなく床板を根太に固定することができる。また、係合具は根太の側面に取り付けられているから、隣り合う床板の隙間から係合具が外観されても殆ど目立つことがなく外観体裁が良好なものとなる。   In the invention of [10], when the floor board is laid on the joist (with the engaging tool), the engaging tool attached to the joist so as to be rotatable is simply moved upward by simply moving the floor board substantially horizontally on the upper face of the joist. Since the floor plate can be engaged and fixed via the engaging tool while being raised, the workability of construction can be significantly improved. That is, the floor board can be fixed to the joist without requiring screwing as in the prior art. In addition, since the engaging tool is attached to the side surface of the joist, even if the engaging tool is externally seen from the gap between adjacent floor boards, the appearance is hardly noticeable.

この発明に係る床構造体(1)の一実施形態を図1に示す。この床構造体(1)は、図12に示すような床板支持構造体(30)の上面に、即ち束(31)、大引(32)及び根太(33)を用いて構成された床板支持構造体(30)の根太(33)の上面に、複数枚の長尺の床板(2)…が相互に隣接した状態で載置固定されたものからなる。   One embodiment of a floor structure (1) according to the present invention is shown in FIG. This floor structure (1) is a floor board support constructed on the upper surface of a floor board support structure (30) as shown in FIG. 12, that is, using a bundle (31), a large pull (32) and a joist (33). On the upper surface of the joist (33) of the structure (30), a plurality of long floor boards (2) are placed and fixed in a state of being adjacent to each other.

まず、前記床板支持構造体(30)について説明する。前記床板支持構造体(30)を構成する大引(32)は、図9に示すように、金属製の長尺の中空押出材からなるものである。前記大引(32)の断面形状は矩形状である。なお、図9において、(37)は大引の中空部であり、(35)は挿通孔である。   First, the floor board support structure (30) will be described. As shown in FIG. 9, the large drawing (32) which comprises the said floor-plate support structure (30) consists of a metal long hollow extrusion material. The cross-sectional shape of the large drawing (32) is rectangular. In FIG. 9, (37) is a large hollow portion, and (35) is an insertion hole.

前記床板支持構造体(30)を構成する根太(33)は、図7に示すように、金属製の長尺の中空押出材からなるものであり、下側中空部(38)及び上側中空部(39)を備えた断面矩形状の本体部(33a)と、該本体部(33a)の上面の幅方向の両縁から上方に延ばされた垂直板部(33b)(33b)と、該垂直板部の先端縁から幅方向内側に向けて延ばされた水平板部(33c)(33c)とを備えている。図7において、(36)は挿通孔である。   As shown in FIG. 7, the joist (33) constituting the floor board support structure (30) is made of a metal long hollow extruded material, and includes a lower hollow portion (38) and an upper hollow portion. A main body portion (33a) having a rectangular cross section with (39), vertical plate portions (33b) (33b) extending upward from both edges in the width direction of the upper surface of the main body portion (33a), And horizontal plate portions (33c) and (33c) extending inward in the width direction from the leading edge of the vertical plate portion. In FIG. 7, (36) is an insertion hole.

また、前記床板支持構造体(30)を構成する束(31)は、ねじ軸からなる支柱部(31a)の下端に略円盤状の土台部(31b)が設けられたものからなる(図2〜4参照)。   Further, the bundle (31) constituting the floor board support structure (30) is formed by providing a substantially disk-shaped base portion (31b) at the lower end of a column portion (31a) made of a screw shaft (FIG. 2). To 4).

しかして、図12に示すように、前記大引(32)(32)(32)が図面前後方向に沿って平行状に相互に離間状態に配置されると共に、これら平行状に配置された大引(32)(32)(32)の上に該大引(32)に対して直交する状態に根太(33)(33)(33)が相互に離間状態に配置され、これら根太(33)と大引(32)とが相互の交差位置においてL字固定金具(50)を用いて連結固定されている。即ち、図2〜4、12に示すように、前記根太(33)と大引(32)の交差位置において、前記根太(33)の側面に前記L字固定金具(50)の一方の当接板(50a)が当接配置されて該当接板(50a)の取付孔にビス等の固定手段が挿通されて前記根太(33)に螺合固定されると共に、前記大引(32)の側面に前記L字固定金具(50)の他方の当接板(50b)が当接配置されて該当接板(50b)の取付孔にビス等の固定手段が挿通されて前記大引(32)に螺合固定されることによって、前記大引(32)(32)(32)と前記根太(33)(33)(33)とが直交状態に連結固定されている。   Then, as shown in FIG. 12, the large pulls (32), (32), and (32) are arranged in parallel with each other along the front-rear direction of the drawing and are spaced apart from each other. The joists (33), (33), and (33) are arranged on the pulls (32), (32), and (32) so as to be orthogonal to the large pulls (32). And the large drawing (32) are connected and fixed using an L-shaped metal fitting (50) at the crossing position. That is, as shown in FIGS. 2 to 4 and 12, at the crossing position of the joist (33) and the large pull (32), one abutment of the L-shaped fixture (50) on the side surface of the joist (33). The plate (50a) is placed in contact with the fixing hole such as a screw through the mounting hole of the corresponding contact plate (50a) and screwed and fixed to the joist (33). The other abutment plate (50b) of the L-shaped fixing metal fitting (50) is disposed in contact therewith, and a fixing means such as a screw is inserted through the attachment hole of the corresponding contact plate (50b) to the large pull (32). By screwing and fixing, the large pull (32) (32) (32) and the joists (33) (33) (33) are connected and fixed in an orthogonal state.

更に、前記大引(32)(32)(32)における前記根太(33)との交差位置での底面に束(31)が固定されている。即ち、前記大引(32)の根太(33)との交差位置での上下両面に、即ち前記大引(32)の両端部及び長さ方向の中心部の上下両面に挿通孔(35)(35)(35)(35)(35)(35)が設けられており(図9参照)、更に図2〜4に示すように前記大引(32)の根太(33)との交差位置での底面の中央部にナット(60)が接合されて、該ナット(60)の孔と前記挿通孔(35)とが連通する状態となされている。しかして、前記大引(32)の底面に接合されたナット(60)の孔及び前記大引(32)の底面の挿通孔(35)に、前記束(31)の支柱部(31a)が挿通螺合されることによって、前記大引(32)の根太(33)との交差位置での底面から下方に向けて束(31)が垂下状に取付固定されている(図2〜4参照)。   Further, the bundle (31) is fixed to the bottom surface at the position of intersection with the joist (33) in the large pull (32) (32) (32). That is, the insertion holes (35) (on both the upper and lower surfaces of the large drawing (32) at the crossing position with the joist (33), that is, both the upper and lower surfaces of both ends of the large drawing (32) and the central portion in the length direction. 35) (35) (35) (35) (35) are provided (see FIG. 9), and as shown in FIGS. 2 to 4, at the crossing position of the large pull (32) with the joist (33). A nut (60) is joined to the central portion of the bottom surface of the nut so that the hole of the nut (60) and the insertion hole (35) communicate with each other. Thus, the column (31a) of the bundle (31) is inserted into the hole of the nut (60) joined to the bottom surface of the large pull (32) and the insertion hole (35) on the bottom surface of the large pull (32). By being inserted and screwed, the bundle (31) is attached and fixed downwardly from the bottom surface at the position where the joist (32) intersects with the joist (33) (see FIGS. 2 to 4). ).

なお、図7に示すように、前記根太(33)の両端部の下面及び長さ方向の中心部の下面にも挿通孔(36)(36)(36)が設けられている。しかして、前記束(31)の高さ調節を行う際に、束(31)の高さを低減する場合には束の支柱部(31a)の上端が螺合操作により上昇するのであるが、この時、上昇した束の支柱部(31a)の上端を、前記大引(32)の上面の挿通孔(35)及び前記根太(33)の下面の挿通孔(36)において挿通受容することができるので、即ち根太(33)の中空部(38)内に受容することができるので(図4参照)、前記束(31)の高さ調節の調節幅を十分に確保することができる。   As shown in FIG. 7, insertion holes (36) (36) (36) are also provided in the lower surface of both ends of the joist (33) and the lower surface of the central portion in the length direction. Thus, when the height of the bundle (31) is adjusted, when the height of the bundle (31) is reduced, the upper end of the bundle column (31a) is raised by the screwing operation. At this time, the upper end of the raised strut (31a) of the bundle is inserted and received in the insertion hole (35) on the upper surface of the large pull (32) and the insertion hole (36) on the lower surface of the joist (33). Since it can be received, that is, it can be received in the hollow portion (38) of the joist (33) (see FIG. 4), it is possible to sufficiently secure the adjustment width of the bundle (31) for height adjustment.

前記大引(32)に取付固定された束(31)(31)(31)(31)(31)(31)(31)(31)(31)は、それぞれ束石(34A)(34A)(34A)(34B)(34B)(34B)(34C)(34C)(34C)の上に載置されている(図1参照)。   The bundles (31) (31) (31) (31) (31) (31) (31) (31) (31) attached and fixed to the large pull (32) are respectively bundled stones (34A) (34A). (34A) (34B) (34B) (34B) (34C) (34C) (34C) (see FIG. 1).

上記のようにして束(31)、大引(32)及び根太(33)等を用いてこれらが安定状態に組み付け固定されて床板支持構造体(30)が構成されている(図12参照)。   As described above, the floor board support structure (30) is configured by assembling and fixing the bundle (31), the large pull (32), the joist (33) and the like in a stable state (see FIG. 12). .

更に、前記床板支持構造体(30)の外周面に幕板取付用の取付金具(40)が取り付けられている(図12、13参照)。即ち、この取付金具(40)は、図11に示すように、中央水平板(41)と、該中央水平板(41)の幅方向の一端縁から上方に向けて延ばされた第1垂直板(42)と、該第1垂直板(42)の上縁から水平方向に延ばされた第1水平板(43)と、該第1水平板(43)の先端縁から上方に向けて延ばされた差込用突起(44)と、前記中央水平板(41)の幅方向の他端縁から下方に向けて延ばされた第2垂直板(45)と、該第2垂直板(45)の下縁から水平方向に延ばされた第2水平板(46)と、該第2水平板(46)の先端縁から上方に向けて延ばされた差込用突起(47)とを備えてなる。   Furthermore, a mounting bracket (40) for attaching a curtain plate is attached to the outer peripheral surface of the floor board support structure (30) (see FIGS. 12 and 13). That is, as shown in FIG. 11, the mounting bracket (40) includes a central horizontal plate (41) and a first vertical extending upward from one end edge in the width direction of the central horizontal plate (41). A plate (42), a first horizontal plate (43) extending in a horizontal direction from the upper edge of the first vertical plate (42), and upward from a tip edge of the first horizontal plate (43) An extended insertion protrusion (44), a second vertical plate (45) extended downward from the other edge in the width direction of the central horizontal plate (41), and the second vertical plate (45) A second horizontal plate (46) extending in the horizontal direction from the lower edge, and an insertion protrusion (47) extending upward from the tip edge of the second horizontal plate (46). And comprising.

しかして、図12、13に示すように、前記床板支持構造体(30)の四周側面のうち前面側及び背面側においては、前記根太(33)の外方側の側面に前記取付金具(40)(40)がビス等の固定手段を用いて取付固定されている。即ち、前記取付金具(40)の第1垂直板(42)にビス等の固定手段を挿通して前記根太(33)の外方側の側面に螺合することによって、前記取付金具(40)が前記根太(33)に固定されている。   Thus, as shown in FIGS. 12 and 13, on the front side and the back side of the four circumferential side surfaces of the floor board support structure (30), the mounting bracket (40) is attached to the outer side surface of the joist (33). ) (40) is mounted and fixed using fixing means such as screws. That is, a fixing means such as a screw is inserted through the first vertical plate (42) of the mounting bracket (40) and is screwed to the outer side surface of the joist (33), whereby the mounting bracket (40). Is fixed to the joist (33).

一方、図12、13に示すように、前記床板支持構造体(30)の四周側面のうち左側面側及び右側面側においては、前記大引(32)の外方側の側面に前記取付金具(40)(40)がビス等の固定手段を用いて取付固定されている。即ち、前記取付金具(40)の第2垂直板(45)にビス等の固定手段を挿通して前記大引(32)の外方側の側面に螺合することによって、前記取付金具(40)が前記大引(32)に固定されている。   On the other hand, as shown in FIGS. 12 and 13, on the left side and the right side of the four circumferential side surfaces of the floor board support structure (30), the mounting bracket is attached to the outer side surface of the large pull (32). (40) (40) is mounted and fixed using fixing means such as screws. That is, by inserting a fixing means such as a screw through the second vertical plate (45) of the mounting bracket (40) and screwing it to the outer side surface of the large pull (32), the mounting bracket (40 ) Is fixed to the large draw (32).

この発明に係る床構造体(1)は、上記構成からなる床板支持構造体(30)の根太(33)の上面に、複数枚の長尺の床板(2)…が相互に隣接した状態で載置固定されたものからなる(図1、12、13参照)。   In the floor structure (1) according to the present invention, a plurality of long floor boards (2) are adjacent to each other on the upper surface of the joist (33) of the floor board support structure (30) having the above-described configuration. It consists of what was mounted and fixed (refer FIG.1,12,13).

前記床板(2)について説明する。床板(2)は、図5に示すように、合成樹脂(例えば木粉を含有した合成樹脂)製の長尺の中空押出材からなるものであり、床板の長さ方向に沿って延ばされた複数個の中空部(10)(10)(10)(10)を備えている。前記床板(2)は平面視長矩形状である。前記床板(2)の幅方向の両端の側面にはそれぞれ側方開放の係合凹部(2a)(2a)が形成されている。即ち、前記床板(2)の幅方向の両端の側面の上縁部から上壁(上側突出部)(11)が延ばされると共に同下縁部から下壁(下側突出部)(12)が延ばされることによって前記係合凹部(2a)が形成されている。前記下壁(12)の上面は床板(2)の表面と平行な平坦面に形成されている。また、前記上壁(11)の先端縁は、前記下壁(12)の先端縁よりも外方に突出している。   The floor board (2) will be described. As shown in FIG. 5, the floor board (2) is made of a long hollow extruded material made of a synthetic resin (for example, a synthetic resin containing wood flour), and is extended along the length direction of the floor board. A plurality of hollow portions (10) (10) (10) (10) are provided. The floor board (2) has a rectangular shape in plan view. Engagement recesses (2a) and (2a) that are laterally open are formed on both side surfaces of the floor plate (2) in the width direction. That is, the upper wall (upper protruding portion) (11) extends from the upper edge of the side surfaces of the floor plate (2) in the width direction, and the lower wall (lower protruding portion) (12) extends from the lower edge. The engagement recess (2a) is formed by being extended. The upper surface of the lower wall (12) is formed in a flat surface parallel to the surface of the floor board (2). The tip edge of the upper wall (11) protrudes outward from the tip edge of the lower wall (12).

前記床板(2)を、前記床板支持構造体(30)の根太(33)の上面に固定するために用いられる係合具(5)を図6に示す。この係合具(5)は、平面視略矩形状の板状体からなる脚部(5a)と、該脚部(5a)の先端側から脚部の幅方向外方に向けて延ばされた一対の平板状の係合凸部(5b)(5b)と、これら係合凸部(5b)(5b)の下縁から水平に延ばされた平板状のストッパー突起(5d)(5d)とを備えている。前記ストッパー突起(5d)は、切り起こし加工によって突設されたものである。前記脚部(5a)の下端側に取付孔(5f)が穿設されている。また前記係合具(5)の係合凸部(5b)の周側面(床板の下壁との当接面)(13)は、外方に向けて張り出す(盛り上がる)略円弧面に形成されている。   FIG. 6 shows an engagement tool (5) used for fixing the floor board (2) to the upper surface of the joist (33) of the floor board support structure (30). This engaging tool (5) is extended from the front end side of the leg part (5a) toward the outer side in the width direction of the leg part (5a) made of a substantially rectangular plate-like body in plan view. A pair of flat engagement protrusions (5b) and (5b), and flat stopper protrusions (5d) and (5d) extending horizontally from the lower edges of the engagement protrusions (5b) and (5b) And. The stopper protrusion (5d) is provided by cutting and raising. An attachment hole (5f) is formed in the lower end side of the leg portion (5a). Moreover, the peripheral side surface (contact surface with the lower wall of a floor board) (13) of the engagement convex part (5b) of the said engagement tool (5) is formed in the substantially circular arc surface which protrudes outward (swells). Has been.

更に、前記係合具(5)には切欠空隙部(6)が形成されている。即ち、前記係合具(5)の先端側(上端側)から切り欠かれて前記脚部(5a)まで達する切欠空隙部(6)が形成されている。前記切欠空隙部(6)の切欠底面(6a)は、床構造体(1)を構成した状態時において、前記脚部(5a)を挟み込む隣り合う床板(2)(2)の下壁(12)(12)の底面よりも下方位置になるようになされている(図2、3参照)。前記係合具(5)の素材としては、特に限定されるものではなく、例えば金属、硬質合成樹脂等が挙げられるが、これらの中でも金属製とするのが好ましい。   Further, a notch gap (6) is formed in the engagement tool (5). That is, a notch gap portion (6) that is notched from the distal end side (upper end side) of the engagement tool (5) and reaches the leg portion (5a) is formed. The notch bottom surface (6a) of the notch gap (6) has a lower wall (12) between adjacent floor plates (2) and (2) sandwiching the legs (5a) when the floor structure (1) is configured. ) (12) is positioned below the bottom surface (see FIGS. 2 and 3). The material of the engagement tool (5) is not particularly limited, and examples thereof include metals and hard synthetic resins. Among these, metal is preferable.

しかして、本実施形態では、前記係合具(5)は、図7に示すように、予め前記根太(33)の側面に転回自在に取り付けられている。即ち、工場からの出荷段階で既に前記根太(33)の側面に前記係合具(5)(5)(5)(5)(5)(5)(5)(5)(5)が転回自在に取り付けられているのが好ましく、これにより現場での施工作業性を飛躍的に向上させることができる。図8に示すように、前記係合具(5)の脚部(5a)は、段部(4a)を備えた段付きビスからなる取付手段(4)を用いて前記根太(33)の一側面に転回自在に取り付けられている。この時、前記係合具(5)のストッパー突起(5d)が前記根太(33)に対してその上部に位置するように取り付けられている。これにより、前記係合具(5)が転回移動した際に前記ストッパー突起(5d)が前記根太(33)の上面に当接して係合具(5)の下方側への転回移動を阻止することができる(図7、8参照)。このストッパー突起(5d)の存在により、前記係合具(5)付き根太(33)において、前記係合凸部(5b)は前記根太(33)の上面よりも高い位置に配置された状態となる(図7参照)。   Thus, in the present embodiment, as shown in FIG. 7, the engagement tool (5) is attached to the side surface of the joist (33) in a freely rotatable manner. That is, the engagement tool (5) (5) (5) (5) (5) (5) (5) (5) (5) is already turned on the side surface of the joist (33) at the shipping stage from the factory. It is preferable that it is attached freely, and this makes it possible to dramatically improve construction workability on site. As shown in FIG. 8, the leg portion (5a) of the engaging tool (5) is formed by using a mounting means (4) made of a stepped screw provided with a step portion (4a). It is attached to the side so that it can rotate freely. At this time, the stopper projection (5d) of the engaging tool (5) is attached to the joist (33) so as to be positioned above the joist (33). Thereby, when the engaging tool (5) rotates, the stopper projection (5d) contacts the upper surface of the joist (33) to prevent the engaging tool (5) from rotating downward. (See FIGS. 7 and 8). Due to the presence of the stopper protrusion (5d), in the joist (33) with the engaging tool (5), the engaging projection (5b) is disposed at a position higher than the upper surface of the joist (33). (See FIG. 7).

また、工場からの出荷段階で既に前記根太(33)の長さ方向の一端部の側面に固定具(7)がビス等の固定手段(9A)(9A)により固定されている(図7参照)。なお、工場からの出荷段階では、前記根太(33)の長さ方向の他端部の側面には固定具(8)が取り付けられておらず、該固定具(8)及び固定手段(9B)(9B)は付属部品とされる(即ちこれらは現場での施工時に取付固定される)。   Further, at the stage of shipment from the factory, the fixture (7) is already fixed to the side surface of one end in the length direction of the joist (33) by fixing means (9A) (9A) such as screws (see FIG. 7). ). At the time of shipment from the factory, the fixture (8) is not attached to the side surface of the other end portion in the length direction of the joist (33), and the fixture (8) and the fixing means (9B). (9B) is an accessory part (that is, they are attached and fixed during construction on site).

前記床板支持構造体(30)の外周面に取付固定される幕板(20)を図10に示す。この幕板(20)は、長尺の平板状の本体部(21)と、該本体部(21)の内面側の上部位置に長さ方向に沿って延ばされた上側突出部(22)と、前記本体部(21)の内面側の下部位置に長さ方向に沿って延ばされた下側突出部(24)と、前記本体部(21)の内面側の上端縁から長さ方向に沿って延ばされた頂面板(26)とを備えている。図10(ロ)に示すように、前記上側突出部(22)の下面の最奥位置には長さ方向に沿って差込用溝(23)が形成され、前記下側突出部(24)の下面の最奥位置にも長さ方向に沿って差込用溝(25)が形成されている。   FIG. 10 shows a curtain plate (20) attached and fixed to the outer peripheral surface of the floor board support structure (30). The curtain plate (20) includes a long flat plate-like main body (21) and an upper protrusion (22) extending along the length direction to an upper position on the inner surface side of the main body (21). And a lower projecting portion (24) extending along the length direction at a lower position on the inner surface side of the main body portion (21), and a length direction from an upper end edge on the inner surface side of the main body portion (21). And a top plate (26) extending along the line. As shown in FIG. 10 (b), an insertion groove (23) is formed along the length direction at the innermost position of the lower surface of the upper protrusion (22), and the lower protrusion (24). An insertion groove (25) is also formed along the length direction at the innermost position of the lower surface of the plate.

しかして、図12に示すように、前記床板支持構造体(30)の根太(33)(33)(33)の左側端部の上面に前記床板(2)を架設する。この時、前記根太(33)(33)(33)の左側端部に取付固定された固定具(7)(7)(7)に前記床板(2)の側面を当接させた状態で前記根太(33)(33)(33)の上面に前記床板(2)を架設する。即ち、図2に示すように、前記根太(33)の端部に取付固定された固定具(7)の係合凹部(7a)内に前記床板(2)の下壁(12)を挿入係合せしめた状態で前記床板(2)を架設する。この時、架設された床板(1枚目の床板)(2)の右側面に隣接状態に係合具(5)が位置している(図12参照)。   Thus, as shown in FIG. 12, the floor plate (2) is installed on the upper surface of the left end portion of the joists (33), (33) and (33) of the floor plate support structure (30). At this time, the side plate of the floor board (2) is brought into contact with the fixtures (7) (7) (7) attached and fixed to the left ends of the joists (33) (33) (33). The floor board (2) is installed on the upper surface of the joists (33) (33) (33). That is, as shown in FIG. 2, the lower wall (12) of the floor plate (2) is inserted into the engaging recess (7a) of the fixture (7) attached and fixed to the end of the joist (33). The floor board (2) is erected in the combined state. At this time, the engaging tool (5) is positioned adjacent to the right side surface of the installed floor board (first floor board) (2) (see FIG. 12).

次に、図14(イ)に示すように、2枚目の床板(2)の下壁(12)を前記係合具(5)の係合凸部(5b)に当接させつつ該床板(2)を図面左方向に移動させると、図14(ロ)に示すように前記係合具(5)が取付手段(4)の取付位置を支点にして上方に起き上がっていき、さらに床板(2)を図面左方向に移動させると、図14(ハ)に示すように1枚目の床板(2)の右側面の係合凹部(2a)内に前記係合具(5)の左側の係合凸部(5b)が侵入して該左側の係合凸部(5b)が1枚目の床板(2)の下壁(12)に係合されると共に、前記係合具(5)の右側の係合凸部(5b)が前記2枚目の床板(2)の左側面の係合凹部(2a)内に侵入して該右側の係合凸部(5b)が2枚目の床板(2)の下壁(12)に係合される(図2参照)。こうして1枚目の床板(2)が前記根太(33)に対して固定される。この時、架設された2枚目の床板(2)の右側面に隣接状態に次の係合具(5)が位置した状態になっている(図14参照)。   Next, as shown in FIG. 14 (a), the bottom plate (2) of the second floor plate (2) is brought into contact with the engagement convex portion (5b) of the engagement tool (5) while the floor plate (2) is brought into contact therewith. When (2) is moved to the left in the drawing, the engaging tool (5) rises upward with the mounting position of the mounting means (4) as a fulcrum as shown in FIG. When 2) is moved to the left in the drawing, as shown in FIG. 14 (c), the left side of the engagement tool (5) is placed in the engagement recess (2a) on the right side surface of the first floor board (2). The engaging protrusion (5b) enters and the left engaging protrusion (5b) is engaged with the lower wall (12) of the first floor plate (2), and the engaging tool (5) The right engaging convex portion (5b) enters the engaging concave portion (2a) on the left side of the second floor plate (2) and the right engaging convex portion (5b) Engages with bottom wall (12) of floor plate (2) Are (see Figure 2). Thus, the first floor board (2) is fixed to the joist (33). At this time, the next engaging tool (5) is located adjacent to the right side surface of the second floor board (2) installed (see FIG. 14).

以下、さらに複数枚の床板(2)(2)(2)(2)(2)(2)(2)(2)についても同様にして前記根太(33)(33)(33)に順次固定していく(図13参照)。図1のA−A線の断面図を図2に示す。隣り合う床板(2)(2)の対向する係合凹部の下壁(12)(12)間に前記係合具(5)の脚部(5a)が挟み込まれると共に、前記隣り合う床板(2)(2)の対向する係合凹部(2a)(2a)によって形成された空間内に、前記係合具(5)の左右一対の係合凸部(5b)(5b)が配置され、前記係合具(5)の左側の係合凸部(5b)が前記隣り合う床板の左側の床板(2)の係合凹部の下壁(12)に上方側から係合され、前記係合具(5)の右側の係合凸部(5b)が前記隣り合う床板の右側の床板(2)の係合凹部の下壁(12)に上方側から係合されており、このような係合構造によって、前記床板(2)が前記根太(33)(33)(33)に強固に固定されている。なお、前記隣り合う床板(2)(2)の対向する係合凹部の上壁(11)(11)同士は所定間隔離間するように配置されている。   Thereafter, a plurality of floor boards (2), (2), (2), (2), (2), (2), (2), and (2) are similarly fixed to the joists (33), (33), and (33) in the same manner. (See FIG. 13). A sectional view taken along line AA in FIG. 1 is shown in FIG. The leg portion (5a) of the engaging tool (5) is sandwiched between the lower walls (12) (12) of the engaging recesses facing each other on the adjacent floor plates (2) (2), and the adjacent floor plates (2 ) A pair of left and right engaging protrusions (5b) (5b) of the engaging tool (5) is disposed in a space formed by the opposing engaging recesses (2a) (2a) of (2), The engagement protrusion (5b) on the left side of the engagement tool (5) is engaged with the lower wall (12) of the engagement recess of the floor plate (2) on the left side of the adjacent floor plate from above, and the engagement tool The right engaging projection (5b) of (5) is engaged from above with the lower wall (12) of the engaging recess of the right floor plate (2) of the adjacent floor plate. The floor board (2) is firmly fixed to the joists (33) (33) (33) by the structure. Note that the upper walls (11) and (11) of the engaging recesses facing each other of the adjacent floor plates (2) and (2) are arranged so as to be spaced apart from each other by a predetermined distance.

しかして、10枚目の床板(2)を前記根太(33)(33)(33)に載置した後、図13に示すように、前記根太(33)(33)(33)の側面の右端部に前記固定具(8)(8)(8)をそれぞれビス等の固定手段(9B)を用いて固定する。こうすることにより、前記根太(33)の右端部に取付固定された固定具(8)の係合凹部(8a)内に前記10枚目の床板(2)の下壁(12)を挿入係合せしめた状態で前記10枚目の床板(2)を架設することができる(図3参照)。   Thus, after placing the tenth floor board (2) on the joists (33), (33) and (33), as shown in FIG. 13, the side surfaces of the joists (33), (33) and (33) are arranged. The fixtures (8), (8), and (8) are fixed to the right end portion by using fixing means (9B) such as screws, respectively. In this way, the lower wall (12) of the tenth floor plate (2) is inserted into the engagement recess (8a) of the fixture (8) attached and fixed to the right end of the joist (33). The tenth floor board (2) can be erected in the combined state (see FIG. 3).

更に、前記幕板(20)(20)(20)(20)を前記床板支持構造体(30)の四周側面に取付固定する(図1参照)。即ち、図2〜4に示すように、前記幕板(20)の下側の差込用溝(25)に、前記取付金具(40)の差込用突起(43)を挿嵌配置しつつ、前記幕板(20)の上側の差込用溝(23)に、前記取付金具(40)の差込用突起(42)を挿嵌配置することによって、前記幕板(20)(20)(20)(20)を前記床板支持構造体(30)の四周側面に取付固定する。   Further, the curtain plates (20), (20), (20) and (20) are attached and fixed to the four circumferential side surfaces of the floor plate support structure (30) (see FIG. 1). That is, as shown in FIGS. 2 to 4, the insertion protrusion (43) of the mounting bracket (40) is inserted and arranged in the insertion groove (25) on the lower side of the curtain plate (20). By inserting and arranging the insertion protrusion (42) of the mounting bracket (40) in the insertion groove (23) on the upper side of the curtain plate (20), the curtain plate (20) (20) (20) Attach and fix (20) to the four circumferential sides of the floor board support structure (30).

こうして、前記床板支持構造体(30)の根太(33)の上面に、複数枚の長尺の床板(2)…を載置固定する(図1参照)。こうして、この発明の床構造体(1)が構成される。   Thus, a plurality of long floor boards (2) are placed and fixed on the upper surface of the joists (33) of the floor board support structure (30) (see FIG. 1). Thus, the floor structure (1) of the present invention is constituted.

この発明の床構造体(1)では、床板(2)を根太(33)の上面に敷設するに際し、図14に示すように根太(33)の上面で床板(2)を略水平移動させるだけで、根太(33)に転回自在に取り付けられた係合具(5)を上方に起き上がらせつつ、係合具(5)を介した床板(2)の根太(33)への係合固定操作を行うことができるので、施工作業性に非常に優れている。即ち、従来技術のようなビス止め固定を要することなく床板を根太に固定することができる。また、係合具(5)は根太(33)の側面に取り付けられているから、隣り合う床板(2)(2)の隙間から係合具(5)が外観されたとしても殆ど目立つことがなく外観体裁が良好なものとなる。   In the floor structure (1) of the present invention, when the floor board (2) is laid on the upper surface of the joist (33), as shown in FIG. 14, the floor board (2) is simply moved substantially horizontally on the upper surface of the joist (33). Then, engaging and fixing operation of the floor board (2) to the joist (33) through the engaging tool (5) while raising the engaging tool (5) attached to the joist (33) so as to be rotatable. Therefore, construction workability is excellent. That is, the floor board can be fixed to the joists without requiring screw fixing as in the prior art. Moreover, since the engaging tool (5) is attached to the side surface of the joist (33), even if the engaging tool (5) is externally seen from the gap between the adjacent floor plates (2) and (2), it is almost noticeable. And appearance is good.

更に、施工後に床板(2)を交換する必要が生じた場合には、係合具(5)が根太(33)に対して転回自在に取り付けられているので、両端部の固定具(7)(8)のうちのいずれか一方(好ましくは交換対象の床板に近い側の固定具)を取り外せば、根太(33)の上面の床板(2)を端から順次略水平移動させるだけで床板(2)の取り外しを行うことができ、従来技術のように打ち込んだビスを1つずつ順次引き抜く煩雑な作業をしなくて済むから、床板交換時の取り外し作業性に優れている。また、交換対象の床板を取り外した後に新たな床板を敷設施工する際には前記と同様にして(図14等参照)施工することで作業性良く施工することができる。   Furthermore, when it is necessary to replace the floor plate (2) after the construction, the engaging tool (5) is attached to the joist (33) so as to be rotatable, so that the fixing tool (7) at both ends is provided. If any one of (8) (preferably the fixture on the side close to the floor board to be replaced) is removed, the floor board (2) on the upper surface of the joist (33) is simply moved substantially horizontally from the end to the floor board ( 2) can be removed, and it is not necessary to perform the troublesome work of sequentially pulling out the driven screws one by one as in the prior art, so that the removal workability at the time of replacing the floorboard is excellent. Moreover, when laying and constructing a new floor board after removing the floor board to be replaced, it can be constructed with good workability by performing the construction in the same manner as described above (see FIG. 14 and the like).

また、本実施形態では、前記係合具(5)の先端側から切り欠かれて脚部(5a)まで達する切欠空隙部(6)が前記係合具(5)に形成されているから、床板(2)が経時的に伸びを生じたとしても、該切欠空隙部(6)で伸び分を吸収させることができ、これにより床板(2)の経時的な伸びによる床板(2)の反り、湾曲等の不良発生を防止することができる。   In the present embodiment, since the notch gap portion (6) that is notched from the distal end side of the engagement tool (5) and reaches the leg portion (5a) is formed in the engagement tool (5), Even if the floor board (2) is stretched over time, the notch gap (6) can absorb the elongation, and thereby the warp of the floor board (2) due to the elongation of the floor board (2) over time. The occurrence of defects such as bending can be prevented.

また、本実施形態では、前記隣り合う床板(2)(2)の対向する係合凹部の上壁(11)(11)同士は所定間隔離間するように配置されているから、床板(2)の上面に存在する水は、該上壁(11)(11)間の隙間から下方向に抜けることができ、これにより十分な排水性を確保することができる。   Moreover, in this embodiment, since the upper walls (11) (11) of the engaging recesses facing each other of the adjacent floor plates (2) (2) are arranged so as to be spaced apart from each other, the floor plate (2) The water existing on the upper surface of the water can escape downward from the gaps between the upper walls (11) and (11), thereby ensuring sufficient drainage.

なお、上記実施形態では、前記床板(2)を10枚敷設した構成を採用しているが、特にこのような構成に限定されるものではなく、前記床板(2)を複数枚敷設する構成であれば良い。   In addition, in the said embodiment, although the structure which laid 10 sheets of the said floor boards (2) is employ | adopted, it is not limited to such a structure in particular, It is the structure which lays a plurality of said floor boards (2). I just need it.

また、上記実施形態では、床板(2)は合成樹脂で形成された構成を採用しているが、特にこのような素材のものに限定されるものではなく、例えば天然木材で構成されていても良いし、或いは金属で構成されていても良い。また、上記実施形態では、大引(32)及び根太(33)は、金属で形成された構成を採用しているが、特にこのような素材のものに限定されるものではなく、例えば天然木材で構成されていても良いし、或いは合成樹脂で構成されていても良い。   Moreover, in the said embodiment, although the structure formed with the synthetic resin is employ | adopted for the floor board (2), it is not specifically limited to the thing of such a material, For example, even if comprised with natural wood, It may be good or may be made of metal. Moreover, in the said embodiment, although the structure (32) and joist (33) employ | adopted the structure formed with the metal, it is not specifically limited to the thing of such a raw material, For example, natural wood It may be made of or may be made of a synthetic resin.

また、前記床板(2)、束(31)、大引(32)、根太(33)の構成は、上記実施形態のものに特に限定されるものではなく、適宜設計変更することができる。   Moreover, the structure of the said floor board (2), bundle (31), large drawing (32), joist (33) is not specifically limited to the thing of the said embodiment, A design change can be carried out suitably.

また、前記係合具(5)の構成は、上記実施形態のものに特に限定されるものではない。例えば図15(イ)(ロ)(ハ)に示すような構成を採用しても良い。或いはまた図15(ニ)に示すような切欠空隙部(6)を有しない構成を採用することもできる。図15(ニ)に示す係合具(5)では、左右一対の係合凸部(5b)(5b)が連接部(5c)で連接されてこれら(5b)(5c)(5b)によって係合頭部(5e)が形成されている。   Moreover, the structure of the said engaging tool (5) is not specifically limited to the thing of the said embodiment. For example, a configuration as shown in FIGS. 15A, 15B and 15C may be adopted. Alternatively, it is also possible to adopt a configuration that does not have the notch gap (6) as shown in FIG. In the engagement tool (5) shown in FIG. 15 (d), a pair of left and right engagement projections (5b) and (5b) are connected by a connection portion (5c) and engaged by these (5b), (5c) and (5b). A joint head (5e) is formed.

また、上記実施形態では、前記係合具(5)はストッパー突起(5d)を備えた構成を採用しているが、特にこのような構成に限定されるものではなく、ストッパー突起(5d)を有しない構成を採用することもできる。ただ、ストッパー突起(5d)を設けない場合には下方に転回移動している係合具(5)を例えば手などで上方に起き上がらせる補助動作を行いつつ床板(2)を敷設することになるのに対し、ストッパー突起(5d)を設けた場合には、根太(33)の上面で床板(2)を略水平移動させるだけで係合具(5)を上方に起き上がらせつつ係合固定作業を遂行できて施工作業効率を向上させることができる利点があるので、ストッパー突起(5d)が設けられているのが好ましい。   Moreover, in the said embodiment, although the said engaging tool (5) employ | adopted the structure provided with the stopper protrusion (5d), it is not specifically limited to such a structure, A stopper protrusion (5d) is provided. It is also possible to adopt a configuration that does not have. However, when the stopper protrusion (5d) is not provided, the floor plate (2) is laid while performing an auxiliary operation of raising the engaging tool (5) that is rotating downward by hand, for example, by hand. On the other hand, when the stopper projection (5d) is provided, the engagement and fixing work is performed while the engagement tool (5) is raised upward by simply moving the floor plate (2) substantially horizontally on the upper surface of the joist (33). Therefore, it is preferable that the stopper projection (5d) is provided.

また、上記実施形態では、前記根太(33)の一方の側面に対して係合具(5)…が転回自在に取り付けられていたが、特にこのような構成に限定されるものではなく、例えば図16に示すように前記根太(33)の幅方向の両側面に係合具(5)…が転回自在に取り付けられた構成を採用しても良いし、或いは図17に示すように前記根太(33)の幅方向の両側面に対して係合具(5)…が千鳥状配置で転回自在に取り付けられた構成を採用しても良い。   Moreover, in the said embodiment, although the engaging tool (5) ... was rotatably attached with respect to one side surface of the said joist (33), it is not specifically limited to such a structure, For example, As shown in FIG. 16, it is possible to adopt a configuration in which engaging tools (5) are rotatably attached to both side surfaces of the joist (33) in the width direction, or as shown in FIG. It is also possible to adopt a configuration in which the engaging tools (5) are attached in a staggered arrangement so as to be able to rotate freely on both side surfaces in the width direction of (33).

また、上記実施形態では、工場からの出荷段階で既に前記根太(33)の側面に前記係合具(5)…が転回自在に取り付けられた構成を採用したが、特にこのような施工方法に限定されるものではなく、例えば現場での施工作業時に係合具(5)…を根太(33)に取り付けるようにしても良い。   Moreover, in the said embodiment, although the said engagement tool (5) ... was already attached to the side surface of the said joist (33) at the stage of shipment from a factory, the structure which can be rotated freely was employ | adopted especially in such a construction method. It is not limited, For example, you may make it attach an engaging tool (5) ... to joist (33) at the time of construction work in the field.

この発明の床構造体(1)は、テラスデッキとして好適に用いられるが、その用途は特に限定されない。   Although the floor structure (1) of this invention is used suitably as a terrace deck, the use is not specifically limited.

この発明の床構造体の一実施形態を示す斜視図である。It is a perspective view which shows one Embodiment of the floor structure of this invention. 図1におけるA−A線の断面図である。It is sectional drawing of the AA in FIG. 図1におけるB−B線の断面図である。It is sectional drawing of the BB line in FIG. 図1におけるC−C線の断面図である。It is sectional drawing of the CC line in FIG. (イ)は床板の斜視図、(ロ)は(イ)におけるD−D線の断面図である。(A) is a perspective view of a floor board, (b) is sectional drawing of the DD line in (a). 係合具を示す斜視図である。It is a perspective view which shows an engaging tool. 係合具付き根太を示す斜視図である。It is a perspective view which shows the joist with an engagement tool. 図7におけるE−E線の断面図である。It is sectional drawing of the EE line in FIG. 大引を示す斜視図である。FIG. (イ)は幕板を示す斜視図、(ロ)は(イ)におけるF−F線の断面図である。(A) is a perspective view which shows a curtain, (b) is sectional drawing of the FF line in (a). 取付金具を示す斜視図である。It is a perspective view which shows an attachment metal fitting. 床板支持構造体の上に床板を敷設していく途中状態(1枚目の床板を敷設した状態)を示す斜視図である。It is a perspective view which shows the state (state which laid the 1st floor board) in the middle of laying a floor board on a floor board support structure. 床板支持構造体の上に床板を敷設していく途中状態(10枚目の床板を敷設した状態)を示す斜視図である。It is a perspective view which shows the state (state which laid the 10th floor board) in the middle of laying a floor board on a floor board support structure. 係合具付き根太の上に床板を敷設する一連の操作を段階的に示す側面図である。It is a side view which shows a series of operation which lays a floor board on the joist with an engagement tool in steps. (イ)(ロ)(ハ)(ニ)いずれも係合具の変形例を示す斜視図である。(A) (B) (C) (D) are all perspective views showing a modified example of the engagement tool. 係合具付き根太の変形例を示す斜視図である。It is a perspective view which shows the modification of a joist with an engagement tool. 係合具付き根太の他の変形例を示す斜視図である。It is a perspective view which shows the other modification of a joist with an engagement tool.

符号の説明Explanation of symbols

1…床構造体
2…床板
2a…係合凹部
4…取付手段
4a…段部
5…係合具
5a…脚部
5b…係合凸部
5d…ストッパー突起
6…切欠空隙部
10…中空部(床板の)
11…上壁(上側突出部)
12…下壁(下側突出部)
13…周側面(係合凸部の)
33…根太
DESCRIPTION OF SYMBOLS 1 ... Floor structure 2 ... Floor board 2a ... Engagement recessed part 4 ... Mounting means 4a ... Step part 5 ... Engagement tool 5a ... Leg part 5b ... Engagement convex part 5d ... Stopper protrusion 6 ... Notch space part 10 ... Hollow part ( Floorboard)
11 ... Upper wall (upper protrusion)
12 ... Lower wall (lower protrusion)
13 ... peripheral side surface (engagement convex part)
33 ... Jota

Claims (10)

根太の上面に複数枚の長尺の床板が相互に隣接した状態で載置固定されてなる床構造体において、
前記床板として、幅方向の両端の側面に側方開放の係合凹部が設けられた床板が用いられ、
前記根太の少なくとも一側面に係合具の脚部が転回自在に取り付けられ、
前記係合具は、前記脚部と、該脚部の先端側から脚部の幅方向外方に向けて突設された左右一対の係合凸部とを備え、
前記隣り合う床板の対向する係合凹部の下壁間に前記係合具の脚部が挟み込まれると共に、前記隣り合う床板の対向する係合凹部によって形成された空間内に前記係合具の左右一対の係合凸部が配置され、前記係合具の一方の係合凸部が前記隣り合う床板の一方の床板の係合凹部の下壁に係合され、前記係合具の他方の係合凸部が前記隣り合う床板の他方の床板の係合凹部の下壁に係合されることによって、前記床板が前記根太に固定されていることを特徴とする床構造体。
In the floor structure formed by mounting and fixing a plurality of long floor boards adjacent to each other on the upper surface of the joists,
As the floor plate, a floor plate provided with side-opening engagement recesses on both side surfaces in the width direction is used,
A leg portion of the engagement tool is attached to at least one side surface of the joist so as to be rotatable.
The engaging tool includes the leg portion, and a pair of left and right engaging convex portions protruding from the distal end side of the leg portion toward the outside in the width direction of the leg portion,
The legs of the engaging tool are sandwiched between the lower walls of the opposing engaging recesses of the adjacent floor plates, and the left and right sides of the engaging tools are within the space formed by the opposing engaging recesses of the adjacent floor plates. A pair of engaging convex portions are arranged, and one engaging convex portion of the engaging tool is engaged with a lower wall of an engaging concave portion of one floor plate of the adjacent floor plate, and the other engaging portion of the engaging tool is engaged. The floor structure is characterized in that the floor plate is fixed to the joist by engaging a mating convex portion with a lower wall of an engagement concave portion of the other floor plate of the adjacent floor plates.
前記係合具に、その先端側から切り欠かれて脚部まで達する切欠空隙部が形成されている請求項1に記載の床構造体。   The floor structure according to claim 1, wherein a notch gap is formed in the engagement tool from the tip end side to reach the leg. 前記係合具に、転回した際に前記根太の上面に当接して下方側への転回移動を阻止し得るストッパー突起が設けられている請求項1または2に記載の床構造体。   The floor structure according to claim 1 or 2, wherein the engaging member is provided with a stopper protrusion that abuts on the upper surface of the joist when it is turned to prevent the downward turning movement. 前記ストッパー突起は、切り起こし加工によって突設されたものである請求項3に記載の床構造体。   The floor structure according to claim 3, wherein the stopper protrusion is provided by cutting and raising. 前記係合具の係合凸部の周側面が外方に向けて張り出す曲面に形成されている請求項1〜4のいずれか1項に記載の床構造体。   The floor structure according to any one of claims 1 to 4, wherein a peripheral side surface of an engagement convex portion of the engagement tool is formed as a curved surface projecting outward. 前記係合具の脚部は、段付きビスを介して前記根太の側面に転回自在に取り付けられている請求項1〜5のいずれか1項に記載の床構造体。   The floor structure according to any one of claims 1 to 5, wherein a leg portion of the engagement tool is rotatably attached to a side surface of the joist via a stepped screw. 前記床板は、床板の長さ方向に沿って延ばされた複数個の中空部を備えた中空押出材からなる請求項1〜6のいずれか1項に記載の床構造体。   The floor structure according to any one of claims 1 to 6, wherein the floor board is made of a hollow extruded material having a plurality of hollow portions extending along the length direction of the floor board. 前記根太として、アルミニウム製の根太が用いられている請求項1〜7のいずれか1項に記載の床構造体。   The floor structure according to any one of claims 1 to 7, wherein an aluminum joist is used as the joist. 請求項1〜8のいずれか1項に記載の床構造体からなるテラスデッキ。   The terrace deck which consists of a floor structure of any one of Claims 1-8. 根太と、
脚部の先端側から脚部の幅方向外方に向けて左右一対の係合凸部が突設されてなる係合具とを備え、
前記根太の少なくとも一側面に前記係合具の脚部が転回自在に取り付けられていることを特徴とする係合具付き根太。
With jota,
An engagement tool in which a pair of left and right engagement projections project from the distal end side of the leg toward the outside in the width direction of the leg,
A joist with an engaging tool, wherein a leg portion of the engaging tool is rotatably attached to at least one side surface of the joist.
JP2005203282A 2005-07-12 2005-07-12 Floor structure, terrace deck and joist with engagement tool Expired - Fee Related JP4268157B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005203282A JP4268157B2 (en) 2005-07-12 2005-07-12 Floor structure, terrace deck and joist with engagement tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005203282A JP4268157B2 (en) 2005-07-12 2005-07-12 Floor structure, terrace deck and joist with engagement tool

Publications (2)

Publication Number Publication Date
JP2007023505A JP2007023505A (en) 2007-02-01
JP4268157B2 true JP4268157B2 (en) 2009-05-27

Family

ID=37784641

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005203282A Expired - Fee Related JP4268157B2 (en) 2005-07-12 2005-07-12 Floor structure, terrace deck and joist with engagement tool

Country Status (1)

Country Link
JP (1) JP4268157B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11371245B2 (en) * 2013-10-25 2022-06-28 Mbrico, Llc Tile and support structure

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5349222B2 (en) * 2009-09-08 2013-11-20 三洋工業株式会社 Deck floor curtain plate fixture and curtain plate mounting structure
EP2388390A1 (en) * 2010-05-17 2011-11-23 Wilfried Wünsch Assembly for attaching profiles
JP5704954B2 (en) * 2011-02-17 2015-04-22 積水化学工業株式会社 Deck material fixing bracket
ITUB20169982A1 (en) * 2016-01-14 2017-07-14 Dakota Group S A S Di Zeno Cipriani & C Support system for raised floors and flooring obtained with this support system
JP6752580B2 (en) * 2016-02-04 2020-09-09 株式会社Lixil Floor structure and construction method of floor structure
KR102038801B1 (en) * 2019-06-21 2019-10-30 이경준 Deck assembly including quick clip module
CN110230379B (en) * 2019-07-23 2023-10-03 佛山市东鹏陶瓷有限公司 Ceramic tile paving device with good sound insulation and paving method thereof
CN110259037B (en) * 2019-07-23 2023-09-12 佛山市东鹏陶瓷有限公司 Ceramic tile paving device and paving method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11371245B2 (en) * 2013-10-25 2022-06-28 Mbrico, Llc Tile and support structure

Also Published As

Publication number Publication date
JP2007023505A (en) 2007-02-01

Similar Documents

Publication Publication Date Title
JP4268157B2 (en) Floor structure, terrace deck and joist with engagement tool
JP2006207363A (en) Construction method of wood deck
JP2008082028A (en) Muntin mounting structure
JP5929650B2 (en) Earthquake-resistant partition panel
KR20140019182A (en) Device for fixing internal and external construction materials
JP2016223174A (en) Brace fixing device for partition panel
JP5266115B2 (en) Outer wall material mounting bracket and outer wall material mounting structure
JP7102167B2 (en) Floor structure
JP4154531B2 (en) Partition and panel element mounting structure
JP2005344371A (en) Floor structure and terrace deck
JP2005113562A (en) Partition panel with shelf
JP4182482B2 (en) Raw partition
JP4791249B2 (en) True wall reinforcement method and reinforcement structure of existing houses
JP6497219B2 (en) Adjuster device for partition panel
JP5749663B2 (en) Column structure
JP6045271B2 (en) Outdoor structure
JP4958443B2 (en) deck
JP6789152B2 (en) Building unit and its manufacturing method
JP4676271B2 (en) Partition device
JP2007002551A (en) Building structure of wall panel
JP4686224B2 (en) fence
JP4673738B2 (en) Connection structure of desk and partition panel
JP5704954B2 (en) Deck material fixing bracket
JP2011099242A (en) Wood deck
JP2008049183A (en) Knockdown desk

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070319

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090114

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090127

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090219

R150 Certificate of patent or registration of utility model

Ref document number: 4268157

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120227

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120227

Year of fee payment: 3

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D02

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130227

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130227

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140227

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees